👉Superelevation (Cant) or Banking

➡️It is the transverse inclination of the pavement surface, in which the outer edge is raised with respect to the inner edge.

🚧Superelevation is provided to counteract the effect of centrifugal force and to reduce the tendency of the vehicle to overturn.

🚧Superelevation is expressed as the ratio of the height of outer edge with respect to the horizontal width.

🚧Maximum limits of Superelevation are

1⃣ For plain and rolling terrains in snow bound areas = 7.0 %

2⃣ For hill roads not bound by snow = 10 %

3⃣ For urban road stretches with frequent intersections = 4%

🚧Superelevation should not be less than the Camber of the road surface.

🚧Superelevation should be attained gradually over the full length of transition curve so that the design Superelevation is available at the starting point of the circular curve.

🚧In case where transition curve cannot be provided,2/3rd of the Superelevation may be attained at the straight portion before the start of the circular curve and the balance 1/3rd at the beginning of the circular curve.

🚧Superelevation is introduced by raising the outer edge of the pavement at a rate not exceeding 1 in 150 in plain and rolling terrains and 1 in 60 on mountainous and steep terrain.

#ConstructionNotes

#HighwayEngineering

@etconp
👉Some Highway Engineering Note

🚧A horizontal curve in a highway, is a curve which is provided to change the direction of the central line of the road.

🚧When a vehicle traverses a horizontal curve, the centrifugal force acts horizontally outwards through the centre of gravity of the vehicle.

🚧Centrifugal ratio or Impact factor -- It is the ratio of centrifugal force (P) to the weight of the vehicle ( W) .

🚧Centrifugal force acting on a vehicle negotiating a horizontal curve has two effects

1⃣ Tendency to overturn the vehicle outwards about the outer wheels,
2⃣ Tendency to skid the vehicle laterally outwards.

If, b = Width of the wheel base
h = Height of the center of gravity of the vehicle above the road surface
f = coefficient of lateral friction
Then,
*⃣Overturning of the vehicle will occur when centrifugal ratio is equal to or more than b/2h.
*⃣Lateral skidding will occur when centrifugal ratio is equal to or more than coefficient of lateral friction( f) .

➡️So to avoid Overturning and lateral skidding on a horizontal curve, the centrifugal ratio should always be less than b/2h and also f.

🚧If, f < b/2h then,
Vehicle would skid first and not overturn.

🚧If, f > b/2h then,
Vehicle would overturn first before skidding.

➡️If the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be higher than the inner wheels, due to the centrifugal force acting outwards.

#HighwayEngineering

@etconp
Ethio Construction Engineering
👉Some Highway Engineering Note 🚧A horizontal curve in a highway, is a curve which is provided to change the direction of the central line of the road. 🚧When a vehicle traverses a horizontal curve, the centrifugal force acts horizontally outwards through…
👉Some Highway Engineering Notes


🚧Stopping distance = Lag distance + Braking distance

▶️Lag distance = Distance travelled by the vehicle during the total reaction time.
▶️Braking distance = Distance travelled by the vehicle after the application of the brakes, to a dead stop position.

🚧In ascending gradients, braking distance decreased.

🚧In descending gradients, braking distance increases.

🚧Stopping sight distance and Stopping distance are different.

🚧Minimum Stopping sight distance = Stopping distance in following cases
(In one way traffic lanes,In two way traffic roads having 2 or more traffic lanes)

🚧Minimum Stopping sight distance = TWICE the Stopping distance in following cases
( On roads with restricted width , On single lane roads when two way movement of traffic is permitted)

🚧The Stopping sight distance (SSD) should be provided throughout the length of all roads and hence this is also known as absolute minimum sight distance.

🚧Higher Stopping sight distance is required in case of descending gradients.

#HighwayEnginnering

#etconp
👍2
👉Methods of Curing

🚧1. Curing by spraying water

➡️Spraying of water continuously on the concrete surface provides an efficient curing. It is mostly used for curing floor slabs.

▶️The concrete should be allowed to set sufficiently before sprinkling is started.

▶️The spray can be obtained from a perforated plastic box. On small jobs sprinkling of water may be done by hand.

▶️Vertical and sloping surfaces can be kept continuously wet by sprinkling water on top surfaces and allowing it to run down between the forms and the concrete. For this method of curing the water requirement is higher.

🚧2. Curing using wet Gunny bags

➡️This is a widely used method of curing, particularly for structural concrete Thus exposed surface of concrete is prevented from drying out by covering it with hessian, canvas or empty cement bags. The covering over vertical and sloping surfaces should be secured properly These are periodically wetted.

▶️The interval of wetting will depend upon the rate of evaporation of water. It should be ensured that the surface of concrete is not allowed to dry even for a short time during the curing period.

▶️Special arrangements for keeping the surface wet must be made at nights and on holidays.

🚧3. Curing by Pounding Method

➡️This is the best method of curing.

▶️It is suitable for curing horizontal surfaces such as floors, roof slabs, road and air field pavements. The horizontal top surfaces of beams can also be Pounded. After placing the concrete, its exposed surface is first covered with moist hessian or canvas. After 24 hours, these covers are removed and small ponds of clay or sand are built across and along the pavements. The area is thus divided into a number of rectangles.

▶️The water is filled between the ponds.

▶️The filling of water in these ponds is done twice or thrice a day, depending upon the atmospheric conditions. Though this method is very efficient, the water requirement is very heavy. Ponds easily break and water flows out. After curing it is difficult to clean the clay.

🚧4. Steam Curing

➡️Steam curing and hot water curing is sometimes adopted. With these methods of curing, the strength development of concrete is very rapid.

▶️These methods can best be used in pre cast concrete work. In steam curing the temperature of steam should be restricted to a maximum of 750C as in the absence of proper humidity (about 90%) the concrete may dry too soon. In case of hot water curing, temperature may be raised to any limit, ay 1000C.

▶️At this temperature, the development of strength is about 70% of 28 days strength after 4 to 5 hours. In both cases, the temperature should be fully controlled to avoid non-uniformity. The concrete should be prevented from rapid drying and cooling which would form cracks.

🚧5. Curing using chemicals

➡️Curing compounds are chemical products usually Sprayed directly over the concrete surface and allowing it to dry.

▶️The compound forms an impermeable membrane that retards the loss of moisture from the concrete.

#ConstructionNotes

#Curing

@etconp
❤1👍1
Media is too big
VIEW IN TELEGRAM
👉ስለነዚህ የተለያዩ አስገራሚ ማሽኖች ታውቃላችሁ?

🚧የመሬት ውስጥ መንገድ ቦርቧሪው፣ ድልድይ ዘርጊው፣ የጡብ መንገድ አንጣፊው፣ ሃዲድ ዘርጊው፣ አሮጌ ህንጻ አፍራሹ እና ሌሎች ቴክኖሎጂዎች በ ምስል አስደግፎ ሰሎሞን ቴክ ቶክ አዘጋጅቶላቹሃል።

🚧ቪድዮ ለማየት ከዚህ ፅሁፍ አያይዘንላቹሀል 166.1MB ስለሆነ WIFI ቢጠቀሙ ይመረጣል።

🎥ወይም በ YOUTUBE ለማየት ከታች ባለው ሊንክ ይከታተሉት

https://youtu.be/gr2Maeyrcnw

Via Tech Talk With Solomon

#ConstructionTechnology

@etconp
Guess the diameter of the bar

@etconp

Instagram:- https://instagram.com/etconp?igshid=h82z1u7h3leg

Facebook:- @etconp
👉ለመላው የክርስትና ዕምነት ተከታዮች እንኳን ለብርሃነ መስቀሉ ደመራ በዓል በሠላም አደረሳችሁ።

🚩በዓሉ የሠላም ፣ የጤና ፣ የፍቅር ፣ የአንድነት ፣ የብልፅግና እንዲሆን ፈጣሪ አምላክ ፍቃዱ ይሁን!"🙏

@etconp
👉ለመላው የክርስትና ዕምነት ተከታዮች እንኳን ለብርሃነ መስቀሉ ደመራ በዓል በሠላም አደረሳችሁ።

🚩በዓሉ የሠላም ፣ የጤና ፣ የፍቅር ፣ የአንድነት ፣ የብልፅግና እንዲሆን ፈጣሪ አምላክ ፍቃዱ ይሁን!"🙏

@etconp
👉What is Liquidated damage?
.
➡ስራ ተቌራጩ ለወሰደው ውል በግዜ ላለመጨረሱ ለባለቤት ወይም ለውል ሰጪው አካል የሚከፍለው የካሳ ክፍያ ነው።

➡️የጠቅላላ ኮንስትራክሽን ውል ይህ ሳይሆን ሲቀር ከዚህ በታች በተጠቀሰው ቅጣት መሰረት ስራ ተቌራጩ መቅጣት እነደሚቻል ይጠቅሳል።

🚧1. ቅጣቱ 0.1 ፐርሰንት ወይም የጠቅላላ ፕሮጀክቱን አንድ አንድ ሺኛ (1/1000) ላልፈፀመው ስራ ቀናት በየቀኑ ሊቀጣ ይገባል።

🚧2. ነገር ግን ስራ ተቌራጩ በጠቅላላው ሊቀጣ የሚችለው የፕሮጀክቱን አስር 10% (አስር ፐርሰንት) ሊበልጥ አይገባም።

⏩"Liquidated damages" means the compensation stated in the contract as being payable by Contractor to the Public Body for failure to perform the contract or part thereof within the periods under the contract, or as payable by Contractor to the Public Body for any specific breach identified in the contract;

🚧(a) A penalty of 0.1% or 1/1000 of the value of undelivered Service for each day of delay until actual delivery or performance.

🚧(b) The cumulative penalty to be paid by the Contractor shall not exceed 10% of the contract price.

#ConstructionLaw

@etconp
Softwares which are used for construction industry

ለ construction industry’ው የምንጠቀማቸው software’ኦች


Facebook:- https://www.facebook.com/115479406977628/posts/120058029853099/?d=n

Instagram:- https://instagram.com/etconp?igshid=h82z1u7h3leg

Telegram:- https://t.me/ETCONp
👉Different parts of an arch are

🚧1. ABUTMENT OR PIER

➡️It is the part of wall or pier on which the arch rests.

🚧2. ARCH RING

➡️It is a course of stones or bricks having a curve similar to that of the arch.

🚧3. INTRADOS OR SOFFIT

➡️It is the under-surface of an arch.

🚧4. EXTRADOS

➡️It is the outer surface of an arch or the outer curve of the arch ring.

🚧5. VOUSSOIRS OR ARCH BLOCK

➡️The wedge-shaped units forming the arch are known as voussoirs or arch stones or arch block.

🚧6. SPRINGING STONE

➡️Springing stone or springer is the first voussoirs at springing level on either side of the arch.

🚧7. SPRINGING LINE

➡️Springing line is an imaginary line joining two springing points.

🚧8. CROWN

➡️Crown is the highest point of the extrados or it is the highest part of the arch.

🚧9. KEY-STONE

➡️It is the highest central wedge-shaped block of an arch.

🚧10. SKEW-BACK

➡️It is the surface of the abutment on which the arch rests.

🚧11. SPAN

➡️Span is the clear horizontal distance between supports.

🚧12. RISE

➡️Rise is the vertical distance between the springing line and the highest point on the intrados.

🚧13. SPRINGING POINT

➡️Springing points are the points at extremities of the intrados.

🚧14. DEPTH OF ARCH

➡️The depth of the arch is the perpendicular distance between the intrados and the extrados.

🚧15. HAUNCH

➡️Haunch of the arch is the portion of the arch situated centrally between the key and skew backs.

🚧16. SPANDRIL

➡️Spandril is the triangular walling enclosed by the extrados of the arch, a horizontal line from the crown of the arch and a perpendicular line from the springing of the outer curves.

#ArcStructure

@etconp
👉ደረጃ(Stair case)
.
🏗ደረጃ አንድ የህንፃ ወሳኝ አካል ነው፡፡
*ሰዎች ከአንድ ፎቅ ወደ ሌላ ፎቅ መሄድ እንዲችሉ በቅደም ተከተል የተቀመጡ ቅደም ተከተሎች ነው።
*ደረጃው በመደበኛ ዲዛይን መርሆዎች መሆን ያለበት እና ሰዎች ደረጃዎቹን በቀላል ሁኔታ ለመደራደር እንዲችሉ በእኩል ደረጃ መሆን አለበት፡፡
.
🚧ደረጃ አንድ የሕንፃ ግንባታ ዋና አካል ነው ፣ መኖሪያ ፣ ቢሮ ወይም የህዝብ መገልገያ።
*የግንባታ ኮዶች መሠረት የተነደፈ እና የተሠራ ነው።
*ደረጃ straight ፣ circular ወይም spiral ሊሆን ይችላል። *ለተጠቃሚዎች ችግር እንዳይፈጥር እና አደጋዎችን ለማስወገድ ታሣቢ መሆን አለበት፡፡
.
⚡️stair design principle
.
ደረጃዎች ከአንድ ፎቅ ወደ ሌላው ወለል ተደራሽነት ለመስጠት ቅደም ተከተል የተደረደሩ way ናቸው፡፡
*እነሱ በህንፃው ምቹ ቦታ መቅረብ አለባቸው፡፡
*ባለብዙ ፎቅ ግንባታ ፣ ምንም እንኳን ከፍ ወዳሉ ፎቆች ለመደበኛ እንቅስቃሴ ከአንድ ፎቅ ወደ ሌላ ቦታ ቢኖሩም፣ እሳት ወይም ሌሎች አደጋዎች ካሉ ደደረጃዎች ለአስቸኳይ መውጣት አስፈላጊ ናቸው ፡፡
.
🙌Technical terms
.
የሚከተሉት ከደረጃ ጋር የተዛመዱ ቴክኒካዊ ቃላት ወይም trminologies ናቸው
.
1. step /እርምጃ-ወደ ላይ ሲወርድ/ ሲወርድ እግሩ የሚቀመጥበት የደረጃ ክፍል ፡፡
.
2. tread - የደረጃው አግድም ክፍል።
.
3. Riser-የደረጃ አንድ ቀጥ ያለ ክፍል ፡፡
.
4. String -ደረጃዎቹን የሚደግፍ ዝንባሌ ያለው አባል ፡፡
.
5. Landing-በእያንዳንዱ በረራ መጨረሻ ላይ የቀረበው አግድም መድረክ ነው ፡፡
.
6. pitch(ማስገቢያ) - የደረጃው ቁመት ነው ፡፡
.
7. Hand railing-እጅን የሚደግፍ ደረጃ ያለው አዝማሚያ አባል ነው ፡፡
.
8 . baluster:- የ hand rail መደገፍያ ቀጥ ያለ መካከለኛ ድጋፍ ነው ፡፡
.
⚡️የሚከተሉት ጥሩ የ ደረጃ ባህሪዎች ናቸው:-

1. ከህንፃው ከሁሉም ጎኖች በቀላሉ መድረስ አለበት

2. አየር መኖር አለበት

3. በእያንዳንዱ flight መጨረሻ ሰፊ landing ሊኖረው ይገባል

4. በመደበኛነት flight ውስጥ ከ 12 ደረጃዎች በላይ መሆን የለበትም።

5. የደረጃዎቹ መነሳት እና መሄዳቸው የተመጣጠነ መሆን ያለበት እና የflight መውጣት እና መውረድ ቀላል ነው ፡፡

6. የእጅ ጣውላ ቢያንስ በደረጃው በአንዱ በኩል መሰጠት አለበት

7. የደረጃው angle ከ 30 እስከ 45 ዲግሪዎች መሆን አለበት ፡፡

🚧(የ ደረጃ ኣይነቶች) Stair types...👇

*Straight stairs
*Quarter-turn stairs
*Dog-legged stairs
*Open-newel stairs
*Circular stairs
*Bifurcated stairs
*Geometrical stairs
*Spiral stairs
.
👉ደረጃዎች ከሚከተሉት ማናቸውም ቁሳቁሶች ይገነባሉ ፡፡
.
*የጡብ ማሳዎች ፣ የድንጋይ ንጣፍ ፣ ጣውላዎች ፣ ብረት ፣ በተጠናከረ የሲሚንቶ ኮንክሪት ሊሰሩ ይችላሉ።
.
#Stair

@etconp
👉WHAT IS LINTEL

➡️Lintel is a horizontal flexural member which spans over the openings in the walls for doors, windows, ventilators, cupboards etc.

➡️The load of masonry above the opening is transferred to the wall by flexural action of the lintel so that frames of doors, windows etc.

➡️The end bearings for the lintel should be at least 200 mm.

➡️The width of lintels is same as that of wall.

➡️Lintels Are various used material Such as:-

⏺(a) Wood
⏺(b) Stone
⏺(c) Brick
⏺(d) R.C.C
⏺(e) Steel.

🚧(a) Wood Lintel

▶️It may be a single piece or may be assembled by joining 2 to 3 pieces.

▶️Sometimes the wooden lintels are strengthened by steel plates at top and bottom

▶️Such lintels are called as flitched beams.

🚧(b) Stone Lintels

▶️Wherever stones are available stone beams are used as lintels.

▶️As stone is weak in tension they can be used only for small spans.

▶️Their depth is kept about 1/10 th span.

▶️Stones are cut to the width of wall and dressed before using as lintels.

🚧(c) Brick Lintels

▶️Well burnt, good quality lintels are laid on ends or edges to form lintels It needs temporary form work at the time of construction.

▶️The lintel is to be cured for 7–14 days before formwork is removed.

▶️Such lintels are useful to span small openings.

🚧(d) R.C.C. Lintels

▶️It is possible to provide R.C.C. lintels of any span required in the building.

▶️They can be isolated or continuous over the openings.

▶️They are provided with suitable reinforcement main reinforcements beings on lower side in the opening.

▶️Nowadays these lintels are used very commonly in buildings.

🚧(e) Steel Lintels

▶️Steel angles or rolled steel I-sections are used as lintels.

▶️Tube separators may be provided to maintain the spacing between the sections.

▶️If the sections are opened to atmospheric action, regular painting is necessary.

▶️Many times they are encased in concrete to avoid maintenance problem.

▶️These lintels can be used for large openings.

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Final quiz about OCR

For under consolidated soil value of OCR (over consolidated ratio) is _______?
Anonymous Quiz
18%
=1
33%
>1
47%
<1
2%
None
Ethio Construction Engineering
Final quiz about OCR

For under consolidated soil value of OCR (over consolidated ratio) is _______?
Answer for this question 👆🏾👆🏾

OCR is equal to maximum applied effective stress in past to the maximum applied effective stress in present.

➪ OCR>1 (OVER CONSOLIDATION STAGE)

➪ OCR=1 (NORMAL CONSOLIDATION STAGE)

➪ OCR<1 (UNDER CONSOLIDATION STAGE)

Quizzes regarding this

👉🏿 https://t.me/ETCONp/3847

👉🏿 https://t.me/ETCONp/3852

👉🏿 https://t.me/ETCONp/3332

Join us on telegram:- @etconp

Follow us on Instagram:- @etconp
❤1
👉ውድ የ ቻናላችን ቤተሰቦች
.
🚧ይህ ቻናላቹ ለ እናንተ ተማሪዎች እና ባለሞያዎች ጠቃሚ የ ኮንስትራክሽን ኖቶች፣የተመረጡ መፅሃፍቶች እና ቪድዮዎች በማስተላለፍ እንዲሁም አርሰበርሳችን እየተማማርን እንዳለን ይታወቃል።

🚧ስለዚህ ተደራሽነቱን ከዚህ ይበልጥ ለማስፋት "ከእናንተ ወደ እናንተ" የሚል ፕሮግራም መጀመራችን ስናበስሮ በደስታ ነው።

🚧ይህ ማለት እናንተ በጣም ይጠቅማል ምትልዋቸው መፅሃፍቶች፣የ ፎቶ እና ቪድዮ ምስሎች፣ጠቃሚ የተዘጋጁ ኮንስትራክሽን ኖቶች እና ይህ ብትለጥፉት ሰዉ ያስተምራል ያላቹትን ማነኛውም ኮንስትራክሽን ነክ ፅሁፎች ካላቹ @ETCONp_Bot ብትልኩልን እኛም መልሰን ስማቹ በመጥቀስ እንለጥፈዋልን።

👌ተጋግዘን ተባብረን እንማማር እንወቅ!

⚡️የ አገራችን ኮንስትራክሽን ኢንዱስትሪ ወደ ከፍታው እንመልስ!

🙏እጅግ አድርገን እናመሰግናለን🙏

@etconp
👉Concrete Cover Distance for Reinforcement Bar

➡️The reinforcement must be fixed with appropriate accuracy in the position specified by the designer to ensure proper structural performance, durability and fire resistance.

▶️Insufficient cover can result in corrosion of the reinforcement, leading to cracking and spalling of the concrete and eventually, if left unchecked, to a reduction in the cross-sectional area of the reinforcement and in the strength of the structure.

▶️The cover must also be sufficient to provide the required degree of fire resistance.

▶️Too little cover reduces the fire resistance; too much, unless precautionary measures are taken, can make the structure vulnerable to spalling, which again reduces the fire resistance. Incorrect positioning of the reinforcement can seriously reduce the load carrying capacity of the structural member.

▶️Unless otherwise specified, the concrete cover to the reinforcement should be within the following permissible deviations from the dimensions specified in BS 8110:

🚧Bars up to 12 mm diameter: +5mm –5mm

🚧Bars over 12 mm up to 25 mm: +10 mm –5mm

🚧Bars over 25 mm: +15 mm –5mm

➡️At each end of reinforcing bar, net less that 25 mm or less than twice the diameter of the bar.

▶️For a longitudinal reinforcing bar in a column, not less than 40 mm not less than the diameter of such bar.

▶️In case of columns of minimum dimension of 20 cm or under, whose reinforcing bards do no not exceed 12 mm a cover of 25 mm to be used. For longitudinal reinforcing bars in a beam, not less than 30 mm or less than the diameter of the bar.

▶️For tensile, compressive shear or other reinforcements in a slab or wall not less than 15 mm, not less that the diameter of such bar.

▶️For any other reinforcement not less than 15 mm, not less than the diameter of such bar.

▶️For footings and other principal structural members in which the concrete is deposited directly against the ground, cover to the bottom reinforcement shall be 75 mm.

▶️If concrete is poured on a layer of lean concrete, the bottom cover maybe reduced to 50 mm.

▶️For concrete surfaces exposed to the weather or the ground after removal of forms, such as retaining walls, grade beams, footing sides and top etc. not less than 50 mm.

▶️Increased cover thickness shall be provided as indicated on the drawings, for surfaces exposed to the action of harmful chemicals (or exposed to earth contaminated by such chemicals), acid, alkali, saline atmosphere, Sulphorone, smoke etc.

▶️For liquid retaining structures, the minimum cover to all steel shall be 40 mm or the diameter of the main bar, whichever is greater.

▶️In the presence of sea water and oils and waters of a corrosive character the covers, shall be increased by 10 mm. Protection to reinforcement in case of concrete exposed to harmful surroundings may also be given by providing a dense impermeable concrete with approved protective coatings.

▶️The correct cover shall be maintained by cement mortar cubes (blocks) or other approved means.

▶️Reinforcements for footings, grade beams and slabs on a sub-grade shall be supported on re-cast concrete blocks as approved by EIC.

▶️The use of pebbles or stones shall not be permitted.

@etconp
👍1
👉PROPERTIES OF PORTLAND CEMENT

➡️Chemical properties

▶️Portland cement consists of the following chemical compounds

⏺(a) Tricalcium silicate 3 CaO.SiO2 (C3S) 40%

⏺(b) Dicalcium silicate 2CaO.SiO2 (C2S) 30%

⏺(c) Tricalcium aluminate 3CaO.Al2O3 (C3A) 11%

⏺(d) Tetracalcium aluminate 4CaO.Al2O3.Fe2O3 (C3AF) 11%

▶️There may be small quantities of impurities present such as calcium oxide (CaO) and magnesium oxide (MgO)

▶️When water is added to cement, C3A is the first to react and cause initial set.

▶️It generates great amount of heat C3S hydrates early and develops strength in the first 28 days It also generates heat C2S is the next to hydrate

▶️It hydrates slowly and is responsible for increase in ultimate strength C4AF is comparatively inactive compound.

➡️Physical properties

▶️The following physical properties should be checked before selecting a portland cement for the Construction engineering works.

▶️IS 269–1967 specifies the method of testing and prescribes the limits

⏺(a) Fineness

⏺(b) Setting time

⏺(c) Soundness

⏺(d) Crushing strength

🚧(a) Fineness

▶️It is measured in terms of percentage of weight retained after sieving the cement through 90 micron sieve or by surface area of cement in square centimeters per gramme of cement.

▶️According to IS code specification weight retained on the sieve should not be more than 10 per cent.

▶️In terms of specific surface should not be less than 2250 cm2/gm.

🚧(b) Setting time

▶️A period of 30 minutes as minimum setting time for initial setting and a maximum period of 600 minutes as maximum setting time is specified by IS code, provided the tests are conducted as per the procedure prescribed by IS 269-1967

🚧(c) Soundness

▶️Once the concrete has hardened it is necessary to ensure that no volumetric changes takes place.

▶️The cement is said to be unsound, if it exhibits volumetric instability after hardening.

▶️IS code recommends test with Le Chatelier mould for testing this property.

▶️At the end of the test, the indicator of Le Chatelier mould should not expand by more than 10 mm

🚧(d) Crushing strength

▶️For this mortar cubes are made with standard sand and tested in compression testing machine as per the specification of IS code.

▶️The minimum strength specified is 16 N/mm2 after 3 days and 22 N/mm2 after 7 days of curing.

#ConcreteTechnology

@etconp
👉Formwork

➡️Formwork is the structure, usually temporary, used to contain poured concrete and to mould it to the required dimensions and support until it is able to support itself.

➡️It consists primarily of the face contact material and the bearers that directly support the face contact material.

🏷Falsework is the more robust structure that holds temporary formwork in place is used in the temporary condition.

➡️Formwork systems used for concrete frame construction have continued to develop significantly since the early 1990s.

➡️The major innovations have focused on on-site efficiency of production, health and safety, and environmental issues, driving the concrete construction industry towards ever-increasing efficiency.

➡️Different formwork systems provide a wide range of concrete construction solutions that can be chosen to suit the needs of a particular development.

➡️Traditional formwork for concrete construction normally consisted of bespoke solutions requiring skilled craftsmen.

➡️This type of formwork often had poor safety features and gave slow rates of construction on site and huge levels of waste.

🚧The main types of formwork systems in use now are:

●System column formwork

●Horizontal panel

●Slipform

●Jump form

●Vertical panel systems

● Permanent formwork used in some types of hybrid concrete construction.

➡️Still in use, but not as common as previously, are the types of forms that require swinging out from the side of the building.

➡️This is due to concerns about moving large objects over unprotected spaces:

●Table form/flying forms

●Tunnel form

➡️The modern formwork systems listed above are mostly modular, which are designed for speed and efficiency.

➡️They are designed to provide increased accuracy and minimise waste in construction and most have enhanced health and safety features built-in.

@etconp
👉MOST POPULAR CONSTRUCTION ENGINEERING PROJECTS OF ALL TIME

➡️Construction engineering is an art, skill, a regular profession that design, and make it become a reality.

➡️There are so many great Construction engineering projects all over the world that transcend time and also to impress the new m generation.

🏷4 Most Popular Construction Engineering Projects of All Time

🚧1. Qingdao Haiwan Bridge

▶️Qingdao Haiwan Bridge that well-known as Jiaozuo Bay Bridge is one of the most popular Construction engineering projects of all time.

▶️This building is the longest bridge over water at 41.58 km and connecting the city of Qingdao in Eastern China across the water of Jiaozuo Bay.

▶️It was designed by the Shandong Gaosu Group with their 10,000 workers for its construction.

🚧2. Burj Khalifa

▶️Burj Khalifa is one of the tallest structure in the world.

▶️It is located in Dubai and standing at 829.8 meters.

▶️This building’s name in honour of the ruler of Dubai and president of the United States Arab Emirates.

▶️The design was inspired by the patterns in islamic architecture.

🚧3. Golden Gate Bridge

▶️Golden Gate Bridge is one of the most popular Construction engineering projects of all time.

▶️This building connect the city of San Fransisco to Marin Country.

▶️It is one of the most influential symbols of the United States since 1937.

🚧4. Brooklyn Bridge

▶️Brooklyn Bridge is the oldest bridges in the United States.

▶️It connects the boroughs of Manhattan and also Brooklyn by spanning the East River since 1883.

▶️The bridge was m designed by John August Roebling and cost over $15.5 million to build.

▶️it has also become a historic icon of New York City and also landmark in 1964.

🏷There are so many Construction engineering projects of all time that you should know.

#ModernConstruction

@etconp