👉What is Slump Test and Why It Matters?
📌Definition: The Slump Test is a simple test used to measure the workability and consistency
of fresh concrete before placing it in formwork.
💫Purpose:
• To check the uniformity of concrete from batch to batch.
• To ensure proper water-cement ratio and desired workability.
Equipment Used:
• Slump cone (300mm high, 200mm bottom dia, 100mm top dia)
• Tamping rod (16mm dia, 600mm long)
• Base plate and measuring scale
📜Procedure:
1. Fill the cone with fresh concrete in 3 layers, each tamped 25 times.
2. Remove the cone vertically and measure the subsidence (slump) of concrete.
3. The difference in height gives the slump value (in mm).
⭐️Types of Slump:
• True Slump – Concrete subsides uniformly.
• Shear Slump – Concrete slides sideways (indicates poor cohesion).
• Collapse Slump – Concrete completely collapses (too wet mix).
Typical Slump Values:
• Mass Concrete: 25–50 mm
• Reinforced Foundation: 50–100 mm
• Slabs & Beams: 75–125 mm
• Pumped Concrete: 100–150 mm
💥Importance:
⏺The slump test ensures proper workability, reduces segregation risk, and confirms concrete quality before casting.
#SlumpTest #ConcreteTesting #WorkabilityTest #CivilEngineering #QualityControl
#ConstructionSite #FreshConcrete #SiteEngineer #ConcreteWork
#EngineeringKnowledge
@etconp
📌Definition: The Slump Test is a simple test used to measure the workability and consistency
of fresh concrete before placing it in formwork.
💫Purpose:
• To check the uniformity of concrete from batch to batch.
• To ensure proper water-cement ratio and desired workability.
Equipment Used:
• Slump cone (300mm high, 200mm bottom dia, 100mm top dia)
• Tamping rod (16mm dia, 600mm long)
• Base plate and measuring scale
📜Procedure:
1. Fill the cone with fresh concrete in 3 layers, each tamped 25 times.
2. Remove the cone vertically and measure the subsidence (slump) of concrete.
3. The difference in height gives the slump value (in mm).
⭐️Types of Slump:
• True Slump – Concrete subsides uniformly.
• Shear Slump – Concrete slides sideways (indicates poor cohesion).
• Collapse Slump – Concrete completely collapses (too wet mix).
Typical Slump Values:
• Mass Concrete: 25–50 mm
• Reinforced Foundation: 50–100 mm
• Slabs & Beams: 75–125 mm
• Pumped Concrete: 100–150 mm
💥Importance:
⏺The slump test ensures proper workability, reduces segregation risk, and confirms concrete quality before casting.
#SlumpTest #ConcreteTesting #WorkabilityTest #CivilEngineering #QualityControl
#ConstructionSite #FreshConcrete #SiteEngineer #ConcreteWork
#EngineeringKnowledge
@etconp
❤18👍2🥰1
👉የአለም ሎሬት ሜትር አርቲስት አፈወርቅ ተክሌ ቤት ወይም ቪላ አልፋ እድሳት መጠናቀቁ ተገለጸ
💫የአለም ሎሬት ሜትር አርቲስት አፈወርቅ ተክሌ ቤት ወይም ቪላ አልፋ እስከ ጥቅምት 2018 ለሕዝብ ክፍት ይሆናል ቢባልም፤ ክፍት ከመደረጉ በፊት መሰራት ያለባቸው ሥራዎች ገና ባለመጠናቀቃቸው እስከ ሚያዚያ ወር ሊቆይ እንደሚችል ነው የተገልጿል፡፡
የተከበሩ የአለም ሎሬት ሜትር አርቲስት አፈወርቅ ተክሌ በሚያዚያ 2 ቀን 2004 ዓ.ም ካረፉ በኋላ ዝግ ሆኖ እስካሁን የዘለቀው ቪላ አልፋ፤ የተለያዩ የጥገና ሥራዎች እየተሰሩለት ነው ቢባልም ግን ለሕዝብ እይታ ተከልክሎ 14ኛ ዓመቱን ይዟል፡፡
ቪላ አልፋ የጥገና ሥራው ከመጀመሩ በፊት ውስጡ ያሉት ተንቀሳቃሽ የጥበብ ሥራዎች እና ሌሎችም ንብረቶች ወደ ቅርስ ባለ-ስልጣን መስሪያ ቤቱ እንዲሄዱ ተደርጎ እንደነበርም የሚታወስ ነው፡፡
ከመሬት በታች በሚወጣ እና ከላይ በሚዘንብ ዝናብ ቪላ አልፋ በጣም ተጎድቶ ነበር፤ አሁን ላይ ግን ከውጭ ሀገራትም ይሁን ከሀገር ውስጥ የአርቲስቱን ሥራዎች እየተመለከቱ ባለሙያዎች ትምህርት ለመውሰድ በሚችሉበት ደረጃ ጥገናው ተደርጓል ነው የተባለው፡፡
እንደ ሙዚየም የሚደራጅ በመሆኑ ጊዜ እንደወሰደም ነው የተገለጸው፡፡
የእድሳቱ ሥራ ተጠናቆ የርክክብ እና ቅርሶችን በቦታቸው የመመለስ ሥራዎች ብቻ ቀርቷል ሲሉም የብሄራዊ ሙዚየም መሪ ስራ አስፈጻሚ አቶ አንዷለም ግርማይ ለአሐዱ ተናግረዋል፡፡
"የእድሳቱ ሥራ ጥንቃቄዎችን የሚጠይቅ ነበር" ያሉት አቶ እንዷለም፤ የርክክብ ሥራዎች ሲጠናቀቁ ቪላ አልፋን በ2018 እስከ ሚያዚያ ወር ለእይታ ክፍት ለማድረግ ታስቧል ነው ያሉት፡፡
የእድሳት ሥራው 65 ሚሊየን ብር እንዳስወጣ ከዚህ በፊት የወጡ መረጃዎች ያመለክታሉ፡የእድሳት ሥራው በምዕራፎች የተከፋፈለ ነበር ነው የተባለው፡፡
@etconp
💫የአለም ሎሬት ሜትር አርቲስት አፈወርቅ ተክሌ ቤት ወይም ቪላ አልፋ እስከ ጥቅምት 2018 ለሕዝብ ክፍት ይሆናል ቢባልም፤ ክፍት ከመደረጉ በፊት መሰራት ያለባቸው ሥራዎች ገና ባለመጠናቀቃቸው እስከ ሚያዚያ ወር ሊቆይ እንደሚችል ነው የተገልጿል፡፡
የተከበሩ የአለም ሎሬት ሜትር አርቲስት አፈወርቅ ተክሌ በሚያዚያ 2 ቀን 2004 ዓ.ም ካረፉ በኋላ ዝግ ሆኖ እስካሁን የዘለቀው ቪላ አልፋ፤ የተለያዩ የጥገና ሥራዎች እየተሰሩለት ነው ቢባልም ግን ለሕዝብ እይታ ተከልክሎ 14ኛ ዓመቱን ይዟል፡፡
ቪላ አልፋ የጥገና ሥራው ከመጀመሩ በፊት ውስጡ ያሉት ተንቀሳቃሽ የጥበብ ሥራዎች እና ሌሎችም ንብረቶች ወደ ቅርስ ባለ-ስልጣን መስሪያ ቤቱ እንዲሄዱ ተደርጎ እንደነበርም የሚታወስ ነው፡፡
ከመሬት በታች በሚወጣ እና ከላይ በሚዘንብ ዝናብ ቪላ አልፋ በጣም ተጎድቶ ነበር፤ አሁን ላይ ግን ከውጭ ሀገራትም ይሁን ከሀገር ውስጥ የአርቲስቱን ሥራዎች እየተመለከቱ ባለሙያዎች ትምህርት ለመውሰድ በሚችሉበት ደረጃ ጥገናው ተደርጓል ነው የተባለው፡፡
እንደ ሙዚየም የሚደራጅ በመሆኑ ጊዜ እንደወሰደም ነው የተገለጸው፡፡
የእድሳቱ ሥራ ተጠናቆ የርክክብ እና ቅርሶችን በቦታቸው የመመለስ ሥራዎች ብቻ ቀርቷል ሲሉም የብሄራዊ ሙዚየም መሪ ስራ አስፈጻሚ አቶ አንዷለም ግርማይ ለአሐዱ ተናግረዋል፡፡
"የእድሳቱ ሥራ ጥንቃቄዎችን የሚጠይቅ ነበር" ያሉት አቶ እንዷለም፤ የርክክብ ሥራዎች ሲጠናቀቁ ቪላ አልፋን በ2018 እስከ ሚያዚያ ወር ለእይታ ክፍት ለማድረግ ታስቧል ነው ያሉት፡፡
የእድሳት ሥራው 65 ሚሊየን ብር እንዳስወጣ ከዚህ በፊት የወጡ መረጃዎች ያመለክታሉ፡የእድሳት ሥራው በምዕራፎች የተከፋፈለ ነበር ነው የተባለው፡፡
@etconp
❤9👍1🥰1
👉TESTS FOR SAND
💫1. Sieve Analysis Test
⏺Used to determine the particle size distribution of sand. Pass sand through sieves
(4.75 mm to 150 µm). Helps to classify as fine, medium, or coarse.
💫2. Silt Content Test
⏺Determines the percentage of silt or clay in sand.
⏺Mix 50 ml sand with 50 ml water in a cylinder, shake, and settle for 3–4 hours.
⏺Silt should not exceed 8%.
💫3. Bulking of Sand Test
⏺Checks the increase in sand volume due to moisture.
⏺Add small amount of water
and note the volume change. Normal bulking = 10–25%.
💫4. Specific Gravity Test
⏺Determines density ratio of sand compared to water. Ideal specific gravity = 2.6 –2.7.
💫5. Organic Impurities Test
⏺Checks for organic matter or clay.
⏺Mix sand with NaOH solution; brown color indicates impurities.
💫6. Moisture Content Test
⏺Finds the amount of water in sand.
⏺Dry the sample at 110°C and calculate moisture % using weight difference.
💫7. Fineness Modulus Test
⏺Indicates sand quality and gradation.
⏺FM = (Cumulative % retained on sieves) /100. Fine sand = 2.2–2.6, Coarse = 2.6–2.9.
🏷Good quality sand ensures strong and durable concrete.
#MaterialTesting
#SandTesting
#QualityControl
#LabTesting
#SoilAndSand
#BuildingMaterialsTest
#ConstructionTesting
#ConcreteQuality
#SiltContentTest
#SieveAnalysis
@etconp
💫1. Sieve Analysis Test
⏺Used to determine the particle size distribution of sand. Pass sand through sieves
(4.75 mm to 150 µm). Helps to classify as fine, medium, or coarse.
💫2. Silt Content Test
⏺Determines the percentage of silt or clay in sand.
⏺Mix 50 ml sand with 50 ml water in a cylinder, shake, and settle for 3–4 hours.
⏺Silt should not exceed 8%.
💫3. Bulking of Sand Test
⏺Checks the increase in sand volume due to moisture.
⏺Add small amount of water
and note the volume change. Normal bulking = 10–25%.
💫4. Specific Gravity Test
⏺Determines density ratio of sand compared to water. Ideal specific gravity = 2.6 –2.7.
💫5. Organic Impurities Test
⏺Checks for organic matter or clay.
⏺Mix sand with NaOH solution; brown color indicates impurities.
💫6. Moisture Content Test
⏺Finds the amount of water in sand.
⏺Dry the sample at 110°C and calculate moisture % using weight difference.
💫7. Fineness Modulus Test
⏺Indicates sand quality and gradation.
⏺FM = (Cumulative % retained on sieves) /100. Fine sand = 2.2–2.6, Coarse = 2.6–2.9.
🏷Good quality sand ensures strong and durable concrete.
#MaterialTesting
#SandTesting
#QualityControl
#LabTesting
#SoilAndSand
#BuildingMaterialsTest
#ConstructionTesting
#ConcreteQuality
#SiltContentTest
#SieveAnalysis
@etconp
1❤16👍9👏2😱1🙏1
A project has a negative Schedule Performance Index (SPI < 1) and a negative Cost Performance Index (CPI < 1). This indicates:
Anonymous Quiz
18%
A. Project is ahead of schedule and under budget
50%
B. Project is behind schedule and over budget
12%
C. Project is ahead of schedule but over budget
20%
D. Project is behind schedule but under budget
👏11❤2
Which standard covers the specification for Portland cement?
Anonymous Quiz
51%
A) ASTM C150
33%
B) ISO 9001
8%
C) IS 456
9%
D) BS 8110
❤15👏2
Which of the following methods allows for both time-cost trade-off and resource analysis?
Anonymous Quiz
50%
A) Gantt chart
18%
B) Line of Balance
22%
C) Time-Scaled Network
11%
D) Precedence Diagramming Method
👌6❤5👍1
What is the value of minimum nominal clear cover for slab?
Anonymous Quiz
54%
15
17%
20
26%
25
3%
30
🙏11❤4
The propagation of shear crack in a prestressed concrete member depends on :
Anonymous Quiz
18%
Tensile reinforcement
23%
Compression reinforcement
47%
Shear reinforcement
12%
Shape of the cross section of beam
👏5❤3
What is the loading rate used in compressive strength test?
Anonymous Quiz
23%
14 N/mm² per hour
52%
14 N/mm² per minute
14%
Both a and b
10%
None of the above
❤8
What is the total percentage of aggregates in concrete in terms of volume?
Anonymous Quiz
25%
65%-80%
5%
90%
59%
60%-75%
12%
40%
👌5❤4
If the foundation of the structure is to be divided into two or more independent units, the ___ may be provided to take care of unequal settlement.
Anonymous Quiz
21%
Slip joints
52%
Strap joints
17%
Base plate
10%
Joists
❤4🎉2
Which of the following pavement is capable of resisting small tensile strength?
Anonymous Quiz
41%
Flexible pavement
35%
Rigid pavement
15%
Semi-flexible pavement
9%
All of the mentioned
❤12
Which type of foundation should be adopted in a clayey or lose type of soil which considerably swells and shrinks by variation in the moisture content.
Anonymous Quiz
77%
Raft foundation
10%
Inverted arch foundation
7%
Cantilever foundation
5%
Grillage foundation
❤13
An analysis of the condition of complete bearing capacity failure is usually termed as ___
Anonymous Quiz
27%
General shear failure
21%
Terzaghi’s analysis
28%
Bearing failure
24%
All of the mentioned
👏8❤6
Diagonal tension reinforcement is provided in a beam as
Anonymous Quiz
33%
(A) Longitudinal bars
32%
(B) Bent-up bars
16%
(C) Helical reinforcement
19%
(D) 90° bend at the bends of main bars
👍5❤4
👉Construction Sequence of a Building – Step by Step
1. Site Preparation: Clear vegetation, mark layout, and level site.
2. Excavation: Excavate to required depth for foundation.
3. Foundation: Place footing, concrete, and reinforcement as per design.
4. Plinth Beam: Cast plinth beam and fill up to floor level.
5. Superstructure: Construct columns, beams, and slabs (RCC work).
6. Brickwork: Build walls between columns for rooms and partitions.
7. Lintel & Roof: Cast lintel and roof slab; apply waterproofing.
8. Plastering: Apply internal and external plaster for smooth surface.
9. Flooring: Lay tiles, marble, or granite flooring.
10. Doors & Windows: Fix frames and shutters properly.
11. Electrical & Plumbing: Install wiring, piping, and fixtures.
12. Painting & Finishing: Paint walls, install fittings and polish surfaces.
13. Final Inspection: Quality check and handover to owner.
#CivilEngineering #BuildingConstruction #SiteWork #constructionsite #constructionsequence #Civil
https://t.me/ETCONpWORK
@etconp
1. Site Preparation: Clear vegetation, mark layout, and level site.
2. Excavation: Excavate to required depth for foundation.
3. Foundation: Place footing, concrete, and reinforcement as per design.
4. Plinth Beam: Cast plinth beam and fill up to floor level.
5. Superstructure: Construct columns, beams, and slabs (RCC work).
6. Brickwork: Build walls between columns for rooms and partitions.
7. Lintel & Roof: Cast lintel and roof slab; apply waterproofing.
8. Plastering: Apply internal and external plaster for smooth surface.
9. Flooring: Lay tiles, marble, or granite flooring.
10. Doors & Windows: Fix frames and shutters properly.
11. Electrical & Plumbing: Install wiring, piping, and fixtures.
12. Painting & Finishing: Paint walls, install fittings and polish surfaces.
13. Final Inspection: Quality check and handover to owner.
#CivilEngineering #BuildingConstruction #SiteWork #constructionsite #constructionsequence #Civil
https://t.me/ETCONpWORK
@etconp
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
❤17👏3
👉WHAT ARE PURPOSE OF REINFORCEMENT RIBS?
🚧These ribs are intentionally formed during manufacturing to improve the bond between the steel reinforcement and the surrounding concrete.
💫Those are ribs (deformations) on the reinforcement bar, designed to enhance bond and prevent slippage in reinforced concrete.
#ConstructionInsights #ReinforcementBars #CivilEngineering #StructuralDesign #ConcreteTechnology #SiteKnowledge #BuildingConstruction #EngineeringEducation #ConstructionQAQC #RebarDetails #StructuralIntegrity #ConcreteBond #ConstructionMaterials
@etconp
🚧These ribs are intentionally formed during manufacturing to improve the bond between the steel reinforcement and the surrounding concrete.
💫Those are ribs (deformations) on the reinforcement bar, designed to enhance bond and prevent slippage in reinforced concrete.
#ConstructionInsights #ReinforcementBars #CivilEngineering #StructuralDesign #ConcreteTechnology #SiteKnowledge #BuildingConstruction #EngineeringEducation #ConstructionQAQC #RebarDetails #StructuralIntegrity #ConcreteBond #ConstructionMaterials
@etconp
❤7🥰2
👉የ Building Construction ኮሌጅ የመጀመሪያዎቹ ምሩቃን ህዳር 1952 ዓ.ም
💫የተያያዙት ምስሎች በአዲስ አበባ ህንፃ ኮሌጅ ምረቃ ላይ የተነሱ ናቸው።
⏺ዋና እንግዶች ንጉሠ ነገሥት ቀዳማዊ ኃይለ ሥላሴ እና ልዑል በርትል ከስዊድን ነበሩ።
🏷በዚህ ቀን በህዳር 1952 ዓም (November 1959) የመጀመሪያ ተማሪዎች ዲግሪያቸውን አግኝተዋል።
⏺ይህ ተቋም በ1954 እኤአ የተመሰረተው በኢትዮጵያ እና በስዊድን መንግስታት መካከል በተደረገው የሁለትዮሽ ስምምነት ነው።
⏺እ.ኤ.አ. በ 1955 የተጀመረው የመጀመሪያ የትምህርት መርሃ ግብር በህንፃ ኢንጂነሪንግ ውስጥ የሶስት ዓመት የዲፕሎማ መርሃ ግብር ለመስጠት ነበር።
⏺በ እ.ኤ.አ. 1957/58 የትምህርት ዘመን ማጠናቀቂያ ላይ ስልጠናው ወደ አራት አመት መርሃ ግብር በማደግ በ Bsc በ ህንፃ ምህንድስና ዲግሪ መስጠት ጀመረ።
https://www.flickr.com/photos/73738739@N03/albums/72157628794132559/
Via አብዱል አዚዝ
@etconp
💫የተያያዙት ምስሎች በአዲስ አበባ ህንፃ ኮሌጅ ምረቃ ላይ የተነሱ ናቸው።
⏺ዋና እንግዶች ንጉሠ ነገሥት ቀዳማዊ ኃይለ ሥላሴ እና ልዑል በርትል ከስዊድን ነበሩ።
🏷በዚህ ቀን በህዳር 1952 ዓም (November 1959) የመጀመሪያ ተማሪዎች ዲግሪያቸውን አግኝተዋል።
⏺ይህ ተቋም በ1954 እኤአ የተመሰረተው በኢትዮጵያ እና በስዊድን መንግስታት መካከል በተደረገው የሁለትዮሽ ስምምነት ነው።
⏺እ.ኤ.አ. በ 1955 የተጀመረው የመጀመሪያ የትምህርት መርሃ ግብር በህንፃ ኢንጂነሪንግ ውስጥ የሶስት ዓመት የዲፕሎማ መርሃ ግብር ለመስጠት ነበር።
⏺በ እ.ኤ.አ. 1957/58 የትምህርት ዘመን ማጠናቀቂያ ላይ ስልጠናው ወደ አራት አመት መርሃ ግብር በማደግ በ Bsc በ ህንፃ ምህንድስና ዲግሪ መስጠት ጀመረ።
https://www.flickr.com/photos/73738739@N03/albums/72157628794132559/
Via አብዱል አዚዝ
@etconp
Flickr
Building College inauguration
These pictures are from the inauguration of Building College, Addis Abeba.
The main guests were emperor Haile Selassie and Prince Bertil, from Sweden.
The first class of students got their degree on this day.
The main guests were emperor Haile Selassie and Prince Bertil, from Sweden.
The first class of students got their degree on this day.
❤10