RC QUIZ For balanced section of RCC(RC) beam, what is the area of steel required if the area of concrete 100 inch². 𝑓𝑐’= 4ksi and 𝑓𝑦= 60ksi. Where ksi= kilopound per square inch or 1000 pounds per square inch. 1. 2.6 inch² 2. 3.6 inch² 3. 4.6…
Answer for this question 👆🏾👆🏾
𝐴s= 0.85 𝑥 𝑓𝑐’ 𝑥 𝐴𝑐
𝑓𝑦
𝐴s= 0.85 x 4000 x 100
60000
As= 5.6 inch²
So the answer is 4️⃣
@etconp
𝐴s= 0.85 𝑥 𝑓𝑐’ 𝑥 𝐴𝑐
𝑓𝑦
𝐴s= 0.85 x 4000 x 100
60000
As= 5.6 inch²
So the answer is 4️⃣
@etconp
Telegram
Ethio Construction Engineering
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
FUNCTIONS OF FOUNDATIONS
Foundations serve the following purposes :-
1.Reduction of load intensity:- Foundations distribute the loads of the super-structure to a larger area so that the intensity of the load at its base (i.e., the total load divided by the total area)does not exceed the safe bearing capacity of the sub-soil. In the case of deep foundations it transmits the super imposed loads to the sub soil both through side friction as well as through end bearing
2.Even distribution of load:- Foundations distribute the non-uniform load of the super-structure evenly to be sub soil. For example two columns carrying unequal loads can have a combined footing which may transmit the load to sub soil evenly with uniform soil pressure. Due to this, differential settlements are minimised.
3. Provision of level surface:- Foundations provide levelled and hard surface over which the super structure can be built.
4. Lateral stability:- It anchors the super structure to the ground, thus imparting lateral stability to the super structure.The stability of the building, against sliding and overturning, due to horizontal forces (Such as wind, Earthquake etc.) is increased due to foundations.
5.Safety against undermining:- It provides the structural safety against undermining or scouring due to burrowing animals and flood water.
6.Protection against soil movements:- Special foundations measures prevents or minimises the distress (or cracks) in the super structure, due to expansion or contraction of the sub soil because of moisture movement in some problematic soils.
ESSENTIAL REQUIREMENTS OF A GOOD FOUNDATIONS :-
Foundations should be constructed to safety the following requirements:-
1.The foundations shall be constructed to sustain dead and imposed loads and to transmit these to the sub soil in such a way that pressure on it will not cause settlement which would impair the stability of the building or adjoining structures.
2.Foundation base should be rigid so that differential settlements are minimised, specially for the case when super imposed loads are not evenly distributed .
3.Foundations should be taken sufficiently deep to gaurd the building against damage or distress caused by swelling or shrinkage of the sub soil.
4. Foundations should be safely located that its performance may not be affected due to any unexpected future influence.
@etconp
Foundations serve the following purposes :-
1.Reduction of load intensity:- Foundations distribute the loads of the super-structure to a larger area so that the intensity of the load at its base (i.e., the total load divided by the total area)does not exceed the safe bearing capacity of the sub-soil. In the case of deep foundations it transmits the super imposed loads to the sub soil both through side friction as well as through end bearing
2.Even distribution of load:- Foundations distribute the non-uniform load of the super-structure evenly to be sub soil. For example two columns carrying unequal loads can have a combined footing which may transmit the load to sub soil evenly with uniform soil pressure. Due to this, differential settlements are minimised.
3. Provision of level surface:- Foundations provide levelled and hard surface over which the super structure can be built.
4. Lateral stability:- It anchors the super structure to the ground, thus imparting lateral stability to the super structure.The stability of the building, against sliding and overturning, due to horizontal forces (Such as wind, Earthquake etc.) is increased due to foundations.
5.Safety against undermining:- It provides the structural safety against undermining or scouring due to burrowing animals and flood water.
6.Protection against soil movements:- Special foundations measures prevents or minimises the distress (or cracks) in the super structure, due to expansion or contraction of the sub soil because of moisture movement in some problematic soils.
ESSENTIAL REQUIREMENTS OF A GOOD FOUNDATIONS :-
Foundations should be constructed to safety the following requirements:-
1.The foundations shall be constructed to sustain dead and imposed loads and to transmit these to the sub soil in such a way that pressure on it will not cause settlement which would impair the stability of the building or adjoining structures.
2.Foundation base should be rigid so that differential settlements are minimised, specially for the case when super imposed loads are not evenly distributed .
3.Foundations should be taken sufficiently deep to gaurd the building against damage or distress caused by swelling or shrinkage of the sub soil.
4. Foundations should be safely located that its performance may not be affected due to any unexpected future influence.
@etconp
General formula for concrete mix
Concrete Mix Ratio = 1:2:4
Let volume of concrete = Zm3
Then
a) Cement = 1/7 x zm3 x1400Kg/m3
x 1.3 shrinkage x 1.05 Wastage
= 273Kgs Z
= 0.19m3 Z
b) Sand = 2/7 x Zm3
x 1840Kg/m3
x 1.3 shrinkage x 1.05 Wastage
= 718Kgs Z
= 718/1840 m3 Z
= 0.39m3 Z
c) Gravel = 4/7 x Zm3 x 2250Kg/m3 x 1.3 shrinkage x 1.05 Wastage
= 1755 Kgs Z
= 0.95 m3 Z
Therfore for 1m3 concrete of C-20
With Mechanical Mix
Mix ratio 1:2:4
Cement = 275kg (5.5bags)
Sand = 718Kg (0.39m3)
Gravel = 1755Kgs (0.78m3)
Water = 110 liters
Assuming
30% Shrinkage
5% Wastage
For Mechanical Mix W/C = 0.4 – 0.5
Hand Mix W/C = 0.4 – 0.65
Note: Hand Mix shall only be allowed for class II concrete, and shall not be
allowed for concrete of class c-20 and above.
@etconp
Concrete Mix Ratio = 1:2:4
Let volume of concrete = Zm3
Then
a) Cement = 1/7 x zm3 x1400Kg/m3
x 1.3 shrinkage x 1.05 Wastage
= 273Kgs Z
= 0.19m3 Z
b) Sand = 2/7 x Zm3
x 1840Kg/m3
x 1.3 shrinkage x 1.05 Wastage
= 718Kgs Z
= 718/1840 m3 Z
= 0.39m3 Z
c) Gravel = 4/7 x Zm3 x 2250Kg/m3 x 1.3 shrinkage x 1.05 Wastage
= 1755 Kgs Z
= 0.95 m3 Z
Therfore for 1m3 concrete of C-20
With Mechanical Mix
Mix ratio 1:2:4
Cement = 275kg (5.5bags)
Sand = 718Kg (0.39m3)
Gravel = 1755Kgs (0.78m3)
Water = 110 liters
Assuming
30% Shrinkage
5% Wastage
For Mechanical Mix W/C = 0.4 – 0.5
Hand Mix W/C = 0.4 – 0.65
Note: Hand Mix shall only be allowed for class II concrete, and shall not be
allowed for concrete of class c-20 and above.
@etconp
Telegram
Ethio Construction Engineering
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Pinnacle tower 🇰🇪
This is a skyscraper 🏙 under construction in the capital of Kenya Nairobi 🇰🇪. The construction started in 2017 and its estimated to be completed in 2023.
➪ Height:- 320 meters
➪ floor count :- 46 the shorter 70 the taller
➪ status :- under construction
➪ cost :- Sh20 billion (Est)
Grounds:- 2.5 acres (1.0 hectare)
Architecture firm:- Archgroup Consultants
Developer:- White Lotus Group Jabavu Village
Engineer:- Meinhardt
Quantity surveyor:- BECS Consultancy
Main contractor :- China State Construction Engineering Corporation
When completed, the skyscraper is expected to become the tallest building in Africa, and the third tallest building in the Southern Hemisphere, at 70 stories and over 1,000 feet (300 m) in height.
CBE headquarter will be the 5th tallest tower in Africa
We wish you a wonderful night
@etconp
This is a skyscraper 🏙 under construction in the capital of Kenya Nairobi 🇰🇪. The construction started in 2017 and its estimated to be completed in 2023.
➪ Height:- 320 meters
➪ floor count :- 46 the shorter 70 the taller
➪ status :- under construction
➪ cost :- Sh20 billion (Est)
Grounds:- 2.5 acres (1.0 hectare)
Architecture firm:- Archgroup Consultants
Developer:- White Lotus Group Jabavu Village
Engineer:- Meinhardt
Quantity surveyor:- BECS Consultancy
Main contractor :- China State Construction Engineering Corporation
When completed, the skyscraper is expected to become the tallest building in Africa, and the third tallest building in the Southern Hemisphere, at 70 stories and over 1,000 feet (300 m) in height.
CBE headquarter will be the 5th tallest tower in Africa
We wish you a wonderful night
@etconp
👍1
Forwarded from Ethio Construction Engineering
👉የአርማታ ብረት በሜትር ምን ያህል ይመዝናል? @COTMp
.
⏩ለኮንስትራክሽን ግብዐት የምንጠቀማቸው የአርማታ ብረት በቅርፃቸው በሁለት ይከፈላሉ
1. ልሙጥ ብረት(Mild Steel or plain rebar)
2. ባለ ክርክር/አርማታ ብረት(Deformed steel rebar)
➡በጥንካሬ ደረጃ ደግሞ በስፋት Grade 60 እና Grade 40
በመባል ይለያሉ ይህም ውጥረታዊ ሀይል/tensile strength/ በመቌቌም አቅማቸው ነው።
*Grade 40=275.79MPa yield strength ሲኖረው
*Grade 60=413.68MPa yield strength ይኖረዋል።
.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
.
⏩ለኮንስትራክሽን ግብዐት የምንጠቀማቸው የአርማታ ብረት በቅርፃቸው በሁለት ይከፈላሉ
1. ልሙጥ ብረት(Mild Steel or plain rebar)
2. ባለ ክርክር/አርማታ ብረት(Deformed steel rebar)
➡በጥንካሬ ደረጃ ደግሞ በስፋት Grade 60 እና Grade 40
በመባል ይለያሉ ይህም ውጥረታዊ ሀይል/tensile strength/ በመቌቌም አቅማቸው ነው።
*Grade 40=275.79MPa yield strength ሲኖረው
*Grade 60=413.68MPa yield strength ይኖረዋል።
.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
Ethio Construction Engineering via @like
Surveying quiz Survey which determines property line (property boundaries) is called __? 1. City survey 2. Cadastral survey 3. Land survey 4. Topographic survey #quiz #survey @etconp
Surveying quiz
Survey which determines property line (property boundaries) is called __?
Survey which determines property line (property boundaries) is called __?
Anonymous Quiz
8%
City survey
59%
Cadastral survey
23%
Land survey
10%
Topographic survey
Ethio Construction Engineering via @like
Surveying quiz Survey which determines property line (property boundaries) is called __? 1. City survey 2. Cadastral survey 3. Land survey 4. Topographic survey #quiz #survey @etconp
👆🏾👆🏾The answer for this question is cadastral surveying 2️⃣
Cadastral surveying is the sub-field of cadastre and surveying that specialises in the establishment and re-establishment of real property boundaries. It is an important component of the legal creation of properties. A cadastral surveyor must apply both the spatial-measurement principles of general surveying and legal principles such as respect of neighboring titles.
@etconp
Cadastral surveying is the sub-field of cadastre and surveying that specialises in the establishment and re-establishment of real property boundaries. It is an important component of the legal creation of properties. A cadastral surveyor must apply both the spatial-measurement principles of general surveying and legal principles such as respect of neighboring titles.
@etconp
Just for discussion:
For defining of earthquake loading some designers are under doubt about user coefficient and response spectrum. What about your view from different requirements......
@etconp
For defining of earthquake loading some designers are under doubt about user coefficient and response spectrum. What about your view from different requirements......
@etconp
Sunrise Kempinski Hotel
Official name :- Sunrise Kempinski Hotel
Status :- completed
Country :- China 🇨🇳
Building purpose :- HOTEL 🏨
Construction started:- 2012 GC
Completion :- 2014 GC
Owner :- Beijing Enterprises International Conference Metropolis Real Estate Co., Ltd.
Architectural design structural design and MEP design :- Shanghai Huadu Architect Design Company
Contractor:- Beijing Urban Construction Group Co., Ltd
Height :- 77 meters
Floor above the ground :- 20
Floors below the ground:- 2
Built up area :- 35,582 m²
@etconp
Official name :- Sunrise Kempinski Hotel
Status :- completed
Country :- China 🇨🇳
Building purpose :- HOTEL 🏨
Construction started:- 2012 GC
Completion :- 2014 GC
Owner :- Beijing Enterprises International Conference Metropolis Real Estate Co., Ltd.
Architectural design structural design and MEP design :- Shanghai Huadu Architect Design Company
Contractor:- Beijing Urban Construction Group Co., Ltd
Height :- 77 meters
Floor above the ground :- 20
Floors below the ground:- 2
Built up area :- 35,582 m²
@etconp
Forwarded from Ethio Construction Engineering
👉ስለ ብሎኬት @COTMp
.
⏩Hollow Concret Block (HCB) ወይም የግድግዳ ብሎኬት/Wall HCB/ በመባል ይታወቃል።
*የብሎኬት ምርት ሲደረግ ጠቀሜታው ለሁለት ጉዳይ ነው
1. ሸክም መቌቌም የሚችል/Load Bearing/
2. ሸክም መቌቌም የማይችል /Non-Load Bearing/
*ይሄንን መሰረት ያደረገም የደረጃ ክፍፍል/Class/ ይኖራቸዋል።
*ሸክም መቌቌም የሚችሉት ብሎኬቶች "ክላስ ኤ እና ቢ" /
Class A and B/ በመባል ሲመደቡ ሸክም መቌቌም
የማይችሉት የብሎኬቶች ደግሞ "ክላስ ሲ" /Class C/ በመባል
ይመደባሉ።
➡ብሎኬት በተለምዶ በመጠናቸው ባለ10፣ ባለ15 እና ባለ 20 በመባል ይለያሉ::
ርዝመት x ስፋት x ቁመት/ Length x width x depth/
ማለትም Standard Dimenssion
*40x20x20cm
*40x15x20cm
*40x10x20cm
➡እያንዳንዱ ብሎኬት ሸክም የመቌቌም አቅማቸው
በሜጋ ፓስካል(Mpa) ይለካል ከዚህ በላይ 👆 በምስል አስደግፈናል።
*Note:
1 kilogram per square centimetre = 0.0981 mega pascal
*Class A=3.8mpa
*Class B=3.2mpa
*Class C=1.8mpa
.
⚡ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
.
⏩Hollow Concret Block (HCB) ወይም የግድግዳ ብሎኬት/Wall HCB/ በመባል ይታወቃል።
*የብሎኬት ምርት ሲደረግ ጠቀሜታው ለሁለት ጉዳይ ነው
1. ሸክም መቌቌም የሚችል/Load Bearing/
2. ሸክም መቌቌም የማይችል /Non-Load Bearing/
*ይሄንን መሰረት ያደረገም የደረጃ ክፍፍል/Class/ ይኖራቸዋል።
*ሸክም መቌቌም የሚችሉት ብሎኬቶች "ክላስ ኤ እና ቢ" /
Class A and B/ በመባል ሲመደቡ ሸክም መቌቌም
የማይችሉት የብሎኬቶች ደግሞ "ክላስ ሲ" /Class C/ በመባል
ይመደባሉ።
➡ብሎኬት በተለምዶ በመጠናቸው ባለ10፣ ባለ15 እና ባለ 20 በመባል ይለያሉ::
ርዝመት x ስፋት x ቁመት/ Length x width x depth/
ማለትም Standard Dimenssion
*40x20x20cm
*40x15x20cm
*40x10x20cm
➡እያንዳንዱ ብሎኬት ሸክም የመቌቌም አቅማቸው
በሜጋ ፓስካል(Mpa) ይለካል ከዚህ በላይ 👆 በምስል አስደግፈናል።
*Note:
1 kilogram per square centimetre = 0.0981 mega pascal
*Class A=3.8mpa
*Class B=3.2mpa
*Class C=1.8mpa
.
⚡ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👍1
Key brick or Keystone: The voussoir located at the crown of the arch. Also called the key.
Spring Line: A horizontal line which intersects the springing.
Extrados: The curve which bounds the upper edge of the arch.
Intrados: The curve which bounds the lower edge of the arch. The distinction between soffit and intrados is that the intrados is a line, while the soffit is a surface.
The point at which the bisector crosses the centre line is the centre or striking point for the segmental arch
Pier or span: The horizontal clear dimension between abutments.
Voussoir: One masonry unit of an arch.
Regarding arch brick construction we come up with some 📹
@etconp
Spring Line: A horizontal line which intersects the springing.
Extrados: The curve which bounds the upper edge of the arch.
Intrados: The curve which bounds the lower edge of the arch. The distinction between soffit and intrados is that the intrados is a line, while the soffit is a surface.
The point at which the bisector crosses the centre line is the centre or striking point for the segmental arch
Pier or span: The horizontal clear dimension between abutments.
Voussoir: One masonry unit of an arch.
Regarding arch brick construction we come up with some 📹
@etconp
Ethio Construction Engineering
Key brick or Keystone: The voussoir located at the crown of the arch. Also called the key. Spring Line: A horizontal line which intersects the springing. Extrados: The curve which bounds the upper edge of the arch. Intrados: The curve which bounds the lower…
This media is not supported in your browser
VIEW IN TELEGRAM
Components of Project cost
♦️ Indirect cost :- Outage loss + Overheads
♦️ Direct project cost :- These include labour cost, material cost, equipment cost etc.
♦️ Normal time :- Normal time is the standard time that an estimator would usually allow for an activity.
♦️ Crash time :- Crash time is the minimum possible time which an activity can be completed by employing extra resources
♦️ Normal cost :- This is direct cost required to complete the activity in normal time duration.
♦️ Crash cost :- This is direct cost corresponding to the completion of the activity within crash time.
Join us @ETCONP
♦️ Indirect cost :- Outage loss + Overheads
♦️ Direct project cost :- These include labour cost, material cost, equipment cost etc.
♦️ Normal time :- Normal time is the standard time that an estimator would usually allow for an activity.
♦️ Crash time :- Crash time is the minimum possible time which an activity can be completed by employing extra resources
♦️ Normal cost :- This is direct cost required to complete the activity in normal time duration.
♦️ Crash cost :- This is direct cost corresponding to the completion of the activity within crash time.
Join us @ETCONP
Instrument used in surveying👇
♦️ Clinometer:- measuring angles of slopes
♦️subtence bar:- measure horizontal distance
♦️Box sextant:- measuring horizontal angle
♦️Planimeter:- measuring area on map
♦️pentagraph:- enlarging or reducing area on map
♦️line Ranger:- ranging a chain line
♦️Hand level:- Making contour & Cross section of preliminary work
♦️Ceylon ghat tracer:- Measuring angles of slopes & setting out grade contours.
@ETCONP
♦️ Clinometer:- measuring angles of slopes
♦️subtence bar:- measure horizontal distance
♦️Box sextant:- measuring horizontal angle
♦️Planimeter:- measuring area on map
♦️pentagraph:- enlarging or reducing area on map
♦️line Ranger:- ranging a chain line
♦️Hand level:- Making contour & Cross section of preliminary work
♦️Ceylon ghat tracer:- Measuring angles of slopes & setting out grade contours.
@ETCONP
_*📌▪BENEFITS OF USING PLASTIC FORMWORKS IN CONCRETE CONSTRUCTION▪*_
Plastic formworks in concrete construction are used to retain newly arranged concrete in place to provide adequate strength. Formworks facilitate to manage concrete efficiently and produce different types of shapes and forms.
Various types of materials like timber, steel, and aluminum are applied to develop formworks. Plastic is considered as best for formworks in relation to other materials in terms of strength, cost-effectiveness, and adaptability.
Sufficient time is required to develop the formworks. Formworks comprise 20 to 25% of the total cost of the structure. The security, cost, quality, and speed of a construction work mainly depend on formworks.
*Benefits of Plastic Formworks in Concrete Construction*
Plastic formworks provide various benefits like longevity, cost, and flexibility. Formworks consume huge labor force and total cost of the project. It is recommended that a formwork system should be cost-effective and assembled, disintegrated and managed smoothly by labor.
*The plastic formworks provide the following benefits to the concrete construction:*
Grading of Aggregates
Economical
Labor-friendly
Eco friendly
Low maintenance
Flexible
*Plastic Formwork System*
Certain grade plastics are used to build up formworks. There are not any chemical reactions among poured material and the plastic form. No patch on the surface of the reinforce concrete element exists.
*Leakages*
Resist leakages with water or newly arranged concrete from various parts of the form by fitting different parts of the system accurately.
Labor-friendly system
Plastic formworks are considered very labor-friendly system. It accommodates and plugs smoothly and significantly lightweight with regards to other types of formwork systems.
*Nailing and oiling*
Nailing and oiling plates are not necessary. Auto-leveling of plugging system can retain plates level automatically. It takes fewer time to install and disassemble.
*Cleaning*
Plastic forms can be cleansed with water without difficulty. Plastic forms can be broken due to handling in an inefficient manner as well as use of low voltage hot air gun for sealing.
Plastic forms can be easily reprocessed and they are eco-friendly to minimize handling time and great re-usability index.
For more concepts of civil engineering
Join us on telegram:- @ETCONP
Follow us on Instagram:- @etconp
Plastic formworks in concrete construction are used to retain newly arranged concrete in place to provide adequate strength. Formworks facilitate to manage concrete efficiently and produce different types of shapes and forms.
Various types of materials like timber, steel, and aluminum are applied to develop formworks. Plastic is considered as best for formworks in relation to other materials in terms of strength, cost-effectiveness, and adaptability.
Sufficient time is required to develop the formworks. Formworks comprise 20 to 25% of the total cost of the structure. The security, cost, quality, and speed of a construction work mainly depend on formworks.
*Benefits of Plastic Formworks in Concrete Construction*
Plastic formworks provide various benefits like longevity, cost, and flexibility. Formworks consume huge labor force and total cost of the project. It is recommended that a formwork system should be cost-effective and assembled, disintegrated and managed smoothly by labor.
*The plastic formworks provide the following benefits to the concrete construction:*
Grading of Aggregates
Economical
Labor-friendly
Eco friendly
Low maintenance
Flexible
*Plastic Formwork System*
Certain grade plastics are used to build up formworks. There are not any chemical reactions among poured material and the plastic form. No patch on the surface of the reinforce concrete element exists.
*Leakages*
Resist leakages with water or newly arranged concrete from various parts of the form by fitting different parts of the system accurately.
Labor-friendly system
Plastic formworks are considered very labor-friendly system. It accommodates and plugs smoothly and significantly lightweight with regards to other types of formwork systems.
*Nailing and oiling*
Nailing and oiling plates are not necessary. Auto-leveling of plugging system can retain plates level automatically. It takes fewer time to install and disassemble.
*Cleaning*
Plastic forms can be cleansed with water without difficulty. Plastic forms can be broken due to handling in an inefficient manner as well as use of low voltage hot air gun for sealing.
Plastic forms can be easily reprocessed and they are eco-friendly to minimize handling time and great re-usability index.
For more concepts of civil engineering
Join us on telegram:- @ETCONP
Follow us on Instagram:- @etconp
Forwarded from Ethio Construction Engineering
👉ፎርምወርክ/Formwork/ @COTMp
➡በምን ያህል ቀን ማፍረስ ይቻላል?👇
.
⏩ ለቌሚ ፎርምወርክ 16ሰዓት
⏩ ለወለል እና ደረጃ /ሶሌታ/ ፎርምወረክ 21 ቀን
⏩ ተጨማሪ ለቢም/beam/ እና ወለል/slab/ ድጋፍ የሚገባ
14ቀን
⚡ የፎርም ወርክ ክፍያን በተመለከተ ባትኮዳ/Batcoda/ ከዚህ በታች የተዘረዘሩትን ነጥቦች ይጠቅሳል።
1. ከ 0.25ካ.ሜ በታች የሆነ ክፍት/opening/ ፎርሞርክ ክፍያ
ላይ ሊቀነስ አይገባም።
2. በተለየ ሁኔታ ካልተጠቀሰ በስተቀር በካ. ሜ ሊለካ ይገባል።
3. የወለል ጠርዝ፣ የደረጃ መወጣጫ እና የጎን ፎርምወረክ
ጥልቀቱን በመጥቀስ በሜትር ሊለኩ ይገባል።
.
🚩ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
➡በምን ያህል ቀን ማፍረስ ይቻላል?👇
.
⏩ ለቌሚ ፎርምወርክ 16ሰዓት
⏩ ለወለል እና ደረጃ /ሶሌታ/ ፎርምወረክ 21 ቀን
⏩ ተጨማሪ ለቢም/beam/ እና ወለል/slab/ ድጋፍ የሚገባ
14ቀን
⚡ የፎርም ወርክ ክፍያን በተመለከተ ባትኮዳ/Batcoda/ ከዚህ በታች የተዘረዘሩትን ነጥቦች ይጠቅሳል።
1. ከ 0.25ካ.ሜ በታች የሆነ ክፍት/opening/ ፎርሞርክ ክፍያ
ላይ ሊቀነስ አይገባም።
2. በተለየ ሁኔታ ካልተጠቀሰ በስተቀር በካ. ሜ ሊለካ ይገባል።
3. የወለል ጠርዝ፣ የደረጃ መወጣጫ እና የጎን ፎርምወረክ
ጥልቀቱን በመጥቀስ በሜትር ሊለኩ ይገባል።
.
🚩ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
🔖አስደሳች ዜና ከ @ETCONp
.
👌ሰላም ውድ የቻናላችን ቤተሰቦች ላለፉት ወራት አንድ DIGITAL LIBRARY BOT ግንባታ ላይ ነበርን።
.
📚ይህም ዲጂታል ቤተመፃህፍት በውስጡ የ SOFTWARE SETUP, የ ARCH, COTM እና CIVIL መፅሀፍቶችን የያዘ ነው።
🚧ይህ የመጀመሪያ ምዕራፍ ግንባታ ሲሆን ለቀጣይ በአስተያየታችው መሰረት ብዙ ነገር ምናስተካክል ይሆናል።
👉ይህን link በመጫን ወደ ቤተመፃህፍቱ ልትሄዱ ትችላላችሁ።
👇👇👇👇👇👇
👉🏿 https://t.me/ETCONpDigitalLibrary_Bot
Good News from @ETCONP
👉🏿 For the last few months we have been developing digital library bot which consists ARCHITECTURE, Construction technology management and civil engineering books
👉🏿 This is the first phase of development base one tour request we will expand it In the future
👉🏿Tap the link below to access the digital library 📚👇🏾👇🏾👇🏾
👉🏿 @ETCONpDigitalLibrary_Bot
.
👌ሰላም ውድ የቻናላችን ቤተሰቦች ላለፉት ወራት አንድ DIGITAL LIBRARY BOT ግንባታ ላይ ነበርን።
.
📚ይህም ዲጂታል ቤተመፃህፍት በውስጡ የ SOFTWARE SETUP, የ ARCH, COTM እና CIVIL መፅሀፍቶችን የያዘ ነው።
🚧ይህ የመጀመሪያ ምዕራፍ ግንባታ ሲሆን ለቀጣይ በአስተያየታችው መሰረት ብዙ ነገር ምናስተካክል ይሆናል።
👉ይህን link በመጫን ወደ ቤተመፃህፍቱ ልትሄዱ ትችላላችሁ።
👇👇👇👇👇👇
👉🏿 https://t.me/ETCONpDigitalLibrary_Bot
Good News from @ETCONP
👉🏿 For the last few months we have been developing digital library bot which consists ARCHITECTURE, Construction technology management and civil engineering books
👉🏿 This is the first phase of development base one tour request we will expand it In the future
👉🏿Tap the link below to access the digital library 📚👇🏾👇🏾👇🏾
👉🏿 @ETCONpDigitalLibrary_Bot
Telegram
ETCONp Digital Library
ማሻሸያ እና አስተያየት ፃፋልን @Philemona7
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
Siporex precast wall
STEEL REINFORCED WALL PANELS
WV are reinforced units, for load bearing applications as either external or internal walls in a wide variety of low and medium rise buildings. They can also be used as non-load bearing cladding for steel or concrete framed structures. They may have single mat or double mat reinforcements depending on the structural requirements.
Siporex floor/roof slabs are reinforced aerated concrete products which are produced in accordance with international standards.
Siporex slabs attain their design strengths during the high-pressure steam curing process in the autoclaves. Thus, after delivery, slabs can be erected immediately within a very short period and ready for occupancy use.
Submerged beam is one that has the same elevation as the top of the slab as well as the bottom of the slab. In most cases a submerged beam is called hidden.
@etconp
STEEL REINFORCED WALL PANELS
WV are reinforced units, for load bearing applications as either external or internal walls in a wide variety of low and medium rise buildings. They can also be used as non-load bearing cladding for steel or concrete framed structures. They may have single mat or double mat reinforcements depending on the structural requirements.
Siporex floor/roof slabs are reinforced aerated concrete products which are produced in accordance with international standards.
Siporex slabs attain their design strengths during the high-pressure steam curing process in the autoclaves. Thus, after delivery, slabs can be erected immediately within a very short period and ready for occupancy use.
Submerged beam is one that has the same elevation as the top of the slab as well as the bottom of the slab. In most cases a submerged beam is called hidden.
@etconp