๐Ÿ‘‰แˆตแˆˆ STAIRS แ‰ตแŠ•แˆฝ แŒ แ‰ƒแˆš แˆƒแˆณแ‰ฅ แŠฅแŠ•แˆ›แˆ›แˆญ ๐Ÿ‘‡

๐ŸšงCalculations for the construction of stairs, ramps and guards are set out in various national building regulations.

๐Ÿ’ซThe guidelines here are based on German standards.

โ–ถ๏ธDwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio.

โบStairs governed by building regulations must have a width of 1.00m and a ratio of 17/28.

โบIn high rise flats they must be 1.25 m wide

โบThe length of stair runs from 23 steps up to 18 steps --> @ Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m).

โบDoors opening into the stairwell must not restrict the effective width.

โ–ถ๏ธThe time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent.

โ–ถ๏ธA staircase at a side entrance or emergency stairs should make a rapid descent easy.

โ–ถ๏ธThe experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps.

โบClimbing stairs takes on average seven times as much energy as walking on the flat.

โบFrom the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30ยฐ and a ratio of rise of:  rise of step/going of step; r/g= 17/29.

โ–ถ๏ธThe angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied: 2r+ g= 63cm (1 stride)

โ–ถ๏ธIn the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.

โ–ถ๏ธNot only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable.

โนHowever, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly.

โบEvery main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be  greater than or equal tothe width of the staircase.

@etconp
๐Ÿ‘18โค2
๐Ÿ‘‰แŠฅแˆตแ‰ฒ แŠฃแˆแŠ• แ‹ฐแˆž แˆตแˆˆ lap length , Development length,Anchorage length แ‰ตแŠ•แˆฝ แŠฅแŠ•แŠ•แŒˆแˆซแ‰นแข

๐Ÿท1. แˆ‹แ• แˆŒแŠ•แŒแ‹ (lap length) - แ‰ฐแˆแˆ‹แŒŠ แ‹จแ‰ฅแˆจแ‰ต (แŒแˆฎ) แˆญแ‹แˆ˜แ‰ต
แ‹แŒฅแˆจแ‰ตแŠ• (stresses) แŠจแŠ แŠ•แ‹ต แ‰ฅแˆจแ‰ต แ‹ˆแ‹ฐแˆŒแˆ‹ แ‹จแˆšแ‰ฐแˆ‹แˆˆแแ‰ แ‰ต แАแ‹‰

โบThe lap length varies from member to member. Lap length for tension members = 40d

โบLap length for compression members = 50d Where, d = Diameter of bars.

๐Ÿท2. แ‹ฐแ‰จแˆŽแ•แˆ˜แŠ•แ‰ต แˆŒแŠ•แŒแ‹ (Development length) -แ‰ฐแˆแˆ‹แŒŠ
แ‹จแ‰ฅแˆจแ‰ต แˆญแ‹แˆ˜แ‰ต แ‹แŒฅแˆจแ‰ตแŠ• (stresses) แŠจแ‰ฅแˆจแ‰ฑ แ‹ˆแ‹ฐ แŠฎแŠ•แŠญแˆชแ‰ฑ แ‹จแˆšแ‰ฐแˆ‹แˆˆแแ‰ แ‰ต แАแ‹แข

๐Ÿท3. แŠ แŠ•แŠฎแˆฌแŒ… แˆŒแŠ•แŒแ‹ (Anchorage length) - แ‹ญแˆ… แˆญแ‹แˆ˜แ‰ต แŠ แ‹ญแАแ‰ต แ‰ แ‰‚ แ‹จแˆ†แА แ‹ฐแ‰จแˆŽแ•แˆ˜แŠ•แ‰ต แˆŒแŠ•แŒแ‹ (development
length ) แ‰ แˆŒแˆˆแ‰ฃแ‰ธแ‹ แ‰  Support / fixed ends แˆ‹แ‹ญ provide แ‹จแˆแŠ“แˆจแŒˆแ‹ แˆญแ‹แˆ˜แ‰ต แАแ‹แข

@etconp
๐Ÿ‘14โค10๐Ÿ‘Œ1
#ADVERTISEMENT

๐Ÿ’ซSpecialized Retrofitting (Jacketing) Services for:

โœ… Columns โ€“ Enhance load-carrying capacity and structural integrity.
โœ… Footings โ€“ Improve stability and prevent settlement.
โœ… Beams โ€“ Restore and upgrade strength for better performance.

๐ŸšงWhy Retrofitting?

๐Ÿ”น Extend Structural Lifespan โ€“ Protect your investment for years to come.
๐Ÿ”น Improve Safety โ€“ Ensure compliance with modern building codes and standards.
๐Ÿ”น Cost-Effective โ€“ Avoid expensive replacements by strengthening existing structures.
๐Ÿ”น Resilience Against Disasters โ€“ Strengthen your building to withstand seismic activity and heavy loads.

๐Ÿ“ž Contact Us Today!

๐Ÿ“ฉ @pragmaengineering
๐Ÿ“ฑ +251975889929 | +251941099797

Pragma Engineering โ€“ Your Trusted Partner in Structural Excellence!
๐Ÿ‘4๐Ÿ‘4โค1
๐Ÿ‘‰แ‰ แˆณแ‹‘แ‹ฒ 23 แ‰ขแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แ‹จแˆแŒ€แ‹ แ‹จแ‰ฃแ‰กแˆญ แˆœแ‰ตแˆฎ แ•แˆฎแŒ€แŠจแ‰ต แ‰ 12 แŠ แˆ˜แ‰ฑ แ‰ฐแŒ แŠ“แ‰† แˆฅแˆซ แŒ€แˆแˆฏแˆแข

๐Ÿšงแ‰ แˆณแ‹‘แ‹ฒ แŠ แˆจแ‰ขแ‹ซ แˆ˜แˆช แŠ•แŒ‰แˆต แˆณแˆแˆ›แŠ• แ‰ฐแˆ˜แˆญแ‰† แˆฅแˆซ แ‹จแŒ€แˆ˜แˆจแ‹ Riyadh Metro 12 แŠ แˆ˜แ‰ต แ‹จแˆแŒ€ แˆœแŒ‹ แ•แˆฎแŒ€แŠญแ‰ต แˆฒแˆ†แŠ•แฃ แ‰ แŒแŠ•แ‰ฃแ‰ณแ‹ แˆ‚แ‹ฐแ‰ต แŠจแˆ˜แˆ‹แ‹ แŠ แˆˆแˆ แ‹จแ‰ฐแ‹ˆแŒฃแŒก แŠฅแŠ“ แ‹ˆแ‹ฐ แ‹ฐแˆญแ‹˜แŠ• แ‹จแˆšแŒ แŒ‰ แ‹จแŠขแŠ•แŒ‚แАแˆชแŠ•แŒแฃ แ‹จแ‹ฒแ‹›แ‹ญแŠ• แŠฅแŠ“ แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แˆฅแˆซ แ‰ฐแ‰‹แˆซแŒฎแ‰ฝ แŠฉแ‰ฃแŠ•แ‹ซแ‹Žแ‰ฝ แ‰ฐแˆณแ‰ตแˆแ‹แ‰ แ‰ณแˆแข

๐Ÿ’ซแ‹จแˆณแ‹‘แ‹ฒ แˆœแ‰ตแˆฎ แ‹ฒแ‹›แ‹ญแŠ• แ‹จแ‰ฐแ‹ฐแˆจแŒˆแ‹ แ‰ แ‰€แŠ• 3.6 แˆšแˆŠแ‹ฎแŠ• แˆ˜แŠ•แŒˆแ‹ฐแŠžแ‰ฝแŠ• แˆ›แŒŽแŒŽแ‹ แŠฅแŠ•แ‹ฒแ‰ฝแˆ แАแ‹แข

๐Ÿทแ‰ แˆณแ‹‘แ‹ฒ แ‹จแŠจแ‰ฐแˆžแ‰ฝแŠ• แˆแŒฃแŠ• แ‹•แ‹ตแŒˆแ‰ต แ‰ฐแŠจแ‰ตแˆŽ แˆˆแˆšแˆแŒ แˆจแ‹ แ‹จแ‰ตแˆซแŠ•แˆตแ–แˆญแ‰ต แ‰ฝแŒแˆญ แˆ˜แˆ‹ แ‹ญแˆ†แŠ“แˆ แ‰ฐแ‰ฅแˆŽ แ‹จแ‰ฐแŒˆแАแ‰ฃแ‹ แ‹ญแˆ… แ•แˆฎแŒ€แŠญแ‰ต แ‹จแ‰ฐแŒˆแАแ‰ฃแ‹ Samsung C&T แ‰ แ‰ฐแ‰ฃแˆˆ แŠ แˆˆแˆ แŠ แ‰€แ แŠฉแ‰ฃแŠ•แ‹ซ แАแ‹แข แŠ แˆญแŠญแ‰ดแŠญแ‰ฑ แ‹ฐแŒแˆž แˆตแˆ˜ แŒฅแˆฉแ‹ Zaha Hadid Architects แАแ‹แข

โญ๏ธแ‹จแˆชแ‹ซแ‹ต แˆœแ‰ตแˆฎ แŒ แ‰…แˆ‹แˆ‹ แ‹ˆแŒช 23 แ‰ขแˆŠแ‹ฎแŠ• แ‹ถแˆญแˆ‹ แ‹จแˆแŒ€ แˆฒแˆ†แŠ• แ‰ฃแ‰กแˆฉ แ‹จแˆšแŠ•แ‰€แˆณแ‰€แˆตแ‹ แ‹ซแˆˆแˆนแŒแˆญ แˆ˜แˆ†แŠ‘ แ‰ณแ‹แ‰‹แˆแข

โ‡๏ธแ‰ แ‹šแˆ…แˆ แ‰ แŠ แˆˆแˆ›แ‰ฝแŠ• แ‹ซแˆˆแˆนแŒแˆญ แ‹จแˆšแŠ•แ‰€แˆณแ‰€แˆต แˆจแŒ…แˆ แ‹จแˆœแ‰ตแˆฎ แ‰ตแˆซแŠ•แˆตแ–แˆญแ‰ต แ‰ฐแ‰ฅแˆแˆแข

๐ŸŒŸแ‰ แŒ แ‰…แˆ‹แˆ‹แ‹ 176 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแˆšแˆจแ‹แˆ˜แ‹ แ‹จแˆชแ‹ซแ‹ต แˆœแ‰ตแˆฎ แ‰ฃแ‰กแˆญ แˆ˜แˆตแˆ˜แˆญ แˆตแ‹ตแˆตแ‰ต แˆ˜แˆตแˆ˜แˆฎแ‰ฝแŠ• แ‹จแ‹ซแ‹˜ แˆฒแˆ†แŠ•แฃ 85 แŒฃแ‰ขแ‹ซแ‹Žแ‰ฝแŠ• แ‹ซแ‰€แˆ แАแ‹แค 34แ‰ฑ แ‹จแˆŠแแ‰ต แˆ˜แ‹ˆแŒฃแŒซ แ‹ซแˆ‹แ‰ธแ‹ แŠ“แ‰ธแ‹แข

@etconp
๐Ÿ‘18
๐Ÿ‘‰High strength concrete

โžกHigh strength concrete (HSC) may be defined as concrete with a specified characteristic cube
strength between 60 and 100 N/mm , although higher strengths have been achieved and used.

โ–ถStrength levels of 80 to 100 N/mm and even higher are being used for both precast and in-situ work in All over the world.

โ–ถThe main applications for HSC in-situ concrete construction are in offshore structures, columns for tall buildings, long-span bridges and other highway structures

โ–ถThe main advantage is the reduction in size of compression elements and/or the amount of longitudinal reinforcement required.

โ–ถThe methods and technology for producing high strength concrete are not substantially different from those required for normal strength concrete.
The target water/cement ratio should be in the range 0.30โ€“0.35 or even lower.

โญ๏ธHSC can be produced with all of the cements and cement
replacements (additions).
A wide range of aggregates can be used though crushed rock aggregates (of suitably high crushing value) are preferable.
Superplasticisers / high range water reducers should be used to achieve maximum water reduction, although plasticisers may be adequate for lower strength HSC (C-60 to C-70)

โบSilica fume (microsilica) or metakaoline can be used to enhance the strength at high levels (C80 and above), but is not needed generally at the lower end (C60 to C80).

๐Ÿ’ซThe terms "High performance concrete" and "High strength concrete" are often taken to mean the same thing.

โบHowever, as indicated, "High performance" strictly relates to a concrete that has been designed to have good specific characteristics, such as high resistance to chloride ingress or high abrasion resistance.

โ–ถ๏ธAs a result it may also have a high strength, but this is not the main consideration.

@etconp
๐Ÿ‘13
๐Ÿ‘‰Why don't we use circular beams in construction or in structures?

๐Ÿ’ซBefore we look at the reasons, please have a look at the framed structure where the conventional Rectangular section has been adapted :                                                                                               
๐Ÿšง1.Formwork

Very difficult It has to be made out of either MS sheets or Aluminum sections.

Fixing it horizontally is more challenging since the base of the beam form work shall be semi circular.

The conventional methods of supporting with wooden CHABI is not suitable.

The Formwork shall need to have a provision on the top for pouring concrete.

๐Ÿšง2.The casting

Imagine that a conventional letter box is laid Horizontality and you have to pour concrete through the opening at the top.

The concrete has to be high slump concrete so that it moves to all crevices of the section.

Finishing the top portion of the beam shall be a highly skilled job.

๐Ÿšง3. The de -shuttering :

It shall not be possible to first strike off the sides and then the beam bottom .

The form work shall have to be removed in two halves after the concrete attains the strength.

โญ๏ธHope youโ€™re clear with certain difficulties associated with the circular sections.

@etconp
๐Ÿ‘12
๐Ÿ‘‰แŠ แˆˆแˆแŠ แ‰€แ แ‹จแˆ…แŠ•แŒป แŠ•แ‹ตแ แ‹แ‹ตแ‹ตแˆญ
แ‹แˆญแ‹แˆฉแŠ• แŠจแ‰ณแ‰ฝ แ‹ญแˆ˜แˆแŠจแ‰ฑแข

๐Ÿ’ซแ‹แ‹ตแ‹ตแˆฉ แˆˆแ‰ฐแˆ›แˆชแ‹Žแ‰ฝแฃ แˆˆแˆ…แŠ•แŒปแАแ‹ณแŠแ‹Žแ‰ฝแฃ แˆˆแˆ˜แˆ€แŠ•แ‹ฒแˆถแ‰ฝ แŠฅแŠ“ แˆˆแˆŒแˆŽแ‰ฝแˆ แŠญแแ‰ต แАแ‹แข

โญ๏ธ๐๐„๐– ๐Š๐€๐ˆ๐‘๐€ ๐‹๐Ž๐Ž๐‘๐Ž ๐€๐‘๐‚๐‡๐ˆ๐“๐„๐‚๐“๐”๐‘๐„ ๐‚๐Ž๐Œ๐๐„๐“๐ˆ๐“๐ˆ๐Ž๐

2025โ€™s Edition โ€“ Nursery School in Africa

We are thrilled to announce the opening of the 2025 Kaira Looro Architecture Competition! This yearโ€™s theme is the design of a Nursery School for rural areas in Sub-Saharan Africa. The aim is to create a safe, inclusive, and sustainable educational architeture where children can learn, play, and grow in an inspiring environment, promoting their development and well-being.

Participation is open to architects, students, designers, engineers, and anyone eager to contribute to this global cause. You can participate individually or as a team.

๐€๐–๐€๐‘๐ƒ๐’
As per tradition, the competition also aims to launch young architectural talents into the international arena by awarding prestigious prizes and professional growth opportunities. Some of the most significant awards include:
๐Ÿ๐ฌ๐ญ ๐๐ซ๐ข๐ณ๐ž: โ‚ฌ5,000 + Internship at Kengo Kuma & Associates in Japan + Construction.
๐Ÿ๐ง๐ ๐๐ซ๐ข๐ณ๐ž: โ‚ฌ2,000 + Internship at one of the following: Benedetta Tagliabue EMBT (Spain), Amanda Levete Architects (UK), or SBGA Blengini Ghirardelli (Italy).
๐Ÿ‘๐ซ๐ ๐๐ซ๐ข๐ณ๐ž: โ‚ฌ1,000 + Internship at one of the following: EMBT (Spain), ALA (UK), or SBGA (Italy).

Others awards: 2 honourable mentions, 5 special mentions, 20 finalists, 20 Top 50, International visibility, Exhibits in exhibitions, events and seminars, official certificates and many others.

๐‰๐”๐‘๐˜
The jury of Kaira Looro is made up of some of the worldโ€™s most renowned and award-winning architects worldwide, such as:Kengo Kuma (Kengo Kuma & Associates), Benedetta Tagliabue (Benedetta Tagliabue โ€“ EMBT Architects), Rafael Aranda, Carme Pigem, Ramรณn (RCR Arquitectes), Mario Cucinella (Mario Cucinella Architects), David Adjaye (Adjaye Associates),  Amanda Levete (Amanda Levete Architects), Manuel Aires Mateus (Aires Mateus Architects), Giancarlo Mazzanti (El Equipo Mazzanti), Agostino Ghirardelli (SBGA | Blengini Ghirardelli), Raul Pantaleo (TAM Associati), Emmanuelle Moureaux (Emmanuelle Moureaux Architecture + Design), Saad El Kabbaj, Driss Kettani, Mohamed Amine Siana

The Early Registration will open on 10th January 2024.

For this edition we are proud to collaborate with leading global media partners, including Archilovers, The Plan, Casabella, DesignBoom, Tectonica, World Architecture Community, Platform, Worl Architects, Amazing Architecture, A+E, Archiportale, Apsaidal, Go Architecture, E-Archtiect, Architektura & Biznes, Uche Okeke Legacy, Toffu, Archetype, Competitions Archi, Architektura, Wettbewrbe, Poject Baikal, Ru Archi.

All competition proceeds will be donated to support charity projects by Balouo Salo in Africa aimed to improve life condition if rural communities.

Join the competition and help build a brighter future.
Register now at www.kairalooro.com

@etconp
๐ŸŽ‰8๐Ÿ‘5
๐Ÿ‘‰แ‰ แ‹ฉแŠ“แ‹ญแ‰ตแ‹ต แˆตแ‰ดแ‰ตแˆต แŠฆแŠญแˆ‹แˆƒแˆ› แ‹แˆตแŒฅ แ‰ แŠ แˆœแˆชแŠซ แŠจแˆšแŒˆแŠ™ แˆฐแˆ›แ‹ญ แŒ แ‰€แˆต แˆ•แŠ•แƒแ‹Žแ‰ฝ แ‹จแˆšแ‰ แˆแŒฅ แŒแ‹™แ แ•แˆฎแŒ€แŠญแ‰ต แ‹จแ‰ แˆจแˆซ แŠฅแŠญแˆ แ‹ญแˆแŒฅแˆซแˆ แ‰ แˆšแˆ แˆแŠญแŠ•แ‹ซแ‰ต แŒแŠ•แ‰ฃแ‰ณแ‹ แˆ˜แˆตแ‰ฐแŒ“แŒ“แˆ แˆŠแˆแŒ แˆญแ‰ แ‰ต แ‰ฝแˆแˆแข

๐Ÿšง"The Legends Tower" แ‰ แˆšแˆ แ‹จแ‰ฐแˆฐแ‹จแˆ˜แ‹แŠ“ 581 แˆœแ‰ตแˆญ แˆญแ‹แˆ˜แ‰ต แ‹จแˆšแŠ–แˆจแ‹ แ‰ แŠฆแŠญแˆ‹แˆƒแˆ› แŠจแ‰ฐแˆ› แˆŠแŒˆแАแ‰ฃ แ‹จแАแ‰ แˆจแ‹ แˆฐแˆ›แ‹ญ แŒ แ‰€แˆต แˆ•แŠ•แƒ แ‰ แŠ’แ‹แ‹ฎแˆญแŠญ แŠจแ‰ฐแˆ› แŠจแˆšแŒˆแŠ˜แ‹แŠ“ แ‰ แŠ แˆœแˆชแŠซ แ‰€แ‹ณแˆšแ‹ แˆฐแˆ›แ‹ญ แŒ แ‰€แˆต แˆ•แŠ•แƒ แŠจแˆ†แАแ‹ World Trade Centre แ‰ 41 แˆœแ‰ตแˆญ แ‹จแˆšแˆจแ‹แˆ แАแ‹แข

๐Ÿ’ซแ‹จแŠฆแŠญแˆ‹แˆƒแˆ› แŠจแ‰ฐแˆ› แŠคแˆญแ–แˆญแ‰ถแ‰ฝ แ‹ณแ‹ญแˆฌแŠญแ‰ฐแˆญ แˆ•แŠ•แƒแ‹ แŠจแ‰ฐแŒˆแАแ‰ฃ แ‹จแŠ แ‹แˆฎแ•แˆ‹แŠ–แ‰ฝ แ‹จแ‰ แˆจแˆซ แˆฐแŠ แ‰ต แŠฅแŠ•แ‹ฒแŒจแˆแˆญ แ‹ซแ‹ฐแˆญแŒ‹แˆ แ‰ฅแˆˆแ‹‹แˆแข

๐ŸทแŒˆแŠ•แ‰ขแ‹Žแ‰น แ‹จแˆ•แŠ•แƒแ‹แŠ• แ‹ฒแ‹›แ‹ญแŠ• แˆฒแˆฐแˆฉ แ‰ แŠ แŠซแ‰ฃแ‰ขแ‹ แ‹จแˆšแŒˆแŠ˜แ‹แŠ• Rogers World Airport แŠฅแŠ“ Tinker Air Force Base แŒแŠ•แ‹›แ‰ค แ‹แˆตแŒฅ แˆ˜แŠญแ‰ฐแ‰ต แАแ‰ แˆจแ‰ฃแ‰ธแ‹ แ‰ฐแ‰ฅแˆแˆแข

@etconp
๐Ÿ‘23โค3๐Ÿฅฐ1
Intercon Construction Chemicals 
    
๐Ÿ‘‰ Authorized agent of MC (Conmix), Weber and SIMENTEK

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Concrete Repair, Grout   
โ— Tile Adhesive & Tile Joint Fillers 
โ— Wall Putty, Prime Coat, Rush Coat
โ— Quartz, Contextra
โ— Specialized paints (Thermal and Insulation Paints, Street and Playground Paints)
โ— Floor hardener, Epoxy              
โ— Geotextiles, Geo-membranes and other construction chemicals and materials

Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
๐Ÿ‘5๐Ÿ™1
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ‘‰แŠจ แŠ แ‰ฃแ‹ญ แŒแ‹ตแ‰ฅ แŠฅแˆตแŠจ แŠฎแˆชแ‹ฐแˆญ แˆแˆ›แ‰ต

แŠจแŒแˆˆแˆฐแ‰ฅ แ‰คแ‰ถแ‰ฝ แŠฅแˆตแŠจ แ‰ฐแ‰‹แˆ›แ‰ต แŠฅแŠ“

แˆ˜แŒ‹แ‹˜แŠ–แ‰ฝ แ‰ แˆแˆ‰แˆ แ‹จแŠขแ‰ตแ‹ฎแŒฝแ‹ซ แŠญแแˆ

แŠ แˆปแˆซแ‰ฝแŠ•แŠ• แŠ แˆณแˆญแˆแŠ“แˆ

๐Ÿ”ฐแˆแŠ• แ‹ญแˆแˆแŒ‹แˆ‰?

โœ‚๏ธแˆ‹แˆœแˆซ แˆ˜แ‰แˆจแŒซ รท แˆ›แŒ แŠแ‹ซ แŠฅแŠ“ แˆ˜แ‰ฅแˆป แˆ›แˆฝแŠ–แ‰ฝ แŠ แˆ‰แŠ•

๐Ÿ”—แŒแˆฎ (แ‰ถแŠ•แ‹ฒแŠ–) แŒฅแˆญแˆต แˆ›แˆตแ‰ แŒ€แ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠซแˆฐแ‰ก แˆˆแˆฑแˆ แˆ›แˆฝแŠ‘ แ‰ แŒƒแ‰ฝแŠ• แАแ‹‰

๐Ÿ“แˆ›แŠ•แŠ›แ‹‰แŠ•แˆ แ‹จแˆžแ‹ฐแŠแŠญ แˆตแˆซแ‹Žแ‰ฝแŠ• แ‹จแˆšแˆฐแˆฉ แ‰ฅแ‰ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแˆ แŠ แˆ‰แŠ•

โ˜Ž๏ธแ‹ญแ‹ฐแ‹‰แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

แŠ แ‹ตแˆซแˆปแ‰ฝแŠ•แฆ
                    แ‰.1 แˆ˜แˆญแŠซแ‰ถ
                    แ‰.2 แ‰ฐแŠญแˆˆแˆ€แ‹ญแˆ›แŠ–แ‰ต
                     แ‰.3 แŠ แ‹จแˆญ แŒคแŠ“

0904040477
0911016833
๐Ÿ‘6
๐Ÿ‘‰What are efficient ways to sound proof A room?
 
๐ŸšงDouble, Air-gapped Walls

โบThis one was key, especially to keep outside sound out and instrument sounds in (like my drums)! Inside of the cinder-block garage, we built a room using 2ร—4โ€™s (or maybe 2ร—6โ€™s). We then built an ever-so-slightly smaller room inside of it, leaving about 4โ€ณ between the outer wall and the inner one. This air-gap helped block transmission of sound. Inside each wall we used fiberglass insulation.

๐ŸšงDouble Sheet Rock

โบOn the walls mentioned above we used two sheets of 5/8โ€ณ sheet rock, not just one. This provided more mass, also good for blocking sound.

๐ŸšงFoam Egg Crates, Foam Rubber, Carpet

โบWe got lucky and found a dozen sheets of foam egg crate at a building auction and bought it for what one sheet of it would normally cost. We covered the walls in it. We used thick carpet on the floor, and some adhesive foam rubber sheets on the door and outside wall.

๐ŸšงAdjacent Mixing tech room

โบWe put the mixing consoles, PC, monitors, and other gear that generated noise in an adjacent room. If we were doing it โ€œrightโ€ I probably would have wired up audio jacks to totally isolate the two rooms, but instead we just put a large conduit between the rooms to run the cabling. I stuffed the conduit full of rags to block the PC fan sounds.


๐ŸšงAngled Window

โบWe put a window between the studio and the mixing room so the tech could see the band and vice versa.

To prevent the sound from going through, we used two panes of glass.

The one on the mixing room side was mounted in a normal up-and-down position.

The second pane, on the studio side was mounted at about a 45 degree angle, so sounds would be deflected down toward the floor. E.g. (Studio) \ | (Mixing Room).

๐ŸšงAC outside of the studio

โบThe studio got pretty hot with all that insulation, so we had to add a window AC unit.

Putting it in the studio was a no-go, so we mounted it in a window in the garage (outside the studioโ€™s double walls) and then fashioned some ducting to run the cool air into the back corner of the studio.

This kept the compressor noise out.

๐ŸšงTreating the gear

โ–ถ๏ธFinally, we would pick up rattling from drum stands, clicks of guitar pedals, snare vibrations, etc. We fixed this as we went โ€“ things like foam, cardboard, electrical tape, and rags all helped.

@etconp
๐Ÿ‘8โค1
#ADVERTISEMENTS

๐Ÿ‘‰แ‹จ แˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณ แ‹ฒแ‹›แ‹ญแŠ• แˆตแˆซ แˆ›แˆฐแˆซแ‰ต แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿทแ‰  แˆ˜แŠ•แŒˆแ‹ต แˆตแˆซ แˆ‹แ‹ญ แ‹จแŠ แˆแˆญ แˆ˜แŒ แŠ• แŠฅแŠ“ แ‹‹แŒ‹ แˆตแˆŒแ‰ตแฃแ‹จ แŠ แˆตแ‹แˆแ‰ต แˆแŠ•แŒฃแ แˆตแˆŒแ‰ตแฃแˆ™แˆ‰ แ‹จ แˆตแ‰ตแˆซแŠญแ‰ธแˆซแˆ แ‹ตแˆฎแ‹ŠแŠ•แŒ แˆตแˆซ แ‰ แŽแŒฅแАแ‰ต แŠฅแŠ“ แ‰  แŒฅแˆซแ‰ต แˆฐแˆญแ‰ฐแŠ• แŠฅแŠ“แˆตแˆจแŠญแ‰ฃแˆˆแŠ•แข

๐ŸšงแŠฅแŠ•แ‹ฒแˆแˆ Civil 3D แ‰ฒแ‰ถแˆญแ‹ซแˆ แ‰ชแ‹ตแ‹ฎ แŠจแА แˆ™แˆ‰ แˆ›แ‰ฐแˆชแ‹ซแˆ
แ‹จ Girder Birdge Working Drawing แŠจแА 3D modelแŠ“ แˆ™แˆ‰ แˆ›แ‰ฐแˆชแ‹ซแˆ แ‰ชแ‹ตแ‹ฎ แ‰ แ‰ฐแŒจแˆ›แˆช แˆ›แАแŠ›แ‹แˆ แ‹จแˆ˜แŠ•แŒˆแ‹ต แˆตแˆซ แ‹แ‹ญแˆŽแ‰ฝ แŠฅแŠ“ แ‰ดแˆแ•แˆŒแ‰ถแ‰ฝ แŠ แˆ‰แŠ•แข

๐Ÿ’ซแŠจแ‰ณแ‰ฝ แ‰ฃแˆ‰แ‰ต แŠฃแˆ›แˆซแŒฎแ‰ฝ แ‹ญแŒŽแ‰ฅแŠ™แŠ•

YouTube: http://www.youtube.com/@musfide

แ‹ตแˆ…แˆจ แŒˆแ…:- www.musfide.com

แ‰ดแˆŒแŒแˆซแˆ แŒˆแ…:- https://t.me/musafide

แˆŠแŠ•แŠญแ‹ฐแŠ•:- https://www.linkedin.com/in/musfide

แ‹ˆแ‹ญแˆ แ‰  +251905666664 แŠจแ‹ฐแ‹ˆแˆ‰ แ‹ซแŒˆแŠ™แŠ“แˆ๐Ÿ™
๐Ÿ‘9โค1๐Ÿ‘1
๐Ÿ‘‰Factors Affecting Concrete Compressive Strength

๐ŸทAmong the large number of factors affecting the compressive strength of concrete.

๐Ÿ’ซthe following are probably the most important for concretes used in structures.

๐Ÿšง1.  Water/cement ratio

โบThe strength of concrete is governed in large part by the
ratio of the weight of the water to the weight of the cement for a given volume of concrete.

โบA lower water/cement ratio reduces the porosity of the hardened concrete and thus increases the number of interlocking solids.

๐Ÿšง2.  Type of cement

โบTraditionally, five basic types of Portland cement have been produced:

Normal, Type I:
Modified, Type II:
High early strength, Type III:
Low heat, Type IV:
Sulfate resisting, Type V:

๐Ÿšง3. Supplementary cementitious materials

โบSometimes, a portion of the cement is replaced by materials such as fly ash, ground granulated blast-furnace slag, or silica fume to achieve economy, reduction of heat of hydration, and, depending on the materials, improved workability.

๐Ÿšง4. Aggregate

โบThe strength of concrete is affected by the strength of the aggregate, its surface texture, its grading, and, to a lesser extent, by the maximum size of the aggregate.

๐Ÿšง5.  Mixing water

โบThere are no standards governing the quality of water for use in mixing concrete.

โบIn most cases, water that is suitable for drinking and that has no pronounced taste or odor may be used

๐Ÿšง6. Moisture conditions during curing

โบThe development of the compressive strength of concrete is strongly affected by the moisture conditions during curing.

โบProlonged moist curing leads to the highest concrete strength

๐Ÿšง7. Temperature conditions during curing

โบThe effect of curing temperature on strength gain for specimens placed and moist-cured for 28 days under the constant temperatures shown in the figure and then moist-cured at 73ยฐF.

โบThe 7- and 28-day strengths are reduced by cold curing temperatures, although the long-term strength tends to be enhanced.

๐Ÿšง8. Age of concrete.

Concrete gains strength with age

๐Ÿšง9. Maturity of concrete

โบYoung concrete gains strength if the concrete remains about a threshold temperature of to or to Maturity is the summation of the product of the difference between the curing temperature and the threshold temperature, and the time the concrete has cured at that temperature

@etconp
๐Ÿ‘16โค2
#ADVERTISEMENT

๐Ÿ’ซSpecialized Retrofitting (Jacketing) Services for:

โœ… Columns โ€“ Enhance load-carrying capacity and structural integrity.
โœ… Footings โ€“ Improve stability and prevent settlement.
โœ… Beams โ€“ Restore and upgrade strength for better performance.

๐ŸšงWhy Retrofitting?

๐Ÿ”น Extend Structural Lifespan โ€“ Protect your investment for years to come.
๐Ÿ”น Improve Safety โ€“ Ensure compliance with modern building codes and standards.
๐Ÿ”น Cost-Effective โ€“ Avoid expensive replacements by strengthening existing structures.
๐Ÿ”น Resilience Against Disasters โ€“ Strengthen your building to withstand seismic activity and heavy loads.

๐Ÿ“ž Contact Us Today!

๐Ÿ“ฉ @pragmaengineering
๐Ÿ“ฑ +251975889929 | +251941099797

Pragma Engineering โ€“ Your Trusted Partner in Structural Excellence!