If 1m³ of sand weighs 1600 kg, how much sand is required for a 1:2:4 mix of 1m³ of concrete?
Anonymous Quiz
29%
A. 320 kg
33%
B. 640 kg
27%
C. 704 kg
12%
D. 960 kg
🎉10👍5😭2
A 6 m wide road is constructed for a 10 km length with an average thickness of 1/4 m. What is the total volume of asphalt required?
👇👇👇👇👇👇
Check Answer At Final
👇👇👇👇👇👇
Check Answer At Final
Anonymous Quiz
8%
A. 12,000 m³
80%
B. 15,000 m³
8%
C. 18,000 m³
4%
D. 20,000 m³
❤10👍4👏1
👉 INTERCON Construction Chemicals
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
Tel: 0961955555
Address: Signal, around signal mall
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
Tel: 0961955555
Address: Signal, around signal mall
❤3👍3👏1
ታምራት ፕሌት እና ጄቦልት አቅራቢ
👉ከ አባይ ግድብ እስከ ኮሪደር ልማት
ከግለሰብ ቤቶች እስከ ተቋማት እና
መጋዘኖች በሁሉም የኢትዮጽያ ክፍል
አሻራችንን አሳርፈናል
🔰ምን ይፈልጋሉ?
✂️ላሜራ መቁረጫ ÷ ማጠፊያ እና መብሻ ማሽኖች አሉን
🔗ፌሮ (ቶንዲኖ) ጥርስ ማስበጀት ወይንም ማሳጠፍ ካሰቡ ለሱም ማሽኑ በጃችን ነዉ
📐ማንኛዉንም የሞደፊክ ስራዎችን የሚሰሩ ብቁ ባለሙያዎችም አሉን
☎️ይደዉሉልን ያማክሩን
📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን
አድራሻችን፦
ቁ.1 መርካቶ
ቁ.2 ተክለሀይማኖት
ቁ.3 አየር ጤና
0904040477
0911016833
👉ከ አባይ ግድብ እስከ ኮሪደር ልማት
ከግለሰብ ቤቶች እስከ ተቋማት እና
መጋዘኖች በሁሉም የኢትዮጽያ ክፍል
አሻራችንን አሳርፈናል
🔰ምን ይፈልጋሉ?
✂️ላሜራ መቁረጫ ÷ ማጠፊያ እና መብሻ ማሽኖች አሉን
🔗ፌሮ (ቶንዲኖ) ጥርስ ማስበጀት ወይንም ማሳጠፍ ካሰቡ ለሱም ማሽኑ በጃችን ነዉ
📐ማንኛዉንም የሞደፊክ ስራዎችን የሚሰሩ ብቁ ባለሙያዎችም አሉን
☎️ይደዉሉልን ያማክሩን
📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን
አድራሻችን፦
ቁ.1 መርካቶ
ቁ.2 ተክለሀይማኖት
ቁ.3 አየር ጤና
0904040477
0911016833
👍5
👉New Safety Related Technologies
🚧In construction, safety always comes first.
⏺Technology is now playing a crucial role in enhancing safety on-site.
⭐️This are some of the technologies currently available
❇️Wearable Devices:
⏺Track health metrics and detect potential hazards in real-time, helping prevent accidents before they happen.
❇️Drones:
⏺Provide aerial views of construction sites to identify safety risks from above, keeping teams safer.
❇️AI & Predictive Analytics:
⏺Anticipate and address potential issues before they become problems, ensuring proactive safety measures.
🔰These technologies need to be embraced in Ethiopia’s construction industry in order to boost productivity and efficiency.
Yonatan Tadesse (PMP)®
@etconp
🚧In construction, safety always comes first.
⏺Technology is now playing a crucial role in enhancing safety on-site.
⭐️This are some of the technologies currently available
❇️Wearable Devices:
⏺Track health metrics and detect potential hazards in real-time, helping prevent accidents before they happen.
❇️Drones:
⏺Provide aerial views of construction sites to identify safety risks from above, keeping teams safer.
❇️AI & Predictive Analytics:
⏺Anticipate and address potential issues before they become problems, ensuring proactive safety measures.
🔰These technologies need to be embraced in Ethiopia’s construction industry in order to boost productivity and efficiency.
Yonatan Tadesse (PMP)®
@etconp
👍8❤6
👉Project Coordinator Vs Project Manager in Construction
💫What’s the Difference?
🏷The construction industry thrives on collaboration, precision, and leadership But when it comes to project execution, two key roles often get confused: Project Coordinator and Project Manager. While both are essential, their responsibilities and impact differ significantly.
🚧Project Coordinator (The Organizer)
⏺A Project Coordinator supports the execution of a construction project by focusing on documentation, communication, and administrative tasks.
🌟Their main responsibilities include:
✅ Assisting in scheduling and tracking project progress
✅ Managing documentation, contracts, and permits
✅ Coordinating between different teams and stakeholders
✅ Ensuring compliance with safety and quality standards
✅ Handling procurement and logistics for materials
🚧Project Manager (The Leader)
A Project Manager takes full ownership of a project, ensuring it is completed on time, within budget, and meets quality standards.
🌟Their key responsibilities include:
✅ Defining project scope, objectives, and strategy
✅ Budgeting and cost control
✅ Managing risks and problem-solving
✅ Leading teams and ensuring smooth execution
✅ Liaising with clients, contractors, and stakeholders
📜Key Differences:
▶️While a Project Coordinator focuses on supporting and organizing, a Project Manager is responsible for decision-making and leadership.
▶️One ensures efficiency in execution, while the other drives the project's overall success.
@etconp
💫What’s the Difference?
🏷The construction industry thrives on collaboration, precision, and leadership But when it comes to project execution, two key roles often get confused: Project Coordinator and Project Manager. While both are essential, their responsibilities and impact differ significantly.
🚧Project Coordinator (The Organizer)
⏺A Project Coordinator supports the execution of a construction project by focusing on documentation, communication, and administrative tasks.
🌟Their main responsibilities include:
✅ Assisting in scheduling and tracking project progress
✅ Managing documentation, contracts, and permits
✅ Coordinating between different teams and stakeholders
✅ Ensuring compliance with safety and quality standards
✅ Handling procurement and logistics for materials
🚧Project Manager (The Leader)
A Project Manager takes full ownership of a project, ensuring it is completed on time, within budget, and meets quality standards.
🌟Their key responsibilities include:
✅ Defining project scope, objectives, and strategy
✅ Budgeting and cost control
✅ Managing risks and problem-solving
✅ Leading teams and ensuring smooth execution
✅ Liaising with clients, contractors, and stakeholders
📜Key Differences:
▶️While a Project Coordinator focuses on supporting and organizing, a Project Manager is responsible for decision-making and leadership.
▶️One ensures efficiency in execution, while the other drives the project's overall success.
@etconp
👍15
👍1
👉በሀገራችን ኢትዮጵያ በግንባታው ዘርፍ የሚታዩ ዋና ዋና ችግሮች:-
🚧በኮንስትራክሽንፈ ኢንዱስትሪ የማጭበርበር አመለካከትና ተግባር የሚስተዋልበት ነባራዊ ሁኔታ መኖሩ
🚧በኮንስትራክሽን ኢንዱስትሪ የሰለጠነና የሙያ ብቃቱ የተረጋገጠ የሰው ኃይል እጥረት ያለ መሆኑ
🚧የኮንስትራክሽን ፕሮጀክቶች ስራ አመራር እና የቴክኖሎጂ ሽግግር የተሳለጠ ያለመሆኑ
🚧በኮንስትራክሽን ኢንዱስትሪ የሚሠማሩ አማካሪዎችና ተቋራጮች መካከል ተወዳዳሪነት በሚፈለገው ደረጃ ማድረስ ያልተቻለ መሆኑ
🚧ለኮንስትክሽን ኢንዱስትሪ የሚያስፈልጉ ግብዓቶች ቀጣይነት ያለው የአቅርቦት ሠንሠለት ያልተዘረጋ መሆኑ
🌟ለኮንስትራክሽን ኢንዱስትሪ መስፋፋትና መጠናከር የተመቻቸ ሁኔታ የሚፈጥር የፋይናንስና የማሽነሪ አቅርቦት ሥርዓት የተጠናከረ ያለመሆን
🌟የኮንስትራክሽን ኢንዱስትሪ ዋና ዋና ባለሚናዎች በተቀናጀና በተደራጀ መንገድ ለዘርፉ የተፋጠነ ዕድገት በጋራ የሚሰሩበት ሁኔታ ያለመፈጠሩ
🌟የህንፃ ግንባታና መጠቀሚያ ፈቃድ አሰጣጥና ቁጥጥር አገልግሎት የተጠናከረ ያለመሆን
🌟ፈርጀ ብዙ ሥራዎች ከኮንስትራክሽን ኢንዱስትሪ ሥራዎች ጋር ተጣጥመው የሚታቀዱበትና የሚተገበሩበት ሥርዓት ያለመዘርጋቱ
🌟የኮንስትራክሽን ኢንዱስትሪ ልማት ፕሮግራም ወይም ፓኬጅ አዘጋጅቶ በተሟላና በቀጣይነት ያለመተግበር
🌟ለባለሞያዎችና ስራተቋራጮች የሚደረግ የአቅም ግንባታ ድጋፍ እጅግ አናሳ መሆን
@etconp
🚧በኮንስትራክሽንፈ ኢንዱስትሪ የማጭበርበር አመለካከትና ተግባር የሚስተዋልበት ነባራዊ ሁኔታ መኖሩ
🚧በኮንስትራክሽን ኢንዱስትሪ የሰለጠነና የሙያ ብቃቱ የተረጋገጠ የሰው ኃይል እጥረት ያለ መሆኑ
🚧የኮንስትራክሽን ፕሮጀክቶች ስራ አመራር እና የቴክኖሎጂ ሽግግር የተሳለጠ ያለመሆኑ
🚧በኮንስትራክሽን ኢንዱስትሪ የሚሠማሩ አማካሪዎችና ተቋራጮች መካከል ተወዳዳሪነት በሚፈለገው ደረጃ ማድረስ ያልተቻለ መሆኑ
🚧ለኮንስትክሽን ኢንዱስትሪ የሚያስፈልጉ ግብዓቶች ቀጣይነት ያለው የአቅርቦት ሠንሠለት ያልተዘረጋ መሆኑ
🌟ለኮንስትራክሽን ኢንዱስትሪ መስፋፋትና መጠናከር የተመቻቸ ሁኔታ የሚፈጥር የፋይናንስና የማሽነሪ አቅርቦት ሥርዓት የተጠናከረ ያለመሆን
🌟የኮንስትራክሽን ኢንዱስትሪ ዋና ዋና ባለሚናዎች በተቀናጀና በተደራጀ መንገድ ለዘርፉ የተፋጠነ ዕድገት በጋራ የሚሰሩበት ሁኔታ ያለመፈጠሩ
🌟የህንፃ ግንባታና መጠቀሚያ ፈቃድ አሰጣጥና ቁጥጥር አገልግሎት የተጠናከረ ያለመሆን
🌟ፈርጀ ብዙ ሥራዎች ከኮንስትራክሽን ኢንዱስትሪ ሥራዎች ጋር ተጣጥመው የሚታቀዱበትና የሚተገበሩበት ሥርዓት ያለመዘርጋቱ
🌟የኮንስትራክሽን ኢንዱስትሪ ልማት ፕሮግራም ወይም ፓኬጅ አዘጋጅቶ በተሟላና በቀጣይነት ያለመተግበር
🌟ለባለሞያዎችና ስራተቋራጮች የሚደረግ የአቅም ግንባታ ድጋፍ እጅግ አናሳ መሆን
@etconp
👍14
👉Earned Value Management (EVM) – A Key to Project Success
⏺Earned Value Analysis (EVA) allows project managers to measure actual project performance beyond basic cost and schedule tracking.
🔹 What is Earned Value Management (EVM)?
⏺EVM is a systematic approach to integrating cost, schedule, and scope to assess project performance and predict future outcomes.
💡 Why Use EVM?
⏺EVM helps determine if a project is on schedule and within budget by evaluating cost and schedule progress against actual accomplishments.
🔎 Performing EVM Analysis: Key Data Points
📌 Planned Value (PV) [Budgeted Cost of Work Scheduled – BCWS]
The authorized budget for scheduled work at a given time.
• Current PV: Budget allocated for work scheduled within a specific period (days, weeks, months).
• Cumulative PV: Total budget for all scheduled work up to a given date.
📌 Actual Cost (AC) [Actual Cost of Work Performed – ACWP]
The actual expenditure incurred to complete work.
📌 Earned Value (EV) [Budgeted Cost of Work Performed – BCWP]
The “worth” of work completed based on the original budget.
📈 Variance Analysis: Measuring Performance
📍 Schedule Variance (SV) = EV – PV
🔹 (+) On Schedule
🔹 (-) Behind Schedule
📍 Cost Variance (CV) = EV – AC
🔹 (+) Underrun (Cost Savings)
🔹 (-) Overrun (Over Budget)
📊 Performance Indicators: Efficiency Measures
📍 Schedule Performance Index (SPI) = EV / PV
🔹 SPI > 1.0 → Project is Ahead of Schedule
🔹 SPI < 1.0 → Project is Behind Schedule
📍 Cost Performance Index (CPI) = EV / AC
🔹 CPI > 1.0 → Project is Under Budget
🔹 CPI < 1.0 → Project is Over Budget
📌 Forecasting Project Cost at Completion
📍 Estimate at Completion (EAC) = AC + ETC
Provides an updated forecast of total project cost.
📍 Estimate to Complete (ETC)
The remaining cost required to complete the project.
📍 Budget at Completion (BAC)
The total authorized budget for the project.
📍 Variance at Completion (VAC) = BAC – EAC
🔹 (+) Project will finish under budget
🔹 (-) Project will finish over budget
✅ Best Practice: Regular EVM analysis ensures better cost control, schedule tracking, and improved decision-making throughout the project lifecycle.
Yonatan Tadesse (PMP)®
@etconp
⏺Earned Value Analysis (EVA) allows project managers to measure actual project performance beyond basic cost and schedule tracking.
🔹 What is Earned Value Management (EVM)?
⏺EVM is a systematic approach to integrating cost, schedule, and scope to assess project performance and predict future outcomes.
💡 Why Use EVM?
⏺EVM helps determine if a project is on schedule and within budget by evaluating cost and schedule progress against actual accomplishments.
🔎 Performing EVM Analysis: Key Data Points
📌 Planned Value (PV) [Budgeted Cost of Work Scheduled – BCWS]
The authorized budget for scheduled work at a given time.
• Current PV: Budget allocated for work scheduled within a specific period (days, weeks, months).
• Cumulative PV: Total budget for all scheduled work up to a given date.
📌 Actual Cost (AC) [Actual Cost of Work Performed – ACWP]
The actual expenditure incurred to complete work.
📌 Earned Value (EV) [Budgeted Cost of Work Performed – BCWP]
The “worth” of work completed based on the original budget.
📈 Variance Analysis: Measuring Performance
📍 Schedule Variance (SV) = EV – PV
🔹 (+) On Schedule
🔹 (-) Behind Schedule
📍 Cost Variance (CV) = EV – AC
🔹 (+) Underrun (Cost Savings)
🔹 (-) Overrun (Over Budget)
📊 Performance Indicators: Efficiency Measures
📍 Schedule Performance Index (SPI) = EV / PV
🔹 SPI > 1.0 → Project is Ahead of Schedule
🔹 SPI < 1.0 → Project is Behind Schedule
📍 Cost Performance Index (CPI) = EV / AC
🔹 CPI > 1.0 → Project is Under Budget
🔹 CPI < 1.0 → Project is Over Budget
📌 Forecasting Project Cost at Completion
📍 Estimate at Completion (EAC) = AC + ETC
Provides an updated forecast of total project cost.
📍 Estimate to Complete (ETC)
The remaining cost required to complete the project.
📍 Budget at Completion (BAC)
The total authorized budget for the project.
📍 Variance at Completion (VAC) = BAC – EAC
🔹 (+) Project will finish under budget
🔹 (-) Project will finish over budget
✅ Best Practice: Regular EVM analysis ensures better cost control, schedule tracking, and improved decision-making throughout the project lifecycle.
Yonatan Tadesse (PMP)®
@etconp
👏14👍13❤4🔥1
👉Types of Planning Reports
💫Types of reports are one of the most important topics to be aware of, due to their great importance in the business.
⏺Reports are the primary means of presenting project data to senior management, managers, and engineers in various departments.
⏺And sometimes it requires a specific report from you for example Earned value report only
⏺Here is an explanation of a range of important types of reports:
🚧1. Progress Report:
This type describes the status of what has been implemented from the project since the last monthly report.
⏺It includes:
1- Outline Progression Details
2- Work Completed
3- Equipment Used
4- Workers On Site
5-Task Locations
6- Delays
7- Incidents
8- Compare Activity Progress With The Project Plan
🚧2. Status Report:
Describes the current status of the project at a specific time based on the planned performance measurement rates (Performance Measurement Baseline).
⏺It includes:
1- Overall Project State
2- Performance Measurement Baseline
3- Key Milestones
4- Deliverables Status
5- Project Overall Dates
6- Planned VS Actual VS Forecast
7- Risks / Issues
🚧3. Forecasting Report:
Describes what is expected for the future based on current and future performance.
⏺It includes:
1- Expected Status
2- Expected Dates
3- Predicting Future Performance
🚧4. Variance Report:
⏺Used to compare planned performance with actual performance both in terms of time and costs.
⏺It includes:
1- "Planned Progress" VS "Actual Progress".
2- Planned Vs Actual Volume of Work.
3- Variance Qty & %
🚧5. Trend Report:
This type is very important for senior management, as it compares the performance of the project over the life of the project.
It helps predict the expected performance in the remainder of the project.
⏺It includes:
1- Comparison between current performance & last performance of the project.
2- Project performance over time
🚧6. Earned Value Report:
It is concerned with project costs in terms of plan, actual, and earned value using earned value management equations.
⏺It includes:
1- Planned Value
2- Earned Value
3- Actual Value
4- Cost Variance
5- Schedule Variance
6- Cost Performance Index
7- Schedule Performance Index
8- Estimated Cost at Completion
@etconp
💫Types of reports are one of the most important topics to be aware of, due to their great importance in the business.
⏺Reports are the primary means of presenting project data to senior management, managers, and engineers in various departments.
⏺And sometimes it requires a specific report from you for example Earned value report only
⏺Here is an explanation of a range of important types of reports:
🚧1. Progress Report:
This type describes the status of what has been implemented from the project since the last monthly report.
⏺It includes:
1- Outline Progression Details
2- Work Completed
3- Equipment Used
4- Workers On Site
5-Task Locations
6- Delays
7- Incidents
8- Compare Activity Progress With The Project Plan
🚧2. Status Report:
Describes the current status of the project at a specific time based on the planned performance measurement rates (Performance Measurement Baseline).
⏺It includes:
1- Overall Project State
2- Performance Measurement Baseline
3- Key Milestones
4- Deliverables Status
5- Project Overall Dates
6- Planned VS Actual VS Forecast
7- Risks / Issues
🚧3. Forecasting Report:
Describes what is expected for the future based on current and future performance.
⏺It includes:
1- Expected Status
2- Expected Dates
3- Predicting Future Performance
🚧4. Variance Report:
⏺Used to compare planned performance with actual performance both in terms of time and costs.
⏺It includes:
1- "Planned Progress" VS "Actual Progress".
2- Planned Vs Actual Volume of Work.
3- Variance Qty & %
🚧5. Trend Report:
This type is very important for senior management, as it compares the performance of the project over the life of the project.
It helps predict the expected performance in the remainder of the project.
⏺It includes:
1- Comparison between current performance & last performance of the project.
2- Project performance over time
🚧6. Earned Value Report:
It is concerned with project costs in terms of plan, actual, and earned value using earned value management equations.
⏺It includes:
1- Planned Value
2- Earned Value
3- Actual Value
4- Cost Variance
5- Schedule Variance
6- Cost Performance Index
7- Schedule Performance Index
8- Estimated Cost at Completion
@etconp
👍21❤7
Civil Engineer Must Know 👍💯
What is the weight of steel reinforcement required for a 10-meter-long beam with 4 bars of 16 mm diameter, considering the formula: 🔺 Check answer at final
What is the weight of steel reinforcement required for a 10-meter-long beam with 4 bars of 16 mm diameter, considering the formula: 🔺 Check answer at final
Anonymous Quiz
10%
A. 50.2 kg
74%
B. 63.15 kg
12%
C. 79.1 kg
3%
D. 98.5 kg
👏24👍6🥰3
👉የኢትዮጵያ መንገዶች አስተዳደር ከአገር በቀል የስራ ተቋራጮች ጋር ውይይት አካሄደ
የኢትዮጵያ መንገዶች አስተዳደር በአገር በቀል ኮንስትራክሽን ኢንዱስትሪ ዘርፍ እያጋጠሙ ያሉ ተግዳሮቶችን እንዲሁም የቀጣይ መፍትሄና አካሄዶችን አስመልክቶ ከአገር በቀል የስራ ተቋራጮች ጋር ውይይት አካሂዷል።
በውይይት መድረኩ የኢፌዲሪ ከተማና መሠረተ ልማት ሚኒስቴር ማኒስትር ድኤታ አቶ የትምጌታ አስራት ፣ የኢትዮጵያ መንገዶች አስተዳደር ዋና ዳይሬክተር ኢንጅነር መሐመድ አብዱራህማን ፣ ሌሎች የፌዴራል ከፍተኛ የስራ ኃላፊዎች ፣ ሀገር በቀል የስራ ተቋራጭ ድርጅት ባለቤት እና ስራ አስኪያጆች እና ከኢትዮጵያ መሃንዲሶች ማህበር የተውጣጡ እንግዶች ተሳትፈዋል፡፡
በባለፋት ዓመታት ሲያጋጥሙ የነበሩ አለምአቀፍና ሀገር አቀፍ ተፅዕኖዎች በመንገድ ግንባታ ዘርፉ ላይ ተፅዕኖ ሲያሳድሩ ስለመቆየታቸው በመድረኩ ጥናታዊ ፅሁፍ ቀርቦ ውይይት ተደርጎበታል።
አሁን ላይ ዘርፉን እየፈተኑ ይገኛሉ ተብለው በጥናታዊ ፅሁፉ ከቀረቡ ተፅዕኖዎች መካከል የፀጥታ ችግር ፣ የወሰን ማስከበር ፣ የኮንስትራክሽን ቁሳቁሶች እና ማሽነሪዎች ዋጋ መጨመር ፣ የአንዳንድ የስራ ተቋራጮች ደካማ ፕሮጀክት አስተዳደር ችግር እና የክፍያ እጥረት በዋንነኛነት የሚጠቀሱ መሆናቸው ተገልጿል፡፡
በእነዚህ ጫናዎች ምክንያት የግንባታ ሂደት መዘግየት ፣ የዋጋ ልዩነት መፈጠር ፣ የጥራት ችግሮች መስተዋል ፣ በኮንትራት ሂደት ላይ የሚያተኩሩ የህግ ክርክሮች መፈጠር እና የፕሮጀክት መቋረጥ ሂደቶች እየተስተዋሉ ስለመሆናቸው ታውቋል።
የኢትዮጵያ መንገዶች አስተዳደር ከተለያዩ የመስተዳድር ከሌሎች ባለድርሻ አካላት ጋር በመተባበር በርካታ ስራዎችን እየሰራ የሚገኝ በመሆኑ ከዚህ ቀደም ይስተዋሉ የነበሩ ችግሮች አሁን ላይ በከፊል እየተቀረፉ ስለመሆናቸው በሰነዱ ቀርቧል።
ኢመአ በስራ ተቋራጮች ላይ የሚስተዋሉ ችግሮችን በአግባቡ ፈትሾ ለውይይት ማቅረቡ የሚያስመሰግነው ስለመሆኑ አስተያየታቸውን የሰጡ የስራ ተቋራጮች ተጨማሪ ያሏቸውን አስተያየቶችም ገልፀዋል።
በዘርፉ ከዋጋ ግሽበት ፣ የፀጥታ ፣ የክፍያ ፣ የታክስ ፣ የወሰን ማስከበርና የመሳሰሉ ዘርፈ ብዙ ተግዳሮቶች እየፈተኑን በመሆኑ የሚመለከተው የመንግስት አካላት አፋጣኝ መፍትሄ ሊሰጠን ይገባል ሲሉ የስራ ተቋራጮቹ ጠይቀዋል ።
በወቅቱ በከተማ እና መሰረተ ልማት ሚኒስቴር ሚኒስትር ድኤታ ክቡር አቶ የትምጌታ አስራት እና በኢመአ ዋና ዳይሬክተር ኢንጅነር መሐመድ አብዱራህማን የማጠቃለያ ሃሳቦች ተሰጥተዋል።
አሁን ላይ እየተስተዋሉ ያሉ ችግሮች የአንድ ወገን ብቻ አለመሆናቸውን በመገንዘብና ሁላችንም ራሳችንን በመፈተሽ እየተስተዋሉ ያሉ ችግሮችን በጋራ ልንቀርፍ ይገባል ሲሉ የኢመአ ዋና ዳይሬክተር ኢንጅነር መሐመድ አብዱራህማን ገልፀዋል፡፡
የከተማ እና መሰረተ ልማት ሚኒስቴር ሚኒስትር ድኤታ ክቡር አቶ የትምጌታ አስራት በበኩላቸው በከተማ እና መሰረተ ልማት ሚኒስቴር እና በኢትዮጵያ መንገዶች አስተዳደር ደረጃ ሊቀረፉ የሚችሉ ጉዳዮችን ለመቅረፍ ከዛሬ ጀምሮ እንቅስቃሴ ይደረጋል ያሉ ሲሆን ፣ መንግስት ዘርፉን ለማጠናከር በርካታ ስራዎች እየሰራ እንደሚገኝም ገልፀዋል፡፡
@etconp
የኢትዮጵያ መንገዶች አስተዳደር በአገር በቀል ኮንስትራክሽን ኢንዱስትሪ ዘርፍ እያጋጠሙ ያሉ ተግዳሮቶችን እንዲሁም የቀጣይ መፍትሄና አካሄዶችን አስመልክቶ ከአገር በቀል የስራ ተቋራጮች ጋር ውይይት አካሂዷል።
በውይይት መድረኩ የኢፌዲሪ ከተማና መሠረተ ልማት ሚኒስቴር ማኒስትር ድኤታ አቶ የትምጌታ አስራት ፣ የኢትዮጵያ መንገዶች አስተዳደር ዋና ዳይሬክተር ኢንጅነር መሐመድ አብዱራህማን ፣ ሌሎች የፌዴራል ከፍተኛ የስራ ኃላፊዎች ፣ ሀገር በቀል የስራ ተቋራጭ ድርጅት ባለቤት እና ስራ አስኪያጆች እና ከኢትዮጵያ መሃንዲሶች ማህበር የተውጣጡ እንግዶች ተሳትፈዋል፡፡
በባለፋት ዓመታት ሲያጋጥሙ የነበሩ አለምአቀፍና ሀገር አቀፍ ተፅዕኖዎች በመንገድ ግንባታ ዘርፉ ላይ ተፅዕኖ ሲያሳድሩ ስለመቆየታቸው በመድረኩ ጥናታዊ ፅሁፍ ቀርቦ ውይይት ተደርጎበታል።
አሁን ላይ ዘርፉን እየፈተኑ ይገኛሉ ተብለው በጥናታዊ ፅሁፉ ከቀረቡ ተፅዕኖዎች መካከል የፀጥታ ችግር ፣ የወሰን ማስከበር ፣ የኮንስትራክሽን ቁሳቁሶች እና ማሽነሪዎች ዋጋ መጨመር ፣ የአንዳንድ የስራ ተቋራጮች ደካማ ፕሮጀክት አስተዳደር ችግር እና የክፍያ እጥረት በዋንነኛነት የሚጠቀሱ መሆናቸው ተገልጿል፡፡
በእነዚህ ጫናዎች ምክንያት የግንባታ ሂደት መዘግየት ፣ የዋጋ ልዩነት መፈጠር ፣ የጥራት ችግሮች መስተዋል ፣ በኮንትራት ሂደት ላይ የሚያተኩሩ የህግ ክርክሮች መፈጠር እና የፕሮጀክት መቋረጥ ሂደቶች እየተስተዋሉ ስለመሆናቸው ታውቋል።
የኢትዮጵያ መንገዶች አስተዳደር ከተለያዩ የመስተዳድር ከሌሎች ባለድርሻ አካላት ጋር በመተባበር በርካታ ስራዎችን እየሰራ የሚገኝ በመሆኑ ከዚህ ቀደም ይስተዋሉ የነበሩ ችግሮች አሁን ላይ በከፊል እየተቀረፉ ስለመሆናቸው በሰነዱ ቀርቧል።
ኢመአ በስራ ተቋራጮች ላይ የሚስተዋሉ ችግሮችን በአግባቡ ፈትሾ ለውይይት ማቅረቡ የሚያስመሰግነው ስለመሆኑ አስተያየታቸውን የሰጡ የስራ ተቋራጮች ተጨማሪ ያሏቸውን አስተያየቶችም ገልፀዋል።
በዘርፉ ከዋጋ ግሽበት ፣ የፀጥታ ፣ የክፍያ ፣ የታክስ ፣ የወሰን ማስከበርና የመሳሰሉ ዘርፈ ብዙ ተግዳሮቶች እየፈተኑን በመሆኑ የሚመለከተው የመንግስት አካላት አፋጣኝ መፍትሄ ሊሰጠን ይገባል ሲሉ የስራ ተቋራጮቹ ጠይቀዋል ።
በወቅቱ በከተማ እና መሰረተ ልማት ሚኒስቴር ሚኒስትር ድኤታ ክቡር አቶ የትምጌታ አስራት እና በኢመአ ዋና ዳይሬክተር ኢንጅነር መሐመድ አብዱራህማን የማጠቃለያ ሃሳቦች ተሰጥተዋል።
አሁን ላይ እየተስተዋሉ ያሉ ችግሮች የአንድ ወገን ብቻ አለመሆናቸውን በመገንዘብና ሁላችንም ራሳችንን በመፈተሽ እየተስተዋሉ ያሉ ችግሮችን በጋራ ልንቀርፍ ይገባል ሲሉ የኢመአ ዋና ዳይሬክተር ኢንጅነር መሐመድ አብዱራህማን ገልፀዋል፡፡
የከተማ እና መሰረተ ልማት ሚኒስቴር ሚኒስትር ድኤታ ክቡር አቶ የትምጌታ አስራት በበኩላቸው በከተማ እና መሰረተ ልማት ሚኒስቴር እና በኢትዮጵያ መንገዶች አስተዳደር ደረጃ ሊቀረፉ የሚችሉ ጉዳዮችን ለመቅረፍ ከዛሬ ጀምሮ እንቅስቃሴ ይደረጋል ያሉ ሲሆን ፣ መንግስት ዘርፉን ለማጠናከር በርካታ ስራዎች እየሰራ እንደሚገኝም ገልፀዋል፡፡
@etconp
👍16
👉 INTERCON Construction Chemicals
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
Tel: 0961955555
Address: Signal, around signal mall
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
Tel: 0961955555
Address: Signal, around signal mall
👍2🎉1🙏1
ኮንስትራክሽን ዘርፍ አደጋ።
"በህይወት ማዉጣት ተችሏል"
🏷ትላንት የካቲት 28 ቀን 2017 ዓ.ም በአራዳ ክፍለ-ከተማ ወረዳ 7 ቤለር እየተባለ በሚጠራዉ አካባቢ በደረሰ የኮንስትራክሽን የስራ ላይ አደጋ ሁለት ሰዎች ላይ ጉዳት ደርሷል።
አደጋዉ የደረሰዉ የመንገድ ፍሳሽ ማስወገጃ ቱቦ ለመቅበር በቁፋሮ ስራ ላይ በነበሩ ሁለት ሰራተኞች ላይ ከፍተኛ መጠን ያለዉ አፈር ተንዶባቸዉ ነበር።
የኮሚሽኑ የአደጋ ጊዜ ባለሞያዎች አምስት ሜትር ገደማ ጥልቀት ካለዉ ጠባብ ጉድጓድ ዉስጥ አፈር ተጭኗቸዉ የነበሩትን ሁለቱን ሰራተኞች 1:20 ሰዓት በፈጀ ጥረት በኋላ በህይወት ማዉጣት ችለዋል።
በህይወት የወጡት ሁለቱ ወጣቶች እድሜያቸው 27 እና 29 ዓመት የተገመተ ሲሆን በአደጋው ምክኒያት ጉዳት የደረሰባቸው በመሆኑ በኮሚሽኑ አምቡላንስ እየተረዱ ወደ ዳግማዊ ሚኒልክ ሆስፒታል ተወስደዋል፡፡
በአዲስ አበባ በኮንስትራክሽን ዘርፍ ተገቢዉን የአደጋ ደህንነት መስፈርትን ጠብቆ ባለመስራት መሰል አደጋዎች በተደጋጋሚ እያጋጠሙ በመሆኑ በተለይም አሰሪዎች የሰራተኞቻቸዉን ደህንነት የመጠበቅ ግዴታቸዉን እንዲወጡም ኮሚሽን መ/ቤቱ ያሳስባል።
ለእሳትና ለሌሎች ድነገተኛ አደጋዎች እንዲሁም ለአንቡላንስ አገልግሎቶች በ 939 ፈጥነው ያሳውቁ
Via እሳትና አደጋ ስጋት ስራ አመራር
@etconp
"በህይወት ማዉጣት ተችሏል"
🏷ትላንት የካቲት 28 ቀን 2017 ዓ.ም በአራዳ ክፍለ-ከተማ ወረዳ 7 ቤለር እየተባለ በሚጠራዉ አካባቢ በደረሰ የኮንስትራክሽን የስራ ላይ አደጋ ሁለት ሰዎች ላይ ጉዳት ደርሷል።
አደጋዉ የደረሰዉ የመንገድ ፍሳሽ ማስወገጃ ቱቦ ለመቅበር በቁፋሮ ስራ ላይ በነበሩ ሁለት ሰራተኞች ላይ ከፍተኛ መጠን ያለዉ አፈር ተንዶባቸዉ ነበር።
የኮሚሽኑ የአደጋ ጊዜ ባለሞያዎች አምስት ሜትር ገደማ ጥልቀት ካለዉ ጠባብ ጉድጓድ ዉስጥ አፈር ተጭኗቸዉ የነበሩትን ሁለቱን ሰራተኞች 1:20 ሰዓት በፈጀ ጥረት በኋላ በህይወት ማዉጣት ችለዋል።
በህይወት የወጡት ሁለቱ ወጣቶች እድሜያቸው 27 እና 29 ዓመት የተገመተ ሲሆን በአደጋው ምክኒያት ጉዳት የደረሰባቸው በመሆኑ በኮሚሽኑ አምቡላንስ እየተረዱ ወደ ዳግማዊ ሚኒልክ ሆስፒታል ተወስደዋል፡፡
በአዲስ አበባ በኮንስትራክሽን ዘርፍ ተገቢዉን የአደጋ ደህንነት መስፈርትን ጠብቆ ባለመስራት መሰል አደጋዎች በተደጋጋሚ እያጋጠሙ በመሆኑ በተለይም አሰሪዎች የሰራተኞቻቸዉን ደህንነት የመጠበቅ ግዴታቸዉን እንዲወጡም ኮሚሽን መ/ቤቱ ያሳስባል።
ለእሳትና ለሌሎች ድነገተኛ አደጋዎች እንዲሁም ለአንቡላንስ አገልግሎቶች በ 939 ፈጥነው ያሳውቁ
Via እሳትና አደጋ ስጋት ስራ አመራር
@etconp
👍17🕊2
👉Construction Accounting Formulas
1. Gross Profit = Sales – Cost of Goods Sold
2. Gross Profit Margin = (Gross Profit / Sales) x 100
3. Operating Profit = Gross Profit – Operating Expenses
4. Operating Profit Margin = (Operating Profit / Sales) x 100
5. Net Profit Margin = (Net Profit / Sales) x 100
6. Return on Investment (ROI) = (Gain/Cost) x 100
7. Return on Equity (ROE) = (Net Profit / Shareholder Equity) x 100
8. Asset Turnover = Sales / Total Assets
9. Inventory Turnover = Cost of Goods Sold / Average Inventory
10. Days Sales Outstanding (DSO) = Accounts Receivable /Sales x Number of Days
11. Days Inventory Outstanding (DIO)= Inventory / Cost of Goods Sold x 365
12. Current Ratio = Current Assets / Current Liabilities
13. Quick Ratio = (Current Assets – Inventory) / Current Liabilities
14. Debt-to-Equity Ratio = Total Debt / Shareholder Equity
15. Earnings Per Share (EPS) = Net Profit/Number of Shares
16. Price-Earnings Ratio (P/E Ratio) Stock Price / EPS
17. Break-Even Point (BEP) = Fixed Costs/ (Selling Price -Variable Costs)
18. Margin of Safety = (Sales – BEP) / Sales
19. Cost of Goods Sold (COGS) = Direct Materials + Direct Labor Overheads
20. Operating Leverage = (Operating Profit/Sales) x (Sales /Fixed Costs)
21. Financial Leverage = (Net Profit/Operating Profit) x (Operating Profit / Sales)
22. Return on Assets (ROA) = Net Profit/Total Assets
23. Return on Capital Employed (ROCE) EBIT / (Total Assets – Current Liabilities)
24. Residual Income (RI) = Net Profit (Total Assets x Cost of Capital)
25. Economic Value Added (EVA) = Net Profit – (Total Assets x Cost of Capital)
26. Cash Conversion Cycle = DIO + DSO-Days Payable Outstanding (DPO)
27. Asset Utilization Sales / Total Assets
28. Profitability Index (PI) = Present Value of Future Cash Flows/Initial Investment
29. Accounting Rate of Return (ARR) = Average Annual Profit/Average Investment
30. Payback Period = Initial Investment / Annual Cash Inflows
31. Discounted Payback Period = Initial Investment/Discounted Cash Inflows
32. Net Present Value (NPV) = Present Value of Future Cash Flows Initial Investment
33. Internal Rate of Return (IRR) = Discount Rate that sets NPV to zero
34. Cost of Capital = Weighted Average of Debt and Equity Costs
35. Weighted Average Cost of Capital (WACC) = (Cost of Debt x Debt) + (Cost of Equity x Equity)
36. Earnings Before Interest, Taxes, Depreciation, and Amortization (EBITDA) = Net Profit + Interest + Taxes + Depreciation + Amortization
37. Interest Coverage Ratio = EBIT/Interest Expenses
38. Cash Flow Margin = (Operating Cash Flow / Sales) x 100
39. Cash Flow Return on Investment (CFROI) = Operating Cash Flow/Total Assets
40. Free Cash Flow (FCF) = Operating Cash Flow – Capital Expenditures
@etconp
1. Gross Profit = Sales – Cost of Goods Sold
2. Gross Profit Margin = (Gross Profit / Sales) x 100
3. Operating Profit = Gross Profit – Operating Expenses
4. Operating Profit Margin = (Operating Profit / Sales) x 100
5. Net Profit Margin = (Net Profit / Sales) x 100
6. Return on Investment (ROI) = (Gain/Cost) x 100
7. Return on Equity (ROE) = (Net Profit / Shareholder Equity) x 100
8. Asset Turnover = Sales / Total Assets
9. Inventory Turnover = Cost of Goods Sold / Average Inventory
10. Days Sales Outstanding (DSO) = Accounts Receivable /Sales x Number of Days
11. Days Inventory Outstanding (DIO)= Inventory / Cost of Goods Sold x 365
12. Current Ratio = Current Assets / Current Liabilities
13. Quick Ratio = (Current Assets – Inventory) / Current Liabilities
14. Debt-to-Equity Ratio = Total Debt / Shareholder Equity
15. Earnings Per Share (EPS) = Net Profit/Number of Shares
16. Price-Earnings Ratio (P/E Ratio) Stock Price / EPS
17. Break-Even Point (BEP) = Fixed Costs/ (Selling Price -Variable Costs)
18. Margin of Safety = (Sales – BEP) / Sales
19. Cost of Goods Sold (COGS) = Direct Materials + Direct Labor Overheads
20. Operating Leverage = (Operating Profit/Sales) x (Sales /Fixed Costs)
21. Financial Leverage = (Net Profit/Operating Profit) x (Operating Profit / Sales)
22. Return on Assets (ROA) = Net Profit/Total Assets
23. Return on Capital Employed (ROCE) EBIT / (Total Assets – Current Liabilities)
24. Residual Income (RI) = Net Profit (Total Assets x Cost of Capital)
25. Economic Value Added (EVA) = Net Profit – (Total Assets x Cost of Capital)
26. Cash Conversion Cycle = DIO + DSO-Days Payable Outstanding (DPO)
27. Asset Utilization Sales / Total Assets
28. Profitability Index (PI) = Present Value of Future Cash Flows/Initial Investment
29. Accounting Rate of Return (ARR) = Average Annual Profit/Average Investment
30. Payback Period = Initial Investment / Annual Cash Inflows
31. Discounted Payback Period = Initial Investment/Discounted Cash Inflows
32. Net Present Value (NPV) = Present Value of Future Cash Flows Initial Investment
33. Internal Rate of Return (IRR) = Discount Rate that sets NPV to zero
34. Cost of Capital = Weighted Average of Debt and Equity Costs
35. Weighted Average Cost of Capital (WACC) = (Cost of Debt x Debt) + (Cost of Equity x Equity)
36. Earnings Before Interest, Taxes, Depreciation, and Amortization (EBITDA) = Net Profit + Interest + Taxes + Depreciation + Amortization
37. Interest Coverage Ratio = EBIT/Interest Expenses
38. Cash Flow Margin = (Operating Cash Flow / Sales) x 100
39. Cash Flow Return on Investment (CFROI) = Operating Cash Flow/Total Assets
40. Free Cash Flow (FCF) = Operating Cash Flow – Capital Expenditures
@etconp
👍20❤2🔥1👌1
👉Procedure for rebound hammer test:
💫It is essential to calibrate the rebound hammer tool before using it to test a concrete section.
⏺The hammer is tested against a test anvil made from steel to calibrate the rebound hammer.
⏺The steel anvil has a Brinell hardness number approximately equal to 5000N/mm2.
⏺After successful calibration against the test anvil, the rebound hammer is pressed against the concrete surface orthogonally to take the readings from the graduated scale in the hammer itself.
🚧The hammer is kept horizontal against vertical surfaces. When we align the hammer at any alternative angle other than 90o against any surface gives a different value for the same concrete.
⏺The rebound value varies with the type of application. Approximate impact energies are different for different surface applications.
🌟Some average impact energy levels are given below for various applications:
1. Normal Weight Concrete - 2.25
2. Light Weight Concrete - 0.75
3. Mass Concrete Testing - 30.00
@etconp
💫It is essential to calibrate the rebound hammer tool before using it to test a concrete section.
⏺The hammer is tested against a test anvil made from steel to calibrate the rebound hammer.
⏺The steel anvil has a Brinell hardness number approximately equal to 5000N/mm2.
⏺After successful calibration against the test anvil, the rebound hammer is pressed against the concrete surface orthogonally to take the readings from the graduated scale in the hammer itself.
🚧The hammer is kept horizontal against vertical surfaces. When we align the hammer at any alternative angle other than 90o against any surface gives a different value for the same concrete.
⏺The rebound value varies with the type of application. Approximate impact energies are different for different surface applications.
🌟Some average impact energy levels are given below for various applications:
1. Normal Weight Concrete - 2.25
2. Light Weight Concrete - 0.75
3. Mass Concrete Testing - 30.00
@etconp
👍7👏3