Ethio Construction Engineering
32.3K subscribers
6.27K photos
359 videos
1.99K files
3.31K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
ታምራት  ፕሌት እና ጄቦልት አቅራቢ

👉ከ አባይ ግድብ እስከ ኮሪደር ልማት

ከግለሰብ ቤቶች እስከ ተቋማት እና

መጋዘኖች በሁሉም የኢትዮጽያ ክፍል

አሻራችንን አሳርፈናል

🔰ምን ይፈልጋሉ?

✂️ላሜራ መቁረጫ ÷ ማጠፊያ እና መብሻ ማሽኖች አሉን

🔗ፌሮ (ቶንዲኖ) ጥርስ ማስበጀት ወይንም ማሳጠፍ ካሰቡ ለሱም ማሽኑ በጃችን ነዉ

📐ማንኛዉንም የሞደፊክ ስራዎችን የሚሰሩ ብቁ ባለሙያዎችም አሉን

☎️ይደዉሉልን ያማክሩን

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን

አድራሻችን፦
                    ቁ.1 መርካቶ
                    ቁ.2 ተክለሀይማኖት
                     ቁ.3 አየር ጤና

0904040477
0911016833
👍5❤1
#ADVERTISEMENT

#በቴምር ሪልስቴት ለሽያጭ የወጡ 3 ሳይቶች
ከልዮ የገና ዲስካውንት ጋር
👉7ሳይቶችን ስርተን አስረክበናል አሁን ላይ ደግሞ ለሽያጭ ካወጣናቸው 3 ሳይቶች

ፒያሳ (ሊሴ ገ/ማርያም á‰ľáˆáˆ…áˆ­á‰ľ ቤት) ጀርባ
    👉1መኝታ 46ካሬ =Soldout
    👉1 መኝታ 66ካሬ=
        10% ቅድመ ክፍያ 693,000ብር
    👉2መኝታ 71ካሬ
      10%ቅድመ ክፍያ 745,000ብር
      ሙሉ ክፍያ 7,455,000ብር
    👉2መኝታ 93ካሬ=
     10% ቅድመ ክፍያ 1,044,000ብር
    👉3መኝታ 130ካሬ
    10%ቅድመ ክፍያ 1,365,000ብር
    👉3መኝታ 142ካሬ
   10%ቅድመ ክፍያ 1,533,600ብር
    👉ቀሪውን 90% በ17ዙር ከፍለው  á‹¨áˆšáŒ¨áˆ­áˆąá‰ľ
0911603746
@Samiwagaye
👍2👏1
👉ማንኛውም ጨረታ ቴክኒካል እና ፋይንናሻል ፕሮፖዛል ከማዘጋጀት በፊት የሚከተሉትን ማድረግ እጅግ ጠቃሚ መሆናቸውን ልብ ይበሉ

💫1. ጨረታውን  ያወጣው ተቋም ያዘጋጀውን ጨረታ ሰነድ በጥልቀት ማንበብና መረዳት

[ምንም እንኳ አብዛኛው ተቋም PPA 2011 Standard Bidding Document ተጠቅሞ ወይም እንደ ግዥው በጀት ምንጭ አለም አቀፍ አበዳሪ ተቋማት ስታንዳርድ ጨረታ ሰነዶችን ተጠቅሞ የሚያዘጋጅ ቢሆንም እንኳ በጨረታ ሰነዱ የሚገኙ የተለያዩ ክፍሎች እንደየፕሮጀክቱና ተቋሙ ሁኔታና መረዳት የሚሞሉ እንደመሆናቸው የተዘጋጀውን ሰነድ ገዝቶ በግዥ ላይ በሰሩና ልምድ ባላቸው ባለሞያዎች በዝርዝር ማየት አስፈላጊ ነው]

💫2. የጨረታ ሰነዱን ገዝተን በዝርዝር ካየን በኋላ አሻሚ የሆኑ፣ ግልጽ ያልሆኑ እና መካተት የነበረባቸው የቀሩ ሰነዶች  አሉ ብለን ካሰብን፤ ጨረታውን ላወጣው ተቋም ማብራሪያ መጠየቅ አለብን

[ ማብራሪያን በተመለከተ እንዴት እና የት እንደሚጠየቅ የጨረታ ሰነዱን ክፍል አንድ ወይም ሁለት ላይ መመልከት ይኖርብናል። ይህንን ጥያቄ መሰረት አድርጎ ጨረታውን ያወጣው ተቋም ማብራሪያ መስጠት ይኖርበታል]

💫3. በግዥ/ጨረታ áˆ‹á‹­ ልምድ ያለው ባለሙያ  የቴክኒካልና ፋይናንሻል ፕሮፖዛል ዝግጅቱን እንዲያከናውን ማድረግ፤

💫4. ቴክኒካል እና ፋይናንሻል ሰነድ ለማዘጋጀት የሚያስፈልጉን ቅጾች/forms/ በጨረታ ሰነዱ ላይ የሚገኙ መሆናቸውን በማረጋገጥ እነሱን ተጠቅሞ ማዘጋጀት ይገባል።

ከዚህ በፊት ከተጠቀምናቸው ቅጾች ሊለዩ ስለሚችሉ በጥንቃቄ መረዳትና ማየቱ ተገቢ ነው።

⭐️Youtube ገፃችን ላይም ቤተሰብ ይሁኑ👇

https://youtube.com/@ethiopianconstruction?si=i3B2u9LyWBNjqAAO

@etconp
🙏11👍5❤3
👉የአፈር ጥቅጠቃ (Fill or Embankment)

🏷በሀገራችን የቀድሞው ባትኮዳ (Building and Transport Construction Design Authority - BaTCoDA) Specification እና በ 'AASHO T147' መሰረት የአፈር ጥቅጠቃ ወይም መረምረም በተቆጣጣሪው መሐንዲስ የጸደቀ ግብአት መሆን ያለበት ሲሆን፦

🚧1ኛ) ቢያንስ 95% የመጠቅጠቅ ብቃትን (95% compaction) ያሟላ መሆን አለበት

🚧2ኛ) የጥቅጠቃ ሥራው ቢበዛ ከ20 ሳንቲሜትር ባልበለጠ የንጣፍ ውፍረት (not ecmxceeding 20cm layers) መጠቅጠቅ አለበት

🚧3ኛ) እያንዳንዱ ንጣፍ በቂ ውሃ እየጠጣ መጠቅጠቅ (watered compaction) አለበት


💫የ FACEBOOK ገፃችንም ይወዳጁ👇

https://www.facebook.com/ethioconp

@etconp
👍19❤2
👉ሰላም ውድ ቤተሰቦቻችን ኣዲስ የ ETABS በ ኣማርኛ ቲቶርያል ከ introduction ጀምሮ Analysis እና Design ኣካተን ምርጥ ቪድዮ ማዘጋጀታችን ይታወሳል።

🫵እንሆ ዛሬ ክፍል 3 ጭነንላቹዋል👇

https://youtu.be/-bRgePRrJCo
👌6👍3🙏2
👉የኮንስትራክሽን ማኔጅመንት ኢንስቲትዩት ከ4 ነጥብ 2 ቢሊዮን ብር በላይ በሆነ ወጪ የኮንስትራክሽን ማኔጅመንትና ምህንድስና ልህቀት ማዕከል ሊያስገነባ ነው

የኮንስትራክሽን ማኔጅመንት ኢንስቲትዩት ከ4 ነጥብ 2 ቢሊዮን ብር በላይ በሆነ ወጪ የኮንስትራክሽን ማኔጅመንትና ምህንድስና ልህቀት ማዕከል ለማስገንባት ከህንጻ ተቋራጮች ጋር የውል ስምምነት ተፈራረመ፡፡

የከተማና መሰረተ ልማት ሚኒስትር ዴኤታ የትምጌታ አስራት፣ የኢንስቲትዩቱ ዋና ዳይሬክተር ኢንጂነር ታምራት ሙሉ እና የህንጻ ተቋራጮች በፊርማ ሥነ ሥርዓቱ ላይ ታድመዋል፡፡

የኢንስቲትዩቱ ምክትል ዋና ዳይሬክተር ኢንጂነር ዳዊት መሀሪ፥ ማዕከሉ በኦሮሚያ ክልል በረክ ወረዳ በሰንዳፋ ከተማ አቅራቢያ በ14 ሄክታር መሬት ላይ እንደሚገነባ ተናግረዋል፡፡

የማዕከሉ ግንባታ በሁለት ምዕራፍ ተከፍሎ የሚገነባ ሲሆን ሁለት ሀገር በቀል የግንባታ ተጫራቾች ግልጽ ዓለም አቀፍ የጨረታ ሂደትን በማሸነፍ ውል መፈራረማቸውን ገልጸዋል።

ሁለቱም የማዕከሉ ግንባታ ምዕራፎች ከ4 ነጥብ 2 ቢሊዮን ብር በላይ በሆነ ወጪ በሶስት ዓመት ውስጥ እንደሚጠናቀቁም ጠቁመዋል።

የማዕከሉ መገንባት ኢንስቲትዩቱ የኮንስትራክሽን ዘርፉን በጥናት፣ በስልጠና፣ በጥራት አስተዳደር፣ በቴክኖሎጂና የክህሎት ሽግግር ለመደገፍ ያለውን ሚና ያጠናክራል ነው ያሉት።

ማዕከሉ የምርጥ ተሞክሮዎች መቀመሪያ፣ የዘመናዊ ኮንስትራክሽን መሳሪያዎች ጥራት ማረጋገጫ እንዲሁም ለሜጋ ፕሮጀክቶች እና በዘርፉ ለሚካሄዱ የጥናትና ምርምር ሥራዎች ትልቅ አበርክቶ እንደሚኖረው አስረድተዋል፡፡

የከተማና መሰረተ ልማት ሚኒስትር ዴኤታ የትምጌታ አስራት በበኩላቸው፥ የኮንስትራክሽን ዘርፉ ለሀገር ዕድገት ጉልህ ሚና እንዳለው ጠቅሰዋል።

ዘርፉን በማዘመንና በማጠናከር ረገድ የኮንስትራክሽን ማኔጅመንትና ምህንድስና ልህቀት ማዕከል መገንባት ትልቅ አብርክቶ እንደሚኖረው ተናግረዋል።

በመሆኑም ማዕከሉን በሁለት ምዕራፍ ለመገንባት ውል የወሰዱ ተቋራጮች በጥራትና በፍጥነት በተያዘለት ጊዜ እንዲያጠናቅቁ አሳስበዋል።

ኢንስቲትዩቱም ለግንባታው መፋጠን ተገቢውን ክትትል ከማድረግ ባለፈ በአደረጃጀትና በግብዓት በበቂ ሁኔታ መዘጋጀትና ማሟላት እንዳለበት ጠቁመዋል።

@etconp
👍8❤1
🫵ውድ ቤተሰቦቻችን ምርጥ የ ETABS ቲቶርያል በ YOUTUBE ቻናላችን በ ኣማርኛ ቋንቋ እንደጀመርን ያውቃሉ?

🌟እንሆ የ Analysis ፓርቱ የመጨረሻ ክፍል 4

🙏ለ YOUTUBE ቻናላችን አዲስ ከሆኑ SUBSCRIBE በማረግ ቤተሰብ ይሁኑ እንዲሁም ለወዳጅዎ ያጋሩ

https://youtube.com/@ethiopianconstruction?si=i3B2u9LyWBNjqAAO

🖱Amharic ETABS Tuetorial Last Part 4 👇

https://youtu.be/JbvUWRVoGgA
👏4
#Advertising #ማስታወቂያ #MusaFide
Our Services Include:

💻 Civil 3D Full Tutorials (4K Video)

Tutorials with project files used throughout the video for hands-on learning.
📊 All Supporting Materials

Access materials, including PKT Files, Superelevation Excels, & ERA Manual XML, to streamline your design work.
🏗 Girder Bridge Working Drawing Preparation

Complete working drawings for Girder Bridges, including all materials used in the tutorial, & the 3D model created in SketchUp.
🚗 Highway Design Expertise

Professional highway design services
🛠 Template Production & PKT Development Template creation & PKT development as per your project standards.

📏 Earthwork & Pavement Quantity Preparation

Earthwork & pavement quantity preparation to ensure precise cost estimation.
🏗 Structural Working Drawing Preparation

Detailed structural working drawings Preparation
Connect with Us:
YouTube: http://www.youtube.com/@musfide
Telegram: https://t.me/musafide
WhatsApp: https://bit.ly/musfide
Call Us: +251 905 666 664
👍9
👉Road cracks are a common problem in pavement and road infrastructure, caused by various factors such as traffic loads, weather conditions, and poor construction practices. Here are the common types of road cracks and methods to prevent them:

1. Longitudinal Cracks

Description: Cracks parallel to the centerline of the road.

Causes:

Weak longitudinal joints.

Poor compaction during construction.

Traffic loading and thermal stresses.

Prevention:

Ensure proper compaction at joints during construction.

Use quality materials and follow proper paving techniques.

Minimize differential thermal stresses through appropriate mix design.

2. Transverse Cracks

Description: Cracks perpendicular to the road’s centerline.

Causes:

Shrinkage of asphalt due to temperature changes.

Poor resistance to thermal stresses.

Prevention:

Use temperature-resistant asphalt mixes.

Apply crack-sealing techniques promptly to prevent water infiltration.

3. Fatigue or Alligator Cracking

Description: A series of interconnected cracks resembling an alligator’s skin.

Causes:

Repeated traffic loads.

Weak base or subgrade layers.

Insufficient pavement thickness.

Prevention:

Design the pavement to withstand expected traffic loads.

Improve the strength of the base and subgrade layers.

Conduct timely maintenance to prevent minor cracks from expanding.

4. Block Cracks

Description: Cracks that form rectangular patterns, typically due to aging.

Causes:

Asphalt binder hardening over time.

Shrinkage due to temperature fluctuations.

Prevention:

Use high-quality asphalt binders with proper additives.

Perform regular seal coating to extend the pavement's lifespan.

5. Edge Cracks

Description: Cracks along the edge of the road.

Causes:

Poor drainage.

Weak support at the road edges.

Heavy traffic near the edge.

Prevention:

Improve road edge support with proper shoulder design.

Ensure effective drainage to avoid water accumulation.

Control vegetation growth along road edges.

6. Reflection Cracks

Description: Cracks that reflect through overlays from underlying pavement.

Causes:

Movement or cracking of the underlying pavement.

Poor bonding between the layers.

Prevention:

Use geotextiles or crack relief layers during resurfacing.

Apply proper bonding techniques between layers.

7. Slippage Cracks

Description: Crescent-shaped cracks caused by slippage between layers.

Causes:

Poor bond between pavement layers.

Traffic braking and acceleration forces.

Prevention:

Apply a tack coat for better bonding during construction.

Use quality materials for base and top layers.

8. Potholes

Description: Depressions or holes in the pavement caused by material failure.

Causes:

Water infiltration.

Traffic loads and freeze-thaw cycles.

Prevention:

Ensure proper drainage design.

Repair minor cracks promptly to avoid water penetration.

Use durable materials and apply regular maintenance.

General Maintenance Tips:

1. Conduct regular inspections to detect early signs of distress.

2. Seal cracks as soon as they appear to prevent them from worsening.

3. Use appropriate construction and maintenance practices suited to the local climate and traffic conditions.

4. Ensure proper training of construction personnel to minimize workmanship errors.

@etconp
👍22❤8
👉በሀገራችን_በህንጻ መዋቅር ጥናት ውስጥ ጥቂት ስለ Seismic (Earthquake) ታሳቢነት

🏷ይህ ጽሁፍ የተዘጋጀው  ወቅታዊው የመሬት መንቀጥቀት ያሳደረብንን ስጋት አንጻር ጥቂት ለማለት ነው።

በሀገራችን ራሱን የቻለ የዲዛይን ኮድ አለን ካሉን የዲዛይን ኮዶች መካከል አንዱ ስለ Seismic Design የሚንመራበት ES EN 1998-1:2015 Design of Structures for Earthquake Resistance የሚለው ይገኝበታል።

የመዋቅር ዲዛይን የሚሰራው ባለሙያም ዲዛይኑን የሚያጸድቀውም መኮንን በዚሁ  መሰረት ዲዛይን ተሰርቶ ወደ ግንባታ እንዲገባ ፈርመው ይሰጣሉ።

ገንቢውም በዚህ ተመስርቶ እንዲገነባ ይጠበቅበታል።

የህንጻ መዋቅር ዲዛይን ታሳቢዎች
በመዋቅር ዲዛይን ታሳቢ የሚደረጉ ጭነቶች (Action loads) መካከል መሰረታዊ የሚባሉት Dead load, Live load Wind Load እና Seismic actions ሲሆኑ እንደ ሁኔታው እየታየ የተዘረዘሩት loadዎች በጋራ የሚያመጡት ጉዳት ከግንዛቤ የሚያስገባ እንደ አስፈላጊነቱ ከ 100 load combination ይሰራል።

ወደ መሬት መንቀጥቀጡ ስንገባ ለህንጻ ዲዛይንም በሬክተር ስኬል እየተለካ ሳይሆን ቀድሞ በተጠና አካባቢያዊ ተጠባቂ ሁኔታ የተከፋፈሉ ዞኖችን ታሳቢ አድርጎ በዚያ አካባቢ የሚጠበቀውን ከፍተኛ የምድር እንቅስቃሴ (Peak Ground Acceleration)  ታሳቢ በማድረግ በተሰሩ ቀመሮችና ለመቀመሪያ በተዘጋጁ Software በመታገዝ ነው።

🚧ወደ ዲዛይን ታሳቢዎች ስንገባ

፩) ህንጻው የሚገባበት አካባቢ ለመሬት መንቀጥቀጥ ያለው ተጋላጭነትን ያገናዘበ ዞን (Seismic Zone) ( አዲስ አበባ ዞን 3 ሲሆን የሰሞኑ የአብዛኛው መሬት መንቀጥቀጥ መነሻ አፋር ክልል ብዙው ዞን 5 ነው)

፪) እያንዳንዱ ህንጻ ስንመለከተው በአርማታ በመሰራቱ ግትር ቢሆንም የመሬት መንቀጥቀጥን ለመከላከል እንዲችል የተወሰነ ያክል ተለማጭ እንዲሆን የሚያስችል ስሌት (Elastic Analysis) ይሰራለታል።

፫) የህንጻው መሰረት የሚያርፍበት የመሬት (አፈር/አለት)
ሁኔታ ( Ground Type) ታሳቢ ይደረጋል።

፬) የሚገነባው ህንጻ መዋቅር ዓይነት ( Structural Type and Behavioral Factor) የጥናቱ አካል ነው።

፭) የህንጻው ቅርጽና ቁመና (Structural Regularity) ከግምት ውስጥ ይገባል።

፮) የህንጻው መዋቅር አካላት Beam, Slab, Column, Wall, Number of Story, Number of Bays እና Foundation Types በልዩ ሁኔታ ታሳቢ ይደረጋሉ።

፯) ለግንባታ የምንጠቀማቸው ቁሶችና ጥራታቸው ( በተለይ የአርማታ የብረት ) በየመስፈሪያቸው የዲዛይኑ ግብዓት ሆነው ያገለግላሉ።

⭐️ከላይ የተዘረዘሩትና ሌሎችም ታሳቢዎች ታክለው በተሰራው የኮምፒውተር ሞዴል በሚሰጣቸው ከመቶ በላይ load combinations የከፋ ጉዳት ሊያደርሱ የሚችሉትን እንዲቋቋም ተደርጎ ፣ የተለያዩ ማሻሻያ የሚያስፈልጋቸው Modifier Factors ተካተው፣ የ Stability Check ተደርጎ የስትራክቸራል ዲዛይን ድሮዊንግ ይሰራል።

❇️ለምን እንንቀጠቀጣለን?

⏺እንዲህ ተሰርቶ ለምን እንንቀጠቀጣለን? ለሚለው መልሱ ከላይ የዘረዘርኩት ማስረጃዎችን ታሳቢ ተደርጎ ከተሰራ ዲዛይን ላይ ሶስት ሞዴሎች ተያይዘዋልና ተመልከቷቸው።

⏺እንቅስቃሴዎቹ በተለያዩ load combinations ህንጻው ራሱን ሲከላከል የሚያሳይ የትክክለኛ ዲዛይን animation ነው።

⏺ይህ እንቅስቃሴ በአይናችን ልናየው ባንችልም የተሰቀሉ መብራቶች ሲንቀሳቀሱ፣የተቀመጠ ዕቃ ሲወድቅ፣ የተከፈተ መስኮት/በር ሲዘጋ...እንመለከታለን እኛም ህንጻው ላይ እንደተቀመጡት ዕቃዎች ንዝረቱ ይሰማናል እንጂ የህንጻውን እንቅስቃሴ ልንመለከት አንችልም ግን እየተንቀሳቀሰ ነው።

⏺ህንጻው ተንቀሳቀሰ ማለት ዲዛይኑ ትክክል አይደለም ማለት ወይም ይፈርሳል ማለት አይደለም። ዲዛይን በተደረገው ሞዴል መሰረት እራሱን እየተከላከለ ነው።

💫ምን ያሰጋናል?

፩) የግንባታ ጥራት
፪) ከዲዛይን ውጪ የተጨመሩ ወለሎች ያሏቸው ህንጻዎች
፫) የመሬት መንቀጥቀጥ የሚነሳባቸው አካባቢ ያሉ ቤቶች
፬) ሳይት ላይ መዋቅሮች የተደረጉ ማሻሻያዎች
፭) በተኛንበት ወይም በተቀመጥንበት የተንጠለጠሉ ቁሶች አናታችን ላይ ወድቀውብን አደጋ እንዳያደርሱብን!

Via ደሳለኝ ከበደ ህንጻ መሀንዲስ፣ ገንቢ፣ ሪል ስቴት አማካሪ

@etconp
👍35❤5
🫵ውድ ቤተሰቦቻችን በ ኣዲሱ የ YOUTUBE ቻናላችን መሉ በ አማርኛ የ ETABS ቲቶርያል UPLOAD ማረጋችን ይታወሳል

📩ለ ቀጣይ እንዲሰራላቹ ምትፈልጉት ቲቶርያል @Philemona7 ፃፉልን🌟

🙏ለ YOUTUBE ቻናላችን አዲስ ከሆኑ SUBSCRIBE በማረግ ቤተሰብ ይሁኑ እንዲሁም ለወዳጅዎ ያጋሩ👇

https://youtube.com/@ethiopianconstruction?si=i3B2u9LyWBNjqAAO

@etconp
👏4👍2
Intercon Construction Chemicals 
    
👉 Authorized agent of MC, SIMENTEK, Sika, Weber

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Concrete Repair, Grouting   
● Tile Adhesive & Tile Joint Fillers 
● Wall Putty, Prime Coat, Rush Coat
● Quartz, Contextra
● Floor hardener, Epoxy              
● Geotextiles, Geo-membranes and other construction chemicals and materials

Tel: 0961955555 or 0961955559
Address: Signal, around signal mall
👍3
👉The amount of diesel fuel used in field density tests (like the sand cone method or nuclear gauge method) is not directly specified in standard testing procedures like AASHTO or ASTM.

Here's why:

* Focus on Density, Not Fuel Consumption: The primary objective of these tests is to determine the in-place density and moisture content of the soil or aggregate.

Fuel consumption is not a critical parameter for the test itself.

* Variability in Equipment and Conditions: The amount of fuel used will vary significantly depending on factors like:
* Equipment type: Different types of compactors (e.g., rollers, vibratory plates) and their sizes will consume varying amounts of fuel.
* Soil type and moisture content: Harder soils and those with higher moisture content will generally require more compaction effort, and thus more fuel.
* Compaction specifications: The required degree of compaction will influence the amount of effort and fuel needed.
* Ambient conditions: Temperature and humidity can affect compaction efficiency and fuel consumption.
Instead of focusing on a specific fuel volume, these standards emphasize:
* Achieving the specified compaction criteria: The primary goal is to achieve the desired level of compaction as defined in the project specifications or relevant standards.
* Proper equipment operation: Ensuring that the compaction equipment is operated correctly and efficiently to minimize fuel consumption while achieving the required compaction.

To estimate fuel consumption:

* Consult equipment manuals: Manufacturers of compaction equipment often provide fuel consumption estimates based on typical operating conditions.
* Monitor fuel usage during the project: Keep track of fuel consumption during the compaction process to establish a baseline for future projects.
* Implement fuel-saving measures: Consider using fuel-efficient equipment, optimizing compaction procedures, and minimizing idling time to reduce fuel consumption.

Disclaimer: This information is for general knowledge and guidance only.

Always refer to the specific project specifications and relevant AASHTO or ASTM standards for the most accurate and up-to-date information.

@etconp
👍12❤1
👉መንግሥት በራሱና በውጭ ተቋራጮች ግንባታዎችን በመቆጣጠሩ የግል ሥራ ተቋራጮች ከሥራ ውጪ መሆናቸውን አስታወቁ!

መንግሥት የመንገድና የሕንፃ ፕሮጀክቶችን ለመገንባት የራሱን የግንባታና የዲዛይን ድርጅቶች በማቋቋም፣ ፕሮጀክቶችን መያዙና የተቀረውን ለውጭ አገር የሥራ ተቋራጮች እየተሰጠ መሆኑ፣ የአገር ውስጥ የግል የሥራ ተቋራጮች ከሥራ ውጪ መሆናቸውን አስታወቁ።

ይህ የተገለጸው የከተማና መሠረተ ልማት ሚኒስቴር ከግሉ የግንባታ ዘርፍ ባለድርሻ አካላት ጋር ባለፈው ሳምንት ባደረገው የምክክር ጉባዔ ላይ ነው።

ሚኒስቴሩ የአገር ውስጥ የሥራ ተቋራጮች በአሥር ዓመታት ውስጥ በአገር ውስጥ ያላቸውን የገበያ ድርሻ ወደ 75 በመቶ፣ በቀጣናው ደግሞ የ25 በመቶ ድርሻ እንዲያሳድጉ ዕቅድ ቢይዝም፣ የሥራ ተቋራጮች በበኩላቸው መንግሥት በውጭ ተቋራጮች ላይ ያለውን ከፍተኛ ጥገኝነት፣ የክፍያዎች መዘግየት፣ በቅርብ የተካሄደው የኢኮኖሚክ ሪፎርም በኢንዱስትሪው ላይ ያሳደረውን ጫናና ሌሎችም ማነቆዎችን በማንሳት፣ መንግሥት በእርግጥ ኢንዱስትሪውን ያውቀዋል ወይ? የሚል ጥያቄ አንስተዋል።

አቶ ሀብታሙ ጌታቸው የተባሉ ተሳታፊ፣ መንግሥት ከቅርብ ጊዜ ወዲህ ኢንዱስትሪውን በብቸኝነት ወደ መቆጣጠር እያመራ ነው ሲሉ ወቅሰዋል።

‹‹ከቅርብ ጊዜ ወዲህ ያው ከመሰላቸትምም ተነስቶ ሊሆን ይችላል፣ ግን በመንግሥት በኩል ኢንዱስትሪውን በብቸኝነት የመያዝ ሒደት ነው እያየን ያለነው። መንግሥት የራሱን የዲዛይን፣ የኮንስትራክሽን ተቋማት እያደራጀና እያዘጋጀ ነው። ስለዚህ ፕሮጀክት ሲመጣ ራሱ ዲዛይን ያደርጋል፣ ራሱ ግንባታ ይፈጽማል፣ በጣም ከእሱ አቅም በላይ የሆነውን ለውጭ ኩባንያዎች ይሰጣል። ስለዚህ ለግሉ ዘርፍ ቦታው ባዶ ነው ብዬ ነው የምገምተው፤›› ብለዋል።

በሌላ በኩል በምክክር መድረኩ የቀረቡ ሁለት ጥናቶች፣ በአገር ውስጥ የሥራ ተቋራጮች የሚገነቡ መንገዶች በ143 በመቶ፣ ሕንፃዎች ደግሞ በ110 በመቶ ከተያዘላቸው ጊዜ አሳልፈው እንደሚጠናቀቁ፣ ከተያዘላቸው በጀትም እንዲሁ የመንገድ ፕሮጀክቶች በ18 በመቶ፣ ሕንፃዎች ደግሞ በ35 በመቶ እንደሚያሳልፉ አመላክተዋል።

ከሚኒስቴሩ በኩል ጥናት ያቀረቡት ባለሙያ፣ ‹‹ከዚህ ጥናት በኋላ በፕላንና ልማት ሚኒስቴር አስተባባሪነት በተደረጉ የፕሮጀክቶች ክትትል በብዙ ፕሮጀክቶች እያንዳንዱ እየተነጠለ ሲታይ የጭማሪዎቹ መጠን ከዚህም በላይ እንደሆነ ማየት ተችሏል፤›› ብለዋል።

ሳሙኤል ሳህለ ማርያም (ኢንጂነር) የተባሉ ጥናት አቅራቢ በበኩላቸው፣ የውጭ ኮንትራክተሮች የሚይዙት ግንባታ መጠን አነስተኛ ሆኖ፣ ነገር ግን የሚይዙት የገበያ ድርሻ እስከ 62 በመቶ እንደሚደርስ አሳውቀዋል።
ከዚህ ጋር ተያይዞም ያሉ ሥጋቶች ላይ ማብራሪያ ሲሰጡ፣ ‹‹የግንባታ ዘርፉ አሁንም ትልልቅ የመሠረተ ልማት ፕሮጀክቶች ትልቁን ድርሻ የያዙት የውጭ ሥራ ተቋራጮች ናቸው። ይህንን ልንቀይርበት የምንችልበት አካሄድ እስካልተፈጠረ ድረስ አሁን በቅርብ ይህ ንግድ ለዓለም የንግድ ድርጅት ክፍት ነው የሚሆ ነው።

ስለዚህ እኛ ምን ይዘን ነው የምንቀላቀለው? ምን ይዘን ነው ለውድድር ልንቀርብ የምንችለው? በዚህ ሁኔታ ከሆነ የምንቆየው ሁላችንም ተበልተን ነው የምናልቀው፤›› ብለዋል።

በሚኒስቴሩ በኩል የቀረቡት ባለሙያ የውጭ ተቋራጮች ጉዳይ እስከ ሉዓላዊነት የደረሰ ችግር ሊያስከትል ይችላል ሲሉ አስጠንቅቀዋል።

በአሁኑ ወቅት በሥራ ላይ ያሉት የአገር ውስጥ የሥራ ተቋራጮችና አማካሪ ኩባንያዎች 35 ሺሕ መድረሳቸውን፣ የባለሙያዎች ብዛትም 151 ሺሕ መሆኑን ጠቅሰዋል።

‹‹በቁጥር ይግዘፍ እንጂ በፌዴራልም ሆነ በክልል ደረጃ የመንግሥት ሜጋ ፕሮጀክቶች በብዛት የተያዙት በሚያሳዝን ሁኔታ በውጭ ኮንትራክተሮች ነው። መጀመሪያ የአገራችንን 75 በመቶ ይዘን የቀጣናውን 25 በመቶ ገበያ ለመያዝ ነው ዕቅዳችን። እነዚህ ቁጥሮች ሳይሆኑ እኛን የሚታደጉን ሄዶ ሄዶ ጉዳዩ የሉዓላዊነት ጉዳይ ጋር ይመጣል፤›› ብለዋል።
ሳሙኤል (ኢንጂነር) የውጭ አገር የሥራ ተቋራጮች ከዚህም ባሻገር ከበጀት ጋር የተያያዙ ጫናዎች እየፈጠሩ መሆናቸውን አሳውቀዋል።

‹‹አንድ በውጭ ተቋራጭ የሚሠራ በጀቱ 800 ሚሊዮን ብር የነበረ ፕሮጀክት፣ ግንባታውን በመሀል አቁመው 3.2 ቢሊዮን ብር ካልከፈላችሁን አንሠራም ማለታቸውን እናውቃለን። ቦሌ ክፍለ ከተማ የሚሠራው ስታዲየምን መጥቀስ ይቻላል፡፡ ፕሮጀክቱ ሲጀመር በጀቱ ከሁለት ቢለዮን ብር ጥቂት ነበር ከፍ የሚለው። ግን በኋላ ላይ እስከ 12 ቢሊዮን ብር አይበቃም ማለታቸውን ሰምተናል፤›› ብለዋል።

ባለሙያው ይህ ዓይነቱ አሠራር ለአገር ውስጥ የሥራ ተቋራጮች እንደማይሠራ ገልጸው፣ ኩባንያዎች፣ ከባንኮች ከግንባታ ዕቃ አቅራቢዎች ጋር ተያይዞ ሊሠራበት የሚችልበት ሁኔታ እንደሌለ ገልጸዋል።

የውጭና የአገር ውስጥ ተቋራጮች አፈጻጸምን በተመለከተ ለአብነት የቻይና ተቋራጮችን አፈጻጸም ያነሲ ሲሆን፣ ፕሮጀክቶችን በሚያገኙበት ወቅት ዕቃ አቅራቢ ፋብሪካ አዘጋጅተው፣ አማካሪ ኩባንያው የራሳቸው አገሮች ኩባንያ መሆኑንና ንዑስ ተቋራጮችም በራሳቸው እንደሚያዘጋጁ ጠቅሰው፣ የቻይና ኤግዚም ባንክ እዚህ ለሚሠሩ ሥራ ተቋራጮች የገንዘብ ፍሰት (Cash Flow) ችግር እንዳያጋጥማቸው እንደሚያቀርብላቸውና በእነዚህ ሁኔታዎች ውስጥ የሚያልፍ የውጭ ተቋራጭ በተገቢው ሁኔታ ሥራውን አከናወነ እንደሚባል ተናግረዋል።

‹‹የእኛ ሥራ ተቋራጭ እኮ በክፍያ ምክንያት የሚያጋጥመው ጫና ምናልባት መንግሥትና ዘርፉ የእውነት ይተዋወቃሉ?› የሚል ጥያቄ እንዳነሳ ነው የሚያደርገኝ። የእውነት ይተዋወቃሉ ወይ? ዘርፉ እኮ እየሞተ ነው ያለው። ክፍያ በአግባቡ ካልተከፈለው የፕሮጀክት ቆይታ በከፍተኛ ሁኔታ ነው እየጨመረ የሚመጣው። ስለዚህ ይህንን ክፍተት መሙላት የሚያስችል የፋይናንስ ሲስተም ያስፈልጋል፤›› ብለዋል።

የከተማና መሠረተ ልማት ሚኒስቴር ደኤታ አቶ የትምጌታ አሥራት በበኩላቸው፣ መንግሥት ፕሮጀክቶችን ለአገር ውስጥ የሥራ ተቋራጮች ለማስተላለፍ እየተሠራ መሆኑን ገልጸዋል።
በሌላ በኩል በውይይት መድረኩ ከተነሱ ዋነኛ ጉዳዩች የውጭ ምንዛሪ ላይ የተደረገው ሪፎርም በኢንዱስትሪው ላይ ሌላ ጫና ይገኝበታል።

‹‹የኢንዱስትሪው ገበያ የሚንቀሳቀሰው በጥቁር ገበያው ነበር፡፡ እዚህ ላይ ምንም ልንወሻሽ የሚገባ ነገር የለም። ለምን አንድ አቅራቢ ዕቃ ከውጭ አምጥቶ ለመሸጥ ለሒደት ማስፈጸሚያ (Procedure Issue) ብቻ የባንክን ምጣኔ ይጠቀማል። ለምሳሌ 60 ብር በነበረበት ሰዓት ለፕሮሲጀር የባንክን ይጠቀማል፡፡ ሌላውን ግን በጥቁር ገበያ ሴኪውር ያደርጋል። ከዚያ በኋላ ግን ዋጋ ሲያወጣ በጥቁር ገበያው ምጣኔ ነው የሚያወጣው፡፡ በዚህ ምክንያት የፕሮጀክት ዋጋ ከፍ ይላል፤›› ብለዋል።


በተጨማሪም፣ ‹‹ምንዛሪ በገበያው መወሰን ሲጀምር በፊት ግብር የሚከፍል የነበረው ባንክ በሰጠው ምጣኔ ነበር። ለምሳሌ ምንዛሪው ሰባት ብር ከነበረ፣ አሁን ግን 125 ሲሆን ግብሩም በዚያው መጠን ከፍ ይላል ምክንያቱም በደረሰኝ ገንዘቡን ዝቅ አያደርግም። እንደነዚህ ዓይነት ዕርምጃዎችን እንዳይሄድና ኃላፊነት እንዲወስድ ብሔራዊ ባንክ አስገዳጅ መመርያ አውጥቶበታል። ያንን ስናይ ደግሞ ከኢንሹራንስና ከትራንስፖርት ጋርና ከሌሎች ሎጂስቲክስ ጉዳዮች ጋር የተገናኙ የወጪ ክፍያዎች አሉበት። ስለዚህ በኢኮኖሚክ ሪፎርሙ የኮንስትራክሽን ዘርፉ አሁንም እንደገና ደግሞ ሌላ ተጋላጭነት አጋጥሞታል፤›› ሲሉ አብራርተዋል።

@etconp
👍12💔2
👉ጥቂት ስለ መሬት መንቀጥቀጥ እና የሕንጻ መዋቅር ዲዛይን

የመሬት መንቀጥቀጥ ከመሬት የውስጠኛው ክፍል በድንገት በሚለቀቅ 'ኢነርጂ' ምክንያት የላይኛው የመሬት ክፍል ላይ በሞገዶች (seismic waves) አማካኝነት የሚተላለፍ ንዝረት ወይም መንቀጥቀጥ ነው።

ለመሬት መንቀጥቀጥ በተጋለጡ አካባቢዎች ያሉ ሕንፃዎች የመሬት መንቀጥቀጥ በሚከሰትበት ጊዜ የሚደርሰውን ጉዳት ለመቀነስ እና ነዋሪዎችን ለመጠበቅ የመሬት መንቀጥቀጥ ኃይሎችን እንዲቋቋሙ ሆነው የተነደፉ መሆን አለባቸው። ይህ የመሬት መንቀጥቀጥን የሚቋቋም ንድፍ earthquake-resistant design (ERD) በመባል የሚታወቅ ሲሆን ይህንንም ለመስራት ልዩ የምህንድስና ትምህርት እና ልምዶችን ይፈልጋል።

በመሬት መንቀጥቀጥ ወቅት መሬቱ በምን ያህል ፍጥነት እንደሚንቀጠቀጥ የሚለካበት በ PGA(Peak Ground Acceleration) መንገድ ነው።

ይህ ለዲዛይን ዋናው መሰረት ነው ፤ እርሱም ከፍተኛውን የመንቀጥቀጥ ፍጥነት ከመሬት የስበት ኃይል (9.81 m/s²) ጋር አዛምዶ ያሳየናል።

ከፍ ያለ PGA ማለት ጠንካራ መንቀጥቀጥ እና የበለጠ ጉዳት ሊያስከስት የሚችል  ማለት ነው።

PGA ከ0.1%g ያነሰ ከሆነ ላናስተውለው እንችላለን ፤ ከ 0.1-1% g ከሆነ ምንም ጉዳት ሳያስከትል በትንሽ እናስተውለዋለን ፤ ከ1-3% g ቀላልና አነስተኛ ፤ ከ3-10% መካከለኛና ትንሽ ጉዳት ፤ ከ10-30% በጣም ጠንካራ የመዋቅራዊ ስንጥቆች (Very strong, structural cracks )፤ከ30-50% ከባድና ከፍተኛ ጉዳት፤ ከ50-100% ኃይለኛና የሕንፃዎች መፈራረስ ፤ ከ100% g በላይ ከሆነ ደግሞ እጅግ በጣም ከባድና  አጠቃላይ ጥፋትን ያስከትላል።

የኢትዮጵያ የሕንፃ ኮድ ኢትዮጵያ ለመሬት መንቀጥቀጥ ተጋላጭ የሆነ አካባቢ እንዳላት በግልጽ ያስቀምጣል።

ለመሬት መንቀጥቀጡ እንዳላቸው ተጋላጭነት ቦታዎቹን አዲሱ የ2015ቱ ኮድ( EBCS EN: 2015) Zone 0, Zone 1, Zone 2, Zone 3, Zone 4 እና Zone 5 በማለት በ6 ምድቦች አስቀምጧቸዋል።

በነገራችን ላይ ይህ ኮድ በጣም የተሻለ ቢሆንም እንኳን በባለሙያዎች ዘንድ በቂ ግንዛቤና ይሁንታን ሳያገኝ እና በበቂ ሁኔታ ተግባራዊ ሳይሆን አዲሱ ኮድ እንደተባለ ይኸው አስር አመት ሞላው ፤ በኮዱ አጠቃቀም ዙርያ በሥራ ላይ ያጋጠሙ ችግሮችንና ያሁኑን ክስተት ከግምት ወስጥ በማስገባት በፍጥነት መከለስ (ክለሳው መጠናቀቅ) ይኖርበታል።

በአዲስ አበባ ያሉ ሕንጻዎች አሁን ባለው የሕንጻ ኮድ (EBCS EN-1998-1:2015)መስፈርት መሰረት ለ 0.1g (ማለትም 10% g) PGA የተሠሩ እና ሊሠሩ የሚገባቸው ናቸው።

የቀድሞው ኮድ እንኳን (EBCS 8 1995) በአዲስ አበባ ለሚሰሩ ሕንጻዎች ከ 5% g እስከ 7% g PGA ታሳቢ ተደርገው እንዲሰሩ ያዛል።

በዚህም መሰረት እስካሁን ባለው ሁኔታ የተከሰተው የመሬት መንቀጥቀት ጥንካሬ (ማለትም 1% g) በአዲስ አበባ ውስጥ ያሉት በበቂ ባለሙያ እና ኮዱን ተከትለው የተሠሩ ሕንጻዎች ላይ ጉዳት ለማድረስ የተከሰተው የመሬት መንቀጥቀት በጣም ትንሽ ነው።

ነገር ግን፣ ከመሬት መንቀጥቀጡ በተወሰኑ ኪሎ ሜትር ርቀት ላይ ባለው አካባቢ፣ 10% g የመሬት መንቀጥቀጥ በሚገመትበት ቦታ ላይ ጉዳት ሊደርስ ይችላል።

ይህ ማለት ግን ስጋቱ የለም ማለት አይደለም ፤ የመሬት መንቀጥቀጡ እየጨመረበት ያለበት ሁኔታ እና ከዚህ ቀደም በ1961 ካራቆሬ ላይ በሬክተር ስኬል 6.5 ተከስቶ የሰዎች ሕይወት እንዳለፈ ሲታሰብ ከፍተኛ ጥንቃቄ ማድረግ እንደሚያሰፈልግ እንረዳለን ።

⭐️ሊደረጉ የሚገባ ጥንቃቄዎች

▶️ተደጋጋሚ እና ጥልቅ የባለሙያዎች እና የሚመለከታቸው አካላት የቀጥታ ውይይትና ገለጻ ችግሩ እስኪቀረፍ ድረስ በቋሚነት በሁሉም የመንግስት እና የግል መገናኛ ተቋማት ያስፈልጋል። ጉዳዩ በመግለጫ ብቻ የሚታለፍ አይደለም ።

▶️አደጋ ቢከሰት ስለሚደረጉ ጥንቃቄዎች ቀድሞ  ማስተማር እና ማዘጋጀት

▶️ያረጁ ሕንፃዎች - በዲዛይን ጊዜ የሚታሰበው የሕንጻዎቹ የአገልግሎት ዘመን  ያበቃ (ከ50 ዓመት በላይ የሆናቸው)ያረጁ ሕንፃዎች በብዙ ምክንያት ለዚህ አደጋ የተጋለጡ ናቸው።

▶️በዘመን ብዛት በ Creep effect እና fatigue ምክንያት የኮንክሪት ስትራክቸር ጥንካሬ ይቀንሳል።

🔰በንጉሡ ጊዜ ተሠርተው አሁንም አገልግሎት እየሰጡ ያሉ ሕዝብ መገልገያ ሕንጻዎች ማለትም ትምህርት ቤት ፤ የህክምን ተቋማትና ሌሎችም።

📜እነዚህ የማጠናከርያ ሥራ (Retrofitting) ይፈልጋሉ ።

⏺በድንጋይ ግንብ (Masonry) ብቻ እና መሰል የአርማታ ብረት የሌላቸው ግንባታዎች።

⏺ተገቢውን የአፈር ጥናት፣ ዲዛይን እና ክትትል ሳይደረግላቸው የተገነቡ ግንባታዎች ለአደጋ ተጋላጭ ናቸው።

⏺በሚገባው ባለሙያ ዲዛይን ያልተደረጉ እና ያልተገነቡ ግንባታዎች ለዚህ ተጋላጭ ናቸው።

⏺ከተገነቡ በኋላ በተለይ ግርግዳቸውና ሌሎች የሕንጻ አካላት ፍርሰው ባዶ ሲሆኑ በወለሎቹ መካከል የጥንካሬ ልዩነት  ሲከሰት (Soft stories) በሰላም ለዘመናት የኖሩትን ሕንጻ ለአደጋ እንዳርጋቸዋለን።

⏺የሕንጻ ኮድ ክለሳውን ማፋጠን

🏷መልካሙን ነገር ያሰማን🙏

Via አቶ ኤልያስ ደፋልኝ መሀንዲስ እና  አትሮንስ ኮንሰልት አማካሪ መሐንዲሶችና አርክቴክቶች ባለቤትና ሼል አስኪያጅ

@etconp
👍19❤2🔥1
👉ውድ ቤተሰቦቻችን ባለፈው እንዲሰራላቹ ምትፈልጉት ቲቶርያል ጠቁሙን ባልነው መሰረት ከ 65 በላይ መልእክቶች SAP የሚል ስለበዛ ይህ ቲቶርያል ቪድዮ እየሰራንላቹ ነው የመጀመርያ ክፍል ነገ ይለቀቃል።

🌟እስከዛ ለ YOUTUBE ቻናላችን ኣዲስ ከሆናቹ ከታች ባለው ሊንክ ገብተው SUBSCRIBE ያድርጉ እንዲሁም ለወዳጅዎ ይደርስ ዘንድ SHARE በማድረግ ያበርቱን🙏

https://youtube.com/@ethiopianconstruction?si=i3B2u9LyWBNjqAAO

@etconp
👍8
“ዛሬ በዳዊት ከተማ መድኃኒት እርሱም ክርስቶስ ጌታ የሆነ ተወልዶላችኋልና።”
— ሉቃስ 2፥11

💫ለክርስትና እምነት ተከታዮች በሙሉ እንኳን ለብርሀነ ልደቱ በሰላም በጤና አደረሳቹ አደረሰን ❤️🎄🎄

@etconp
❤27👍3💔2🙏1
👉የቤተልሔም የግንባታ ታሪክ

ቤተልሔም በታሪክ ውስጥ የተዘፈቀች ከተማ፣ በኖረችበት ዘመን ሁሉ የተለያዩ የሕንፃ ስልቶችን ተመልክታለች።

የከተማዋ የግንባታ ታሪክ በእድገቷ ላይ ተፅእኖ ያላቸውን የተለያዩ ሥልጣኔዎች እና ኢምፓየሮች ያሳያል።

ቀደምት ጊዜያት፡-

* የከነዓናውያን ዘመን፡ ትክክለኛው አመጣጥ ግልጽ ባይሆንም፣ የቤተልሔም መገኘት የከነዓናውያን ዘመን ጀምሮ ነው። ቀደምት ሕንፃዎች ቀላል የጭቃ ጡብ መኖሪያ እና የእርሻ ሕንፃዎች ሊሆኑ ይችላሉ::

* የእስራኤል ዘመን፡- በእስራኤል ዘመን ቤተ ልሔም የንጉሥ ዳዊት የትውልድ ቦታ እንደሆነች ትታወቅ ነበር።

የግንባታ ቴክኒኮች እንደ ድንጋይ ያሉ ይበልጥ ዘላቂ የሆኑ ቁሳቁሶችን በመጠቀም የዳበረ ነበር።

* የሮማውያን ዘመን፡- አካባቢውን የተቆጣጠሩት ሮማውያን የሕንፃ ስልታቸውን አስተዋውቀዋል እንደ ቤተመቅደሶች እና የአስተዳደር መዋቅሮች ያሉ ህዝባዊ ሕንፃዎች የተገነቡት የሮማውያን የሥነ ሕንፃ ክፍሎችን በመጠቀም ነው።

▶️የባይዛንታይን እና የመስቀል ጦርነት ጊዜያት፡-

* የባይዛንታይን ዘመን፡ የባይዛንታይን ዘመን የልደተ ልደትን ባዚሊካን ጨምሮ አስደናቂ የሆኑ አብያተ ክርስቲያናት ሲገነቡ ተመልክቷል።

ይህ ወቅት በሥነ ሕንፃ ቴክኒኮች እና ቁሳቁሶች ውስጥ ትልቅ እድገት አሳይቷል።
* የመስቀል ጦርነት ጊዜ፡- እየሩሳሌምን እና ቤተልሔምን የያዙት የመስቀል ጦረኞች፣ ምሽጎችንና አብያተ ክርስቲያናትን በሮማንሳዊ ዘይቤ ገነቡ።
የኦቶማን ጊዜ።
* የኦቶማን አገዛዝ፡ የኦቶማን ኢምፓየር ወደ ቤተልሔም የተለየ የሕንፃ ጥበብ አመጣ።

የኦቶማን ዘመን ህንጻዎች የሚታወቁት በአካባቢው ድንጋይ፣ በሮች የተሸፈኑ እና ውስብስብ ጌጣጌጦችን በመጠቀም ነው።

🚧ዘመናዊ ጊዜ

* የብሪቲሽ ስልጣን፡ በብሪቲሽ ስልጣን ጊዜ፣ ቤተልሔም የዕድገት እና የዘመናዊነት ጊዜን አሳልፋለች።

Art Deco እና Bauhausን ጨምሮ አዳዲስ ሕንፃዎች በተለያዩ ቅይጦች ተገንብተዋል።

* ዘመናዊ ዘመን፡ ዘመናዊቷ ቤተልሔም በዝግመተ ለውጥ መምጣቷን ቀጥላለች፣ አዳዲስ ሕንፃዎች ዘመናዊ የሥነ ሕንፃ አዝማሚያዎችን የሚያንፀባርቁ ናቸው።

ነገር ግን፣ የከተማዋ ታሪካዊ እምብርት ባህላዊ ባህሪውን ይይዛል፣ ብዙ የኦቶማን ዘመን ሕንፃዎች አሁንም ቆመዋል።

⭐️የቤተልሔም ከተማ ታሪክ

የቤተልሔም ታሪክ ዓለም አቀፋዊ ጠቀሜታ ካላቸው ሃይማኖታዊ እና ፖለቲካዊ ክስተቶች ጋር የተጣመረ ነው።

* መጽሐፍ ቅዱሳዊ ጠቀሜታ፡- ቤተ ልሔም በጣም ዝነኛ የሆነችው ከኢየሱስ ክርስቶስ ልደት ጋር ያላት ግንኙነት ነው።

*ከተማዋ በመጽሐፍ ቅዱስ ውስጥ የንጉሥ ዳዊት የትውልድ ቦታ እንደሆነች ተጠቅሷል።

* የሮማውያን አገዛዝ፡- ሮማውያን ኢየሱስ በተወለደበት ጊዜ አካባቢውን ይቆጣጠሩ ነበር።

* የባይዛንታይን እና የመስቀል ጦርነት ጊዜዎች፡- የባይዛንታይን እና የመስቀል ጦርነት ጊዜያት ቤተልሔም የክርስቲያኖች የጉዞ ቦታ ሆና አብባ ነበር።

* የኦቶማን አገዛዝ፡- የኦቶማን ኢምፓየር ቤተልሔምን ለዘመናት በመግዛት የባህልና የሕንፃ መልከዓ ምድሩን ቀርጿል።

* የብሪቲሽ ስልጣን፡ የብሪቲሽ ማንዴት ጊዜ የቱሪዝም እድገትን ጨምሮ ከፍተኛ ለውጦችን አምጥቷል።

* የዘመናችን ዘመን: ዘመናዊቷ ቤተልሔም ከእስራኤል እና ፍልስጤም ግጭት ጋር የተያያዙ ተግዳሮቶች ከፊቷ ተደቅነዋል፣ነገር ግን ጉልህ የሆነ የሃይማኖት እና የባህል ማዕከል ሆና ቆይታለች።

💫 ቁልፍ ታሪካዊ ቦታዎች፡-

* የልደቱ ቤተ ክርስቲያን፡ በዩኔስኮ የዓለም ቅርስነት ያስመዘገበው ይህ ቤተ ክርስቲያን በኢየሱስ የትውልድ ቦታ ላይ እንደሚሠራ ይታመናል።

* ማንገር አደባባይ፡- በቤተልሔም ማእከላዊ አደባባይ፣ በልደተ ክርስቶስ ቤተክርስቲያን ፊት ለፊት ይገኛል።

* ሚልክ ግሮቶ፡- በወግ መሠረት ድንግል ማርያም ሕፃኑን ኢየሱስን የምታጠባበት በአቅራቢያው ያለ ዋሻ ነው።

የቤተልሔም ታሪክ ሃይማኖታዊ እና ባህላዊ ጠቀሜታ ያለው ቦታ ለመሆኗ ዘላቂ ጠቀሜታዋን የሚያሳይ ነው የበለፀገው ያለፈው ታሪክ የአሁኑን እና የወደፊቱን መቀረፅ ይቀጥላል።

መልካም በዓል

Via Fila

@etconp
❤13👍12
#Advertising #ማስታወቂያ #MusaFide
Our Services Include:

💻 Civil 3D Full Tutorials (4K Video)

Tutorials with project files used throughout the video for hands-on learning.
📊 All Supporting Materials

Access materials, including PKT Files, Superelevation Excels, & ERA Manual XML, to streamline your design work.
🏗 Girder Bridge Working Drawing Preparation

Complete working drawings for Girder Bridges, including all materials used in the tutorial, & the 3D model created in SketchUp.
🚗 Highway Design Expertise

Professional highway design services
🛠 Template Production & PKT Development Template creation & PKT development as per your project standards.

📏 Earthwork & Pavement Quantity Preparation

Earthwork & pavement quantity preparation to ensure precise cost estimation.
🏗 Structural Working Drawing Preparation

Detailed structural working drawings Preparation
Connect with Us:
YouTube: http://www.youtube.com/@musfide
Telegram: https://t.me/musafide
WhatsApp: https://bit.ly/musfide
Call Us: +251 905 666 664
👍9❤2👏2
👉Cost Control Process Flow Chart

🚧Below step-by-step flowchart structure for effective cost control in project management

1️⃣ Project Budget Development

Define the total project budget, including direct and indirect costs.

2️⃣ Cost Baseline Establishment 📊

Set a baseline to track and compare actual costs.

3️⃣ Resource Allocation 🔧

Assign resources based on the budget and schedule.

4️⃣ Cost Monitoring and Tracking 🔍

Collect actual cost data regularly.

Compare actual costs with the baseline.

5️⃣ Variance Analysis 📈

Identify cost variances (overruns or savings).

Analyze the reasons for discrepancies.

6️⃣ Cost Forecasting 🔮

Predict future costs based on current trends.

Adjust estimates to reflect project changes.

7️⃣ Corrective Actions 🛠

Implement measures to control overruns ( reduce scope, optimize resources)

8️⃣ Cost Reporting 📑

Share cost performance reports with stakeholders.

Highlight key findings and financial health.

9️⃣ Continuous Improvement ♻️

Document lessons learned for better cost management in future projects.

This flow ensures project costs are managed effectively, helping to complete projects within budget while maintaining quality.

@etconp