Ethio Construction Engineering
https://youtu.be/sCk9f6iFN_s
YouTube
🚀 ETABS Full Course 2026 – Part 17 | ከጀማሪ እስከ Advanced | ETABS Tutorial በአማርኛ 🏗️📐
🚀 ETABS Full Course – Part 17 | Structural Design & Analysis Tutorial
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 17, we continue the ETABS workflow…
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 17, we continue the ETABS workflow…
❤3🥰3👏1
👉የግድብ ምህንድስና (Dam Engineering) ምንድን ነው?
☄የግድብ ምህንድስና የውሃ ሀብትን ለማከማቸት፣ ለመቆጣጠርና ለተለያዩ ዓላማዎች ለመጠቀም ግድቦችን ማጥናት፣ መንደፍ፣ መገንባት፣ መከታተልና ማስተዳደር የሚመለከት የምህንድስና ዘርፍ ነው።
🔹 የግድብ ምህንድስና ዋና ዋና የሥራ ዘርፎች፦
🌧️ Hydrology – የዝናብ፣ የወንዝ ፍሰትና የጎርፍ ጥናት
💧 Hydraulics – የውሃ ፍሰትና ግፊት ትንተና
🪨 Geotechnical Engineering – የመሠረት፣ የአፈርና የድንጋይ ጥናት
🏗️ Structural Engineering – የግድቡን ጥንካሬና መረጋጋት ዲዛይን
🚧 Construction Engineering – የግንባታ ሂደትና ጥራት ቁጥጥር
🛡️ Dam Safety – የግድቡን ደህንነትና አፈጻጸም መከታተል
🎯 ግድቦች ለምን ይገነባሉ?
💧 ለመጠጥ ውሃ
🌾 ለመስኖ
⚡ ለኤሌክትሪክ ሀይል ማመንጨት
🌊 የጎርፍ ቁጥጥር
🏭 ለኢንዱስትሪ ውሃ
🐟 የውሃ ሀብት አስተዳደር
🌟በአጭሩ፣ Dam Engineering ማለት ግድብን መገንባት ብቻ ሳይሆን፣ ከቦታ ጥናት → ዲዛይን → ግንባታ → አሠራር → ጥገና → ደህንነት ድረስ ያለውን ሙሉ ሂደት የሚመለከት ሰፊ የምህንድስና ዘርፍ ነው።
━━━━━━━━━━━━━━
📌 ተጨማሪ ዝርዝር መረጃዎችን እና የሳምንቱን የኮንስትራክሽን ዜናዎች ለማግኘት የፌስቡክ ገፃችን ይጎብኙ👇
https://www.facebook.com/profile.php?id=61592085774934
@etconp
☄የግድብ ምህንድስና የውሃ ሀብትን ለማከማቸት፣ ለመቆጣጠርና ለተለያዩ ዓላማዎች ለመጠቀም ግድቦችን ማጥናት፣ መንደፍ፣ መገንባት፣ መከታተልና ማስተዳደር የሚመለከት የምህንድስና ዘርፍ ነው።
🔹 የግድብ ምህንድስና ዋና ዋና የሥራ ዘርፎች፦
🌧️ Hydrology – የዝናብ፣ የወንዝ ፍሰትና የጎርፍ ጥናት
💧 Hydraulics – የውሃ ፍሰትና ግፊት ትንተና
🪨 Geotechnical Engineering – የመሠረት፣ የአፈርና የድንጋይ ጥናት
🏗️ Structural Engineering – የግድቡን ጥንካሬና መረጋጋት ዲዛይን
🚧 Construction Engineering – የግንባታ ሂደትና ጥራት ቁጥጥር
🛡️ Dam Safety – የግድቡን ደህንነትና አፈጻጸም መከታተል
🎯 ግድቦች ለምን ይገነባሉ?
💧 ለመጠጥ ውሃ
🌾 ለመስኖ
⚡ ለኤሌክትሪክ ሀይል ማመንጨት
🌊 የጎርፍ ቁጥጥር
🏭 ለኢንዱስትሪ ውሃ
🐟 የውሃ ሀብት አስተዳደር
🌟በአጭሩ፣ Dam Engineering ማለት ግድብን መገንባት ብቻ ሳይሆን፣ ከቦታ ጥናት → ዲዛይን → ግንባታ → አሠራር → ጥገና → ደህንነት ድረስ ያለውን ሙሉ ሂደት የሚመለከት ሰፊ የምህንድስና ዘርፍ ነው።
━━━━━━━━━━━━━━
📌 ተጨማሪ ዝርዝር መረጃዎችን እና የሳምንቱን የኮንስትራክሽን ዜናዎች ለማግኘት የፌስቡክ ገፃችን ይጎብኙ👇
https://www.facebook.com/profile.php?id=61592085774934
@etconp
Facebook
Ethio Construction Engineering - ETCONp | Addis Ababa
Ethio Construction Engineering - ETCONp, Addis Ababa. 715 followers · 49 talking about this. World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and...
Latest updates, tips, and tutorials on building, civil engineering, and...
❤6🥰1
🏗️ለኢንጅነሮች | 60 m³ Concrete እንዴት እንሰላለን?
🔆አንድ Client እንዲህ ቢልዎት፦
**“60 m³ የሚሆን የኮንክሪት ሥራ አለኝ። Mix Ratio = 1:2:3 ነው።
ስንት ሲሚንቶ፣ አሸዋ እና ጠጠር እንደሚያስፈልገኝ በዝርዝር አስላልኝ።
Dry Volume Factor = 1.54።”
እንደ Engineer እንዴት እንሰላለን? 👇
⸻
🔹 STEP 1 — Given Data
የተሰጠን፦
• Wet concrete volume = 60 m³
• Mix ratio = 1 : 2 : 3
• Dry volume factor = 1.54
Total proportion:
1 + 2 + 3 = 6 parts
⸻
🔹 STEP 2 — Dry Volume
Concrete ሲዘጋጅ የaggregate ክፍተቶችን ለመሙላት እና በmixing ሂደት የሚፈጠረውን volume change ለማስተካከል dry material volume ከfinished concrete volume ይበልጣል።
ስለዚህ፦
Dry volume = Wet volume × 1.54
= 60 × 1.54
= 92.40 m³
⸻
🔹 STEP 3 — Cement
Cement = 1 part out of 6 parts
Cement volume
= 92.40 × 1/6
= 15.40 m³
የcement density እንደ 1400 kg/m³ ብንወስድ፦
Cement weight
= 15.40 × 1400
= 21,560 kg
= 21.56 tonnes
= 215.6 quintals
50 kg/bag ብንወስድ፦
21,560 ÷ 50
= 431.2 bags
👉 ስለዚህ በtheoretical calculation ≈ 432 bags ሲሚንቶ ያስፈልጋል።
⸻
🔹 STEP 4 — Sand
Sand = 2 parts out of 6
Sand volume
= 92.40 × 2/6
= 30.80 m³
👉 Sand ≈ 30.80 m³
⸻
🔹 STEP 5 — Coarse Aggregate
Coarse aggregate = 3 parts out of 6
Aggregate volume
= 92.40 × 3/6
= 46.20 m³
👉 Coarse aggregate ≈ 46.20 m³
⸻
📌 FINAL MATERIAL SUMMARY
ለ 60 m³ wet concrete እና 1:2:3 nominal mix፦
Material Calculated Quantity
🧱 Cement 21,560 kg
🧱 Cement ≈ 432 bags @ 50 kg
🏖️ Sand 30.80 m³
🪨 Coarse Aggregate 46.20 m³
🏗️ Total dry volume 92.40 m³
⸻
⚠️ አስፈላጊ ENGINEERING NOTE
❌ ትልቁ ስህተት፦
“1:2:3 ከሆነ W/C = 0.5 እንወስዳለን” ብሎ ውሃን በቀጥታ መወሰን ትክክል አይደለም።
የwater requirement በሚከተሉት ይወሰናል፦
• Required workability/slump
• Water-cement ratio
• Cement type
• Aggregate size and grading
• Aggregate moisture condition
• Absorption
• Temperature
• Admixture/superplasticizer
• Required concrete strength
• Exposure condition
ስለዚህ W/C ratio ከmix design በፊት በግምት መውሰድ የstructural concrete design ላይ አደገኛ ነው።
⸻
🚨 ሌላ አስፈላጊ ነጥብ
Curing water ≠ Mixing water
በconcrete mixing የሚጠቀሙት ውሃ እና ለcuring የሚያስፈልገው ውሃ ተመሳሳይ calculation አይደሉም።
ስለዚህ፦
❌ “60 m³ × 0.1285 = 7.71 m³፣ ስለዚህ 10 m³ water ያስፈልጋል”
ብሎ መደምደም professional mix-design calculation አይደለም።
የmixing water በapproved mix design መሠረት መወሰን አለበት፤ curing water ደግሞ በcuring method፣ surface area፣ duration እና site condition ይለያያል።
⸻
🧠 ENGINEER’S GOLDEN RULE
Nominal Mix ≠ Mix Design
1:2:3 እንደ ቀላል site estimation ሊያገለግል ይችላል፤ ግን structural concrete ለማምረት approved concrete mix design እና required strength/workability መሠረት ማድረግ ይገባል።
እንዲሁም 1.54 እዚህ ላይ የተወሰደ የdry-volume factor ነው፤ ለሁሉም concrete mix በራስ-ሰር ቋሚ የሆነ የengineering constant አይደለም።
⸻
🔥 CHALLENGE FOR ENGINEERS
60 m³ concrete + 1:2:3 mix
ከላይ ባለው calculation መሠረት፦
👉 Cement = ≈432 bags
👉 Sand = 30.8 m³
👉 Coarse aggregate = 46.2 m³
🏛ግን ይህን ተመልከቱ፦
❓ 1:2:3 ማለት በweight ratio ነው ወይስ volume ratio?
❓ 50 kg cement bag ነው?
❓ Sand እርጥብ ነው ወይስ dry?
❓ Aggregate moisture correction ተደርጓል?
❓ የconcrete grade ስንት MPa ነው?
❓ Slump requirement ስንት ነው?
❓ የapproved mix design አለ?
☄እውነተኛ Engineer ስሌቱን ብቻ አይሰራም — የስሌቱን assumptions ይጠይቃል። 🏗️📐
🌟በነገራችን ላይ የ C-25 Concrete Cost Breakdown & Detailed Calculation ከነ Excel እና PDF Note ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a86960fc21e9_etconp
🔆አንድ Client እንዲህ ቢልዎት፦
**“60 m³ የሚሆን የኮንክሪት ሥራ አለኝ። Mix Ratio = 1:2:3 ነው።
ስንት ሲሚንቶ፣ አሸዋ እና ጠጠር እንደሚያስፈልገኝ በዝርዝር አስላልኝ።
Dry Volume Factor = 1.54።”
እንደ Engineer እንዴት እንሰላለን? 👇
⸻
🔹 STEP 1 — Given Data
የተሰጠን፦
• Wet concrete volume = 60 m³
• Mix ratio = 1 : 2 : 3
• Dry volume factor = 1.54
Total proportion:
1 + 2 + 3 = 6 parts
⸻
🔹 STEP 2 — Dry Volume
Concrete ሲዘጋጅ የaggregate ክፍተቶችን ለመሙላት እና በmixing ሂደት የሚፈጠረውን volume change ለማስተካከል dry material volume ከfinished concrete volume ይበልጣል።
ስለዚህ፦
Dry volume = Wet volume × 1.54
= 60 × 1.54
= 92.40 m³
⸻
🔹 STEP 3 — Cement
Cement = 1 part out of 6 parts
Cement volume
= 92.40 × 1/6
= 15.40 m³
የcement density እንደ 1400 kg/m³ ብንወስድ፦
Cement weight
= 15.40 × 1400
= 21,560 kg
= 21.56 tonnes
= 215.6 quintals
50 kg/bag ብንወስድ፦
21,560 ÷ 50
= 431.2 bags
👉 ስለዚህ በtheoretical calculation ≈ 432 bags ሲሚንቶ ያስፈልጋል።
⸻
🔹 STEP 4 — Sand
Sand = 2 parts out of 6
Sand volume
= 92.40 × 2/6
= 30.80 m³
👉 Sand ≈ 30.80 m³
⸻
🔹 STEP 5 — Coarse Aggregate
Coarse aggregate = 3 parts out of 6
Aggregate volume
= 92.40 × 3/6
= 46.20 m³
👉 Coarse aggregate ≈ 46.20 m³
⸻
📌 FINAL MATERIAL SUMMARY
ለ 60 m³ wet concrete እና 1:2:3 nominal mix፦
Material Calculated Quantity
🧱 Cement 21,560 kg
🧱 Cement ≈ 432 bags @ 50 kg
🏖️ Sand 30.80 m³
🪨 Coarse Aggregate 46.20 m³
🏗️ Total dry volume 92.40 m³
⸻
⚠️ አስፈላጊ ENGINEERING NOTE
❌ ትልቁ ስህተት፦
“1:2:3 ከሆነ W/C = 0.5 እንወስዳለን” ብሎ ውሃን በቀጥታ መወሰን ትክክል አይደለም።
የwater requirement በሚከተሉት ይወሰናል፦
• Required workability/slump
• Water-cement ratio
• Cement type
• Aggregate size and grading
• Aggregate moisture condition
• Absorption
• Temperature
• Admixture/superplasticizer
• Required concrete strength
• Exposure condition
ስለዚህ W/C ratio ከmix design በፊት በግምት መውሰድ የstructural concrete design ላይ አደገኛ ነው።
⸻
🚨 ሌላ አስፈላጊ ነጥብ
Curing water ≠ Mixing water
በconcrete mixing የሚጠቀሙት ውሃ እና ለcuring የሚያስፈልገው ውሃ ተመሳሳይ calculation አይደሉም።
ስለዚህ፦
❌ “60 m³ × 0.1285 = 7.71 m³፣ ስለዚህ 10 m³ water ያስፈልጋል”
ብሎ መደምደም professional mix-design calculation አይደለም።
የmixing water በapproved mix design መሠረት መወሰን አለበት፤ curing water ደግሞ በcuring method፣ surface area፣ duration እና site condition ይለያያል።
⸻
🧠 ENGINEER’S GOLDEN RULE
Nominal Mix ≠ Mix Design
1:2:3 እንደ ቀላል site estimation ሊያገለግል ይችላል፤ ግን structural concrete ለማምረት approved concrete mix design እና required strength/workability መሠረት ማድረግ ይገባል።
እንዲሁም 1.54 እዚህ ላይ የተወሰደ የdry-volume factor ነው፤ ለሁሉም concrete mix በራስ-ሰር ቋሚ የሆነ የengineering constant አይደለም።
⸻
🔥 CHALLENGE FOR ENGINEERS
60 m³ concrete + 1:2:3 mix
ከላይ ባለው calculation መሠረት፦
👉 Cement = ≈432 bags
👉 Sand = 30.8 m³
👉 Coarse aggregate = 46.2 m³
🏛ግን ይህን ተመልከቱ፦
❓ 1:2:3 ማለት በweight ratio ነው ወይስ volume ratio?
❓ 50 kg cement bag ነው?
❓ Sand እርጥብ ነው ወይስ dry?
❓ Aggregate moisture correction ተደርጓል?
❓ የconcrete grade ስንት MPa ነው?
❓ Slump requirement ስንት ነው?
❓ የapproved mix design አለ?
☄እውነተኛ Engineer ስሌቱን ብቻ አይሰራም — የስሌቱን assumptions ይጠይቃል። 🏗️📐
🌟በነገራችን ላይ የ C-25 Concrete Cost Breakdown & Detailed Calculation ከነ Excel እና PDF Note ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a86960fc21e9_etconp
❤18👍2🎉2🙏2
👉የ ህንፃ ዲዛይን አዘጋጅታቹ ለማፅደቅ ዲዛይኑ መካተት ያለባቸው የአርክቴክቸራል፣ስትራክቸራል፣ሳኒተሪ እና ኤሌክትሪካል ቼክሊስቶች ከፈለጉ ከታች ባለው ሊንክ ያውርዱ👇
https://ye-buna.com/etconp?ref=product_detail&product=6a76b89233390_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a76b89233390_etconp
Ye-Buna
Ethiopian Building Design Permit Checklist
Complete Architectural, Structural, Electrical & Sanitary… 499 ETB · ★ 2.1 (8 reviews) · 12 sold. Instant download from Ethio Construction Engineering on…
❤4🙏1
👉በስላብ ብረት ዝርጋታ ወቅት የ Cranked (Bent-up) Bars ጥቅም! 🏗️
🌟በምስሉ ላይ እንደምታዩት በስላብ ዝርጋታ ወቅት በቢም (Beam) አቅራቢያ እና በድጋፎች (Supports) አካባቢ ብረቶች ወደ ላይ እንዲታጠፉ (Crank እንዲደረጉ) ይደረጋል።
💡 የ Cranked / Bent-up Bars ዋና ዋና ጥቅሞች፦
1️⃣ የNegative Bending Moment መቋቋም፦ በድጋፎች (Supports) አካባቢ የሚከሰተውን የላዩን የመታጠፍ ግፊት (Negative Moment) ለመቋቋም ያስችላል።
2️⃣ የShear Force መቋቋም፦ በቢም እና በስላብ መገናኛ አካባቢ የሚፈጠረውን የ Shear Stress (የመቁረጥ ሀይል) ለመቀነስ ይረዳል።
3️⃣ ወጪ መቆጠብ፦ ተጨማሪ የብረት ቁራጮችን (Top Extra Bars) ከመጠቀም ይልቅ የታችኛውን ዋና ብረት ወደ ላይ በማጠፍ (Crank በማድረግ) ወጪንና ብረትን መቆጠብ ይቻላል።
🔆አስፈላጊ ማስታወሻ፦ የክራንክ ማዕዘን (Crank Angle) አብዛኛውን ጊዜ 45° (ወይም እንደ ስላቡ ውፍረት 30° - 60°) መሆን አለበት!
👉የ RC ዲዛይን ላይ ሙሉ ቴምፕሌቶች ከፈለጉ ማለትም
⏺Calculation of Design Coefficients
⏺Design of Slabs
⏺Design of Flat Slabs
⏺Design of Beams
⏺Design of Sections Under M & N
⏺Shear Design & Checks
⏺Design of Rectangular Columns
⏺Design of Circular Columns
⏺Design of Isolated Footings
Isolated Footings Under Moment እና ሌሎች👇
https://ye-buna.com/etconp?ref=product_detail&product=6a7bf1e6dcc09_etconp
🌟በምስሉ ላይ እንደምታዩት በስላብ ዝርጋታ ወቅት በቢም (Beam) አቅራቢያ እና በድጋፎች (Supports) አካባቢ ብረቶች ወደ ላይ እንዲታጠፉ (Crank እንዲደረጉ) ይደረጋል።
💡 የ Cranked / Bent-up Bars ዋና ዋና ጥቅሞች፦
1️⃣ የNegative Bending Moment መቋቋም፦ በድጋፎች (Supports) አካባቢ የሚከሰተውን የላዩን የመታጠፍ ግፊት (Negative Moment) ለመቋቋም ያስችላል።
2️⃣ የShear Force መቋቋም፦ በቢም እና በስላብ መገናኛ አካባቢ የሚፈጠረውን የ Shear Stress (የመቁረጥ ሀይል) ለመቀነስ ይረዳል።
3️⃣ ወጪ መቆጠብ፦ ተጨማሪ የብረት ቁራጮችን (Top Extra Bars) ከመጠቀም ይልቅ የታችኛውን ዋና ብረት ወደ ላይ በማጠፍ (Crank በማድረግ) ወጪንና ብረትን መቆጠብ ይቻላል።
🔆አስፈላጊ ማስታወሻ፦ የክራንክ ማዕዘን (Crank Angle) አብዛኛውን ጊዜ 45° (ወይም እንደ ስላቡ ውፍረት 30° - 60°) መሆን አለበት!
👉የ RC ዲዛይን ላይ ሙሉ ቴምፕሌቶች ከፈለጉ ማለትም
⏺Calculation of Design Coefficients
⏺Design of Slabs
⏺Design of Flat Slabs
⏺Design of Beams
⏺Design of Sections Under M & N
⏺Shear Design & Checks
⏺Design of Rectangular Columns
⏺Design of Circular Columns
⏺Design of Isolated Footings
Isolated Footings Under Moment እና ሌሎች👇
https://ye-buna.com/etconp?ref=product_detail&product=6a7bf1e6dcc09_etconp
❤9
RCC Column – Components, Details & Functions
An RCC (Reinforced Cement Concrete) column is a structural compression member designed to transfer loads from slabs and beams safely to the foundation and soil. It combines the strength of concrete in compression with steel reinforcement to provide strength, stability and durability.
🔹 Main Components
1. Vertical Reinforcement (Main Bars)
Longitudinal steel bars carry the primary axial load and also contribute to bending resistance. The number and diameter of bars must be determined from structural design.
2. Stirrups / Ties
Closed reinforcement placed around the main bars. They help:
Restrain the longitudinal bars
Prevent buckling of main bars
Provide confinement to concrete
Maintain the reinforcement cage in position
3. Concrete Cover
The concrete surrounding reinforcement protects the steel against corrosion and fire and provides proper bond between steel and concrete. Cover must comply with the applicable design code and exposure conditions.
4. RCC Footing
The footing transfers the column load safely to the supporting soil. Its dimensions and reinforcement depend on column loads, soil bearing capacity and structural design.
5. Column–Beam Junction
This is a critical structural zone. Proper reinforcement anchorage, continuity, confinement and detailing are essential for effective load transfer.
6. RCC Slab / Beam
Beams and slabs transfer loads to columns, which then transfer the loads toward the foundations.
🔹 Key Functions
✅ Transfers vertical loads safely to the foundation
✅ Resists compression and bending forces
✅ Provides stability to the building frame
✅ Stirrups provide lateral restraint and confinement
✅ Works together with beams and slabs to form the structural system
✅ Proper detailing improves durability and structural performance
🔹 Important Construction Guidelines
Use reinforcement sizes and spacing specified by the structural drawings.
Maintain the required concrete cover.
Ensure proper bar development length, anchorage and lap locations.
Use properly detailed and closed ties/stirrups.
Ensure good-quality concrete, proper vibration and adequate curing.
Check column dimensions, reinforcement and alignment before concreting.
Follow the structural design standard applicable to the project, such as IS 456, ACI 318, Eurocode or AS 3600, as appropriate.
Structural member sizes and reinforcement should not be selected from typical illustrations alone; they must be designed for the actual loads, geometry, materials and site conditions.
🏗️ Key Takeaway
A well-designed RCC column is essential for safely transferring building loads and maintaining the strength and stability of the entire structural frame.
@etconp
An RCC (Reinforced Cement Concrete) column is a structural compression member designed to transfer loads from slabs and beams safely to the foundation and soil. It combines the strength of concrete in compression with steel reinforcement to provide strength, stability and durability.
🔹 Main Components
1. Vertical Reinforcement (Main Bars)
Longitudinal steel bars carry the primary axial load and also contribute to bending resistance. The number and diameter of bars must be determined from structural design.
2. Stirrups / Ties
Closed reinforcement placed around the main bars. They help:
Restrain the longitudinal bars
Prevent buckling of main bars
Provide confinement to concrete
Maintain the reinforcement cage in position
3. Concrete Cover
The concrete surrounding reinforcement protects the steel against corrosion and fire and provides proper bond between steel and concrete. Cover must comply with the applicable design code and exposure conditions.
4. RCC Footing
The footing transfers the column load safely to the supporting soil. Its dimensions and reinforcement depend on column loads, soil bearing capacity and structural design.
5. Column–Beam Junction
This is a critical structural zone. Proper reinforcement anchorage, continuity, confinement and detailing are essential for effective load transfer.
6. RCC Slab / Beam
Beams and slabs transfer loads to columns, which then transfer the loads toward the foundations.
🔹 Key Functions
✅ Transfers vertical loads safely to the foundation
✅ Resists compression and bending forces
✅ Provides stability to the building frame
✅ Stirrups provide lateral restraint and confinement
✅ Works together with beams and slabs to form the structural system
✅ Proper detailing improves durability and structural performance
🔹 Important Construction Guidelines
Use reinforcement sizes and spacing specified by the structural drawings.
Maintain the required concrete cover.
Ensure proper bar development length, anchorage and lap locations.
Use properly detailed and closed ties/stirrups.
Ensure good-quality concrete, proper vibration and adequate curing.
Check column dimensions, reinforcement and alignment before concreting.
Follow the structural design standard applicable to the project, such as IS 456, ACI 318, Eurocode or AS 3600, as appropriate.
Structural member sizes and reinforcement should not be selected from typical illustrations alone; they must be designed for the actual loads, geometry, materials and site conditions.
🏗️ Key Takeaway
A well-designed RCC column is essential for safely transferring building loads and maintaining the strength and stability of the entire structural frame.
@etconp
👍4❤2
Media is too big
VIEW IN TELEGRAM
👉በሀገሪቱ የኮንስትራክሽን ኢንዱስትሪ ዘርፍ እድገት ከፍተኛ ሚና ይጫወታል የተባለዉ አዲስ የፕሮጀክት ፊዚካል አፈጻጸም መለኪያ ስታንዳርድ ከሰሞኑ ይፋ ተደርጓል።
🌟ይህ ስታንዳርድ ለዘርፉ ምንድነዉ? የኢትዮጵያ ኮንስትራክሽን ባለስልጣን ዋና ዳይሬክተር መስፍን ነገዎ በዚህ ዙሪያ ማብራሪያ ሰጥተዋል።
📉ለድርጅታቹ እድገት እና ስራቹ በቀላሉ ማስተዳደር እንድትችሉ የሚያግዝ ሙሉ የ በ EXCEL የተገነባ ሲስተም ፋይል አዘጋጅተንላቹዋል ከታች ባለው ሊንክ በመግባት ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
🌟ይህ ስታንዳርድ ለዘርፉ ምንድነዉ? የኢትዮጵያ ኮንስትራክሽን ባለስልጣን ዋና ዳይሬክተር መስፍን ነገዎ በዚህ ዙሪያ ማብራሪያ ሰጥተዋል።
📉ለድርጅታቹ እድገት እና ስራቹ በቀላሉ ማስተዳደር እንድትችሉ የሚያግዝ ሙሉ የ በ EXCEL የተገነባ ሲስተም ፋይል አዘጋጅተንላቹዋል ከታች ባለው ሊንክ በመግባት ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
❤4🥰2🎉1
👉Drawing እና Specification ቢጋጩ የቱ ያሸንፋል?
Drawing እና Specification ሲጋጩ ብዙ ጊዜ በስፋት የሚያመነጭ ጉዳይ ነው። በFIDIC Red Book Sub‑Clause 1.5 መሠረት የሰነዶች ደረጃ በእርስ በእርሳቸው mutually explanatory እንደሆኑ ይታወቃል፤ ነገር ግን ከፍተኛ የሆነ discrepancy ካለ የSpecification ግዴታ ይሻላል።
ምን ይሆናል? (ምሳሌ)
- ኮንትራክተር በDrawing መሠረት column እንደተገለፀው ይገነባል።
- በInspection ጊዜ Resident Engineer (RE) የSpecification ውስጥ ተጠቃሚ የconcrete cover እሴት እንዳለ ይገልፃል እና ሥራውን ወደ rework ያደርጋል።
የሰነዶች ደረጃ (Sub‑Clause 1.5) ቅደም ተከተል
a. Contract Agreement
b. Letter of Acceptance
c. Letter of Tender
d. Particular Conditions Part A – Contract Data
e. Particular Conditions Part B – Special Provisions
f. General Conditions
g. Specification
h. Drawings
i. Schedules
j. JV Undertaking (ኮንትራክተሩ JV ከሆነ)
k. ሌሎች የኮንትራት ሰነዶች
እንደዚህ ሲሆን Specification (g) በDrawings (h) ላይ ይወሰዳል፤ ስለዚህ ቀጥታ ግጭት ከሆነ Specification ያሸንፋል።
ተጠያቂነትና ሥራ ማስተካከያ
- ሰነዶቹን ከመጋጨታቸው በፊት አብረው መነበብ አለባቸው። አንዱን ብቻ መከተል ይቻለም።
- RE ወይም ኮንትራክተር ማስታወቂያ (Notice) ሲላኩ በSub‑Clause 1.5 መሠረት የችግሩን ክስተት በዝርዝር መግለጽ አለበት።
- RE የNotice መቀበል ወይም ራሱ ካላየ ከፍተኛ ማብራሪያ ወይም መመሪያ ማቅረብ አለበት።
ልምድ ያለው ባለሙያ ምን ይሠራል?
- በግምት ማስተካከያ አይደለም፤ irreversible ስራዎች (ለምሳሌ concrete works) ከጀምሩ በፊት የRE የጽሑፍ ውሳኔ ይጠበቃል።
- ሰው እንዳለው እርሱን የሚገልጽ መደበኛ የNotice ሂደት ይጠቀማል።
በቅርብ ቃል
- የSpecification ዝርዝር ከDrawing በላይ ይባላል። ቀጥታ ግጭት ከሆነ Specification ያሸንፋል።
- ይሁን እንጂ ይህ እንደሚወሰን በSub‑Clause 1.5 የተገለፀውን የሰነዶች ደረጃ መከተል፣ የNotice ሂደት ማካሄድና RE የጽሑፍ ውሳኔ እንደሚጠይቀው ማስፈላጊነት አለ።
ጥያቄ ለተከናወኑ ሰራተኞች
- የኮንትራክት ሰነዶችን አብረው አንቀበሉ፤ አንዱን ብቻ አትጠቀሙ።
- የSpecification እና Drawing ግጭት ካጋጠመ፣ ወዲያውኑ በSub‑Clause 1.5 መሠረት Engineer ወይም RE ለNotice ግልጽ መግለጫ ይላኩ።
- irreversible ስራዎች ከጀምሩ በፊት በRE የጽሑፍ ውሳኔ እንዲኖር ይጠይቁ።
ጨረታ / CTA
ይህ መረጃ ለግንባታ ሰራተኞች፣ ኮንትራክተሮች እና RE የሚረዳ ነው። ለእርስዎ የሚነሱ ጥያቄዎች ካሉ ማነጽ ወይም የተደረገውን ምሳሌ ካለዎት እንዲጋሩ ይጋብዙ።
👉የኮንስትራክሽን ሥራ ውል አዘገጃጀት — ሙያዊ መመሪያ በአማርኛ
🏛የኮንስትራክሽን ሥራ ውል ከመዘጋጀቱ በፊት ሊታወቁና ሊካተቱ የሚገባቸውን ዋና ዋና ጉዳዮች በአማርኛ የሚያብራራ ሙያዊ መመሪያ።
ውል በኮንስትራክሽን ሥራ ውስጥ የባለቤትና የተቋራጭ መብትና ግዴታን በግልጽ ለማስቀመጥ፣ አለመግባባቶችን ለመቀነስ እና የሥራ ሂደቱን በተደራጀ መልኩ ለመመራት አስፈላጊ ነው።
👷 ሲቪልና ኮንስትራክሽን መሐንዲሶች
⚖️ የሕግ ባለሙያዎች
🏗️ ተቋራጮችና አማካሪዎች
📋 ፕሮጀክት ማኔጀሮች
🎓 የኮንስትራክሽን ተማሪዎች የሚጠቅም ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
Drawing እና Specification ሲጋጩ ብዙ ጊዜ በስፋት የሚያመነጭ ጉዳይ ነው። በFIDIC Red Book Sub‑Clause 1.5 መሠረት የሰነዶች ደረጃ በእርስ በእርሳቸው mutually explanatory እንደሆኑ ይታወቃል፤ ነገር ግን ከፍተኛ የሆነ discrepancy ካለ የSpecification ግዴታ ይሻላል።
ምን ይሆናል? (ምሳሌ)
- ኮንትራክተር በDrawing መሠረት column እንደተገለፀው ይገነባል።
- በInspection ጊዜ Resident Engineer (RE) የSpecification ውስጥ ተጠቃሚ የconcrete cover እሴት እንዳለ ይገልፃል እና ሥራውን ወደ rework ያደርጋል።
የሰነዶች ደረጃ (Sub‑Clause 1.5) ቅደም ተከተል
a. Contract Agreement
b. Letter of Acceptance
c. Letter of Tender
d. Particular Conditions Part A – Contract Data
e. Particular Conditions Part B – Special Provisions
f. General Conditions
g. Specification
h. Drawings
i. Schedules
j. JV Undertaking (ኮንትራክተሩ JV ከሆነ)
k. ሌሎች የኮንትራት ሰነዶች
እንደዚህ ሲሆን Specification (g) በDrawings (h) ላይ ይወሰዳል፤ ስለዚህ ቀጥታ ግጭት ከሆነ Specification ያሸንፋል።
ተጠያቂነትና ሥራ ማስተካከያ
- ሰነዶቹን ከመጋጨታቸው በፊት አብረው መነበብ አለባቸው። አንዱን ብቻ መከተል ይቻለም።
- RE ወይም ኮንትራክተር ማስታወቂያ (Notice) ሲላኩ በSub‑Clause 1.5 መሠረት የችግሩን ክስተት በዝርዝር መግለጽ አለበት።
- RE የNotice መቀበል ወይም ራሱ ካላየ ከፍተኛ ማብራሪያ ወይም መመሪያ ማቅረብ አለበት።
ልምድ ያለው ባለሙያ ምን ይሠራል?
- በግምት ማስተካከያ አይደለም፤ irreversible ስራዎች (ለምሳሌ concrete works) ከጀምሩ በፊት የRE የጽሑፍ ውሳኔ ይጠበቃል።
- ሰው እንዳለው እርሱን የሚገልጽ መደበኛ የNotice ሂደት ይጠቀማል።
በቅርብ ቃል
- የSpecification ዝርዝር ከDrawing በላይ ይባላል። ቀጥታ ግጭት ከሆነ Specification ያሸንፋል።
- ይሁን እንጂ ይህ እንደሚወሰን በSub‑Clause 1.5 የተገለፀውን የሰነዶች ደረጃ መከተል፣ የNotice ሂደት ማካሄድና RE የጽሑፍ ውሳኔ እንደሚጠይቀው ማስፈላጊነት አለ።
ጥያቄ ለተከናወኑ ሰራተኞች
- የኮንትራክት ሰነዶችን አብረው አንቀበሉ፤ አንዱን ብቻ አትጠቀሙ።
- የSpecification እና Drawing ግጭት ካጋጠመ፣ ወዲያውኑ በSub‑Clause 1.5 መሠረት Engineer ወይም RE ለNotice ግልጽ መግለጫ ይላኩ።
- irreversible ስራዎች ከጀምሩ በፊት በRE የጽሑፍ ውሳኔ እንዲኖር ይጠይቁ።
ጨረታ / CTA
ይህ መረጃ ለግንባታ ሰራተኞች፣ ኮንትራክተሮች እና RE የሚረዳ ነው። ለእርስዎ የሚነሱ ጥያቄዎች ካሉ ማነጽ ወይም የተደረገውን ምሳሌ ካለዎት እንዲጋሩ ይጋብዙ።
👉የኮንስትራክሽን ሥራ ውል አዘገጃጀት — ሙያዊ መመሪያ በአማርኛ
🏛የኮንስትራክሽን ሥራ ውል ከመዘጋጀቱ በፊት ሊታወቁና ሊካተቱ የሚገባቸውን ዋና ዋና ጉዳዮች በአማርኛ የሚያብራራ ሙያዊ መመሪያ።
ውል በኮንስትራክሽን ሥራ ውስጥ የባለቤትና የተቋራጭ መብትና ግዴታን በግልጽ ለማስቀመጥ፣ አለመግባባቶችን ለመቀነስ እና የሥራ ሂደቱን በተደራጀ መልኩ ለመመራት አስፈላጊ ነው።
👷 ሲቪልና ኮንስትራክሽን መሐንዲሶች
⚖️ የሕግ ባለሙያዎች
🏗️ ተቋራጮችና አማካሪዎች
📋 ፕሮጀክት ማኔጀሮች
🎓 የኮንስትራክሽን ተማሪዎች የሚጠቅም ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
❤12🥰2👏1🎉1😭1
Q. Define Bearing Capacity of Soil. State and explain the factors affecting it.
Definition:
Bearing Capacity of Soil is the maximum load per unit area that the soil can safely support without experiencing shear failure or excessive settlement.
Factors Affecting Bearing Capacity of Soil:
1. Soil Type and Strength
Dense sand and hard clay have higher bearing capacity than loose sand and soft clay.
2. Soil Density
Higher density generally increases the bearing capacity of soil.
3. Moisture Content
Excess water reduces soil strength and decreases bearing capacity.
4. Groundwater Table
A high water table lowers the effective stress in soil, reducing bearing capacity.
5. Depth of Foundation
Bearing capacity generally increases with foundation depth due to greater confinement.
6. Size and Shape of Foundation
Larger and properly shaped foundations distribute loads more effectively.
7. Soil Compaction
Well-compacted soil provides better support and higher bearing capacity.
8. Load Inclination and Eccentricity
Inclined or off-center loads reduce the effective bearing capacity.
9. Drainage Conditions
Poor drainage can weaken soil and decrease its load-carrying capacity.
10. Layering of Soil
Weak layers beneath the foundation can significantly reduce bearing capacity.
Conclusion:
The bearing capacity of soil is a critical factor in foundation design. Proper soil investigation and site assessment are essential to ensure the safety and stability of structures. 🏗️👷♂️
👉መሰረታዊ የ ፋውንዴሽን ኢንጅነሪንግ የምትስረዳ ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱ👇
🌟Foundation Engineering Fundamentals – Complete Introductory Ebook
https://ye-buna.com/etconp?ref=product_detail&product=6a8743a519501_etconp
Definition:
Bearing Capacity of Soil is the maximum load per unit area that the soil can safely support without experiencing shear failure or excessive settlement.
Factors Affecting Bearing Capacity of Soil:
1. Soil Type and Strength
Dense sand and hard clay have higher bearing capacity than loose sand and soft clay.
2. Soil Density
Higher density generally increases the bearing capacity of soil.
3. Moisture Content
Excess water reduces soil strength and decreases bearing capacity.
4. Groundwater Table
A high water table lowers the effective stress in soil, reducing bearing capacity.
5. Depth of Foundation
Bearing capacity generally increases with foundation depth due to greater confinement.
6. Size and Shape of Foundation
Larger and properly shaped foundations distribute loads more effectively.
7. Soil Compaction
Well-compacted soil provides better support and higher bearing capacity.
8. Load Inclination and Eccentricity
Inclined or off-center loads reduce the effective bearing capacity.
9. Drainage Conditions
Poor drainage can weaken soil and decrease its load-carrying capacity.
10. Layering of Soil
Weak layers beneath the foundation can significantly reduce bearing capacity.
Conclusion:
The bearing capacity of soil is a critical factor in foundation design. Proper soil investigation and site assessment are essential to ensure the safety and stability of structures. 🏗️👷♂️
👉መሰረታዊ የ ፋውንዴሽን ኢንጅነሪንግ የምትስረዳ ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱ👇
🌟Foundation Engineering Fundamentals – Complete Introductory Ebook
https://ye-buna.com/etconp?ref=product_detail&product=6a8743a519501_etconp
Ye-Buna
Foundation Engineering — Complete Introduction & Practical Design Guide
Foundation Engineering — Complete Introduction & Practical… 199 ETB · 4 sold. Instant download from Ethio Construction Engineering on Ye-Buna. Pay with…
❤8🥰1🙏1
👉ማስታወቂያ ለማህበር ቤት ተጠባባቂ ምዝገባ
የአዲስ አበባ ቤቶች ልማት እና አስተዳደር ቢሮ በ2005 ዓ.ም የጋራ መኖሪያ ቤት ተመዝግበው በመቆጠብ ላይ ካሉ ቤት ፈላጊዎች ውስጥ በማህበር ተደራጅቶ በጋራ ቤት ለመስራት አቅም እና ፍላጎት ያላቸውን ተመዝጋቢዎች በማህበርአደራጅቶ መሬት በማስረከብ በተለያዩ ሳይቶች ግንባታ እንዲጅምሩ ማድረጉ ይታወቃል፡፡
በመሆኑም ከማህበሩ ውስጥ አባላት በተለያዩ ምክንያት ሲጓደሉ ቢሮው ተጠባባቂዎችን መዝግቦ በማዘጋጀት በሚጓደሉ አባላት ተተኪ አባላት ይመድባል፡፡
በመሆኑም በተጠባባቂነት በመመዝገብ በማህበር ተደራጅቶ ቤት ለመገንባት አቅም እና ፍላጎት ያላችሁ የ2005 ዓ.ም የጋራ መኖሪያ ቤት ተመዝጋቢዎች ብቻ በተዘጋጀው ሲስተም ከታች የተቀመጠውን ሊንክ በመጠቀም ማስታወቂያው ከወጣበት 07/01/2019 ቀን ጀምሮ ባሉት 10 ተከታታይ ቀናቶች ውስጥ መመዝገብ የምትችሉ መሆኑን እናሳውቃለን፡፡
ለመመዝገብ የሚያስፈልጉ መስፈርቶች
1. የ2005 የጋራ መኖሪያ ቤት ተመዝጋቢ የሆኑ እና እየቆጠቡ የሚገኙ፡፡
2. ለቤት ግንባታ የሚውለውን 70 በመቶ ገንዘብ ማህበራቱ እያስገነቡ በሚገኝበት ዋጋ መሰረት ማዋጣት የሚችል እና ቀሪውን 30 በመቶ ቢሮው ባመቻቸው መሰረት ከባንክ ለመበደር ፍቃደኛ የሆኑ፡፡
▶️ማሳሳቢያ:- ምዝገባው የሚደረገው ኦንላይን ብቻ በመሆኑ ቢሮ መምጣት አያስፈልግም (የሞባይል ስልክዎን ተጠቅሞ መመዝገብ ይችላሉ)
የአዲስ አበባ ቤቶች ልማት እና አስተዳደር ቢሮ
የመመዝገቢያ ሊንክ፡- https://forms.gle/3y6E2EmAZSbboRg8A
@etconp
የአዲስ አበባ ቤቶች ልማት እና አስተዳደር ቢሮ በ2005 ዓ.ም የጋራ መኖሪያ ቤት ተመዝግበው በመቆጠብ ላይ ካሉ ቤት ፈላጊዎች ውስጥ በማህበር ተደራጅቶ በጋራ ቤት ለመስራት አቅም እና ፍላጎት ያላቸውን ተመዝጋቢዎች በማህበርአደራጅቶ መሬት በማስረከብ በተለያዩ ሳይቶች ግንባታ እንዲጅምሩ ማድረጉ ይታወቃል፡፡
በመሆኑም ከማህበሩ ውስጥ አባላት በተለያዩ ምክንያት ሲጓደሉ ቢሮው ተጠባባቂዎችን መዝግቦ በማዘጋጀት በሚጓደሉ አባላት ተተኪ አባላት ይመድባል፡፡
በመሆኑም በተጠባባቂነት በመመዝገብ በማህበር ተደራጅቶ ቤት ለመገንባት አቅም እና ፍላጎት ያላችሁ የ2005 ዓ.ም የጋራ መኖሪያ ቤት ተመዝጋቢዎች ብቻ በተዘጋጀው ሲስተም ከታች የተቀመጠውን ሊንክ በመጠቀም ማስታወቂያው ከወጣበት 07/01/2019 ቀን ጀምሮ ባሉት 10 ተከታታይ ቀናቶች ውስጥ መመዝገብ የምትችሉ መሆኑን እናሳውቃለን፡፡
ለመመዝገብ የሚያስፈልጉ መስፈርቶች
1. የ2005 የጋራ መኖሪያ ቤት ተመዝጋቢ የሆኑ እና እየቆጠቡ የሚገኙ፡፡
2. ለቤት ግንባታ የሚውለውን 70 በመቶ ገንዘብ ማህበራቱ እያስገነቡ በሚገኝበት ዋጋ መሰረት ማዋጣት የሚችል እና ቀሪውን 30 በመቶ ቢሮው ባመቻቸው መሰረት ከባንክ ለመበደር ፍቃደኛ የሆኑ፡፡
▶️ማሳሳቢያ:- ምዝገባው የሚደረገው ኦንላይን ብቻ በመሆኑ ቢሮ መምጣት አያስፈልግም (የሞባይል ስልክዎን ተጠቅሞ መመዝገብ ይችላሉ)
የአዲስ አበባ ቤቶች ልማት እና አስተዳደር ቢሮ
የመመዝገቢያ ሊንክ፡- https://forms.gle/3y6E2EmAZSbboRg8A
@etconp
❤9👍1🥰1
#ADVERTISEMENT
ጎጆ Shine የጽዳት አገልግሎት - የንፅህና አጋርዎ!
/ Your trusted cleaning partner./
*ለ መኖሪያ ቤቶች
*ለ ሆቴሎች
*ለ ሬስቶራንቶች
*ለ ካፌዎች
*ለ Guest house
*ለ ሱፐር ማርኬቶች
*ለ ቢሮዎች
*ለ ትምህርት ቤቶች
*ለ ሆስፒታሎች
*ለ construction ሳይቶች
*ለ GYM ቤቶች
*ለ event አዳራሾች ሙሉ የ ቤት ጽዳት አገልግሎት እንሰጣለን።
ቤትዎ ወይም የመስሪያ ቦታዎ ንጹህ፣ ማራኪ እና ምቹ እንዲሆን ይፈልጋሉ? ጎጆ Shine ዘመናዊ በሆኑ ማሽኖች እና በሰለጠኑ ባለሙያዎች ጥራት ያለው የጽዳት አገልግሎት ይሰጥዎታል።
□ የምንሰጣቸው አገልግሎቶች፦
🛋️ የሶፋ እና የ ፍራሽ እጥበት
🧹 የምንጣፍ እጥበት እና የአረቢያን መጅሊስ እጥበት
🏢 የቤት እና የቢሮ ጽዳት
✨ ጥልቅ ጽዳት (Deep Cleaning)
🏗️ ከግንባታ በኋላ ጽዳት
🪟 የመስኮትና መስታወት ጽዳት
🚗 የመኪና እጥበት (Car Wash)
ያሉበት ድረስ መጥተን በታማኝነትና በጥራት እናገለግላለን!
📞 አሁኑኑ ይደውሉልን፦
📱 0986416457
📱 0965635149
📱 0704982721
🔻Website:- http://gojoshine.vercel.app
#የጽዳትአገልግሎት #GojoShine #CleaningService #AddisAbaba #Ethiopia
ጎጆ Shine የጽዳት አገልግሎት - የንፅህና አጋርዎ!
/ Your trusted cleaning partner./
*ለ መኖሪያ ቤቶች
*ለ ሆቴሎች
*ለ ሬስቶራንቶች
*ለ ካፌዎች
*ለ Guest house
*ለ ሱፐር ማርኬቶች
*ለ ቢሮዎች
*ለ ትምህርት ቤቶች
*ለ ሆስፒታሎች
*ለ construction ሳይቶች
*ለ GYM ቤቶች
*ለ event አዳራሾች ሙሉ የ ቤት ጽዳት አገልግሎት እንሰጣለን።
ቤትዎ ወይም የመስሪያ ቦታዎ ንጹህ፣ ማራኪ እና ምቹ እንዲሆን ይፈልጋሉ? ጎጆ Shine ዘመናዊ በሆኑ ማሽኖች እና በሰለጠኑ ባለሙያዎች ጥራት ያለው የጽዳት አገልግሎት ይሰጥዎታል።
□ የምንሰጣቸው አገልግሎቶች፦
🛋️ የሶፋ እና የ ፍራሽ እጥበት
🧹 የምንጣፍ እጥበት እና የአረቢያን መጅሊስ እጥበት
🏢 የቤት እና የቢሮ ጽዳት
✨ ጥልቅ ጽዳት (Deep Cleaning)
🏗️ ከግንባታ በኋላ ጽዳት
🪟 የመስኮትና መስታወት ጽዳት
🚗 የመኪና እጥበት (Car Wash)
ያሉበት ድረስ መጥተን በታማኝነትና በጥራት እናገለግላለን!
📞 አሁኑኑ ይደውሉልን፦
📱 0986416457
📱 0965635149
📱 0704982721
🔻Website:- http://gojoshine.vercel.app
#የጽዳትአገልግሎት #GojoShine #CleaningService #AddisAbaba #Ethiopia
👍7❤3🥰1
👉ስለ C-40 ኮንክሪት ትንሽ እንበላቹ
🔆Grade 40 (M40 / C40) ኮንክሪት High-Strength Concrete ስለሆነ በተለመደው የቁጥር ስብጥር (Nominal Mix) አይዘጋጅም፤ በላቦራቶሪ ጥናትና በክብደት መለኪያ (Mix Design) ነው የሚዘጋጀው።
🌟ሆኖም ግን ለአጠቃላይ መነሻና ለግምት የሚሆኑ መደበኛ ስብጥሮች (Nominal Mix Ratios) የሚከተሉት ናቸው፡
1. የቁጥር ስብጥር (Nominal Mix Ratio) ስብጥር (Cement : Sand : Aggregate): 1 : 1 : 2 ወይም 1 : 1.5 : 2.5
የውሃ መጠን (Water-Cement Ratio): 0.35 - 0.40
ጠቅላላ ድምር (Total Proportion): 4` እስከ 5 ክፍሎች (1 ሲሚንቶ + 1 አሸዋ + 2 ጠጠር)
2. ለ1 cubic meter የሚሆን የቁሳቁስ መጠን (Design Mix Estimate)
በግንባታ ቦታ ላይ በክብደት ወይም በጆንያ ሲሰላ፡ ሲሚንቶ (Cement): 400 - 450 kg (~8 - 9 ጆንያ)
አሸዋ (Fine Aggregate): 600 - 700 kg
ጠጠር (Coarse Aggregate): 1100 - 1200 kg
ውሃ (Water): 160 - 180 ሊትር
አድሚክስቸር (Plasticizer): ጥንካሬውን ለመጨመርና የውሃ መጠን ለመቀነስ ያገለግላል።
⏺ማሳሰቢያ: Grade 40 ኮንክሪት ለትላልቅ ህንፃዎች፣ ድልድዮችና ከፍተኛ ሸክም ለሚሸከሙ ምሰሶዎች (Columns/Beams) የሚውል በመሆኑ፣ እንደተጠቀመው አሸዋና ጠጠር ዓይነት በላቦራቶሪ (Concrete Mix Design) አሰራር መፈተን አለበት።
🏛በነገራችን ላይ ሙሉ የ Quantity Surveying Full Course በቅናሽ ዋጋ በ ኦንላይን መማር ለምትፈልጉ 👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
🔆Grade 40 (M40 / C40) ኮንክሪት High-Strength Concrete ስለሆነ በተለመደው የቁጥር ስብጥር (Nominal Mix) አይዘጋጅም፤ በላቦራቶሪ ጥናትና በክብደት መለኪያ (Mix Design) ነው የሚዘጋጀው።
🌟ሆኖም ግን ለአጠቃላይ መነሻና ለግምት የሚሆኑ መደበኛ ስብጥሮች (Nominal Mix Ratios) የሚከተሉት ናቸው፡
1. የቁጥር ስብጥር (Nominal Mix Ratio) ስብጥር (Cement : Sand : Aggregate): 1 : 1 : 2 ወይም 1 : 1.5 : 2.5
የውሃ መጠን (Water-Cement Ratio): 0.35 - 0.40
ጠቅላላ ድምር (Total Proportion): 4` እስከ 5 ክፍሎች (1 ሲሚንቶ + 1 አሸዋ + 2 ጠጠር)
2. ለ1 cubic meter የሚሆን የቁሳቁስ መጠን (Design Mix Estimate)
በግንባታ ቦታ ላይ በክብደት ወይም በጆንያ ሲሰላ፡ ሲሚንቶ (Cement): 400 - 450 kg (~8 - 9 ጆንያ)
አሸዋ (Fine Aggregate): 600 - 700 kg
ጠጠር (Coarse Aggregate): 1100 - 1200 kg
ውሃ (Water): 160 - 180 ሊትር
አድሚክስቸር (Plasticizer): ጥንካሬውን ለመጨመርና የውሃ መጠን ለመቀነስ ያገለግላል።
⏺ማሳሰቢያ: Grade 40 ኮንክሪት ለትላልቅ ህንፃዎች፣ ድልድዮችና ከፍተኛ ሸክም ለሚሸከሙ ምሰሶዎች (Columns/Beams) የሚውል በመሆኑ፣ እንደተጠቀመው አሸዋና ጠጠር ዓይነት በላቦራቶሪ (Concrete Mix Design) አሰራር መፈተን አለበት።
🏛በነገራችን ላይ ሙሉ የ Quantity Surveying Full Course በቅናሽ ዋጋ በ ኦንላይን መማር ለምትፈልጉ 👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
❤13👍3🥰1
🌉የBridge Design Excel Template ይፈልጋሉ?
🌟የድልድይ ዲዛይንና ስሌት ስራዎን በቀላሉ፣ በፍጥነትና በተደራጀ መልኩ ያከናውኑ።
✅ Bridge Geometry
✅ Deck & Girder Design
✅ Girder Calculations
✅ Bearing Calculations
✅ Automated Excel Calculations የያዘ 👷♂️ለCivil & Structural Engineers፣ Bridge Designers፣ Contractors እና Engineering Students ተስማሚ የሆነ ፋይል ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6aa299412b4e4_etconp
🌟የድልድይ ዲዛይንና ስሌት ስራዎን በቀላሉ፣ በፍጥነትና በተደራጀ መልኩ ያከናውኑ።
✅ Bridge Geometry
✅ Deck & Girder Design
✅ Girder Calculations
✅ Bearing Calculations
✅ Automated Excel Calculations የያዘ 👷♂️ለCivil & Structural Engineers፣ Bridge Designers፣ Contractors እና Engineering Students ተስማሚ የሆነ ፋይል ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6aa299412b4e4_etconp
Ye-Buna
🌉 Bridge Design Excel Template — Professional Engineering Tool
Description Take your bridge design calculations to the… 499 ETB · 3 sold. Instant download from Ethio Construction Engineering on Ye-Buna. Pay with…
❤4🥰1🙏1
👉Delay Justification, Extension of time(EOT) እና የጊዜ ጉዳት መቀጮ/Liquidated damage/:
በኢትዮጵያ ይሁን በዓለም አቀፍ ደረጃ በሚካሄዱ የግንባታ ፕሮጀክቶች (Construction Projects) ላይ በስፋት ስለሚተገበሩት (Delay Justification)፣(Time Extension Request) እና (Liquidated Damages) አተገባበር በመጠኑ ሃሳብ ለመስጠት የተጋጀ አጭር ፅሁፍ ነው፡፡
1ኛ. የፕሮጀክት መዘግየት ምክንያታዊነት ማብራሪያ (Delay Justification)
Contractor የተሰጠውን ስራ በቅድሚያ በውል በተወሰነው ጊዜ ማጠናቀቅ ግዴታ እንዳለበት ግልፅ ነው። ነገር ግን በተለያዩ ምክንያቶች ፕሮጀክቱ በጊዜ ላይጠናቀቅ ይችላል። ስለዚህ ለነዚህ የባከኑ ጊዜዎች አሳማኝ ምክንያቶች በማቅረብ የፕሮጀክቱን ቀሪ ስራዎች ለማጠናቀቅ የሚያስችለውን የጊዜ ማራዘሚያ ለመጠየቅ ይችላል።
🌟ለፕሮጀክት መዘግየት ምክንያቶች
1. አስገዳጅ ሁኔታዎች (Force Majeure):
*ከባድ ዝናብ፣ጎርፍ፣አውሎነፋስና የመሳሰሉ ከቁጥጥር ውጭ የሆኑ ምክንያቶች ናቸው።
2 በተቋራጭ ምክንያት የሚፈጠር መዘግየት:
*በውሉ ዕቅድ መሰረት የግንባታ ሀብቶችን/ማቴሪያል፣የሰው ሀይል፣ ማሽነሪና ባጀት ማቅረብ አለመቻል።
*የስራ አመራር ችግር/ከእቅድ ዝግጅት ችግር፣የማደራጀት ብቃት ማነስ፣የመምራት፣የክትትልና ቁጥጥር ብቃት ከማነስ/
3. በአማካሪ ምክንያት የሚከሰቱ
*ለማፅደቅ ማዘግየት/ዕቅድ፣ዲዛይን፣ሜትዶሎጂ፣ክፍያ... /
4. በአሰሪ ምክንያት የሚከሰቱ
*የክፍያ ማዘግየት፣ ቢሮክራሲ፣ የፍላጎት ለውጥ/Change & Variations.. /፣....
5. ከመሬት በታች ያልተጠበቁ ክስተቶች/Unforseen works/:
*ከመሬት በታች በሚሰራ ቁፋሮ ስራ ወቅት በመጠን ወይም በዓይነት የተለየ ስራ ሲያጋጥም/በውል ያልተጠቀሰ የአፈር ዓይነት/Unpredicted soil strata/፣ ቫኩም ወይም ቮይድ/void/፣ የማያቋርጥ የሚፈልቅ/ምንጭ ውሃ/Underground Water/፣ የደካማ አፈር ጥልቀትና መጠን/over volume of loss soil/፣...
6. በመንግስት የፖሊሲ ለውጥ ምክንያትና
7 የፖለቲካ ጫና፣ጦርነትና ርሃብ
2ኛ. የጊዜ ማራዘሚያ ጥያቄ ስለማቅረብ/EOT/
ሥራ ተቋራጩ ለስራው መዘግየት ምክንያት ናቸው የሚላቸውን ነጥቦች አንድ በአንድ በመጥቀስ፣በማስረጃ በማብራራት ቀሪ ስራዎችን ለማጠናቀቅ የሚያስፈልገውን ተጨማሪ ጊዜ እንዲፈቀድለት ማቅረብ የሚችል ይሆናል።
3ኛ. ለባከነ የግንባታ ጊዜ ''የጊዜ ጉዳት መቀጫ''/Liquidated damage/
ተቋራጩ የውሉን የግንባታ ስራ በውሉ በተቀመጠው የጊዜ ገደብ በወቅቱ ሰርቶ ያላጠናቀቀ እንደሆነ ከውሉ ማጠናቀቂያ ጊዜ/completion date/ በኋላ ግንባታው እስከሚጠናቀቅበት ጊዜ ድረስ ለእያንዳንዱ ቀን ተቋራጩ የግንባታ መዘግየት ምክንያት ለአሰሪው የጊዜ ጉዳት መቀጫ/Liquidated damage/ የመክፈል ሀላፊነት ይኖርበታል፡፡
በኮንስትራክሽን ውል ስለ ጊዜ አቆጣጠር:
-የግንባታ ውል የተደረገበት ቀን/contract signing date/ ፣
-ሞቢላይዜሽን ፔሬድ/mobilization period/፣
-የሳይት መረከቢያ ቀን/site handover/፣
-የስራ መጀመሪያ ቀን/commencement date/ እና
-የስራ ማጠናቀቂያ ቀን/completion date/ የሚሉትን መረዳት የግንባታ የጊዜ የጉዳት መቀጫ/Liquidated damage/ የሚለውን በአግባቡ ለማወቅ ይጠቅማል፡፡
እዚህ ላይ ሊታወቅ የሚገባው ነገር በኮንስትራክሽን ውሉ ላይ የተወሰነውን የስራ ክፍል ከውሉ የማጠናቀቂያ ጊዜ አስቀድሞ ማጠናቀቅ ውል ሊደረግ የሚችልበት እድልም አለ፡፡/Partial completion/ ማለት ነው፡፡የቀን አቆጣጠሩ ከላይ እንደተብራራው የሚሰላ ይሆናል፡፡
**ሌላው ተቋራጩ ወደ መዘግየት ቅጣት እንዲገባ ከመደረጉ አስቀድሞ በአግባቡ መረጋገጥ ያለበት ነገር መሀንዲሱ ለተቋራጩ የጊዜ ማራዘሚያ/Extension of Time / ፈቅዷል ወይስ አልፈቀደም የሚለው ነጥብ ነው፡፡
ምክንያቱም ለተቋራጩ የጊዜ ማራዘሚያ ተፈቅዶለት ከሆነ የግንባታ ማጠናቀቂያ ጊዜውም አብሮ ስለሚራዘምና ቀኑ ስለሚቀየር ነው፡፡
የሀገራችን የህግ ማዕቀፍ በዚህ ረገድ ምን ይላል?
በፍትሀብሄር ህግ አንቀጽ 1887 እስከ 1895 ድረስ የተደነገጉትን መዳሰስ ይጠይቃል፡፡
በፍትሀብሄር ህግ አንቀጽ 1889 ላይ ተዋዋዮች በውላቸው ምናልባት አንደኛው ወገን እንደውሉ ግዴታውን ያልፈጸመ እንደሆነ ወይም አጓድሎ የፈጸመ እንደሆነ ወይም አዘግይቶ የፈጸመ እንደሆነ የሚከፍለውን የመቀጮ መጠን አስቀድመው በውላቸው ለመወሰን እንደሚችሉ በሚፈቅድ መልኩ ተደንግጓል፡፡እዚህ ላይ የውል ግዴታን አዘግይቶ መፈጸም ስለሚያስከትለው ቅጣት የሚዋዋሉት በተለይ የግንባታ ጊዜ የጉዳት መቀጫ/liquidated damage/ የሚመለከት ይሆናል፡፡
የመዘግየት ቅጣት ስምምነት ባለ ጊዜ አሰሪው የውሉ ስራ እንዲፈጸምና የቅጣት ገንዘቡንም ለመቀበል መብት እንደሚኖረው የፍ/ህ/ቁ 1890(2) ይደነግጋል፡፡እንደዚሁም አሰሪው ኪሳራ ባይደርስበት እንኳ የመዘግየት ቅጣት ገንዘቡ ሊከፈለው እንደሚገባ የፍ/ህ/ቁ 1892(1) ይደነግጋል፡፡እንግዲህ ተቋራጩ ግንባታውን በወቅቱ ያላጠናቀቀው አሰሪውን ሆነ ብሎ ለመጉዳት አስቦ ጉልህ በሆነ ቸልተኝነት ወይም በከባድ ጥፋት መሆኑ የተረጋገጠ እንደሆነ አሰሪው በውሉ ከተቀመጠው የቅጣት ገንዘብ በላይ በደረሰበት ትክክለኛ ጉዳት መጠን ልክ ከተቋራጩ ላይ ኪሳራ ለመጠየቅ እንደሚችል የፍ/ህ/ቁ 1892(2) ይደነግጋል፡፡
ሌላው የመዘግየት ቅጣት መጠን በዳኞች ሊቀነስ የሚችልበት እድል ስለመኖሩ የፍ/ህ/ቁ 1893 ይደነግጋል፡፡ይሄውም ተቋራጩ ግዴታውን በከፊል የፈጸመ ሆኖ ሲገኝ ነው፡፡ይህ ማለት ተቋራጩ ባከናወነው ስራ ሁሉ ቅጣት የሚጣልበት አይሆንም ማለት ነው፡፡
በዚህ ረገድ በሲቪል ግንባታ ስራዎች ቋሚ የውል መተዳደሪያ አንቀጽ 47(1) ላይ ተቋራጩ ስራውን በውሉ የማጠናቀቂያ ጊዜ ካላጠናቀቀ ለዘገየበት ለእያንዳንዱ ቀን የውሉን ዋጋ 1/1000 እንደሚከፍል እና ይሄውም አጠቃላይ መጠኑ ከውሉ ዋጋ ከ10% መብለጥ እንደማይችል ይደነግጋል፡፡ሆኖም ግን በከፊል ለተከናወነው ስራ መሀንዲሱ ማረጋገጫ ሰርተፍኬት በሰጠ ጊዜ የቅጣቱ መጠን የሚሰላው ባልተከናወነው ስራ መጠን ዋጋ ላይ በመመስረት ይሆናል ማለት ነው፡፡
በመጨረሻም የመዘግየት ቅጣት በኛ ሀገር ከላይ እንዳየነው እንደቅጣት የሚቆጠርና በህጉ ቅጣቱ እውቅና የሚሰጠው ሲሆን በኮመን ሎው የህግ ስርአት ግን ቅጣት አይደለም፡፡
በኮመን ሎው የጊዜ የጉዳት መቀጫ በአሰሪው ላይ ከደረሰው ጉዳት ጋር እኩል ሆኖ መመዛዘን የሚኖርበት ሲሆን የቅጣት አይነት ተመሳሳይ ባህሪ ካለው ተፈጻሚነት አይኖረውም፡፡
🌟ለተጨማሪ ዓለም አቀፍ እና የሀገር ውስጥ የኮንስትራክሽን መረጃዎች ሌላኛው የቴሌግራም ቻናላችንን ይቀላቀሉ።
https://t.me/ETCONpWORK
በኢትዮጵያ ይሁን በዓለም አቀፍ ደረጃ በሚካሄዱ የግንባታ ፕሮጀክቶች (Construction Projects) ላይ በስፋት ስለሚተገበሩት (Delay Justification)፣(Time Extension Request) እና (Liquidated Damages) አተገባበር በመጠኑ ሃሳብ ለመስጠት የተጋጀ አጭር ፅሁፍ ነው፡፡
1ኛ. የፕሮጀክት መዘግየት ምክንያታዊነት ማብራሪያ (Delay Justification)
Contractor የተሰጠውን ስራ በቅድሚያ በውል በተወሰነው ጊዜ ማጠናቀቅ ግዴታ እንዳለበት ግልፅ ነው። ነገር ግን በተለያዩ ምክንያቶች ፕሮጀክቱ በጊዜ ላይጠናቀቅ ይችላል። ስለዚህ ለነዚህ የባከኑ ጊዜዎች አሳማኝ ምክንያቶች በማቅረብ የፕሮጀክቱን ቀሪ ስራዎች ለማጠናቀቅ የሚያስችለውን የጊዜ ማራዘሚያ ለመጠየቅ ይችላል።
🌟ለፕሮጀክት መዘግየት ምክንያቶች
1. አስገዳጅ ሁኔታዎች (Force Majeure):
*ከባድ ዝናብ፣ጎርፍ፣አውሎነፋስና የመሳሰሉ ከቁጥጥር ውጭ የሆኑ ምክንያቶች ናቸው።
2 በተቋራጭ ምክንያት የሚፈጠር መዘግየት:
*በውሉ ዕቅድ መሰረት የግንባታ ሀብቶችን/ማቴሪያል፣የሰው ሀይል፣ ማሽነሪና ባጀት ማቅረብ አለመቻል።
*የስራ አመራር ችግር/ከእቅድ ዝግጅት ችግር፣የማደራጀት ብቃት ማነስ፣የመምራት፣የክትትልና ቁጥጥር ብቃት ከማነስ/
3. በአማካሪ ምክንያት የሚከሰቱ
*ለማፅደቅ ማዘግየት/ዕቅድ፣ዲዛይን፣ሜትዶሎጂ፣ክፍያ... /
4. በአሰሪ ምክንያት የሚከሰቱ
*የክፍያ ማዘግየት፣ ቢሮክራሲ፣ የፍላጎት ለውጥ/Change & Variations.. /፣....
5. ከመሬት በታች ያልተጠበቁ ክስተቶች/Unforseen works/:
*ከመሬት በታች በሚሰራ ቁፋሮ ስራ ወቅት በመጠን ወይም በዓይነት የተለየ ስራ ሲያጋጥም/በውል ያልተጠቀሰ የአፈር ዓይነት/Unpredicted soil strata/፣ ቫኩም ወይም ቮይድ/void/፣ የማያቋርጥ የሚፈልቅ/ምንጭ ውሃ/Underground Water/፣ የደካማ አፈር ጥልቀትና መጠን/over volume of loss soil/፣...
6. በመንግስት የፖሊሲ ለውጥ ምክንያትና
7 የፖለቲካ ጫና፣ጦርነትና ርሃብ
2ኛ. የጊዜ ማራዘሚያ ጥያቄ ስለማቅረብ/EOT/
ሥራ ተቋራጩ ለስራው መዘግየት ምክንያት ናቸው የሚላቸውን ነጥቦች አንድ በአንድ በመጥቀስ፣በማስረጃ በማብራራት ቀሪ ስራዎችን ለማጠናቀቅ የሚያስፈልገውን ተጨማሪ ጊዜ እንዲፈቀድለት ማቅረብ የሚችል ይሆናል።
3ኛ. ለባከነ የግንባታ ጊዜ ''የጊዜ ጉዳት መቀጫ''/Liquidated damage/
ተቋራጩ የውሉን የግንባታ ስራ በውሉ በተቀመጠው የጊዜ ገደብ በወቅቱ ሰርቶ ያላጠናቀቀ እንደሆነ ከውሉ ማጠናቀቂያ ጊዜ/completion date/ በኋላ ግንባታው እስከሚጠናቀቅበት ጊዜ ድረስ ለእያንዳንዱ ቀን ተቋራጩ የግንባታ መዘግየት ምክንያት ለአሰሪው የጊዜ ጉዳት መቀጫ/Liquidated damage/ የመክፈል ሀላፊነት ይኖርበታል፡፡
በኮንስትራክሽን ውል ስለ ጊዜ አቆጣጠር:
-የግንባታ ውል የተደረገበት ቀን/contract signing date/ ፣
-ሞቢላይዜሽን ፔሬድ/mobilization period/፣
-የሳይት መረከቢያ ቀን/site handover/፣
-የስራ መጀመሪያ ቀን/commencement date/ እና
-የስራ ማጠናቀቂያ ቀን/completion date/ የሚሉትን መረዳት የግንባታ የጊዜ የጉዳት መቀጫ/Liquidated damage/ የሚለውን በአግባቡ ለማወቅ ይጠቅማል፡፡
እዚህ ላይ ሊታወቅ የሚገባው ነገር በኮንስትራክሽን ውሉ ላይ የተወሰነውን የስራ ክፍል ከውሉ የማጠናቀቂያ ጊዜ አስቀድሞ ማጠናቀቅ ውል ሊደረግ የሚችልበት እድልም አለ፡፡/Partial completion/ ማለት ነው፡፡የቀን አቆጣጠሩ ከላይ እንደተብራራው የሚሰላ ይሆናል፡፡
**ሌላው ተቋራጩ ወደ መዘግየት ቅጣት እንዲገባ ከመደረጉ አስቀድሞ በአግባቡ መረጋገጥ ያለበት ነገር መሀንዲሱ ለተቋራጩ የጊዜ ማራዘሚያ/Extension of Time / ፈቅዷል ወይስ አልፈቀደም የሚለው ነጥብ ነው፡፡
ምክንያቱም ለተቋራጩ የጊዜ ማራዘሚያ ተፈቅዶለት ከሆነ የግንባታ ማጠናቀቂያ ጊዜውም አብሮ ስለሚራዘምና ቀኑ ስለሚቀየር ነው፡፡
የሀገራችን የህግ ማዕቀፍ በዚህ ረገድ ምን ይላል?
በፍትሀብሄር ህግ አንቀጽ 1887 እስከ 1895 ድረስ የተደነገጉትን መዳሰስ ይጠይቃል፡፡
በፍትሀብሄር ህግ አንቀጽ 1889 ላይ ተዋዋዮች በውላቸው ምናልባት አንደኛው ወገን እንደውሉ ግዴታውን ያልፈጸመ እንደሆነ ወይም አጓድሎ የፈጸመ እንደሆነ ወይም አዘግይቶ የፈጸመ እንደሆነ የሚከፍለውን የመቀጮ መጠን አስቀድመው በውላቸው ለመወሰን እንደሚችሉ በሚፈቅድ መልኩ ተደንግጓል፡፡እዚህ ላይ የውል ግዴታን አዘግይቶ መፈጸም ስለሚያስከትለው ቅጣት የሚዋዋሉት በተለይ የግንባታ ጊዜ የጉዳት መቀጫ/liquidated damage/ የሚመለከት ይሆናል፡፡
የመዘግየት ቅጣት ስምምነት ባለ ጊዜ አሰሪው የውሉ ስራ እንዲፈጸምና የቅጣት ገንዘቡንም ለመቀበል መብት እንደሚኖረው የፍ/ህ/ቁ 1890(2) ይደነግጋል፡፡እንደዚሁም አሰሪው ኪሳራ ባይደርስበት እንኳ የመዘግየት ቅጣት ገንዘቡ ሊከፈለው እንደሚገባ የፍ/ህ/ቁ 1892(1) ይደነግጋል፡፡እንግዲህ ተቋራጩ ግንባታውን በወቅቱ ያላጠናቀቀው አሰሪውን ሆነ ብሎ ለመጉዳት አስቦ ጉልህ በሆነ ቸልተኝነት ወይም በከባድ ጥፋት መሆኑ የተረጋገጠ እንደሆነ አሰሪው በውሉ ከተቀመጠው የቅጣት ገንዘብ በላይ በደረሰበት ትክክለኛ ጉዳት መጠን ልክ ከተቋራጩ ላይ ኪሳራ ለመጠየቅ እንደሚችል የፍ/ህ/ቁ 1892(2) ይደነግጋል፡፡
ሌላው የመዘግየት ቅጣት መጠን በዳኞች ሊቀነስ የሚችልበት እድል ስለመኖሩ የፍ/ህ/ቁ 1893 ይደነግጋል፡፡ይሄውም ተቋራጩ ግዴታውን በከፊል የፈጸመ ሆኖ ሲገኝ ነው፡፡ይህ ማለት ተቋራጩ ባከናወነው ስራ ሁሉ ቅጣት የሚጣልበት አይሆንም ማለት ነው፡፡
በዚህ ረገድ በሲቪል ግንባታ ስራዎች ቋሚ የውል መተዳደሪያ አንቀጽ 47(1) ላይ ተቋራጩ ስራውን በውሉ የማጠናቀቂያ ጊዜ ካላጠናቀቀ ለዘገየበት ለእያንዳንዱ ቀን የውሉን ዋጋ 1/1000 እንደሚከፍል እና ይሄውም አጠቃላይ መጠኑ ከውሉ ዋጋ ከ10% መብለጥ እንደማይችል ይደነግጋል፡፡ሆኖም ግን በከፊል ለተከናወነው ስራ መሀንዲሱ ማረጋገጫ ሰርተፍኬት በሰጠ ጊዜ የቅጣቱ መጠን የሚሰላው ባልተከናወነው ስራ መጠን ዋጋ ላይ በመመስረት ይሆናል ማለት ነው፡፡
በመጨረሻም የመዘግየት ቅጣት በኛ ሀገር ከላይ እንዳየነው እንደቅጣት የሚቆጠርና በህጉ ቅጣቱ እውቅና የሚሰጠው ሲሆን በኮመን ሎው የህግ ስርአት ግን ቅጣት አይደለም፡፡
በኮመን ሎው የጊዜ የጉዳት መቀጫ በአሰሪው ላይ ከደረሰው ጉዳት ጋር እኩል ሆኖ መመዛዘን የሚኖርበት ሲሆን የቅጣት አይነት ተመሳሳይ ባህሪ ካለው ተፈጻሚነት አይኖረውም፡፡
🌟ለተጨማሪ ዓለም አቀፍ እና የሀገር ውስጥ የኮንስትራክሽን መረጃዎች ሌላኛው የቴሌግራም ቻናላችንን ይቀላቀሉ።
https://t.me/ETCONpWORK
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
❤12👍2🥰1
👉አዲስ ባሁን የገበያ ዋጋ የተሰራ የህንፃ Cost BreakDown Analysis እና BOQ ከፈለጉ ከታች ባለው ሊንክ ያውርዱ👇
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
🙏2🥰1
👉በኮንስትራክሽን ዘርፍ የኳንቲቲ ሰርቬየር ሚና ምንድ ነው?
🏷Quantity surveyor ማናቸውም በግንባታ ዙሪያ ለተካተተ ሥራ የሚያስፈልገውን የቁጥር ብዛት በማስላት ወጪውን ያሰላል፤በእቅድ እና በተዛማጅ ሥራ በዋናነት በግንባታ ወጪ ስሌት ውስጥ ይሳተፋል።
⭐️የ Quantity surveyor ሚና ከዚህ በታች ተዘርዝረዋል፦
1.ዋጋ መገመት
2. ወጪ ማዕቅድ
3. ወጪዎችን ማዘጋጀት, መካፈል እና መተንተን ጨረታዎች እና ኮንትራቶች
4. የግዥ ምክር /Procurement advice
5. የክፍያ መጠየቂያዎችን ማዘጋጀት(BOQ)
6. በጀት የመቆጣጠር
7. የክፍያ መጠየቂያ ደረሰኝ እና የምስክር ወረቀት ዝግጅት
8. የእለት ግምገማ ማድረግ
9. ግጭትን መፍታት/Dispute resolution
10. የአዋጭነት ጥናቶችን በማዘጋጀት
11. የወጪ ቁጥጥር
12. የዋጋ ምህንድስና/Value engineering.
13. በዋጋ ገደቦች እና በጀቶች ላይ ምክር
14. የህይወት ዑደት ወጪ/Whole life cycle costing
15. ለዋስትና ዓላማዎች የሚውል የዋጋ ትመና/Valuation for insurance purposes
16. የፕሮጀክት አስተዳደር
17. በውል ክርክር ላይ ምክር/Advice on contractual disputes
18. የመጨረሻውን መለያ ዝግጅት
19. የሳይት ጉብኝቶች, ግምገማዎች እና ትንበያ ለወደፊት ሥራ
20. የተጠናቀቀ ሥራን መተንተን እና ያመቻቻል ለኮንትራክተሮች ክፍያ
21. መጪውን ሥራ ለኮንትራክተሮች መመደብ/ከእነዚህ በተጨማሪ quantity surveyors በግንባታው በተወሰነ ቦታ ውስጥ ልዩ እንደ ወጪና ምክር ባሉ ኢንዱስትሪ እና ትኩረት ያድርጉ የንብረት ግብር፣ትግበራ ምንጮችን፣ነባር ሕንፃዎችን ለመጠገን.......ወዘተ ስራዎችን ኳንቲቲ ሰርቬየሩ ያስተገብራል።
🏛በነገራችን ላይ ሙሉ የ Quantity Surveying Full Course በቅናሽ ዋጋ በ ኦንላይን መማር ለምትፈልጉ 👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
🏷Quantity surveyor ማናቸውም በግንባታ ዙሪያ ለተካተተ ሥራ የሚያስፈልገውን የቁጥር ብዛት በማስላት ወጪውን ያሰላል፤በእቅድ እና በተዛማጅ ሥራ በዋናነት በግንባታ ወጪ ስሌት ውስጥ ይሳተፋል።
⭐️የ Quantity surveyor ሚና ከዚህ በታች ተዘርዝረዋል፦
1.ዋጋ መገመት
2. ወጪ ማዕቅድ
3. ወጪዎችን ማዘጋጀት, መካፈል እና መተንተን ጨረታዎች እና ኮንትራቶች
4. የግዥ ምክር /Procurement advice
5. የክፍያ መጠየቂያዎችን ማዘጋጀት(BOQ)
6. በጀት የመቆጣጠር
7. የክፍያ መጠየቂያ ደረሰኝ እና የምስክር ወረቀት ዝግጅት
8. የእለት ግምገማ ማድረግ
9. ግጭትን መፍታት/Dispute resolution
10. የአዋጭነት ጥናቶችን በማዘጋጀት
11. የወጪ ቁጥጥር
12. የዋጋ ምህንድስና/Value engineering.
13. በዋጋ ገደቦች እና በጀቶች ላይ ምክር
14. የህይወት ዑደት ወጪ/Whole life cycle costing
15. ለዋስትና ዓላማዎች የሚውል የዋጋ ትመና/Valuation for insurance purposes
16. የፕሮጀክት አስተዳደር
17. በውል ክርክር ላይ ምክር/Advice on contractual disputes
18. የመጨረሻውን መለያ ዝግጅት
19. የሳይት ጉብኝቶች, ግምገማዎች እና ትንበያ ለወደፊት ሥራ
20. የተጠናቀቀ ሥራን መተንተን እና ያመቻቻል ለኮንትራክተሮች ክፍያ
21. መጪውን ሥራ ለኮንትራክተሮች መመደብ/ከእነዚህ በተጨማሪ quantity surveyors በግንባታው በተወሰነ ቦታ ውስጥ ልዩ እንደ ወጪና ምክር ባሉ ኢንዱስትሪ እና ትኩረት ያድርጉ የንብረት ግብር፣ትግበራ ምንጮችን፣ነባር ሕንፃዎችን ለመጠገን.......ወዘተ ስራዎችን ኳንቲቲ ሰርቬየሩ ያስተገብራል።
🏛በነገራችን ላይ ሙሉ የ Quantity Surveying Full Course በቅናሽ ዋጋ በ ኦንላይን መማር ለምትፈልጉ 👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
❤18👏1
11. For an estimate, area should be measured nearest to:
Anonymous Quiz
27%
0.1 sq m
45%
0.01 sq m
17%
0.001 sq m
11%
None of the above
🥰6👏4
12. For measurement of Quantity degree of accuracy for volume is taken as:
Anonymous Quiz
60%
0.01 cu meter
34%
1 cu meter
4%
10 cu meter
2%
100 cu meter
👏5❤4👍2
13. As per IS standards on method of measurement of building and civil engineering works, the dimensions have to be measured to the nearest:
Anonymous Quiz
16%
0.1 m
62%
0.01 m
5%
1.0 m
17%
0.001 m
👍8❤2
👉የግንባታ ፕሮጀክትዎን BOQ፣ ወጪ፣ የሥራ አፈጻጸም፣ ክፍያ፣ Cash Flow እና Profit/Loss በአንድ ፕሮፌሽናል Excel System በቀላሉ ለማስተዳዳር የሚጠቅም Editable Microsoft Excel System ለContractors፣ Engineers፣ Quantity Surveyors፣ Construction PLCs፣ Consultants፣ Project Owners እና Project Managers ይጠቅማል ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6aaf8ac262672_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6aaf8ac262672_etconp
Ye-Buna
Construction Project Financial Management Excel System
👉የግንባታ ፕሮጀክት ወጪ፣ ክፍያ እና የፋይናንስ አስተዳደር Excel System የግንባታ… 999 ETB · 12 sold. Instant download from Ethio Construction Engineering on Ye-Buna. Pay with…
🥰2🙏1