proposal@etconp.pdf
384.4 KB
Research proposal
ውድ የቻናላችን ቤተሰቦች በጠየቃችሁን መሰረት research proposal ይዘንላችሁ መተናል።
#reseachproposal #shareit
@etconp
ውድ የቻናላችን ቤተሰቦች በጠየቃችሁን መሰረት research proposal ይዘንላችሁ መተናል።
#reseachproposal #shareit
@etconp
research proposal@etconp.pdf
641.3 KB
Research proposal
ውድ የቻናላችን ቤተሰቦች በጠየቃችሁን መሰረት research proposal ይዘንላችሁ መተናል።
#reseachproposal #shareit
@etconp
ውድ የቻናላችን ቤተሰቦች በጠየቃችሁን መሰረት research proposal ይዘንላችሁ መተናል።
#reseachproposal #shareit
@etconp
ጥያቄ
Basic Mechanics
Number of reaction in roller support is_______?
1. 2
2. 1
3. 3
4. 0
እኚ ቀል ያሉ ጥያቄዎች Engineering mechanics’ን እድታስታውሱት ነው።
#mechanics #rollersupport
@etconp
Basic Mechanics
Number of reaction in roller support is_______?
1. 2
2. 1
3. 3
4. 0
እኚ ቀል ያሉ ጥያቄዎች Engineering mechanics’ን እድታስታውሱት ነው።
#mechanics #rollersupport
@etconp
@etconp soil mechanics I report.pdf
516.6 KB
Soil mechanics lab report
በጠየቃችሁን መሰረት soil lab report ይዘንላችሁ መተናል
Content of this lab report
1. Water content test
2. Specific gravity test
3. Hydrometer Analysis
4. Permeability test
ይህን Lab report ለጓደኞቻችው በማጋራት አጋርነታችሁን አሳዩን 🙏
#labreport #soilmechnics
@etconp
በጠየቃችሁን መሰረት soil lab report ይዘንላችሁ መተናል
Content of this lab report
1. Water content test
2. Specific gravity test
3. Hydrometer Analysis
4. Permeability test
ይህን Lab report ለጓደኞቻችው በማጋራት አጋርነታችሁን አሳዩን 🙏
#labreport #soilmechnics
@etconp
Media is too big
VIEW IN TELEGRAM
#repost
How to calculate the volume of sand , aggregate and cement in 1m^3 of concrete? Take c-20 concrete
Answer
Example c-20 mix design (1:2:3) if we are given 1 m^3 concrete
First we add up 1+2+3=6
Means 1 cement
2 sand
3 aggregate
To calculate the the volume of sand
1 * 2/6= 2/6 m^3 =0.33m^3
To calculate the volume of aggregate (gravel)
1 * 3/6 = 0.5m^3
To calculate the volume of cement
1 * 1/6 = 0.167m^3
To calculate cement in piece
1 bag of cement is 0.036m^3 so divide the quantity of cement with a bag of cement
Bag of cement = 0.167 / 0.036 = 4.6
So we use 5 bag of cement
👉🏿We consider dry volume not wet volume
👉🏿 To convert dry volume to wet volume we multiply it by 1.54
Wet volume =1.54 dry volume
📌 10% shrinkage
📌 44% wastage
@etconp
#repost
@etconp
How to calculate the volume of sand , aggregate and cement in 1m^3 of concrete? Take c-20 concrete
Answer
Example c-20 mix design (1:2:3) if we are given 1 m^3 concrete
First we add up 1+2+3=6
Means 1 cement
2 sand
3 aggregate
To calculate the the volume of sand
1 * 2/6= 2/6 m^3 =0.33m^3
To calculate the volume of aggregate (gravel)
1 * 3/6 = 0.5m^3
To calculate the volume of cement
1 * 1/6 = 0.167m^3
To calculate cement in piece
1 bag of cement is 0.036m^3 so divide the quantity of cement with a bag of cement
Bag of cement = 0.167 / 0.036 = 4.6
So we use 5 bag of cement
👉🏿We consider dry volume not wet volume
👉🏿 To convert dry volume to wet volume we multiply it by 1.54
Wet volume =1.54 dry volume
📌 10% shrinkage
📌 44% wastage
@etconp
#repost
@etconp
👍1
Ethio Construction Engineering
ጥያቄ How do we consider Earthquake as a load ? @etconp
Earthquake@etconp.pdf
97.5 KB
How is that earthquake is a load ?
Answer for this question
It’s only one page written in Amharic and English
@etconp
Answer for this question
It’s only one page written in Amharic and English
@etconp
What can you say about this picture? Do you agree
ስለዚህ ምስል ምን ትላላችሁ? ትስማማላችሁ?
#manger #capitalism
@etconp
ስለዚህ ምስል ምን ትላላችሁ? ትስማማላችሁ?
#manger #capitalism
@etconp
EBCS-1_2 @etconp.PDF
1.5 MB
EBCS 1
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_2 basics design
@etconp
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_2 basics design
@etconp
👍1
EBCS-1_3 (2) @etconp.PDF
1.3 MB
EBCS 1
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_3basics design
@etconp
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_3basics design
@etconp
EBCS-1_4 @etconp.PDF
1.8 MB
EBCS 1
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_4 self weight and imposed load
@etconp
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_4 self weight and imposed load
@etconp
EBCS-1_5@etconp.PDF
1.8 MB
EBCS 1
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_5 wind action
@etconp
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_5 wind action
@etconp
EBCS-1_6 @etconp.PDF
1.2 MB
EBCS 1
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_6 aerodynamic coefficient
@etconp
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_6 aerodynamic coefficient
@etconp
EBCS-1_7 @etconp.PDF
718 KB
EBCS 1
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_7 aerodynamic coefficient
@etconp
EBCS(Ethiopian building code and standard)
Basic design and action on structure
EBCS 1_7 aerodynamic coefficient
@etconp
Super Elevation
👉🏿 Objective
👉🏿 Concept
g(fs + e)
Where : e= rate of super elevation
fs = coefficient of friction
R = radius of horizontal curve in meter
V = design speed in m/s
g= 9.81 m/s
#highway #superelevation
❓ስለዚህ super elevation ምን ትላላችሁ?
❓What do you say about this super elevation?
@etconp
👉🏿 Objective
To counteract the centrifugal force acting on the vehicle at circular curves.👉🏿 Concept
Raise the road at the edge so the weight component vehicle balance the centrifugal acceleration and avoid the slipping and overturning or vehicle.
👉🏿 Equations
Rv = V²g(fs + e)
Where : e= rate of super elevation
fs = coefficient of friction
R = radius of horizontal curve in meter
V = design speed in m/s
g= 9.81 m/s
#highway #superelevation
❓ስለዚህ super elevation ምን ትላላችሁ?
❓What do you say about this super elevation?
@etconp
Ethio Construction Engineering
Discuss @cotmp Join us on telegram:- @etconp
The main reason of the slab leakage of the roof slab was construction and water proofing problems.
The slab wasn't coated with water proof. They used cement screed to prevent water penetration.
cement screed often causes problems. Under intense sunshine this thin layer can get very hot while the reinforced concrete of the roof beneath stays cooler. The screed expands more than the concrete and as a result the screed cracks and you will see cracks across the surface of the roof. This cracking also often results in the screed separating from the reinforced concrete beneath.
So now when it rains water can penetrate the cracks in the screed and can travel across the roof between the cement screed and the reinforced concrete and will manage to find any leaks through the reinforced concrete and into the room below.
@etconp
The slab wasn't coated with water proof. They used cement screed to prevent water penetration.
cement screed often causes problems. Under intense sunshine this thin layer can get very hot while the reinforced concrete of the roof beneath stays cooler. The screed expands more than the concrete and as a result the screed cracks and you will see cracks across the surface of the roof. This cracking also often results in the screed separating from the reinforced concrete beneath.
So now when it rains water can penetrate the cracks in the screed and can travel across the roof between the cement screed and the reinforced concrete and will manage to find any leaks through the reinforced concrete and into the room below.
@etconp
Architects "are never taught the right thing"
"But the constraints are not just budget constraints – the building logic, the political framework, and the policies, are part of the equation and we're not well trained for that," he said.
"We're never taught the right thing at university."
- Alejandro Aravena, speaking to dezeen.com
المهندسين المعماريين "لا يتم تعليمهم الشيء الصحيح"
وقال "لكن القيود ليست مجرد قيود على الميزانية - منطق البناء والإطار السياسي والسياسات هي جزء من المعادلة ونحن غير مدربين تدريباً جيداً على ذلك".
"نحن لم نعلم الشيء الصحيح في الجامعة."
- أليخاندرو أرافينا ، يتحدث إلى dezeen.com
@wintaassefa for @ETCONp
"But the constraints are not just budget constraints – the building logic, the political framework, and the policies, are part of the equation and we're not well trained for that," he said.
"We're never taught the right thing at university."
- Alejandro Aravena, speaking to dezeen.com
المهندسين المعماريين "لا يتم تعليمهم الشيء الصحيح"
وقال "لكن القيود ليست مجرد قيود على الميزانية - منطق البناء والإطار السياسي والسياسات هي جزء من المعادلة ونحن غير مدربين تدريباً جيداً على ذلك".
"نحن لم نعلم الشيء الصحيح في الجامعة."
- أليخاندرو أرافينا ، يتحدث إلى dezeen.com
@wintaassefa for @ETCONp