Ethiopian Construction Vacancy & Tender
18.1K subscribers
4.57K photos
56 videos
528 files
3.76K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

๐Ÿ“ฉ @Philemona7
Download Telegram
๐Ÿ‘‰Complete Guide to Reading Building Drawings

๐Ÿ“แˆ˜แ…แˆƒแ‰ แ‹จแˆ…แŠ•แƒแŠ• แ‹ตแˆฎแ‹ŠแŠ•แŒ แ‰ แ‰ฐแŒแ‰ฃแˆญ แˆˆแˆ˜แˆจแ‹ณแ‰ต แŠฅแŠ“ แˆตแˆˆ แŒ แ‰…แˆ‹แˆ‹ แŠ แˆญแŠญแ‰ดแŠญแ‰ธแˆญ แˆณแ‹ญแАแˆต แ‹จแˆšแ‹ณแˆตแˆต แˆแˆญแŒฅ แˆ˜แ…แˆแ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆฉแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
โค3๐Ÿฅฐ1
๐ŸŒ‰ BRIDGE STRUCTURE & LOAD PATH

๐Ÿ—๏ธ Main Bridge Components & Functions

1๏ธโƒฃ Parapet: Protects pedestrians and vehicles.

2๏ธโƒฃ Wearing Surface: Provides a durable riding surface.

3๏ธโƒฃ Deck Slab: Supports traffic loads.

4๏ธโƒฃ Cross Beams: Distribute loads between girders.

5๏ธโƒฃ Main Girders: Carry loads from the deck.

6๏ธโƒฃ Bearings: Transfer loads to the substructure.

7๏ธโƒฃ Pier Cap: Distributes loads to pier columns.

8๏ธโƒฃ Pier Columns: Transfer loads toward the foundation.

9๏ธโƒฃ Pile Cap: Distributes loads to foundation piles.

๐Ÿ”Ÿ Foundation Piles: Transfer loads into soil or rock.

1๏ธโƒฃ1๏ธโƒฃ Supporting Ground: Provides foundation resistance.

1๏ธโƒฃ2๏ธโƒฃ Drainage Outlets: Remove rainwater from the deck.

๐Ÿ“Œ BRIDGE LOAD PATH

Traffic Loads โ†’ Deck Slab โ†’ Girders โ†’ Bearings โ†’ Pier Cap โ†’ Columns โ†’ Pile Cap โ†’ Foundation Piles โ†’ Soil/Rock

โš ๏ธ Note: Actual bridge design must consider structural loads, site conditions, and applicable engineering standards.

๐Ÿ—๏ธ Build Smarter, Build Stronger!

@ETCONpWORK
๐Ÿ‘4โค2๐Ÿฅฐ1
๐Ÿ’ป AUTOCAD SKILLS THAT CAN IMPROVE YOUR CONSTRUCTION CAREER

AutoCAD is widely used for preparing and editing technical drawings in construction, architecture, and engineering.
If you are learning AutoCAD for employment, focus on practical skills rather than memorizing commands alone.

๐Ÿ”น Essential Skills to Practice

๐Ÿ“ Drawing Commands: Lines, polylines, circles, arcs, and other basic geometry.
โœ๏ธ Editing Commands: Move, copy, trim, extend, offset, and mirror.
๐Ÿ“š Layers: Organize drawing elements by type and purpose.
๐Ÿ“ Dimensions: Add accurate dimensions and annotations.
๐Ÿ—‚๏ธ Blocks: Create and manage reusable drawing components.
๐Ÿ“„ Layouts and Plotting: Prepare drawings for printing at the required scale.
๐Ÿ”— External References: Work with linked drawings where appropriate.
๐Ÿ“‹ Drawing Standards: Use suitable line types, text styles, and units.

๐ŸŽฏ Practice Project: Prepare a simple floor plan with dimensions, room labels, doors, windows, and organized layers.

๐Ÿ“Œ Your goal is to create clear, accurate drawings that follow project requirements.


@ETCONpWORK
โค3๐Ÿ‘3๐Ÿฅฐ1
๐Ÿ— JOB VACANCY: SITE ENGINEER

๐Ÿข MIDROC Construction Ethiopia PLC

๐Ÿ“‹ Vacancy Number: MCE/FORM/5/348

๐ŸŽ“ Education: BSc in Civil Engineering or related field

๐Ÿ’ผ Experience: 4โ€“6 years of relevant construction site experience

๐Ÿ“ Work Location: Bahir Dar & other projects outside Addis Ababa

๐Ÿ’ฐ Salary & Benefits:Competitive (As per company scale)

๐Ÿ“ฅ How to Apply

Interested candidates should submit an updated CV, cover letter, educational/professional credentials, and 3 professional references:

In Person: MIDROC Construction Head Office, Mekanisa Abo (next to Queens Supermarket, Ethic Agriceft Building, Ground Floor, Human Resource Administration).

Via Telegram: 0911207433

โš ๏ธ Note: Please indicate "Job Positions" in your application subject/message.


โณ Deadline: October 27, 2026

@etconp
โค5๐Ÿ‘2
โฐ 7 TIME-MANAGEMENT TIPS FOR CONSTRUCTION PROFESSIONALS

Construction projects involve deadlines, changing conditions, multiple teams, and activities that depend on one another.

Effective time management helps professionals prioritize work and respond to delays.

๐Ÿ”น 1. Plan Daily Priorities

Identify the most important activities at the start of the day.

๐Ÿ”น 2. Understand Dependencies

Know which activities must be completed before others can begin.

๐Ÿ”น 3. Monitor Deadlines

Use the approved project programme and relevant milestone dates.

๐Ÿ”น 4. Communicate Delays Early

Report constraints before they create larger scheduling problems.

๐Ÿ”น 5. Prepare Resources

Check materials, labour, equipment, and access before activities begin.

๐Ÿ”น 6. Avoid Unnecessary Rework

Verify drawings, dimensions, and required approvals.

๐Ÿ”น 7. Review Progress

Compare actual progress with the plan and record significant differences.

๐Ÿ“Œ Remember: Effective planning does not eliminate every delay, but it helps teams identify problems earlier and make informed decisions.

@ETCONpWORK
๐Ÿ‘5โค1
๐ŸŒ๐Ÿ— แ‹จแ‹“แˆˆแˆ แŠ แ‰€แ แ‹จแŒแŠ•แ‰ฃแ‰ณแฃ แ‹จแŠขแŠ•แแˆซแˆตแ‰ตแˆซแŠญแ‰ธแˆญแŠ“ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แˆณแˆแŠ•แ‰ณแ‹Š แ‹ณแˆฐแˆณ

๐Ÿ‘‹แˆฐแˆ‹แˆ แ‰ แ‹šแˆ… แˆณแˆแŠ•แ‰ต แ‰ แ‹“แˆˆแˆ แŠ แ‰€แ แ‹จแ‰คแ‰ต แŒแŠ•แ‰ฃแ‰ณแฃ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ตแŠ“ แ‹จแ‹ฒแŒ‚แ‰ณแˆ แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แ‹˜แˆญแŽแ‰ฝ แ‹จแ‰ณแ‹ฉ แŠ แˆตแˆแˆ‹แŒŠ แŠฅแ‹ตแŒˆแ‰ถแ‰ฝแŠ• แŠฅแŠ“ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹ซแˆ‹แ‰ธแ‹แŠ• แ‰ตแˆแˆ…แˆญแ‰ถแ‰ฝ แŠฅแŠ•แˆ˜แˆˆแŠจแ‰ณแˆˆแŠ•แข
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ— 1. แ‰ แŠ แˆœแˆชแŠซ แ‹จแ‰คแ‰ต แŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แ‹จแŒˆแ‰ แ‹ซ แŠฅแˆแАแ‰ต แ‰ 14 แ‹“แˆ˜แ‰ต แ‰ฐแŠฉแˆ แ‹แˆตแŒฅ แ‹ˆแ‹ฐ แ‹แ‰…แ‰ฐแŠ› แ‹ฐแˆจแŒƒ แ‹ˆแˆจแ‹ฐ

Reuters แ‰ แŠฆแŠญแ‰ถแ‰ แˆญ 19แฃ 2026 แ‰ฃแ‹ˆแŒฃแ‹ แ‹˜แŒˆแ‰ฃ แˆ˜แˆ แˆจแ‰ตแฃ แ‹จNAHB/Wells Fargo แ‹จแ‰คแ‰ต แŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แ‹จแŒˆแ‰ แ‹ซ แŠฅแˆแАแ‰ต แˆ˜แˆˆแŠชแ‹ซ แ‰ 3 แАแŒฅแ‰ฅ แ‹ˆแ‹ฐ 29 แ‹แ‰… แ‰ฅแˆแˆแข

แ‹‹แŠ“ แˆแŠญแŠ•แ‹ซแ‰ถแ‰น
๐Ÿ”น แŠจแแ‰ฐแŠ› แ‹จแ‰คแ‰ต แ‰ฅแ‹ตแˆญ แ‹ˆแˆˆแ‹ต ๐Ÿ”น แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‰แˆณแ‰แˆตแŠ“ แ‹จแˆ แˆซแ‰ฐแŠ› แ‹ˆแŒช แŒญแˆ›แˆช
๐Ÿ”น แ‹จแŒˆแ‹ขแ‹Žแ‰ฝ แแˆ‹แŒŽแ‰ต แˆ˜แ‰€แАแˆต
แŠจแŒˆแŠ•แ‰ขแ‹Žแ‰น 43% แ‹จแˆšแˆ†แŠ‘แ‰ต แ‹จแˆฝแ‹ซแŒญ แ‹‹แŒ‹แŠ• แˆ˜แ‰€แАแˆณแ‰ธแ‹แˆ แ‰ฐแŒˆแˆแŒฟแˆแข

๐Ÿ“Œ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹ซแˆˆแ‹ แ‰ตแˆแˆ…แˆญแ‰ต
แ‹จแ‰คแ‰ต แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ

แŠจแˆ˜แŒ€แˆ˜แˆซแ‰ธแ‹ แ‰ แŠแ‰ต แ‹จแŒˆแ‰ แ‹ซ แแˆ‹แŒŽแ‰ตแฃ แ‹จแŒˆแ‹ขแ‹Žแ‰ฝ แ‹จแˆ˜แŠญแˆแˆ แŠ แ‰…แˆแŠ“ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‹ˆแŒช แ‰ แŒฅแŠ•แ‰ƒแ‰„ แˆ˜แ‰ฐแŠ•แ‰ฐแŠ• แ‹ซแˆตแˆแˆแŒ‹แˆแข แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹ แ‹ซแˆ‹แ‰ธแ‹แŠ• แ‰คแ‰ถแ‰ฝ แˆ˜แŠ•แ‹ฐแแŠ“ แ‹ˆแŒชแŠ• แˆ˜แ‰†แŒฃแŒ แˆญ แ‹˜แˆ‹แ‰‚ แˆ˜แแ‰ตแˆ„ แˆŠแˆ†แŠ• แ‹ญแ‰ฝแˆ‹แˆแข

๐Ÿ”— แˆแŠ•แŒญแฆ Reuters โ€” แŠฆแŠญแ‰ถแ‰ แˆญ 19แฃ 2026
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿข 2. แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แŒˆแ‰ แ‹ซ

แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‹ˆแŒช แ‹ˆแˆณแŠ แАแ‹
แ‰ แŠ•แŒแ‹ต แˆชแˆ แŠฅแˆตแ‰ดแ‰ต แ‹˜แˆญแ แ‹จแ‰ฅแ‹ตแˆญ แ‹ˆแŒชแฃ แ‹จแŠ•แ‰ฅแˆจแ‰ต แ‹‹แŒ‹แŠ“ แ‹จแŒˆแ‰ แ‹ซ แแˆ‹แŒŽแ‰ต แ‰ แŠขแŠ•แ‰จแˆตแ‰ตแˆ˜แŠ•แ‰ต แ‹แˆณแŠ”แ‹Žแ‰ฝ แˆ‹แ‹ญ แ‰ตแˆแ‰… แ‰ฐแŒฝแ‹•แŠ– แ‹ซแˆณแ‹ตแˆซแˆ‰แข แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‹ˆแŒช แˆฒแŒจแˆแˆญ แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝแŠ• แˆ›แˆตแŒ€แˆ˜แˆญแฃ แˆ›แŒ แŠ“แ‰€แ‰…แŠ“ แ‰ตแˆญแ‹แˆ› แˆ›แ‹ตแˆจแŒ แ‹จแ‰ แˆˆแŒ  แˆแ‰ณแŠ แ‹ญแˆ†แŠ“แˆแข

๐Ÿ“Œ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹ซแˆˆแ‹ แ‰ตแˆแˆ…แˆญแ‰ต
แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แ‰ แ‰ฐแŒจแ‰ฃแŒญ แ‹จแ‹ˆแŒช แŒแˆแ‰ตแฃ แŒ แŠ•แŠซแˆซ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แแˆฐแ‰ต แŠฅแ‰…แ‹ตแŠ“ แ‹จแŠ แ‹ฐแŒ‹ แ‰ตแŠ•แ‰ฐแŠ“ แˆ‹แ‹ญ แˆ˜แˆ˜แˆตแˆจแ‰ต แŠ แˆˆแ‰ฃแ‰ธแ‹แข
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ–ฅ 3. แ‰ แˆ•แŠ•แ‹ต 64 MW แŠ แ‰…แˆ แ‹ซแˆˆแ‹ แ‹จAI แ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ แŒแŠ•แ‰ฃแ‰ณ แ‰ฐแŒ€แˆ˜แˆจ

Colt Data Centre Services (Colt DCS) แŠฅแŠ“ RMZ แ‰ แŠฆแŠญแ‰ถแ‰ แˆญ 15แฃ 2026 แ‰ แŠ“แ‰ช แˆ™แˆแ‰ฃแ‹ญแฃ แˆ•แŠ•แ‹ต แ‹จMumbai 3 แ‹จแ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ แŒแŠ•แ‰ฃแ‰ณ แˆ˜แŒ€แˆ˜แˆฉแŠ• แŠ แˆตแ‰ณแ‹แ‰€แ‹‹แˆแข

แ•แˆฎแŒ€แŠญแ‰ฑ แˆฒแŒ แŠ“แ‰€แ‰… 64 MW แ‹จแŠƒแ‹ญแˆ แŠ แ‰…แˆ แ‹ญแŠ–แˆจแ‹‹แˆแข แ‹จAI แŠ แŒˆแˆแŒแˆŽแ‰ถแ‰ฝแŠ•แŠ“ แŠจแแ‰ฐแŠ› แ‹จแŠฎแˆแ’แ‹แ‰ฒแŠ•แŒ แŠ แ‰…แˆ แ‹จแˆšแˆแˆแŒ‰ แˆฅแˆซแ‹Žแ‰ฝแŠ• แˆˆแˆ˜แ‹ฐแŒˆแ แ‰ณแˆตแ‰ฆ แАแ‹แข

๐ŸŒŸแ‹‹แŠ“ แ‹‹แŠ“ แ‰ฃแˆ…แˆชแ‹ซแ‰ฑ

๐Ÿ”น แ‹จแŠ แ‹จแˆญแŠ“ แ‹จแ‰€แŒฅแ‰ณ แˆแˆณแˆฝ แˆ›แ‰€แ‹แ‰€แ‹ฃ แˆฅแˆญแ‹“แ‰ต
๐Ÿ”น 220 kV แ‹จแŠคแˆŒแŠญแ‰ตแˆชแŠญ แˆ›แŠจแ‹แˆแ‹ซ
๐Ÿ”น 100% แ‰ณแ‹ณแˆฝ แŠƒแ‹ญแˆ แ‹จแˆ˜แŒ แ‰€แˆ แ‹•แ‰…แ‹ต
๐Ÿ”น แ‹จแ‹แˆƒ แ‰ฅแŠญแАแ‰ตแŠ• แ‹จแˆšแ‰€แŠ•แˆต แ‹แŒ แ‹จแˆ›แ‰€แ‹แ‰€แ‹ฃ แ‹‘แ‹ฐแ‰ต
แ•แˆฎแŒ€แŠญแ‰ฑ แ‰ แŒแŠ•แ‰ฃแ‰ณแŠ“ แ‰ แŠ แˆ แˆซแˆญ แ‹ˆแ‰…แ‰ต แŠจ700 แ‰ แˆ‹แ‹ญ แ‹จแˆฅแˆซ แŠฅแ‹ตแˆŽแ‰ฝแŠ• แŠฅแŠ•แ‹ฐแˆšแˆแŒฅแˆญ แ‰ฐแŒˆแˆแŒฟแˆแข

๐Ÿ“Œ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹ซแˆˆแ‹ แ‰ตแˆแˆ…แˆญแ‰ต
แ‹จแ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ‹แ‰ต แŠ แ‹ฒแˆต แ‹จแŒแŠ•แ‰ฃแ‰ณแŠ“ แ‹จแŠขแŠ•แ‰จแˆตแ‰ตแˆ˜แŠ•แ‰ต แ‹˜แˆญแ แŠ“แ‰ธแ‹แข แˆˆแŠฅแАแ‹šแˆ… แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ แ‹จแ‰ฐแˆจแŒ‹แŒ‹ แŠƒแ‹ญแˆแฃ แˆแŒฃแŠ• แ‹จแŠ”แ‰ตแ‹ˆแˆญแŠญ แŒแŠ•แŠ™แАแ‰ตแฃ แ‰€แˆแŒฃแ‹ แˆ›แ‰€แ‹แ‰€แ‹ฃแŠ“ แ‹แŒคแ‰ณแˆ› แ‹จแ‹แˆƒ แŠ แŒ แ‰ƒแ‰€แˆ แŠ แˆตแˆแˆ‹แŒŠ แŠ“แ‰ธแ‹แข

๐Ÿ”— แˆแŠ•แŒญแฆ Colt DCS โ€” แŠฆแŠญแ‰ถแ‰ แˆญ 15แฃ 2026
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ“ฃ แ‹ญแˆ… แ‹จแ‹ณแˆฐแˆณแ‰ฝแŠ• แŠญแแˆ 1 แАแ‹แข

แ‰ แŠญแแˆ 2 แ‹จAI แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แ‹จแŠƒแ‹ญแˆแŠ“ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‰ฐแŒแ‹ณแˆฎแ‰ถแ‰ฝแŠ• แŠฅแŠ“ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแˆšแˆแŒฅแˆฉแ‰ตแŠ• แŠฅแ‹ตแˆŽแ‰ฝ แŠฅแŠ•แˆ˜แˆˆแŠจแ‰ณแˆˆแŠ•แข

Via Ethio Con

๐Ÿ”” แˆˆแ‰ฐแŒจแˆ›แˆช แ‹จแŒแŠ•แ‰ฃแ‰ณแŠ“ แ‹จแŠขแŠ•แแˆซแˆตแ‰ตแˆซแŠญแ‰ธแˆญ แ‹œแŠ“แ‹Žแ‰ฝ แ‹‹แŠ“แ‹ แ‹จแ‰ดแˆŒแŒแˆซแˆ แ‰ปแŠ“แˆ‹แ‰ฝแŠ•แŠ• แ‹ญแ‰€แˆ‹แ‰€แˆ‰๐Ÿ‘‡

https://t.me/ETCONp
โค4๐Ÿ™2๐Ÿ”ฅ1
๐Ÿ—๏ธ แ‹จ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆตแˆซ แ‹แˆ แ‹ฐแ‰ฅแ‹ณแ‰คแ‹Žแ‰ฝ แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿ“‘120+ แˆˆแˆตแˆซ แ‹แŒแŒ แ‹จแˆ†แŠ‘ แˆตแ‰ณแŠ•แ‹ณแˆญแ‹ต แ‹ฐแ‰ฅแ‹ณแ‰คแ‹Žแ‰ฝ
โœ… แˆˆแŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฎแ‰ฝแˆ แˆ†แА แˆˆแŠ แˆ›แŠซแˆชแ‹Žแ‰ฝ แ‰ฐแ‹˜แŒ‹แŒ…แ‰ถ แ‹จแ‰€แˆจแ‰ 
โœ… แŠจ PPA 2025 แŠฅแŠ“ FIDIC Red Book 2017 แˆ…แŒŽแ‰ฝ แŒ‹แˆญ แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แ‹จแ‰ฐแŒฃแŒฃแˆ˜
โœ… แ‰  Microsoft Word แ‰ แ‰€แˆ‹แˆ‰ แŠคแ‹ฒแ‰ต แ‹จแˆšแ‹ฐแˆจแŒ (Editable) แŠจแ‰ฐแŒจแˆ›แˆช PDF แ‹แ‹ญแˆŽแ‰ฝ

๐Ÿš€ แ‹จแŠฎแŠ•แ‰ตแˆซแ‰ต แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แˆตแˆซแ‹ŽแŠ• แ‰€แˆ‹แˆแŠ“ แ•แˆฎแŒแˆฝแŠ“แˆ แˆˆแˆ›แ‹ตแˆจแŒ แ‹แ‹ญแˆŽแ‰น แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
๐Ÿฅฐ2๐Ÿ‘2
๐Ÿ‘ทโ€โ™‚๏ธ Junior Civil Engineer

๐Ÿข Company Sector: Import & Export / Construction
๐Ÿ“ Location: Mebrat Hail, Jackros, Addis Ababa
๐Ÿ’ผ Employment Type: Permanent (แ‰‹แˆš)
๐ŸŽ“ Education: First Degree in Civil Engineering
โณ Experience Level: 0 โ€“ 2 Years (Entry Level)
๐Ÿ“… Application Deadline: October 30, 2026
๐Ÿ”ข Openings: 1
๐Ÿ›  Key Skills & Tools
AutoCAD & Revit
Microsoft Excel & Word
Engineering Research & Technical Documentation
๐Ÿ“‹ Key Responsibilities
Design & Drafting: Prepare 2D drawings and assist with 3D engineering models using AutoCAD and Revit.
Documentation & BOQs: Assist in preparing Bills of Quantities (BOQs), quantity takeoffs, and material schedules.
Site & Team Support: Participate in site inspections, track RFIs, and coordinate with internal teams and contractors.
Reporting: Maintain engineering archives and help draft routine progress reports.
๐Ÿ”— How to Apply
Interested candidates can apply via the link below:
๐Ÿ‘‰ Click Here to Apply
โค8๐Ÿฅฐ2
๐Ÿ‘‰แ‰ฃแˆแŠ‘ แ‰ฃแˆˆแ‹ แ‹‹แŒ‹ แ‹จแ‰ฐแˆฐแˆซแฃแŒจแˆจแ‰ณ แˆตแ‰ตแˆžแˆ‰แˆ แ‹จแˆšแŒ แ‰…แˆ›แ‰น แ‹จแˆ˜แŠ•แŒˆแ‹ต แˆตแˆซ
Professional Road Construction Cost Estimation & BOQ Excel Template แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aa4f7a526f13_etconp
๐Ÿ‘Œ2๐Ÿฅฐ1๐Ÿ‘1
๐Ÿšจ๐Ÿ“ข URGENT JOB VACANCY ANNOUNCEMENT!

๐Ÿข SUBA ENGINEERING P.L.C. | GRADE 1 GENERAL CONTRACTOR

SUBA Engineering P.L.C. invites qualified, experienced, and motivated male and female professionals to apply for the following job opportunities in its head office and various construction projects across Ethiopia. ๐Ÿ‘ทโ€โ™‚๏ธ๐Ÿ‘ทโ€โ™€๏ธ

๐Ÿ“‹ AVAILABLE POSITIONS

1๏ธโƒฃ Project Manager โ€” 02 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering or related field
โณ Experience: 10+ years, including 4+ years in a similar position
๐Ÿ“ Duty Station: Ambo Project and other projects

2๏ธโƒฃ Project Coordinator โ€” 01 Vacancy
๐ŸŽ“ Qualification: BA/BSc in Civil Engineering, COTM, or related field
โณ Experience: 10+ years, including 5+ years in a similar position
๐Ÿ“ Duty Station: Head Office, Addis Ababa

3๏ธโƒฃ Project Senior Office Engineer โ€” 02 Vacancies
๐ŸŽ“ Qualification: BA/BSc in Civil Engineering, COTM, or related field
โณ Experience: 6+ years, including 3+ years in a similar position
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

4๏ธโƒฃ Project Junior Office Engineer โ€” 03 Vacancies
๐ŸŽ“ Qualification: BA/BSc in Civil Engineering, COTM, or related field
โณ Experience: 1+ year
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

5๏ธโƒฃ Project Engineer โ€” 03 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering, COTM, or related field
โณ Experience: 7+ years, including 5+ years in a similar position
๐Ÿ“ Duty Station: Jemma, Ambo, Dire Dawa, and Woliso

6๏ธโƒฃ Senior Site Engineer โ€” 01 Vacancy
๐ŸŽ“ Qualification: BSc in Civil Engineering, COTM, or related field
โณ Experience: 7+ years, including 4+ years in a similar position
๐Ÿ“ Duty Station: Jemma and other projects

7๏ธโƒฃ Junior Site Engineer โ€” 03 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering, COTM, or related field
โณ Experience: 1+ year
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

8๏ธโƒฃ Construction Engineer โ€” 03 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering, COTM, or related field
โณ Experience: 8+ years, including 5+ years in a similar position
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

9๏ธโƒฃ Earthwork Foreman โ€” 03 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering, Diploma, or TVT
โณ Experience: 6โ€“8 years, including 4+ years in a similar position
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

๐Ÿ”Ÿ Finishing Foreman โ€” 03 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering, Diploma, or TVT
โณ Experience: 6โ€“8 years, including 4+ years in a similar position
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

1๏ธโƒฃ1๏ธโƒฃ Structural Foreman โ€” 03 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering, Diploma, or TVT
โณ Experience: 6โ€“8 years, including 4+ years in a similar position
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

1๏ธโƒฃ2๏ธโƒฃ Building Foreman โ€” 03 Vacancies
๐ŸŽ“ Qualification: BSc in Civil Engineering, Diploma, or TVT
โณ Experience: 6โ€“8 years, including 4+ years in a similar position
๐Ÿ“ Duty Station: Ambo, Jemma, Dire Dawa, and Woliso

1๏ธโƒฃ3๏ธโƒฃ Project Storekeeper โ€” 03 Vacancies
๐ŸŽ“ Qualification: BA, Diploma, TVT, or a qualification in Purchasing and Material Supplies
โณ Experience: 2+ years
๐Ÿ“ Duty Station: Jemma and Dire Dawa

1๏ธโƒฃ4๏ธโƒฃ Project Purchaser โ€” 03 Vacancies
๐ŸŽ“ Qualification: BA, Diploma, TVT, or a qualification in Purchasing and Material Supplies
โณ Experience: 2+ years
๐Ÿ“ Duty Station: Jemma and Dire Dawa

๐Ÿ’ฐ SALARY & BENEFITS
Attractive and negotiable salary package.

๐Ÿ“ฉ HOW TO APPLY
Interested and qualified applicants of both genders should submit their:
๐Ÿ“„ Updated CV
๐Ÿ“ Application letter
๐Ÿ“‘ Non-returnable copies of relevant educational and work experience documents

Applications can be submitted in person at the head office or through Telegram or email.

๐Ÿ“ HEAD OFFICE LOCATION
Addis Ababa, 22 Area. Turn from Golagul Building towards Megenagna and proceed approximately 200 metres towards the train station. The office is on the left side, on the 7th floor of the H&M Building.

๐Ÿ“ž CONTACT INFORMATION
๐Ÿ’ฌ Telegram: Suba Engineering
๐Ÿ“ฑ Phone: +251 955 78 91 80

๐Ÿ—“ APPLICATION DEADLINE: Wednesday, October 28, 2026
๐Ÿ“… Ethiopian Calendar: Tikimt 18, 2019 E.C.

@etconp
โค4๐Ÿ™3
๐Ÿ‘‰แ‰ แ‹แŒช แŠ แŒˆแˆญ แ‹จแˆ˜แˆ›แˆญ แˆ…แˆแˆ แŠ แˆแ‹Žแ‰ต? แŠฅแŠ› แˆ…แˆแˆแ‹ŽแŠ• แŠฅแ‹แŠ• แˆˆแˆ›แ‹ตแˆจแŒ แ‰ฐแ‹˜แŒ‹แŒ…แ‰ฐแŠ“แˆ๐ŸคŒ

๐ŸŽ“ Scholarship Roadmap for Ethiopian Students

๐ŸŒŸโ€‹แ‹ญแˆ… แˆ˜แŒฝแˆแแฆ

โœ… 480+ แŠ แˆตแ‰ฐแˆ›แˆ›แŠ แ‹จแˆตแŠฎแˆ‹แˆญแˆบแ• แ‹ตแˆจ-แŒˆแŒพแ‰ฝแŠ• แ‹ซแŠซแ‰ฐแ‰ฐ
โœ… แˆˆแ‰…แ‹ตแˆ˜-แˆแˆจแ‰ƒ (Undergraduate)แฃ แˆˆแˆ›แˆตแ‰ฐแˆญแˆต (Masterโ€™s) แŠฅแŠ“ แˆˆแ‹ถแŠญแ‰ตแˆฌแ‰ต (PhD) แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แ‰ฐแ‰ฅแˆŽ แ‹จแ‰ฐแ‹˜แŒ‹แŒ€
โœ… แŠฅแŠ•แ‹ดแ‰ต Scholarship แˆ›แˆ˜แˆแŠจแ‰ต แŠฅแŠ•แ‹ฐแˆšแ‰ฝแˆ‰ แ‹ฐแˆจแŒƒ-แ‰ แ‹ฐแˆจแŒƒ แ‹ญแˆ˜แˆซแ‹Žแ‰ณแˆแข

๐Ÿ—‚โ€‹แŒŠแ‹œแ‹ŽแŠ• แŠฅแŠ“ แŒ‰แˆแ‰ แ‰ตแ‹ŽแŠ• แŠ แ‹ญแ‰ฃแŠญแŠ‘แข แ‹จแ‹แŒช แŠ แŒˆแˆญ แ‰ตแˆแˆ…แˆญแ‰ต แ‹•แ‹ตแˆ แˆˆแˆ›แŒแŠ˜แ‰ต แ‹›แˆฌแ‹แŠ‘ แ‹ญแŒ€แˆแˆฉ!

๐Ÿ“—โ€‹แŠ แˆแŠ‘แŠ‘ แˆ˜แ…แˆแ‰แŠ• แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6ad8386b95dd8_etconp
๐Ÿ‘Œ3โค2
๐Ÿ‘ท WHY ARE COMMUNICATION SKILLS IMPORTANT FOR SITE ENGINEERS?

Construction projects involve coordination among engineers, supervisors, contractors, consultants, suppliers, and workers.

Even technically correct work can face delays when instructions and information are unclear.

๐Ÿ”น Essential Communication Skills

๐Ÿ“‹ Clear Instructions: Explain what needs to be done and identify the relevant drawings or specifications.

๐Ÿ“ Technical Clarification: Raise discrepancies through the appropriate project channels.

โš ๏ธ Safety Communication: Report hazards and communicate relevant precautions promptly.

๐Ÿ“Š Progress Reporting: Provide accurate information about completed work and delays.

๐Ÿค Team Coordination: Confirm responsibilities, deadlines, and dependencies.

๐Ÿ“ Written Records: Document important decisions, instructions, and issues as required.

๐Ÿ”น Practical Example

If reinforcement on site differs from the approved drawing, a site engineer should document the discrepancy, notify the responsible parties, and follow the required clarification and approval process.

๐Ÿ“Œ Good communication means being clear, respectful, accurate, and timely.


@ETCONpWORK
โค8
Ethiopian Construction Vacancy & Tender
๐ŸŒ๐Ÿ— แ‹จแ‹“แˆˆแˆ แŠ แ‰€แ แ‹จแŒแŠ•แ‰ฃแ‰ณแฃ แ‹จแŠขแŠ•แแˆซแˆตแ‰ตแˆซแŠญแ‰ธแˆญแŠ“ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แˆณแˆแŠ•แ‰ณแ‹Š แ‹ณแˆฐแˆณ ๐Ÿ‘‹แˆฐแˆ‹แˆ แ‰ แ‹šแˆ… แˆณแˆแŠ•แ‰ต แ‰ แ‹“แˆˆแˆ แŠ แ‰€แ แ‹จแ‰คแ‰ต แŒแŠ•แ‰ฃแ‰ณแฃ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ตแŠ“ แ‹จแ‹ฒแŒ‚แ‰ณแˆ แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แ‹˜แˆญแŽแ‰ฝ แ‹จแ‰ณแ‹ฉ แŠ แˆตแˆแˆ‹แŒŠ แŠฅแ‹ตแŒˆแ‰ถแ‰ฝแŠ• แŠฅแŠ“ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹ซแˆ‹แ‰ธแ‹แŠ• แ‰ตแˆแˆ…แˆญแ‰ถแ‰ฝ แŠฅแŠ•แˆ˜แˆˆแŠจแ‰ณแˆˆแŠ•แข โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ” ๐Ÿ— 1. แ‰ แŠ แˆœแˆชแŠซ แ‹จแ‰คแ‰ต แŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แ‹จแŒˆแ‰ แ‹ซ แŠฅแˆแАแ‰ต แ‰ 14 แ‹“แˆ˜แ‰ต แ‰ฐแŠฉแˆ แ‹แˆตแŒฅ แ‹ˆแ‹ฐ แ‹แ‰…แ‰ฐแŠ› แ‹ฐแˆจแŒƒ แ‹ˆแˆจแ‹ฐ Reuters แ‰ แŠฆแŠญแ‰ถแ‰ แˆญโ€ฆ
๐ŸŒ๐Ÿ—แ‹จแ‹“แˆˆแˆ แŠ แ‰€แ แ‹จแŒแŠ•แ‰ฃแ‰ณแŠ“ แ‹จแŠขแŠ•แแˆซแˆตแ‰ตแˆซแŠญแ‰ธแˆญ แˆณแˆแŠ•แ‰ณแ‹Š แ‹ณแˆฐแˆณ โ€” แŠญแแˆ 2

๐ŸŒŸแ‰ แŠญแแˆ 1 แ‹จแ‰คแ‰ต แŒˆแ‰ แ‹ซแŠ•แฃ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แ‹แ‹ญแŠ“แŠ•แˆตแŠ•แŠ“ แ‰ แˆ•แŠ•แ‹ต แ‹จแ‰ฐแŒ€แˆ˜แˆจแ‹แŠ• แ‹จAI แ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ แ•แˆฎแŒ€แŠญแ‰ต แ‰ฐแˆ˜แˆแŠญแ‰ฐแŠ“แˆแข

๐Ÿšฅแ‰ แ‹šแˆ… แŠญแแˆ แ‹ฐแŒแˆž แ‰ แ‹ฒแŒ‚แ‰ณแˆ แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แ‹˜แˆญแ แ‹ซแˆ‰ แ‰ฐแŒแ‹ณแˆฎแ‰ถแ‰ฝแŠ•แŠ“ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแˆšแˆฐแŒกแ‰ตแŠ• แ‰ตแˆแˆ…แˆญแ‰ถแ‰ฝ แŠฅแŠ“แ‹ซแˆˆแŠ•แข
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿค– 4. แ‹จAI แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ตแฆ แ‹จแŠƒแ‹ญแˆ แŠ แ‰…แˆญแ‰ฆแ‰ต แ‹ˆแˆณแŠ แ‰ฐแŒแ‹ณแˆฎแ‰ต แˆ†แŠ—แˆ

Reuters แ‰ แŠฆแŠญแ‰ถแ‰ แˆญ 19แฃ 2026 แ‰ฃแ‹ˆแŒฃแ‹ แ‹˜แŒˆแ‰ฃ แˆ˜แˆ แˆจแ‰ตแฃ Microsoft แ‰ แŠฅแŠ•แŒแˆŠแ‹ แˆŽแ‹แ‰ฐแŠ• (Loughton) แˆˆแ‰ณแ‰€แ‹ฐแ‹ แ‹จNscale แ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ แ‹จแŠชแˆซแ‹ญ แˆตแˆแˆแАแ‰ตแŠ• แŠ แ‰‹แˆญแŒงแˆแข

แ‹‹แŠ“แ‹ แ‰ฐแŒแ‹ณแˆฎแ‰ต แŠจแŠคแˆŒแŠญแ‰ตแˆชแŠญ แˆ˜แˆจแ‰ฅ แŒ‹แˆญ แ‹จแˆšแ‹ฐแˆจแŒˆแ‹ แŒแŠ•แŠ™แАแ‰ต แˆ˜แ‹˜แŒแ‹จแ‰ต แˆฒแˆ†แŠ•แฃ แ‹จแŠƒแ‹ญแˆ แŠ แ‰…แˆญแ‰ฆแ‰ฑ แŠฅแˆตแŠจ 2030แ‹Žแ‰น แ‹ตแˆจแˆต แˆŠแ‹˜แŒˆแ‹ญ แŠฅแŠ•แ‹ฐแˆšแ‰ฝแˆ แ‰ฐแŒˆแˆแŒฟแˆแข
แ‹ญแˆ… แ‹จแ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ แ‰ แˆ•แŠ•แƒ แŒแŠ•แ‰ฃแ‰ณ แ‰ฅแ‰ป แŠฅแŠ•แ‹ฐแˆ›แ‹ญแ‹ˆแˆฐแŠ‘ แ‹ซแˆณแ‹ซแˆแข แ‹จแŠƒแ‹ญแˆ แŠ แ‰…แˆญแ‰ฆแ‰ตแฃ แ‹จแ•แˆฎแŒ€แŠญแ‰ต แŒŠแ‹œ แˆฐแˆŒแ‹ณแŠ“ แ‹จแ‹ฐแŠ•แ‰ แŠ› แ‰แˆญแŒ แŠแАแ‰ต แŠฅแŠฉแˆ แ‹ˆแˆณแŠ แŠ“แ‰ธแ‹แข

๐Ÿ“Œ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹ซแˆˆแ‹ แ‰ตแˆแˆ…แˆญแ‰ต
แ‰ตแˆแ‰… แ‹จแŠขแŠ•แแˆซแˆตแ‰ตแˆซแŠญแ‰ธแˆญ แ•แˆฎแŒ€แŠญแ‰ต แŠจแˆ˜แŒ€แˆ˜แˆฉ แ‰ แŠแ‰ต แ‹จแŠƒแ‹ญแˆแŠ“ แ‹จแ‹แˆƒ แŠ แ‰…แˆญแ‰ฆแ‰ตแฃ แ‹จแˆ˜แˆฌแ‰ต แ‹แŒแŒ…แ‰ตแฃ แˆแ‰ƒแ‹ถแ‰ฝแฃ แ‹แ‹ญแŠ“แŠ•แˆตแŠ“ แ‹จแ‹ฐแŠ•แ‰ แŠ› แแˆ‹แŒŽแ‰ต แ‰ แ‰ฐแŒแ‰ฃแˆญ แˆ˜แˆจแŒ‹แŒˆแŒฅ แŠ แˆˆแ‰ฃแ‰ธแ‹แข

๐Ÿ”— แˆแŠ•แŒญแฆ Reuters โ€” Microsoft แŠจNscale แ‹จแ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ แˆตแˆแˆแАแ‰ต แˆ˜แ‹แŒฃแ‰ฑแฃ แŠฆแŠญแ‰ถแ‰ แˆญ 19แฃ 2026
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ™ 5. แ‹จแ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ‹แ‰ตแฆ แŠ แ‹ฒแˆต แ‹จแŒแŠ•แ‰ฃแ‰ณแŠ“ แ‹จแŠขแŠ•แ‰จแˆตแ‰ตแˆ˜แŠ•แ‰ต แŠฅแ‹ตแˆ
แ‹จAI แŠ แŒˆแˆแŒแˆŽแ‰ถแ‰ฝ แแˆ‹แŒŽแ‰ต แˆ˜แŒจแˆ˜แˆญ แ‹จแ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ‹แ‰ตแŠ• แŠฅแŠ•แ‹ฐ แŠ แ‹ฒแˆต แ‹จแŠขแŠ•แแˆซแˆตแ‰ตแˆซแŠญแ‰ธแˆญ แŠขแŠ•แ‰จแˆตแ‰ตแˆ˜แŠ•แ‰ต แ‹˜แˆญแ แŠฅแ‹ซแˆณแ‹ฐแŒˆ แАแ‹แข

๐Ÿ›แŠฅแАแ‹šแˆ… แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝแฆ

๐Ÿ”น แŠ แ‹ณแ‹ฒแˆต แ‹จแŒแŠ•แ‰ฃแ‰ณแŠ“ แ‹จแˆ™แ‹ซ แŠฅแ‹ตแˆŽแ‰ฝแŠ• แ‹ญแˆแŒฅแˆซแˆ‰แข
๐Ÿ”น แ‹จแŠคแˆŒแŠญแ‰ตแˆชแŠญแŠ“ แ‹จแ‰ดแˆŒแŠฎแˆ™แŠ’แŠฌแˆฝแŠ• แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ตแŠ• แ‹ซแˆตแˆแˆแŒ‹แˆ‰แข
๐Ÿ”น แ‰ แˆ›แ‰€แ‹แ‰€แ‹ฃแฃ แ‰ แ‹แˆƒ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญแŠ“ แ‰ แŠคแˆŒแŠญแ‰ตแˆชแŠญ แˆฅแˆญแ‹“แ‰ต แ‹จแ‰ฐแŠซแŠ‘ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแŠ• แ‹ญแˆแˆแŒ‹แˆ‰แข
๐Ÿ”น แˆˆแ‰ดแŠญแŠ–แˆŽแŒ‚แŠ“ แˆˆแŒแŠ•แ‰ฃแ‰ณ แŠฉแ‰ฃแŠ•แ‹ซแ‹Žแ‰ฝ แŠ แ‹ณแ‹ฒแˆต แ‹จแŠ•แŒแ‹ต แŠฅแ‹ตแˆŽแ‰ฝแŠ• แˆŠแŠจแแ‰ฑ แ‹ญแ‰ฝแˆ‹แˆ‰แข

โฌ†๏ธแˆ†แŠ–แˆ แŠจแแ‰ฐแŠ› แ‹จแŠƒแ‹ญแˆ แแˆ‹แŒŽแ‰ตแฃ แ‹จแˆ›แ‰€แ‹แ‰€แ‹ฃ แ‹ˆแŒชแฃ แ‹จแ‹แˆƒ แŠ แŒ แ‰ƒแ‰€แˆแŠ“ แ‹จแˆ˜แŒ€แˆ˜แˆชแ‹ซ แŠซแ’แ‰ณแˆ แแˆ‹แŒŽแ‰ต แ‰ แŒฅแŠ•แ‰ƒแ‰„ แˆ˜แ‰ณแ‰€แ‹ต แŠ แˆˆแ‰ฃแ‰ธแ‹แข

๐Ÿ“Œ แˆˆแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹ซแˆˆแ‹ แ‰ตแˆแˆ…แˆญแ‰ต
แ‹จแ‹ฒแŒ‚แ‰ณแˆ แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แŠจแŠ แŒˆแˆชแ‰ฑ แ‹จแŠคแˆŒแŠญแ‰ตแˆชแŠญ แŠ แ‰…แˆแฃ แŠจแ‰ดแˆŒแŠฎแˆ™แŠ’แŠฌแˆฝแŠ• แŠ”แ‰ตแ‹ˆแˆญแŠญแฃ แŠจแ‰ณแ‹ณแˆฝ แŠƒแ‹ญแˆแŠ“ แŠจแˆจแŒ…แˆ แŒŠแ‹œ แ‹จแŠขแŠ•แ‰จแˆตแ‰ตแˆ˜แŠ•แ‰ต แŠฅแ‰…แ‹ต แŒ‹แˆญ แ‰ แ‰…แŠ•แŒ…แ‰ต แˆ›แ‹ฐแŒ แŠ แˆˆแ‰ แ‰ตแข
๐Ÿ”— แ‹จแ‰ฐแ‹ซแ‹ซแ‹˜ แˆแŠ•แŒญแฆ Colt DCS โ€” แ‹จMumbai 3 แ‹จแ‹ณแ‰ณ แˆ›แ‹•แŠจแˆ แ•แˆฎแŒ€แŠญแ‰ต
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ’ก แ‹จแˆณแˆแŠ•แ‰ฑ แ‹‹แŠ“ แˆ˜แˆแ‹•แŠญแ‰ต
แŒ แŠ•แŠซแˆซ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ•แˆฎแŒ€แŠญแ‰ต แ‰ แŒฅแˆฉ แ‹ฒแ‹›แ‹ญแŠ• แ‰ฅแ‰ป แŠ แ‹ญแˆณแŠซแˆแข

โ˜„แ‰ฐแŒจแ‰ฃแŒญ แ‹จแŒˆแ‰ แ‹ซ แŒฅแŠ“แ‰ตแฃ แ‹จแ‰ฐแˆจแŒ‹แŒ‹ แ‹แ‹ญแŠ“แŠ•แˆตแฃ แ‹จแ‰ฐแˆจแŒ‹แŒˆแŒ  แ‹จแˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แŠ แ‰…แˆญแ‰ฆแ‰ตแŠ“ แŒฅแˆฉ แ‹จแ•แˆฎแŒ€แŠญแ‰ต แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แ‹ซแˆตแˆแˆแŒ‹แˆ‰แข

๐Ÿ”†แŠขแ‰ตแ‹ฎแŒตแ‹ซ แŠจแ‹“แˆˆแˆ แŠ แ‰€แ แˆแˆแ‹ถแ‰ฝ แ‰ แˆ˜แˆ›แˆญ แ‹จแ‰ แˆˆแŒ  แ‹แŒคแ‰ณแˆ›แฃ แ‹˜แˆ‹แ‰‚แŠ“ แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝแŠ• แˆ›แˆณแ‹ฐแŒ แ‰ตแ‰ฝแˆ‹แˆˆแ‰ฝแข

๐Ÿ”” แˆˆแ‰ฐแŒจแˆ›แˆช แ‹จแŒแŠ•แ‰ฃแ‰ณแฃ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ตแŠ“ แ‹จแŠขแŠ•แแˆซแˆตแ‰ตแˆซแŠญแ‰ธแˆญ แ‹œแŠ“แ‹Žแ‰ฝ แ‹‹แŠ“แ‹ แ‹จแ‰ดแˆŒแŒแˆซแˆ แ‰ปแŠ“แˆ‹แ‰ฝแŠ•แŠ• แ‹ญแ‰€แˆ‹แ‰€แˆ‰๐Ÿ‘‡

https://t.me/ETCONp
โค4๐Ÿฅฐ1
๐Ÿ“‘ TECHNICAL vs. FINANCIAL EVALUATION IN CONSTRUCTION TENDERS

Tender evaluation is the process of assessing submitted bids against the requirements and criteria stated in the procurement documents.

๐Ÿ”น 1. Technical Evaluation

This may assess:
๐Ÿ“‹ Compliance with technical specifications.
๐Ÿ—๏ธ Proposed methodology.
๐Ÿ‘ท Personnel and equipment requirements.
๐Ÿ“ Relevant experience.
๐Ÿ“„ Required technical documentation.

๐Ÿ”น 2. Financial Evaluation

This may assess:
๐Ÿ’ฐ Bid price.
๐Ÿ“Š Pricing schedules and BOQ.
๐Ÿงพ Arithmetic corrections where permitted.
๐Ÿ“‹ Other financial criteria specified in the tender.

๐Ÿ”น Why Does the Difference Matter?

A low price does not automatically mean that a bid will be accepted. The bid must be evaluated according to the stated requirements and applicable procurement rules.

๐Ÿ“Œ Some procurement methods evaluate technical compliance before considering financial offers. Others may use different permitted evaluation approaches.

โš ๏ธ Always consult the official tender documents. Never assume that all tenders follow the same evaluation sequence.


@ETCONpWORK
๐Ÿ‘3โค1๐Ÿ‘1
๐Ÿ—๏ธ Professional Contract Administration Full Kit โ€“ แŠ แˆแŠ‘แŠ‘ แ‹ซแŒแŠ™

๐ŸŒŸแ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แŠฎแŠ•แ‰ตแˆซแ‰ต แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญแ‹ŽแŠ• แ‰ แ‰€แˆ‹แˆ‰แŠ“ แ‰ แˆ™แ‹ซแ‹Š แˆ˜แŠ•แŒˆแ‹ต แ‹ซแ‹ฐแˆซแŒ

โœ… Excel แ‹จแŠฎแŠ•แ‰ตแˆซแ‰ต แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แˆฒแˆตแ‰ฐแˆžแ‰ฝ
โœ… 16 แ‹จแˆแ‹แŒˆแ‰ฃแŠ“ แ‹จแŠญแ‰ตแ‰ตแˆ แˆ˜แˆณแˆชแ‹ซแ‹Žแ‰ฝ
โœ… 20 แˆ™แ‹ซแ‹Š Word Forms
โœ… แ‹จแŠญแแ‹ซแฃ Variationแฃ Claim แŠฅแŠ“ EOT แŠญแ‰ตแ‰ตแˆ
โœ… แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแŒแŠ•แ‰ฃแ‰ณ แŠฎแŠ•แ‰ตแˆซแ‰ถแ‰ฝแŠ• แ‹ซแˆ›แŠจแˆ‰ แ‹ถแŠญแˆ˜แŠ•แ‰ถแ‰ฝ แ‹จแ‹ซแ‹˜ Zip แ‹แ‹ญแˆ แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=7092d10597da2
๐Ÿ‘2โค1๐Ÿฅฐ1๐Ÿซก1
๐Ÿ‘‰แ‹จแŒแŠ•แ‰ฃแ‰ณ แŒจแˆจแ‰ณ

แŠจ แˆชแ–แˆญแ‰ฐแˆญ แŒ‹แ‹œแŒฃ แŒฅแ‰…แˆแ‰ต 8 แ‰€แŠ• 2019
แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€

https://t.me/ETCONpWORK

โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€

@etconp
โค4
๐Ÿ—๏ธ RCC STAIRCASE CONSTRUCTION: FORMWORK, REINFORCEMENT & CONCRETING

๐Ÿ”น KEY CONSTRUCTION COMPONENTS
1๏ธโƒฃ Base Formwork: Supports fresh concrete and reinforcement.
2๏ธโƒฃ Props & Bracing: Provide stability and prevent excessive deflection.
3๏ธโƒฃ Step Formwork: Ensures uniform tread and riser dimensions.
4๏ธโƒฃ Reinforcement: Provides structural strength according to the design.
5๏ธโƒฃ Landing Slab: Connects staircase flights and transfers loads.
6๏ธโƒฃ Side Shuttering: Maintains the staircase width and shape.
7๏ธโƒฃ Concrete Compaction: Reduces voids and honeycombing.

๐Ÿ“ TYPICAL STAIRCASE DIMENSIONS

โœ… Tread: 250โ€“300 mm
โœ… Riser: 150โ€“180 mm
โœ… Stair Width: 900โ€“1200 mm
โœ… Waist Slab: Approximately 100โ€“150 mm, subject to design.

๐Ÿ› ๏ธ CONSTRUCTION SEQUENCE

1,Set out dimensions and levels.
2,Install and brace formwork.
3,Fix reinforcement and check concrete cover.
4,Pour and compact concrete properly.
5,Finish the steps and landing.
Cure adequately and remove 6,formwork only when permitted.

@ETCONpWORK
โค5๐Ÿฅฐ1
๐Ÿ—๏ธ 4 COMMON TYPES OF BUILDING FOUNDATIONS

A foundation transfers building loads safely to the ground, ensuring stability and reducing settlement.

๐Ÿ“ Types of Foundations

1๏ธโƒฃ Isolated Footing: Supports individual columns; common in RCC buildings.
2๏ธโƒฃ Strip Footing: A continuous foundation beneath load-bearing walls.
3๏ธโƒฃ Raft Foundation: A large RCC slab supporting multiple columns and walls, suitable for certain weak-soil conditions.
4๏ธโƒฃ Pile Foundation: Transfers loads to deeper, stronger soil layers or rock.

๐Ÿ“Œ Key Factors in Foundation Selection

โœ… Soil bearing capacity
โœ… Building loads and height
โœ… Groundwater level
โœ… Soil conditions and settlement
โœ… Cost and construction requirements

โš ๏ธ Engineering Note: Foundation design must be based on geotechnical investigation, structural calculations, and local building codes.

@ETCONpWORK
โค5๐Ÿ‘1