Ethiopian Construction Vacancy & Tender
18.1K subscribers
4.57K photos
56 videos
528 files
3.76K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

๐Ÿ“ฉ @Philemona7
Download Telegram
๐Ÿ‘‰แ‹จแŒแŠ•แ‰ฃแ‰ณ แŒจแˆจแ‰ณ

แŠจ แˆชแ–แˆญแ‰ฐแˆญ แŒ‹แ‹œแŒฃ แŒฅแ‰…แˆแ‰ต 8 แ‰€แŠ• 2019
แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€

https://t.me/ETCONpWORK

โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€

@etconp
โค4
๐Ÿ—๏ธ RCC STAIRCASE CONSTRUCTION: FORMWORK, REINFORCEMENT & CONCRETING

๐Ÿ”น KEY CONSTRUCTION COMPONENTS
1๏ธโƒฃ Base Formwork: Supports fresh concrete and reinforcement.
2๏ธโƒฃ Props & Bracing: Provide stability and prevent excessive deflection.
3๏ธโƒฃ Step Formwork: Ensures uniform tread and riser dimensions.
4๏ธโƒฃ Reinforcement: Provides structural strength according to the design.
5๏ธโƒฃ Landing Slab: Connects staircase flights and transfers loads.
6๏ธโƒฃ Side Shuttering: Maintains the staircase width and shape.
7๏ธโƒฃ Concrete Compaction: Reduces voids and honeycombing.

๐Ÿ“ TYPICAL STAIRCASE DIMENSIONS

โœ… Tread: 250โ€“300 mm
โœ… Riser: 150โ€“180 mm
โœ… Stair Width: 900โ€“1200 mm
โœ… Waist Slab: Approximately 100โ€“150 mm, subject to design.

๐Ÿ› ๏ธ CONSTRUCTION SEQUENCE

1,Set out dimensions and levels.
2,Install and brace formwork.
3,Fix reinforcement and check concrete cover.
4,Pour and compact concrete properly.
5,Finish the steps and landing.
Cure adequately and remove 6,formwork only when permitted.

@ETCONpWORK
โค5๐Ÿฅฐ1
๐Ÿ—๏ธ 4 COMMON TYPES OF BUILDING FOUNDATIONS

A foundation transfers building loads safely to the ground, ensuring stability and reducing settlement.

๐Ÿ“ Types of Foundations

1๏ธโƒฃ Isolated Footing: Supports individual columns; common in RCC buildings.
2๏ธโƒฃ Strip Footing: A continuous foundation beneath load-bearing walls.
3๏ธโƒฃ Raft Foundation: A large RCC slab supporting multiple columns and walls, suitable for certain weak-soil conditions.
4๏ธโƒฃ Pile Foundation: Transfers loads to deeper, stronger soil layers or rock.

๐Ÿ“Œ Key Factors in Foundation Selection

โœ… Soil bearing capacity
โœ… Building loads and height
โœ… Groundwater level
โœ… Soil conditions and settlement
โœ… Cost and construction requirements

โš ๏ธ Engineering Note: Foundation design must be based on geotechnical investigation, structural calculations, and local building codes.

@ETCONpWORK
โค5๐Ÿ‘1
๐Ÿ“ข TENDER ADDENDUM โ€” WHY SHOULD EVERY BIDDER CHECK FOR ONE?

A tender addendum is an official document that modifies, clarifies, or supplements previously issued tender documents.
It may be issued when the procuring entity needs to correct an error, clarify a requirement, or communicate a change.

๐Ÿ”น What Might an Addendum Change?

๐Ÿ“ Technical specifications.
๐Ÿ“Š BOQ descriptions or quantities.
๐Ÿ“… Submission deadlines.
๐Ÿ“‹ Required documents.
๐Ÿ—๏ธ Scope of work.
๐Ÿ“‘ Contract conditions or other tender information.

๐Ÿ”น What Should Bidders Do?

1๏ธโƒฃ Check official communication channels for updates.

2๏ธโƒฃ Review every addendum carefully.

3๏ธโƒฃ Identify which parts of the original documents have changed.

4๏ธโƒฃ Update calculations and submission documents where necessary.

5๏ธโƒฃ Acknowledge the addendum when required.

6๏ธโƒฃ Submit the bid according to the latest official instructions.

โš ๏ธ Never rely on unofficial screenshots or old copies when an official revised document is available.


@ETCONpWORK
๐Ÿฅฐ3โค2
๐Ÿ“ŠProfessional Interim Payment Certificate (IPC) Excel Template

๐ŸŒŸแ‹จแŒแŠ•แ‰ฃแ‰ณ แˆฅแˆซ แŠญแแ‹ซแŠ• แ‰ แ‰€แˆ‹แˆ‰ แˆˆแˆ›แˆตแˆ‹แ‰ตแฃ แˆˆแˆ˜แŠจแ‰ณแ‰ฐแˆ แŠฅแŠ“ IPC แˆˆแˆ›แ‹˜แŒ‹แŒ€แ‰ต แ‹ญแˆ…แŠ• Editable Excel Template แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹‰ แˆŠแŠ•แŠญ แŠ แ‹แˆญแ‹ฐแ‹ แ‹ญแŒ แ‰€แˆ™๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aafe8a2089de_etconp
๐Ÿ‘3โค1๐Ÿฅฐ1
๐Ÿ‘‰แ‹จแŒแŠ•แ‰ฃแ‰ณ แŒจแˆจแ‰ณแ‹Žแ‰ฝ

๐ŸŒŸแŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ•  แŒฅแ‰…แˆแ‰ต 10 แ‰€แŠ• 2019 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€
https://t.me/ETCONpWORK

@etconp
โค4๐Ÿ‘2
๐Ÿ‘‰แˆตแŠฎแˆ‹แˆญแˆฝแ• แˆˆแˆ›แˆ˜แˆแŠจแ‰ต แŠจแ‰ฅแ‹ถแ‰ณแˆ?

โœ…แŠจ 480+ แŠ แˆตแ‰ฐแˆ›แˆ›แŠ แ‹จแˆตแŠฎแˆ‹แˆญแˆบแ• แ‹ตแˆจ-แŒˆแŒพแ‰ฝแŠ• แ‹ซแŠซแ‰ฐแ‰ฐ
โœ… แˆˆ12แŠ› แŠญแแˆ แŒจแˆแˆฎ แˆˆแ‰…แ‹ตแˆ˜-แˆแˆจแ‰ƒ (Undergraduate)แฃ แˆˆแˆ›แˆตแ‰ฐแˆญแˆต (Masterโ€™s) แŠฅแŠ“ แˆˆแ‹ถแŠญแ‰ตแˆฌแ‰ต (PhD) แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แ‰ฐแ‰ฅแˆŽ แ‹จแ‰ฐแ‹˜แŒ‹แŒ€
โœ… แŠฅแŠ•แ‹ดแ‰ต Scholarship แˆ›แˆ˜แˆแŠจแ‰ต แŠฅแŠ•แ‹ฐแˆšแ‰ฝแˆ‰ แ‹ฐแˆจแŒƒ-แ‰ แ‹ฐแˆจแŒƒ แ‹ญแˆ˜แˆซแ‹Žแ‰ณแˆแข

๐Ÿ“—โ€‹แŠ แˆแŠ‘แŠ‘ แˆ˜แ…แˆแ‰แŠ• แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6ad8386b95dd8_etconp
๐Ÿฅฐ2๐Ÿ‘Œ1
โ›ช CHURCH / WORSHIP CENTRE FLOOR PLAN

A well-designed church provides a comfortable, safe, and welcoming space for worship, prayer, and community gatherings.

๐Ÿ—๏ธ Key Design Features

1๏ธโƒฃ Altar / Stage: Space for the pastor, choir, and worship activities.
2๏ธโƒฃ Main Auditorium: Organized seating with clear aisles.
3๏ธโƒฃ Male & Female Toilets: Separate hygienic facilities.
4๏ธโƒฃ Staircase: Access to upper floors where required.
5๏ธโƒฃ Side Doors: Additional access and emergency exits.
6๏ธโƒฃ Prayer Room: For private prayer and counselling.
7๏ธโƒฃ Storage Room: For chairs and worship equipment.
8๏ธโƒฃ Main Entrance / Foyer: Welcoming access for worshippers.

๐Ÿ“ Important Design Considerations

โœ… Adequate lighting and ventilation.
โœ… Clear circulation and accessible routes.
โœ… Good acoustics and seating arrangements.
โœ… Fire safety and emergency exits.
โœ… Proper structural and plumbing design.

@ETCONpWORK
โค5๐Ÿ‘1
Ethiopian Construction Vacancy & Tender
โ›ช CHURCH / WORSHIP CENTRE FLOOR PLAN A well-designed church provides a comfortable, safe, and welcoming space for worship, prayer, and community gatherings. ๐Ÿ—๏ธ Key Design Features 1๏ธโƒฃ Altar / Stage: Space for the pastor, choir, and worship activities. 2๏ธโƒฃโ€ฆ
๐Ÿ‘‰แ‹จแ‰คแ‰ฐ แŠญแˆญแˆตแ‰ฒแ‹ซแŠ• แˆ•แŠ•แƒ แ‹ฒแ‹›แ‹ญแŠ• แˆƒแ‹ญแˆ›แŠ–แ‰ณแ‹Š แ‹ญแ‹˜แ‰ฑ แŒ แ‰ฅแ‰† แŠจแˆ˜แˆ แˆจแ‰ณแ‹Š แ‹จแˆ•แŠ•แƒ แŠ แŠซแˆ‹แ‰ต แŠฅแˆตแŠจ แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แŠญแแˆŽแ‰ฝแŠ“ แ‹จแˆ•แŠ•แƒ แ‰…แˆญแ†แ‰ฝ แ‰ แ‰€แˆ‹แˆแˆ‰ แˆˆแˆ˜แˆจแ‹ณแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แˆแˆญแŒฅ แ‹จแŠ แˆ›แˆญแŠ› แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆ˜แ…แˆแ แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a8a873add2d7_etconp
๐Ÿ‘Œ2
๐Ÿ“ข TENDER ADDENDUM โ€” WHY SHOULD EVERY BIDDER CHECK FOR ONE?

A tender addendum is an official document that modifies, clarifies, or supplements previously issued tender documents.
It may be issued when the procuring entity needs to correct an error, clarify a requirement, or communicate a change.

๐Ÿ”น What Might an Addendum Change?

๐Ÿ“ Technical specifications.
๐Ÿ“Š BOQ descriptions or quantities.
๐Ÿ“… Submission deadlines.
๐Ÿ“‹ Required documents.
๐Ÿ—๏ธ Scope of work.
๐Ÿ“‘ Contract conditions or other tender information.

๐Ÿ”น What Should Bidders Do?

1๏ธโƒฃ Check official communication channels for updates.

2๏ธโƒฃ Review every addendum carefully.

3๏ธโƒฃ Identify which parts of the original documents have changed.

4๏ธโƒฃ Update calculations and submission documents where necessary.

5๏ธโƒฃ Acknowledge the addendum when required.

6๏ธโƒฃ Submit the bid according to the latest official instructions.

โš ๏ธ Never rely on unofficial screenshots or old copies when an official revised document is available.


@ETCONpWORK
๐Ÿ‘3โค2
๐Ÿ—๏ธ CONSTRUCTION TENDER PREQUALIFICATION โ€” WHAT SHOULD CONTRACTORS KNOW?

Prequalification is a procurement process used to assess whether potential bidders meet specified requirements before a later stage of procurement.

It helps the procuring entity determine whether applicants have the required capacity for the proposed work.

๐Ÿ”น Common Assessment Areas

1๏ธโƒฃ Experience: Relevant previous projects.

2๏ธโƒฃ Technical Capacity: Qualified personnel and technical capability.

3๏ธโƒฃ Financial Capacity: Financial information required by the tender.

4๏ธโƒฃ Equipment and Resources: Access to the resources needed for the work.

5๏ธโƒฃ Legal Eligibility: Registration, licensing, or other required documentation.

6๏ธโƒฃ Safety and Quality: Relevant records or systems where specified.

๐Ÿ”น How Can Contractors Prepare?

โœ… Keep registration documents current.

โœ… Organize project completion certificates and references.

โœ… Maintain accurate financial documentation.

โœ… Prepare personnel and equipment records.

โœ… Review the eligibility criteria before applying.

โš ๏ธ Requirements differ between procurement processes. Submit only accurate, verifiable information and follow the official instructions.

@ETCONpWORK
๐Ÿ‘3โค1
๐Ÿ›๏ธ AUDITORIUM / COMMUNITY CENTRE โ€“ FLOOR PLAN

An auditorium and community centre is a multifunctional building designed for conferences, cultural events, worship, education, and community gatherings.

๐Ÿ“ Key Dimensions & Facilities

๐Ÿ“ Building size: 56 m ร— 38 m

๐Ÿ’บ Auditorium capacity: 861 seats

๐ŸŽญ Stage: 12 m ร— 6 m

๐Ÿข Multipurpose room: 12 m ร— 15 m

๐ŸŒฟ Patio: 11.5 m ร— 7.5 m

๐ŸŽ›๏ธ Control room, cafรฉ, kitchen, and conference room

๐Ÿ“š Classrooms, offices, chapel, and meeting rooms

๐Ÿšป Restrooms, first-aid room, and storage areas

โœ… Important Design Considerations

*Safe exits and emergency evacuation routes
*Accessible entrances and circulation
*Proper lighting, ventilation, and acoustics
*Clear stage visibility and seating arrangements
*Adequate sanitation and fire-safety provisions

Design Note: Verify all dimensions, seating capacities, structural details, and safety requirements against scaled drawings and local building codes before construction.

@ETCONpWORK
โค4๐Ÿฅฐ1
๐Ÿ’ผ ENGINEERS: HOW TO IMPROVE YOUR PROFESSIONAL ONLINE PROFILE

A professional profile can help employers and colleagues understand your background and skills.

๐Ÿ”น What Should You Include?

๐Ÿ“Œ A clear professional headline.

๐ŸŽ“ Education and relevant qualifications.

๐Ÿ‘ท Work experience and responsibilities.

๐Ÿ’ป Technical and software skills.

๐Ÿ“ Relevant projects.

๐Ÿ“œ Verified certifications and training.

๐Ÿ“ฉ Appropriate contact information.

๐Ÿ”น How to Improve Your Profile

โœ… Keep your information accurate and up to date.

โœ… Describe your responsibilities clearly.

โœ… Use a professional photograph if you choose to include one.

โœ… Share relevant engineering knowledge and professional achievements.

โœ… Respect employer confidentiality.

๐Ÿ“Œ Important: Your online profile should be consistent with your CV. Never claim a professional license, certification, or experience you do not have.

@ETCONpWORK
โค5๐Ÿ‘1๐Ÿฅฐ1
๐Ÿ‘‰แŠ แˆตแ‹ฐแˆณแ‰ฝ แ‹œแŠ“ แˆˆแ‹šแˆ… แ‰ปแŠ“แˆ แ‰คแ‰ฐแˆฐแ‰ฆแ‰ฝ

๐ŸŽฅแŠจ UDEMY แ‰  200 แ‹ถแˆ‹แˆญ แ‹จแŒˆแ‹›แŠ“แ‰ธแ‹ แ‹จ SAP แŠฅแŠ“ ETABS แˆ™แˆ‰ แŠฎแˆญแˆถแ‰ฝ แ‰ แŒฃแˆ แ‰ แˆญแŠซแˆฝ แ‹‹แŒ‹ แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‰ฅแˆญ แˆ˜แŒแ‹›แ‰ต แ‹จแˆแ‰ตแˆแˆแŒ‰ @Philemona7 แƒแ‰แˆแŠ•๐Ÿ™

๐Ÿ—‚แŠจแ‹šแˆ… แ‰ แ‰ฐแŒจแˆ›แˆช แ‹จ Tekla แŠฅแŠ“ Revit แˆ™แˆ‰ แŠฎแˆญแˆถแ‰ฝแˆ แŠฃแˆ‰๐ŸคŽ
๐Ÿซก1
๐ŸŽ“ LOOKING FOR A CONSTRUCTION INTERNSHIP? HERE IS HOW TO PREPARE

An internship can help students and recent graduates develop practical skills and understand professional construction environments.

๐Ÿ”น Step 1: Identify Relevant Employers

Explore contractors, consulting firms, developers, and organizations with suitable training opportunities.

๐Ÿ”น Step 2: Prepare Your CV

Include your education, relevant coursework, projects, technical skills, and contact details.

๐Ÿ”น Step 3: Build Basic Skills

Practice reading drawings, using relevant software, and understanding construction safety.

๐Ÿ”น Step 4: Apply Professionally

Follow the official application instructions and submit the required documents.

๐Ÿ”น Step 5: Ask About Learning Opportunities

Understand the expected responsibilities, supervision, and learning objectives.

๐Ÿ”น Step 6: Keep Records of Your Learning

Record permitted activities, skills developed, and feedback received.

โš ๏ธ Verify that an internship is genuine. Be cautious about requests for unexplained fees or sensitive personal information.

๐Ÿ“Œ The goal is to gain useful experience while following workplace safety and professional requirements.

@ETCONpWORK
โค4๐Ÿ‘3๐Ÿฅฐ1๐Ÿ™1
๐Ÿ‘‰แŒจแˆจแ‰ณ แˆ›แ‹˜แŒ‹แŒ€แ‰ต แŠ แˆฐแˆแ‰ฝแ‰ถแ‹Žแ‰ณแˆ?

๐Ÿ“‘แ‹จแŒจแˆจแ‰ณ แˆฐแАแ‹ต แˆ›แ‹˜แŒ‹แŒ€แ‰ตแฅ แŠ แˆแŠ• แŠจแ‰ แŠแ‰ฑ แ‹ญแ‰ แˆแŒฅ แ‰€แˆ‹แˆ แŠฅแŠ“ แˆแŒฃแŠ• แˆ†แА

๐ŸŒŸโ€‹แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซแŠ• PPA 2025 Standard Bidding Document แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝ แˆ˜แˆฐแˆจแ‰ต แŠ แ‹ตแˆญแŒŽ แ‰ แŠคแŠญแˆดแˆ (Excel) แ‹จแ‰ฐแ‹˜แŒ‹แŒ€แ‹ แ‹˜แˆ˜แŠ“แ‹Šแ‹ TENDER PREPARATION SUITE แŠจแ‹šแˆ… แ‰ แ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แŠ แ‹แˆญแ‹ฐแ‹ แ‹ญแŒ แ‰€แˆ™ แ‰ แˆตแˆ…แ‰ฐแ‰ต แŠฅแŠ“ แ‰ฃแˆˆแˆ˜แˆŸแˆ‹แ‰ต แ‹จแˆšแˆฐแˆจแ‹™ แˆฐแАแ‹ถแ‰ฝแŠ• แ‹ซแˆตแ‰€แˆฉ๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6ab1114dcd55e_etconp
โค3๐Ÿ‘Œ1
๐Ÿ‘‰แ‹›แˆฌ แˆแˆญแŒฅ แˆ˜แ…แˆƒแ แ‹ญแ‹˜แŠ•แˆ‹แ‰น แˆ˜แŒฅแ‰ฐแŠ“แˆ

๐Ÿ›Quantity Surveying & Specification๐Ÿ“˜

๐ŸŒŸแ‹จQuantity Surveying แŠฅแŠ“ Building Construction Estimation แŠจ แˆ€ แŠ แˆตแŠจ แ แ‰ฝแˆŽแ‰ณแ‹ŽแŠ• แ‰ แ‰ฐแŒแ‰ฃแˆซแ‹Š แˆแˆณแˆŒแ‹Žแ‰ฝ แ‹จแˆšแ‹ซแˆณแ‹ตแŒ‰แ‰ แ‰ต แˆแˆญแŒฅ แˆ˜แ…แˆแ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a8dd294cbaa9_etconp
๐Ÿฅฐ2๐Ÿ‘1
๐Ÿ“‘ BILL OF QUANTITIES (BOQ) โ€” WHY IS IT IMPORTANT IN TENDERING?

A Bill of Quantities is a structured document that describes construction work items and provides quantities and units used for pricing and procurement, according to the applicable tender arrangements.

๐Ÿ”น What Does a BOQ Usually Contain?

๐Ÿ“Œ Item number.
๐Ÿ“Œ Description of work.
๐Ÿ“Œ Unit of measurement.
๐Ÿ“Œ Quantity.
๐Ÿ“Œ Unit rate, where required.
๐Ÿ“Œ Total amount, where required.

๐Ÿ—๏ธ Example

If the quoted unit rate is 5,000 currency units per mยณ, the amount for this illustrative item is: 10 ร— 5,000 = 50,000 currency units.

๐Ÿ”น Why Is the BOQ Important?

โœ… Provides a structured pricing format.
โœ… Supports tender comparison where applicable.
โœ… Helps estimate project costs.
โœ… Supports valuations and cost monitoring under the contract.

โš ๏ธ Always follow the official BOQ format, measurement rules, and tender instructions. Do not change prescribed quantities or descriptions unless permitted.