Intercon Construction Chemicals
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐3โค1
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐แตแ STAIRS แตแแฝ แ แแ แแณแฅ แฅแแแแญ ๐
๐งCalculations for the construction of stairs, ramps and guards are set out in various national building regulations.
๐ซThe guidelines here are based on German standards.
โถ๏ธDwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio.
โบStairs governed by building regulations must have a width of 1.00m and a ratio of 17/28.
โบIn high rise flats they must be 1.25 m wide
โบThe length of stair runs from 23 steps up to 18 steps --> @ Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m).
โบDoors opening into the stairwell must not restrict the effective width.
โถ๏ธThe time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent.
โถ๏ธA staircase at a side entrance or emergency stairs should make a rapid descent easy.
โถ๏ธThe experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps.
โบClimbing stairs takes on average seven times as much energy as walking on the flat.
โบFrom the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30ยฐ and a ratio of rise of: rise of step/going of step; r/g= 17/29.
โถ๏ธThe angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied: 2r+ g= 63cm (1 stride)
โถ๏ธIn the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
โถ๏ธNot only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable.
โนHowever, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly.
โบEvery main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.
@etconp
๐งCalculations for the construction of stairs, ramps and guards are set out in various national building regulations.
๐ซThe guidelines here are based on German standards.
โถ๏ธDwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio.
โบStairs governed by building regulations must have a width of 1.00m and a ratio of 17/28.
โบIn high rise flats they must be 1.25 m wide
โบThe length of stair runs from 23 steps up to 18 steps --> @ Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m).
โบDoors opening into the stairwell must not restrict the effective width.
โถ๏ธThe time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent.
โถ๏ธA staircase at a side entrance or emergency stairs should make a rapid descent easy.
โถ๏ธThe experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps.
โบClimbing stairs takes on average seven times as much energy as walking on the flat.
โบFrom the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30ยฐ and a ratio of rise of: rise of step/going of step; r/g= 17/29.
โถ๏ธThe angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied: 2r+ g= 63cm (1 stride)
โถ๏ธIn the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
โถ๏ธNot only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable.
โนHowever, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly.
โบEvery main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.
@etconp
๐18โค2
๐แฅแตแฒ แฃแแ แฐแ แตแ lap length , Development length,Anchorage length แตแแฝ แฅแแแแซแนแข
๐ท1. แแ แแแแ (lap length) - แฐแแแ แจแฅแจแต (แแฎ) แญแแแต
แแฅแจแตแ (stresses) แจแ แแต แฅแจแต แแฐแแ แจแแฐแแแแ แต แแ
โบThe lap length varies from member to member. Lap length for tension members = 40d
โบLap length for compression members = 50d Where, d = Diameter of bars.
๐ท2. แฐแจแแแแแต แแแแ (Development length) -แฐแแแ
แจแฅแจแต แญแแแต แแฅแจแตแ (stresses) แจแฅแจแฑ แแฐ แฎแแญแชแฑ แจแแฐแแแแ แต แแแข
๐ท3. แ แแฎแฌแ แแแแ (Anchorage length) - แญแ แญแแแต แ แญแแต แ แ แจแแ แฐแจแแแแแต แแแแ (development
length ) แ แแแฃแธแ แ Support / fixed ends แแญ provide แจแแแจแแ แญแแแต แแแข
@etconp
๐ท1. แแ แแแแ (lap length) - แฐแแแ แจแฅแจแต (แแฎ) แญแแแต
แแฅแจแตแ (stresses) แจแ แแต แฅแจแต แแฐแแ แจแแฐแแแแ แต แแ
โบThe lap length varies from member to member. Lap length for tension members = 40d
โบLap length for compression members = 50d Where, d = Diameter of bars.
๐ท2. แฐแจแแแแแต แแแแ (Development length) -แฐแแแ
แจแฅแจแต แญแแแต แแฅแจแตแ (stresses) แจแฅแจแฑ แแฐ แฎแแญแชแฑ แจแแฐแแแแ แต แแแข
๐ท3. แ แแฎแฌแ แแแแ (Anchorage length) - แญแ แญแแแต แ แญแแต แ แ แจแแ แฐแจแแแแแต แแแแ (development
length ) แ แแแฃแธแ แ Support / fixed ends แแญ provide แจแแแจแแ แญแแแต แแแข
@etconp
๐14โค10๐1
#ADVERTISEMENT
๐ซSpecialized Retrofitting (Jacketing) Services for:
โ Columns โ Enhance load-carrying capacity and structural integrity.
โ Footings โ Improve stability and prevent settlement.
โ Beams โ Restore and upgrade strength for better performance.
๐งWhy Retrofitting?
๐น Extend Structural Lifespan โ Protect your investment for years to come.
๐น Improve Safety โ Ensure compliance with modern building codes and standards.
๐น Cost-Effective โ Avoid expensive replacements by strengthening existing structures.
๐น Resilience Against Disasters โ Strengthen your building to withstand seismic activity and heavy loads.
๐ Contact Us Today!
๐ฉ @pragmaengineering
๐ฑ +251975889929 | +251941099797
Pragma Engineering โ Your Trusted Partner in Structural Excellence!
๐ซSpecialized Retrofitting (Jacketing) Services for:
โ Columns โ Enhance load-carrying capacity and structural integrity.
โ Footings โ Improve stability and prevent settlement.
โ Beams โ Restore and upgrade strength for better performance.
๐งWhy Retrofitting?
๐น Extend Structural Lifespan โ Protect your investment for years to come.
๐น Improve Safety โ Ensure compliance with modern building codes and standards.
๐น Cost-Effective โ Avoid expensive replacements by strengthening existing structures.
๐น Resilience Against Disasters โ Strengthen your building to withstand seismic activity and heavy loads.
๐ Contact Us Today!
๐ฉ @pragmaengineering
๐ฑ +251975889929 | +251941099797
Pragma Engineering โ Your Trusted Partner in Structural Excellence!
๐4๐4โค1
๐แ แณแแฒ 23 แขแแฎแ แถแแญ แจแแแ แจแฃแกแญ แแตแฎ แแฎแแจแต แ 12 แ แแฑ แฐแ แแ แฅแซ แแแฏแแข
๐งแ แณแแฒ แ แจแขแซ แแช แแแต แณแแแ แฐแแญแ แฅแซ แจแแแจแ Riyadh Metro 12 แ แแต แจแแ แแ แแฎแแญแต แฒแแแฃ แ แแแฃแณแ แแฐแต แจแแแ แ แแ แจแฐแแฃแก แฅแ แแฐ แฐแญแแ แจแแ แ แจแขแแแแชแแแฃ แจแฒแแญแ แฅแ แจแฐแแซแฉ แฅแซ แฐแแซแฎแฝ แฉแฃแแซแแฝ แฐแณแตแแแ แณแแข
๐ซแจแณแแฒ แแตแฎ แฒแแญแ แจแฐแฐแจแแ แ แแ 3.6 แแแฎแ แแแแฐแแฝแ แแแแ แฅแแฒแฝแ แแแข
๐ทแ แณแแฒ แจแจแฐแแฝแ แแฃแ แแตแแต แฐแจแตแ แแแแ แจแ แจแตแซแแตแแญแต แฝแแญ แแ แญแแแ แฐแฅแ แจแฐแแแฃแ แญแ แแฎแแญแต แจแฐแแแฃแ Samsung C&T แ แฐแฃแ แ แแ แ แแ แฉแฃแแซ แแแข แ แญแญแดแญแฑ แฐแแ แตแ แฅแฉแ Zaha Hadid Architects แแแข
โญ๏ธแจแชแซแต แแตแฎ แ แ แแ แแช 23 แขแแฎแ แถแญแ แจแแ แฒแแ แฃแกแฉ แจแแแแณแแตแ แซแแนแแญ แแแ แณแแแแข
โ๏ธแ แแ แ แ แ แแแฝแ แซแแนแแญ แจแแแแณแแต แจแ แ แจแแตแฎ แตแซแแตแแญแต แฐแฅแแแข
๐แ แ แ แแแ 176 แชแ แแตแญ แจแแจแแแ แจแชแซแต แแตแฎ แฃแกแญ แแตแแญ แตแตแตแต แแตแแฎแฝแ แจแซแ แฒแแแฃ 85 แฃแขแซแแฝแ แซแแ แแแค 34แฑ แจแแแต แแแฃแซ แซแแธแ แแธแแข
@etconp
๐งแ แณแแฒ แ แจแขแซ แแช แแแต แณแแแ แฐแแญแ แฅแซ แจแแแจแ Riyadh Metro 12 แ แแต แจแแ แแ แแฎแแญแต แฒแแแฃ แ แแแฃแณแ แแฐแต แจแแแ แ แแ แจแฐแแฃแก แฅแ แแฐ แฐแญแแ แจแแ แ แจแขแแแแชแแแฃ แจแฒแแญแ แฅแ แจแฐแแซแฉ แฅแซ แฐแแซแฎแฝ แฉแฃแแซแแฝ แฐแณแตแแแ แณแแข
๐ซแจแณแแฒ แแตแฎ แฒแแญแ แจแฐแฐแจแแ แ แแ 3.6 แแแฎแ แแแแฐแแฝแ แแแแ แฅแแฒแฝแ แแแข
๐ทแ แณแแฒ แจแจแฐแแฝแ แแฃแ แแตแแต แฐแจแตแ แแแแ แจแ แจแตแซแแตแแญแต แฝแแญ แแ แญแแแ แฐแฅแ แจแฐแแแฃแ แญแ แแฎแแญแต แจแฐแแแฃแ Samsung C&T แ แฐแฃแ แ แแ แ แแ แฉแฃแแซ แแแข แ แญแญแดแญแฑ แฐแแ แตแ แฅแฉแ Zaha Hadid Architects แแแข
โญ๏ธแจแชแซแต แแตแฎ แ แ แแ แแช 23 แขแแฎแ แถแญแ แจแแ แฒแแ แฃแกแฉ แจแแแแณแแตแ แซแแนแแญ แแแ แณแแแแข
โ๏ธแ แแ แ แ แ แแแฝแ แซแแนแแญ แจแแแแณแแต แจแ แ แจแแตแฎ แตแซแแตแแญแต แฐแฅแแแข
๐แ แ แ แแแ 176 แชแ แแตแญ แจแแจแแแ แจแชแซแต แแตแฎ แฃแกแญ แแตแแญ แตแตแตแต แแตแแฎแฝแ แจแซแ แฒแแแฃ 85 แฃแขแซแแฝแ แซแแ แแแค 34แฑ แจแแแต แแแฃแซ แซแแธแ แแธแแข
@etconp
๐18
๐High strength concrete
โกHigh strength concrete (HSC) may be defined as concrete with a specified characteristic cube
strength between 60 and 100 N/mm , although higher strengths have been achieved and used.
โถStrength levels of 80 to 100 N/mm and even higher are being used for both precast and in-situ work in All over the world.
โถThe main applications for HSC in-situ concrete construction are in offshore structures, columns for tall buildings, long-span bridges and other highway structures
โถThe main advantage is the reduction in size of compression elements and/or the amount of longitudinal reinforcement required.
โถThe methods and technology for producing high strength concrete are not substantially different from those required for normal strength concrete.
The target water/cement ratio should be in the range 0.30โ0.35 or even lower.
โญ๏ธHSC can be produced with all of the cements and cement
replacements (additions).
A wide range of aggregates can be used though crushed rock aggregates (of suitably high crushing value) are preferable.
Superplasticisers / high range water reducers should be used to achieve maximum water reduction, although plasticisers may be adequate for lower strength HSC (C-60 to C-70)
โบSilica fume (microsilica) or metakaoline can be used to enhance the strength at high levels (C80 and above), but is not needed generally at the lower end (C60 to C80).
๐ซThe terms "High performance concrete" and "High strength concrete" are often taken to mean the same thing.
โบHowever, as indicated, "High performance" strictly relates to a concrete that has been designed to have good specific characteristics, such as high resistance to chloride ingress or high abrasion resistance.
โถ๏ธAs a result it may also have a high strength, but this is not the main consideration.
@etconp
โกHigh strength concrete (HSC) may be defined as concrete with a specified characteristic cube
strength between 60 and 100 N/mm , although higher strengths have been achieved and used.
โถStrength levels of 80 to 100 N/mm and even higher are being used for both precast and in-situ work in All over the world.
โถThe main applications for HSC in-situ concrete construction are in offshore structures, columns for tall buildings, long-span bridges and other highway structures
โถThe main advantage is the reduction in size of compression elements and/or the amount of longitudinal reinforcement required.
โถThe methods and technology for producing high strength concrete are not substantially different from those required for normal strength concrete.
The target water/cement ratio should be in the range 0.30โ0.35 or even lower.
โญ๏ธHSC can be produced with all of the cements and cement
replacements (additions).
A wide range of aggregates can be used though crushed rock aggregates (of suitably high crushing value) are preferable.
Superplasticisers / high range water reducers should be used to achieve maximum water reduction, although plasticisers may be adequate for lower strength HSC (C-60 to C-70)
โบSilica fume (microsilica) or metakaoline can be used to enhance the strength at high levels (C80 and above), but is not needed generally at the lower end (C60 to C80).
๐ซThe terms "High performance concrete" and "High strength concrete" are often taken to mean the same thing.
โบHowever, as indicated, "High performance" strictly relates to a concrete that has been designed to have good specific characteristics, such as high resistance to chloride ingress or high abrasion resistance.
โถ๏ธAs a result it may also have a high strength, but this is not the main consideration.
@etconp
๐13
๐Why don't we use circular beams in construction or in structures?
๐ซBefore we look at the reasons, please have a look at the framed structure where the conventional Rectangular section has been adapted :
๐ง1.Formwork
Very difficult It has to be made out of either MS sheets or Aluminum sections.
Fixing it horizontally is more challenging since the base of the beam form work shall be semi circular.
The conventional methods of supporting with wooden CHABI is not suitable.
The Formwork shall need to have a provision on the top for pouring concrete.
๐ง2.The casting
Imagine that a conventional letter box is laid Horizontality and you have to pour concrete through the opening at the top.
The concrete has to be high slump concrete so that it moves to all crevices of the section.
Finishing the top portion of the beam shall be a highly skilled job.
๐ง3. The de -shuttering :
It shall not be possible to first strike off the sides and then the beam bottom .
The form work shall have to be removed in two halves after the concrete attains the strength.
โญ๏ธHope youโre clear with certain difficulties associated with the circular sections.
@etconp
๐ซBefore we look at the reasons, please have a look at the framed structure where the conventional Rectangular section has been adapted :
๐ง1.Formwork
Very difficult It has to be made out of either MS sheets or Aluminum sections.
Fixing it horizontally is more challenging since the base of the beam form work shall be semi circular.
The conventional methods of supporting with wooden CHABI is not suitable.
The Formwork shall need to have a provision on the top for pouring concrete.
๐ง2.The casting
Imagine that a conventional letter box is laid Horizontality and you have to pour concrete through the opening at the top.
The concrete has to be high slump concrete so that it moves to all crevices of the section.
Finishing the top portion of the beam shall be a highly skilled job.
๐ง3. The de -shuttering :
It shall not be possible to first strike off the sides and then the beam bottom .
The form work shall have to be removed in two halves after the concrete attains the strength.
โญ๏ธHope youโre clear with certain difficulties associated with the circular sections.
@etconp
๐12
๐แ แแแ แแ แจแ
แแป แแตแ แแตแตแญ
แแญแแฉแ แจแณแฝ แญแแแจแฑแข
๐ซแแตแตแฉ แแฐแแชแแฝแฃ แแ แแปแแณแแแฝแฃ แแแแแฒแถแฝ แฅแ แแแแฝแ แญแแต แแแข
โญ๏ธ๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐
2025โs Edition โ Nursery School in Africa
We are thrilled to announce the opening of the 2025 Kaira Looro Architecture Competition! This yearโs theme is the design of a Nursery School for rural areas in Sub-Saharan Africa. The aim is to create a safe, inclusive, and sustainable educational architeture where children can learn, play, and grow in an inspiring environment, promoting their development and well-being.
Participation is open to architects, students, designers, engineers, and anyone eager to contribute to this global cause. You can participate individually or as a team.
๐๐๐๐๐๐
As per tradition, the competition also aims to launch young architectural talents into the international arena by awarding prestigious prizes and professional growth opportunities. Some of the most significant awards include:
๐๐ฌ๐ญ ๐๐ซ๐ข๐ณ๐: โฌ5,000 + Internship at Kengo Kuma & Associates in Japan + Construction.
๐๐ง๐ ๐๐ซ๐ข๐ณ๐: โฌ2,000 + Internship at one of the following: Benedetta Tagliabue EMBT (Spain), Amanda Levete Architects (UK), or SBGA Blengini Ghirardelli (Italy).
๐๐ซ๐ ๐๐ซ๐ข๐ณ๐: โฌ1,000 + Internship at one of the following: EMBT (Spain), ALA (UK), or SBGA (Italy).
Others awards: 2 honourable mentions, 5 special mentions, 20 finalists, 20 Top 50, International visibility, Exhibits in exhibitions, events and seminars, official certificates and many others.
๐๐๐๐
The jury of Kaira Looro is made up of some of the worldโs most renowned and award-winning architects worldwide, such as:Kengo Kuma (Kengo Kuma & Associates), Benedetta Tagliabue (Benedetta Tagliabue โ EMBT Architects), Rafael Aranda, Carme Pigem, Ramรณn (RCR Arquitectes), Mario Cucinella (Mario Cucinella Architects), David Adjaye (Adjaye Associates), Amanda Levete (Amanda Levete Architects), Manuel Aires Mateus (Aires Mateus Architects), Giancarlo Mazzanti (El Equipo Mazzanti), Agostino Ghirardelli (SBGA | Blengini Ghirardelli), Raul Pantaleo (TAM Associati), Emmanuelle Moureaux (Emmanuelle Moureaux Architecture + Design), Saad El Kabbaj, Driss Kettani, Mohamed Amine Siana
The Early Registration will open on 10th January 2024.
For this edition we are proud to collaborate with leading global media partners, including Archilovers, The Plan, Casabella, DesignBoom, Tectonica, World Architecture Community, Platform, Worl Architects, Amazing Architecture, A+E, Archiportale, Apsaidal, Go Architecture, E-Archtiect, Architektura & Biznes, Uche Okeke Legacy, Toffu, Archetype, Competitions Archi, Architektura, Wettbewrbe, Poject Baikal, Ru Archi.
All competition proceeds will be donated to support charity projects by Balouo Salo in Africa aimed to improve life condition if rural communities.
Join the competition and help build a brighter future.
Register now at www.kairalooro.com
@etconp
แแญแแฉแ แจแณแฝ แญแแแจแฑแข
๐ซแแตแตแฉ แแฐแแชแแฝแฃ แแ แแปแแณแแแฝแฃ แแแแแฒแถแฝ แฅแ แแแแฝแ แญแแต แแแข
โญ๏ธ๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐
2025โs Edition โ Nursery School in Africa
We are thrilled to announce the opening of the 2025 Kaira Looro Architecture Competition! This yearโs theme is the design of a Nursery School for rural areas in Sub-Saharan Africa. The aim is to create a safe, inclusive, and sustainable educational architeture where children can learn, play, and grow in an inspiring environment, promoting their development and well-being.
Participation is open to architects, students, designers, engineers, and anyone eager to contribute to this global cause. You can participate individually or as a team.
๐๐๐๐๐๐
As per tradition, the competition also aims to launch young architectural talents into the international arena by awarding prestigious prizes and professional growth opportunities. Some of the most significant awards include:
๐๐ฌ๐ญ ๐๐ซ๐ข๐ณ๐: โฌ5,000 + Internship at Kengo Kuma & Associates in Japan + Construction.
๐๐ง๐ ๐๐ซ๐ข๐ณ๐: โฌ2,000 + Internship at one of the following: Benedetta Tagliabue EMBT (Spain), Amanda Levete Architects (UK), or SBGA Blengini Ghirardelli (Italy).
๐๐ซ๐ ๐๐ซ๐ข๐ณ๐: โฌ1,000 + Internship at one of the following: EMBT (Spain), ALA (UK), or SBGA (Italy).
Others awards: 2 honourable mentions, 5 special mentions, 20 finalists, 20 Top 50, International visibility, Exhibits in exhibitions, events and seminars, official certificates and many others.
๐๐๐๐
The jury of Kaira Looro is made up of some of the worldโs most renowned and award-winning architects worldwide, such as:Kengo Kuma (Kengo Kuma & Associates), Benedetta Tagliabue (Benedetta Tagliabue โ EMBT Architects), Rafael Aranda, Carme Pigem, Ramรณn (RCR Arquitectes), Mario Cucinella (Mario Cucinella Architects), David Adjaye (Adjaye Associates), Amanda Levete (Amanda Levete Architects), Manuel Aires Mateus (Aires Mateus Architects), Giancarlo Mazzanti (El Equipo Mazzanti), Agostino Ghirardelli (SBGA | Blengini Ghirardelli), Raul Pantaleo (TAM Associati), Emmanuelle Moureaux (Emmanuelle Moureaux Architecture + Design), Saad El Kabbaj, Driss Kettani, Mohamed Amine Siana
The Early Registration will open on 10th January 2024.
For this edition we are proud to collaborate with leading global media partners, including Archilovers, The Plan, Casabella, DesignBoom, Tectonica, World Architecture Community, Platform, Worl Architects, Amazing Architecture, A+E, Archiportale, Apsaidal, Go Architecture, E-Archtiect, Architektura & Biznes, Uche Okeke Legacy, Toffu, Archetype, Competitions Archi, Architektura, Wettbewrbe, Poject Baikal, Ru Archi.
All competition proceeds will be donated to support charity projects by Balouo Salo in Africa aimed to improve life condition if rural communities.
Join the competition and help build a brighter future.
Register now at www.kairalooro.com
@etconp
๐8๐5
๐แ แฉแแญแตแต แตแดแตแต แฆแญแแแ แแตแฅ แ แ แแชแซ แจแแแ แฐแแญ แ แแต แแแแแฝ แจแแ แแฅ แแแ แแฎแแญแต แจแ แจแซ แฅแญแ แญแแฅแซแ แ แแ แแญแแซแต แแแฃแณแ แแตแฐแแแ แแแ แญแ แต แฝแแแข
๐ง"The Legends Tower" แ แแ แจแฐแฐแจแแแ 581 แแตแญ แญแแแต แจแแแจแ แ แฆแญแแแ แจแฐแ แแแแฃ แจแแ แจแ แฐแแญ แ แแต แแแ แ แแแฎแญแญ แจแฐแ แจแแแแแ แ แ แแชแซ แแณแแ แฐแแญ แ แแต แแแ แจแแแ World Trade Centre แ 41 แแตแญ แจแแจแแ แแแข
๐ซแจแฆแญแแแ แจแฐแ แคแญแแญแถแฝ แณแญแฌแญแฐแญ แแแแ แจแฐแแแฃ แจแ แแฎแแแแฝ แจแ แจแซ แฐแ แต แฅแแฒแจแแญ แซแฐแญแแ แฅแแแแข
๐ทแแแขแแน แจแแแแแ แฒแแญแ แฒแฐแฉ แ แ แซแฃแขแ แจแแแแแ Rogers World Airport แฅแ Tinker Air Force Base แแแแค แแตแฅ แแญแฐแต แแ แจแฃแธแ แฐแฅแแแข
@etconp
๐ง"The Legends Tower" แ แแ แจแฐแฐแจแแแ 581 แแตแญ แญแแแต แจแแแจแ แ แฆแญแแแ แจแฐแ แแแแฃ แจแแ แจแ แฐแแญ แ แแต แแแ แ แแแฎแญแญ แจแฐแ แจแแแแแ แ แ แแชแซ แแณแแ แฐแแญ แ แแต แแแ แจแแแ World Trade Centre แ 41 แแตแญ แจแแจแแ แแแข
๐ซแจแฆแญแแแ แจแฐแ แคแญแแญแถแฝ แณแญแฌแญแฐแญ แแแแ แจแฐแแแฃ แจแ แแฎแแแแฝ แจแ แจแซ แฐแ แต แฅแแฒแจแแญ แซแฐแญแแ แฅแแแแข
๐ทแแแขแแน แจแแแแแ แฒแแญแ แฒแฐแฉ แ แ แซแฃแขแ แจแแแแแ Rogers World Airport แฅแ Tinker Air Force Base แแแแค แแตแฅ แแญแฐแต แแ แจแฃแธแ แฐแฅแแแข
@etconp
๐23โค3๐ฅฐ1
Intercon Construction Chemicals
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐ Authorized agent of MC (Conmix), Weber and SIMENTEK
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Concrete Repair, Grout
โ Tile Adhesive & Tile Joint Fillers
โ Wall Putty, Prime Coat, Rush Coat
โ Quartz, Contextra
โ Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ Floor hardener, Epoxy
โ Geotextiles, Geo-membranes and other construction chemicals and materials
Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐5๐1
แณแแซแต แแแต แฅแ แแฆแแต แ แ
แซแข
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐แจ แ แฃแญ แแตแฅ แฅแตแจ แฎแชแฐแญ แแแต
แจแแแฐแฅ แคแถแฝ แฅแตแจ แฐแแแต แฅแ
แแแแแฝ แ แแแ แจแขแตแฎแฝแซ แญแแ
แ แปแซแฝแแ แ แณแญแแแ
๐ฐแแ แญแแแแ?
โ๏ธแแแซ แแแจแซ รท แแ แแซ แฅแ แแฅแป แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แแตแ แแต แแญแแ แแณแ แ แซแฐแก แแฑแ แแฝแ แ แแฝแ แแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แจแแฐแฉ แฅแ แฃแแแซแแฝแ แ แแ
โ๏ธแญแฐแแแแ แซแแญแฉแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณแแ
แ แตแซแปแฝแแฆ
แ.1 แแญแซแถ
แ.2 แฐแญแแแญแแแต
แ.3 แ แจแญ แคแ
0904040477
0911016833
๐6
๐What are efficient ways to sound proof A room?
๐งDouble, Air-gapped Walls
โบThis one was key, especially to keep outside sound out and instrument sounds in (like my drums)! Inside of the cinder-block garage, we built a room using 2ร4โs (or maybe 2ร6โs). We then built an ever-so-slightly smaller room inside of it, leaving about 4โณ between the outer wall and the inner one. This air-gap helped block transmission of sound. Inside each wall we used fiberglass insulation.
๐งDouble Sheet Rock
โบOn the walls mentioned above we used two sheets of 5/8โณ sheet rock, not just one. This provided more mass, also good for blocking sound.
๐งFoam Egg Crates, Foam Rubber, Carpet
โบWe got lucky and found a dozen sheets of foam egg crate at a building auction and bought it for what one sheet of it would normally cost. We covered the walls in it. We used thick carpet on the floor, and some adhesive foam rubber sheets on the door and outside wall.
๐งAdjacent Mixing tech room
โบWe put the mixing consoles, PC, monitors, and other gear that generated noise in an adjacent room. If we were doing it โrightโ I probably would have wired up audio jacks to totally isolate the two rooms, but instead we just put a large conduit between the rooms to run the cabling. I stuffed the conduit full of rags to block the PC fan sounds.
๐งAngled Window
โบWe put a window between the studio and the mixing room so the tech could see the band and vice versa.
To prevent the sound from going through, we used two panes of glass.
The one on the mixing room side was mounted in a normal up-and-down position.
The second pane, on the studio side was mounted at about a 45 degree angle, so sounds would be deflected down toward the floor. E.g. (Studio) \ | (Mixing Room).
๐งAC outside of the studio
โบThe studio got pretty hot with all that insulation, so we had to add a window AC unit.
Putting it in the studio was a no-go, so we mounted it in a window in the garage (outside the studioโs double walls) and then fashioned some ducting to run the cool air into the back corner of the studio.
This kept the compressor noise out.
๐งTreating the gear
โถ๏ธFinally, we would pick up rattling from drum stands, clicks of guitar pedals, snare vibrations, etc. We fixed this as we went โ things like foam, cardboard, electrical tape, and rags all helped.
@etconp
๐งDouble, Air-gapped Walls
โบThis one was key, especially to keep outside sound out and instrument sounds in (like my drums)! Inside of the cinder-block garage, we built a room using 2ร4โs (or maybe 2ร6โs). We then built an ever-so-slightly smaller room inside of it, leaving about 4โณ between the outer wall and the inner one. This air-gap helped block transmission of sound. Inside each wall we used fiberglass insulation.
๐งDouble Sheet Rock
โบOn the walls mentioned above we used two sheets of 5/8โณ sheet rock, not just one. This provided more mass, also good for blocking sound.
๐งFoam Egg Crates, Foam Rubber, Carpet
โบWe got lucky and found a dozen sheets of foam egg crate at a building auction and bought it for what one sheet of it would normally cost. We covered the walls in it. We used thick carpet on the floor, and some adhesive foam rubber sheets on the door and outside wall.
๐งAdjacent Mixing tech room
โบWe put the mixing consoles, PC, monitors, and other gear that generated noise in an adjacent room. If we were doing it โrightโ I probably would have wired up audio jacks to totally isolate the two rooms, but instead we just put a large conduit between the rooms to run the cabling. I stuffed the conduit full of rags to block the PC fan sounds.
๐งAngled Window
โบWe put a window between the studio and the mixing room so the tech could see the band and vice versa.
To prevent the sound from going through, we used two panes of glass.
The one on the mixing room side was mounted in a normal up-and-down position.
The second pane, on the studio side was mounted at about a 45 degree angle, so sounds would be deflected down toward the floor. E.g. (Studio) \ | (Mixing Room).
๐งAC outside of the studio
โบThe studio got pretty hot with all that insulation, so we had to add a window AC unit.
Putting it in the studio was a no-go, so we mounted it in a window in the garage (outside the studioโs double walls) and then fashioned some ducting to run the cool air into the back corner of the studio.
This kept the compressor noise out.
๐งTreating the gear
โถ๏ธFinally, we would pick up rattling from drum stands, clicks of guitar pedals, snare vibrations, etc. We fixed this as we went โ things like foam, cardboard, electrical tape, and rags all helped.
@etconp
๐8โค1
#ADVERTISEMENTS
๐แจ แแแแต แแแฃแณ แฒแแญแ แตแซ แแฐแซแต แญแแแแ?
๐ทแ แแแแต แตแซ แแญ แจแ แแญ แแ แ แฅแ แแ แตแแตแฃแจ แ แตแแแต แแแฃแ แตแแตแฃแแ แจ แตแตแซแญแธแซแ แตแฎแแแ แตแซ แ แแฅแแต แฅแ แ แฅแซแต แฐแญแฐแ แฅแแตแจแญแฃแแแข
๐งแฅแแฒแแ Civil 3D แฒแถแญแซแ แชแตแฎ แจแ แแ แแฐแชแซแ
แจ Girder Birdge Working Drawing แจแ 3D modelแ แแ แแฐแชแซแ แชแตแฎ แ แฐแจแแช แแแแแ แจแแแแต แตแซ แแญแแฝ แฅแ แดแแแแถแฝ แ แแแข
๐ซแจแณแฝ แฃแแต แฃแแซแฎแฝ แญแแฅแแ
YouTube: http://www.youtube.com/@musfide
แตแ แจ แแ :- www.musfide.com
แดแแแซแ แแ :- https://t.me/musafide
แแแญแฐแ:- https://www.linkedin.com/in/musfide
แแญแ แ +251905666664 แจแฐแแ แซแแแแ๐
๐แจ แแแแต แแแฃแณ แฒแแญแ แตแซ แแฐแซแต แญแแแแ?
๐ทแ แแแแต แตแซ แแญ แจแ แแญ แแ แ แฅแ แแ แตแแตแฃแจ แ แตแแแต แแแฃแ แตแแตแฃแแ แจ แตแตแซแญแธแซแ แตแฎแแแ แตแซ แ แแฅแแต แฅแ แ แฅแซแต แฐแญแฐแ แฅแแตแจแญแฃแแแข
๐งแฅแแฒแแ Civil 3D แฒแถแญแซแ แชแตแฎ แจแ แแ แแฐแชแซแ
แจ Girder Birdge Working Drawing แจแ 3D modelแ แแ แแฐแชแซแ แชแตแฎ แ แฐแจแแช แแแแแ แจแแแแต แตแซ แแญแแฝ แฅแ แดแแแแถแฝ แ แแแข
๐ซแจแณแฝ แฃแแต แฃแแซแฎแฝ แญแแฅแแ
YouTube: http://www.youtube.com/@musfide
แตแ แจ แแ :- www.musfide.com
แดแแแซแ แแ :- https://t.me/musafide
แแแญแฐแ:- https://www.linkedin.com/in/musfide
แแญแ แ +251905666664 แจแฐแแ แซแแแแ๐
๐9โค1๐1