Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.22K links
๐Ÿ”จ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

๐Ÿ“จ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
#Estimation #civil_engineering
WHAT IS PLOT AREA, CARPET AREA, BUILT UP AREA, SUPER BUILT UP AREA & SETBACK AREA???

PLOT AREA:

---Plot area commonly known as site area is a piece of land enclosed by definite boundaries. The mean horizontal distance between the front and rear site boundaries is known as depth of the plot area.

BUILT UP AREA OR PLINTH AREA:

Built up area is the total covered area measured at the floor level of the basement or of any storey. That means the area covered by a typical building or flat. It is also known as plinth area.

Areas included in built-up area:

Bedrooms, living room, hall, balcony, kitchen, bathroom, utility area, shafts, staircase, terrace, verandah, Wall thickness.

SUPER BUILT UP AREA:

The built-up area plus common proportionate areas such as swimming pool, garden, park, gym, playground etc is known as super built-up area.

Areas included in super built-up area:

Swimming pool, garden, park, gym, playground, clubhouse, and other amenities.

CARPET AREA:

Carpet area is the area excluding the walls of built-up area. In simple words, it is the internal space within the walls which you can actually use. Usually, carpet area is around 70 -90 % of the built-up area

SETBACK AREA:

The area on all sides of the plot boundaries laid down by the local municipal authority beyond which nothing can be constructed toward the plot boundary is known as setback area.

The line usually parallel to the plot area on each side is call setback line. This area helps a building to get more daylight and fresh air to the street level.
@ETCONP
Forwarded from Ethio Construction Engineering (Yonathan)
Let us say you are a site enginner for a given site. your structural plan drawing instruct you to place a dia 20 reinforcement bar c/c 15cm, but dia 20 bar is not available in the market because of some reasons. what would you do if you can't get it in the market?
Discuss @cotmp

#siteengineers #civil #reinforcment
@etconp
#Update
#AutoCAD_&_safe_softwares

โœ…#Starts #Saturday 6:30_8:30 (lt
And 3:30_5:30 (lt) respectively

โœ…#From August 12 _September 10

#Etabs_and_sap_softwares
#Starts Monday

โœ…August 14 _ September 10

๐Ÿ‘ฉโ€๐Ÿฆฝ๐Ÿ‘ฉโ€๐Ÿฆฏ๐Ÿƒ๐Ÿƒโ€โ™€Come and learn

แ‹ซแˆ‰แ‰ แ‰ต แ‰ฆแ‰ณ แˆ†แАแ‹ แˆˆแˆ˜แˆ˜แ‹แŒˆแ‰ฅ ๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡

https://forms.gle/PavhxRBtXMfNx3GS7

For more information contact us
๐Ÿ‘‰  0993749494
@YEHAEngineering


#training #traininginstitute #structuraldesign #engineering #engineeringsoftware #autocad #civilsoftwaretraining #etabs #constructionsoftware #civil

Join us ๐Ÿ‘‰ https://t.me/yeha_engineering 

https://www.facebook.com/YEHAENGINEERING/

๐Ÿ“ @แˆแ‹ฐแ‰ณ แˆ˜แˆญแŠซแ‰ถ แˆ…แŠ•แƒ 6แŠ› แŽแ‰… #644

YEHA Engineering | Interior | Training
๐Ÿ‘2
#October_class_schedule
๐Ÿช‘๐Ÿ›‹  #Limited_sets_left

๐Ÿ‘‰ #AutoCAD__Primavera_&_Etabs software_class
#Starts October 14

๐Ÿ‘‰ #Ms_project software_class
#Starts October 16

แ‹จแ‰€แˆฉแŠ• แ‰ฆแ‰ณแ‹Žแ‰ฝ แ‹แˆตแŠ• แ‰ แˆ˜แˆ†แŠ“แ‰ธแ‹ แ‰€แ‹ตแˆ˜แ‹ แ‹ญแˆ˜แ‹แŒˆแ‰ก

๐Ÿ‘ฉโ€๐Ÿฆฝ๐Ÿ‘ฉโ€๐Ÿฆฏ๐Ÿƒ๐Ÿƒโ€โ™€Come and learn

แ‹ซแˆ‰แ‰ แ‰ต แ‰ฆแ‰ณ แˆ†แАแ‹ แˆˆแˆ˜แˆ˜แ‹แŒˆแ‰ฅ ๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡

https://forms.gle/iHS7FZhUUU9aqpS98

For more information contact us
๐Ÿ‘‰  0993749494
@YEHAEngineering


#training #traininginstitute #structuraldesign #engineering #engineeringsoftware #autocad #civilsoftwaretraining #etabs #constructionsoftware #civil


แ‹ญแŠจแ‰ฐแˆ‰แŠ•๐Ÿ‘‰ Telegram | Instagram | Facebook | LinkedIn | Twitter | Tumblr

๐Ÿ“ @แˆแ‹ฐแ‰ณ แˆ˜แˆญแŠซแ‰ถ แˆ…แŠ•แƒ 6แŠ› แŽแ‰… #644

YEHA Engineering | Interior | Training
๐Ÿ‘4โค2
# 1 แ‰€แŠ• แ‰ฅแ‰ป แ‰€แˆจ๐Ÿ˜Š๐Ÿ˜Š
แАแŒˆ แ‰…แ‹ณแˆœ แ‹ญแŒ€แˆแˆซแˆ (แˆ€แˆแˆŒ _13)

Price
Ms_project  3000    2200 birr๐Ÿ˜ฑ
Primavera    2800    2300๐Ÿ˜ฑ
Auto_CAD   4200
    2000๐Ÿ˜ฑ
ETABS          2800    2100๐Ÿ˜ฑ


๐Ÿ‘ฉโ€๐Ÿฆฝ๐Ÿ‘ฉโ€๐Ÿฆฏ๐Ÿƒ๐Ÿƒโ€โ™€Come and learn

For more information contact us
๐Ÿ‘‰  0993749494
@YEHAEngineering
๐ŸŒ http://yehaengineeringplc.com

#training #traininginstitute #structuraldesign #engineering #engineeringsoftware #autocad #civilsoftwaretraining #etabs #constructionsoftware #civil


แ‹ญแŠจแ‰ฐแˆ‰แŠ•๐Ÿ‘‰ Telegram | Instagram | Facebook | LinkedIn | Twitter | Tumblr


#Address:- Mexico  around st. lideta, แŒแ‹›แŠญ แ‹จแŒˆแ‰ แ‹ซ แˆ›แ‹•แŠจแˆ 7th floor, #701

"Let's walk what we talk!"
๐Ÿ‘4๐Ÿ‘Œ4โค2
๐Ÿ‘‰Types of Culverts

๐Ÿšง1.Pipe Culvert

โบCircular, Elliptical, or Pipe Arch shape. Made of concrete, steel, or PVC. Used for small streams or drainage under roads.

โบEasy to install and cost-effective.

๐Ÿšง2.Box Culvert

โบRectangular or square in shape, made of RCC.

โบUsed for large discharges and urban drainage.

โบCan carry road traffic directly above.

๐Ÿšง3.Arch Culvert

โบArch-shaped structure made of stone masonry, brick, or RCC.

โบUsed for moderate flow and offers aesthetic appeal.

๐Ÿšง4.Slab Culvert

โบRCC slab over masonry or concrete abutments.

โบUsed for small spans (up to 3 m).

โบSimple and economical for short crossings.

๐Ÿšง5.Bridge Culvert

โบCombination of bridge and culvert structure.

โบUsed for large spans and heavy flow areas.

โบActs both as a bridge and a culvert.

๐Ÿšง6.Pipe Arch Culvert

โบArch-like pipe with a wide bottom, used when headroom is limited but wide flow is needed.

โบBetter hydraulic efficiency than circular pipes.

๐Ÿšง7.Scupper Culvert

โบUsed to drain water from bridge decks or roads.

โบUsually small openings along bridge sides.

#CulvertDesign #CivilEngineering #BridgeConstruction #RoadDrainage #PipeCulvert #BoxCulvert #ArchCulvert #SlabCulvert #BridgeCulvert #ConstructionTechnology #HydraulicStructure #WaterFlowControl #InfrastructureDesign #EngineeringStudy #sitework #civil #civilservice #civilrights #civilengineering

@etconp
โค10๐Ÿ‘1
๐Ÿ‘‰Construction Sequence of a Building โ€“ Step by Step

1. Site Preparation: Clear vegetation, mark layout, and level site.

2. Excavation: Excavate to required depth for foundation.

3. Foundation: Place footing, concrete, and reinforcement as per design.

4. Plinth Beam: Cast plinth beam and fill up to floor level.

5. Superstructure: Construct columns, beams, and slabs (RCC work).

6. Brickwork: Build walls between columns for rooms and partitions.

7. Lintel & Roof: Cast lintel and roof slab; apply waterproofing.

8. Plastering: Apply internal and external plaster for smooth surface.

9. Flooring: Lay tiles, marble, or granite flooring.

10. Doors & Windows: Fix frames and shutters properly.

11. Electrical & Plumbing: Install wiring, piping, and fixtures.

12. Painting & Finishing: Paint walls, install fittings and polish surfaces.

13. Final Inspection: Quality check and handover to owner.

#CivilEngineering #BuildingConstruction #SiteWork #constructionsite #constructionsequence #Civil

https://t.me/ETCONpWORK

@etconp
โค17๐Ÿ‘3
๐Ÿ‘‰How to Calculate Number of Floor Tiles

1. Measure Room Dimensions

- Example: Length = 20 ft, Width = 20 ft
- Total area = 400 sq ft

2. Measure Tile Size

- Example: 60 cm ร— 60 cm
- Area of one tile = 3.875 sq ft

3. Calculate Tiles Needed

- Divide total floor area by tile area
- Result โ‰ˆ 104 tiles

4. Final Result
Youโ€™ll need around 104 tiles to cover the floor.

๐ŸทAlways add 5โ€“10% extra for wastage and cutting.

๐Ÿ“Œ Viral Caption Idea
โ€œMeasure smart, tile right! ๐Ÿงฑโœจ Accurate tile calculation saves money, time, and effort.

#construction
#civil #building #civilconstruction
#structure
#civilengineer
โค9