📌Sound proofing
🔸Sound Proof Construction Techniques
➡️Unwelcome sound transmission in a building is typically perceived as a noise problem by the occupants.
➡️With more and more people living closer together, soundproof construction techniques are increasingly utilized in reducing noise and providing quieter working and living environments.
🔸The Fundamentals of Noise
➡️As human population density continually increases, the desire for peaceful, noise free living and working environments increases commensurately.
➡️Noise in this instance is defined as a collection of one or more unwelcome sounds as perceived by the hearer.
➡️Humans generally have little capacity for blocking their sense of hearing, unlike vision which can be “turned off’ simply by closing eyelids So any unwelcome sound that reaches the ear is usually considered undesirable and given the label of “noise".
➡️Even the pure tones of a musical scale can be perceived as noise if heard by unappreciative ears, and drives the quest for knowledge on how to sound proof a room for example.
➡️Reducing noise, then, is an exercise in eliminating sound transmission through walls, floors, and ceilings and is the goal of sound proof construction and design.
🔸Sound Proof Design Principles
➡️There are three broad design categories for sound transmission control
🚧Increase sealed dead space:
▶️As sound travels, acoustic energy is dissipated and the intensity or “volume" decreases as the result.
▶️This is why we usually cannot hear someone speaking who is standing far away.
▶️However, over short distances it is also important to eliminate sound transmission through the air which can be achieved by eliminating open penetrations through walls, floors, and ceilings.
▶️This is especially effective to soundproof existing rooms.
🚧Increase mass
▶️Sound is generated by vibrating objects generating pressure waves in the air.
▶️Sound can also cause objects to vibrate and regenerate these pressure waves at a different location on the object, but will lose acoustic energy in the process.
▶️The more massive an object is, the more energy is required to vibrate, and less energy is available to regenerate a sound.
🚧Decrease vibratory response
▶️Objects that do not readily vibrate in response to audible sound will not Transmit that sound.
▶️This is why a pillow will muffle, or dampen, sounds instead of regenerating them.
▶️Some soundproof window treatments rely on this method.
🚧Applying Sound Proof Design to Construction Practice
▶️There are several ways to sound proof a structure.
▶️The question of how to soundproof a room can be addressed with some surprisingly simple construction techniques, starting with building a sound proof wall for example Commonly used dry wall, or sheet rock, is actually an effective material for sound proofing due to its high mass.
▶️However, for maximum effect changes to the mounting system should be employed.
▶️A dampening material, such as a bead of silicone caulk, should be used between the sheet rock panel and framing.
▶️If allowed by code, cutting the sill plate to create an air gap in the middle of the sill effectively stops it from transmitting sound.
▶️Alternating studs on either side of the split sill plate stops sound transmission through the studs from one side of the wall to the other.
▶️Otherwise, an additional layer of sheetrock spaced with acoustic caulk or foam will also create an acoustically dead air gap. Acoustic drywall, which incorporates a dampening material layer in the sheet rock itself, can also be used.
▶️Other high mass building materials, such as concrete, stucco, logs, mass loaded vinyl, etc. can also be utilized in cost effective sound proof methods especially on exterior walls.
▶️Commonly overlooked sources of sound transmitters in a building are windows, pipes, electrical conduits, and wall penetrations for utilities.
#ConstructionTechnology
@etconp
🔸Sound Proof Construction Techniques
➡️Unwelcome sound transmission in a building is typically perceived as a noise problem by the occupants.
➡️With more and more people living closer together, soundproof construction techniques are increasingly utilized in reducing noise and providing quieter working and living environments.
🔸The Fundamentals of Noise
➡️As human population density continually increases, the desire for peaceful, noise free living and working environments increases commensurately.
➡️Noise in this instance is defined as a collection of one or more unwelcome sounds as perceived by the hearer.
➡️Humans generally have little capacity for blocking their sense of hearing, unlike vision which can be “turned off’ simply by closing eyelids So any unwelcome sound that reaches the ear is usually considered undesirable and given the label of “noise".
➡️Even the pure tones of a musical scale can be perceived as noise if heard by unappreciative ears, and drives the quest for knowledge on how to sound proof a room for example.
➡️Reducing noise, then, is an exercise in eliminating sound transmission through walls, floors, and ceilings and is the goal of sound proof construction and design.
🔸Sound Proof Design Principles
➡️There are three broad design categories for sound transmission control
🚧Increase sealed dead space:
▶️As sound travels, acoustic energy is dissipated and the intensity or “volume" decreases as the result.
▶️This is why we usually cannot hear someone speaking who is standing far away.
▶️However, over short distances it is also important to eliminate sound transmission through the air which can be achieved by eliminating open penetrations through walls, floors, and ceilings.
▶️This is especially effective to soundproof existing rooms.
🚧Increase mass
▶️Sound is generated by vibrating objects generating pressure waves in the air.
▶️Sound can also cause objects to vibrate and regenerate these pressure waves at a different location on the object, but will lose acoustic energy in the process.
▶️The more massive an object is, the more energy is required to vibrate, and less energy is available to regenerate a sound.
🚧Decrease vibratory response
▶️Objects that do not readily vibrate in response to audible sound will not Transmit that sound.
▶️This is why a pillow will muffle, or dampen, sounds instead of regenerating them.
▶️Some soundproof window treatments rely on this method.
🚧Applying Sound Proof Design to Construction Practice
▶️There are several ways to sound proof a structure.
▶️The question of how to soundproof a room can be addressed with some surprisingly simple construction techniques, starting with building a sound proof wall for example Commonly used dry wall, or sheet rock, is actually an effective material for sound proofing due to its high mass.
▶️However, for maximum effect changes to the mounting system should be employed.
▶️A dampening material, such as a bead of silicone caulk, should be used between the sheet rock panel and framing.
▶️If allowed by code, cutting the sill plate to create an air gap in the middle of the sill effectively stops it from transmitting sound.
▶️Alternating studs on either side of the split sill plate stops sound transmission through the studs from one side of the wall to the other.
▶️Otherwise, an additional layer of sheetrock spaced with acoustic caulk or foam will also create an acoustically dead air gap. Acoustic drywall, which incorporates a dampening material layer in the sheet rock itself, can also be used.
▶️Other high mass building materials, such as concrete, stucco, logs, mass loaded vinyl, etc. can also be utilized in cost effective sound proof methods especially on exterior walls.
▶️Commonly overlooked sources of sound transmitters in a building are windows, pipes, electrical conduits, and wall penetrations for utilities.
#ConstructionTechnology
@etconp
❤1👍1
When and why strengthening of reinforced concrete structures
The purpose of reinforcing concrete structures with a concrete or steel jacket increases the compressive and shear strength and maintains enclosure to enhance the ductility or bonding of concrete and reinforcement.
Strengthening systems are often classified into two categories: Passive systems and active systems.
Passive strengthening systems don't introduce forces to the structure or its elements. Passive systems like steel ferroconcrete enlargement and therefore the addition of steel components contribute to load sharing and therefore the overall resistance of the member once it deforms beneath external hundreds.
Active strengthening systems, like external post-tensioning (PT), involve the introduction of external forces to the structural parts that might offset half or all of the results of external masses.
For example, new post-tensioned mono-strands will be profiled on the span of an existing beam to supply uplift at mid-span which will be used to offset existing strength deficiency or permit the member to support extra load.
The primary reasons for the strengthening of concrete structures are typically to increase existing elements’ capacity to carry new loads or to resolve an existing deficiency. Several strengthening techniques such as section enlargement, externally bonded fiber reinforced polymer (FRP) reinforcement, supplemental steel elements...
Many Reasons to strengthening of Reinforce Concrete Structures:
1- When a structure is damaged by events such as earthquakes.
2- When the user of a residential building is changed.
3- When there are plans to increase the structural classes.
It is possible to maintain the shear strength, compression and enclosure of columns, walls, slabs and beams also their bearing capacity will increase against earthquake and vertical side loads.
#Structures
@etconp
The purpose of reinforcing concrete structures with a concrete or steel jacket increases the compressive and shear strength and maintains enclosure to enhance the ductility or bonding of concrete and reinforcement.
Strengthening systems are often classified into two categories: Passive systems and active systems.
Passive strengthening systems don't introduce forces to the structure or its elements. Passive systems like steel ferroconcrete enlargement and therefore the addition of steel components contribute to load sharing and therefore the overall resistance of the member once it deforms beneath external hundreds.
Active strengthening systems, like external post-tensioning (PT), involve the introduction of external forces to the structural parts that might offset half or all of the results of external masses.
For example, new post-tensioned mono-strands will be profiled on the span of an existing beam to supply uplift at mid-span which will be used to offset existing strength deficiency or permit the member to support extra load.
The primary reasons for the strengthening of concrete structures are typically to increase existing elements’ capacity to carry new loads or to resolve an existing deficiency. Several strengthening techniques such as section enlargement, externally bonded fiber reinforced polymer (FRP) reinforcement, supplemental steel elements...
Many Reasons to strengthening of Reinforce Concrete Structures:
1- When a structure is damaged by events such as earthquakes.
2- When the user of a residential building is changed.
3- When there are plans to increase the structural classes.
It is possible to maintain the shear strength, compression and enclosure of columns, walls, slabs and beams also their bearing capacity will increase against earthquake and vertical side loads.
#Structures
@etconp
This media is not supported in your browser
VIEW IN TELEGRAM
👉A Tuned Mass Damper (TMD )
➡️A tuned mass damper (TMD), also known as a harmonic absorber or seismic damper, is a device mounted in structures to reduce the amplitude of mechanical vibrations.
➡️Their application can prevent discomfort, damage, or outright structural failure.
🚧They are frequently used in power transmission, automobiles, and buildings.
#ConstructionTechnology
@etconp
➡️A tuned mass damper (TMD), also known as a harmonic absorber or seismic damper, is a device mounted in structures to reduce the amplitude of mechanical vibrations.
➡️Their application can prevent discomfort, damage, or outright structural failure.
🚧They are frequently used in power transmission, automobiles, and buildings.
#ConstructionTechnology
@etconp
አምፊ-ቁጥር 5.pdf
1.2 MB
👉አምፊ መጽሔት በከፍተኛ የትምህርት ተቋማት ተማሪዎች የምትዘጋጅ ወርሃዊ ዲጂታል፣ ነጻ፣ ባለ ብዙ ልሳን እና ለሁሉም ክፍት መጽሔት ናት።
🚧በዚህ ቁጥር 5 የናንተ ቻናል የሆነው @ETCONp ተዳሳለችና እነሆ ለእናንተ ለውድ አንባቢዎቻችን ጋበዝናቹ።
🏷ይቀላቀሉን ፣ ያጋሩ ይሳተፉ ቤተሰብ ይሁኑ።
🚧አምፊ - የጋራ መድረክ🙏
@amphimagazine
🚧በዚህ ቁጥር 5 የናንተ ቻናል የሆነው @ETCONp ተዳሳለችና እነሆ ለእናንተ ለውድ አንባቢዎቻችን ጋበዝናቹ።
🏷ይቀላቀሉን ፣ ያጋሩ ይሳተፉ ቤተሰብ ይሁኑ።
🚧አምፊ - የጋራ መድረክ🙏
@amphimagazine
👉በባህርዳር ከተማ እየተገነባ የሚገኘው አዲሱ የዓባይ ወንዝ ድልድይ የግንባታ ስራ እየተፋጠነ ይገኛል፡፡
➡️የፕሮጀክቱን የስራ እንቅስቃሴ እና የባህርዳር ጢስ እሳት የመንገድ ግንባታ ስራን በዛሬው እለት በትራንስፖርት ሚኒስትር ድኤታው አቶ ካሳሁን ጎፌ ፣በኢመባ ዋና ዳይሬክተር ኢንጅነር ሃብታሙ ተገኘ እና የተቋሙ ከፍተኛ የስራ ሃላፊዎች በመስክ የስራ ቅኘት ተጎብኝቷል።
🚧አዲሱ የአባይ ወንዝ ድልድይ 380 ሜትር ርዝመት እና 43 ሜትር የጎን ስፋት ያለው ድልድይ ነው።
🚧በጉብኝቱ ወቅት ፕሮጀክቱ ላይ በዋነኛነት የድልድይ ተሸካሚ ምሰሶዎችን (piers) ለአርማታ ሙሌት ስራ ማመቻቸት እንዲሁም የድጋፍ ግንቡን ከመሬት በታች የድልድዩ የቋሚ ተሸካሚ መሰረቶች (Abutment piles) ቁፋሮ እና አርማታ ሙሌት ስራ ነው እየተከናወነ የሚገኘው፡፡
🚧ለድልድዩ ከሚያስፈልጉት 4 ቋሚ የድልድይ ተሸካሚ ምሶሶውች የመሰረት ስራቸው ከነ ማቀፊያው ሙሉ ለሙሉ ተጠናቋል::
🚧በተጨማሪም የአንዱ ድልድይ ተሸካሚ ምሶሶ የኮንክሪት ሙሌት ስራ ሙሉ ለሙሉ ሲጠናቀቅ የቀሪዎቹ ሶስት ድልድይ ተሸካሚ ምሶሶ ሙሌት ስራም በመጪዎቹ ሁለት ወራት ውስጥ ለማጠናቀቅ እየተሰራ ነው
🚧ከመሬት በታች የሚቀበሩት የክብ ቅርፅ ያላቸው የድልድዩ የቋሚ ተሸካሚ መሰረቶች በዲዛይኑ መሰረት ከዝቅተኛው 14 ሜትር እስከ ከፍተኛው 23 ሜትር ድረስ ጥልቀት ያላቸው ሲሆኑ የአንዱ የቋሚ ተሸካሚ መሰረት የመሀል መለኪያ ስፋት በድልድዩ የድጋፍ ግንብ ጋር 1.5 ሜትር ሲሆን የመካከል ተሸካሚዎች ጋር ደግሞ 1.8 ሜትር ነው፡፡
🚧380 ሜትር የሚረዝመው አዲሱ የአባይ ወንዝ ድልድይ የግንባታ ስራ ፕሮጀክት በእስካሁኑ አፈፃፀም በአጠቃላይ ድልድዩን ለመሸከም ከሚያስፈልጉ 88 የቋሚ ተሸካሚ መሰረቶች ውስጥ 54 የሚሆኑት የቁፋሮ እና የአርማታ ሙሌት ስራ ሙሉ ለሙሉ ሲጠናቀቁ
🚧የቀሪዎቹን የቋሚ ተሸካሚ መሰረቶችም በአጭር ጊዜ ለማጠናቀቅ እቅድ ተይዞ እየተሰራ ይገኛል፡፡
🚧የድልድዩ ስራ አሁናዊ የግንባታ ስራዎች አራት ቋሚ ተሸካሚ ምሶሶዎች የኮንክሪት ሙሌት እና የብርት ማሰር ስራዎች ተከናውነዋል።
🚧የድልድዩን ዋና ዋና ስራዎችን በእቅዱ መሰረት ለማከናወን አጠቃላይ የግንባታ ሂደቱ በመፍጠን ላይ መሆኑ በስራ ሃላፊዎቹ ተገምግሟል።
🚧የስራ ሃላፊዎቹ በቀጣይ የሚጠበቁ ጉልህ ስራዎችን ኮንትራክተሩ በገባው ውል መሰረት በጥራት እንዲሰራም ቀጣይ የስራ አቅጣጫን ሰተዋል።
🚧ድልድዩ በግራና በቀኝ በአንድ ጊዜ 6 ተሽከርካሪዎችን በተጨማሪም 5 ሜትር የእግረኛ መንገድ እንዲሁም የብስክሌት ተጠቃሚዎችን መስመር ባካተተ መልኩ ነው እየተገነባ የሚገኘው ፡፡
🚧በኢትዮጵያ መንግስት በተመደበ 1.4 ቢሊዮን ብር ግንባታውን እያከናወነ የሚገኘው ቻይና ኮሙኒኬሽን ኮንስትራክሽን ካምፓኒ የተባለው ተቋራጭ ነው።
🚧በባህር ዳር ከተማ ከሚገኘው ነባሩ የአባይ ወንዝ ድልድይ 2 ኪሎ ሜትር ርቀት ላይ እየተገነባ ያለው ይህ ዘመናዊ ድልድይ ተሰርቶ ሲጠናቀቅ ከሚያበረክተው ኢኮኖሚያዊና ማህበራዊ ጠቀሜታ ጎን ለጎን ምቹ የሆነ የትራፊክ ፍሰት እንዲኖር በማድረግና መስመሩን ከአደጋ የፀዳ እንዲሆን ከማስቻሉ ባሻገር ከተማዋ ተጨማሪ ውበት እንድትላበስ ብሎም የሀገሪቱ ወጪና ገቢ ንግድ እንዲያድግ ከፍተኛ አስተዋዕፆ ያበረክታል፡፡
🚧በተያያዘ ዜናም የስራ ሃላፊዎቹ በ ትላንት የመስክ ጉዞቸው የባህርዳር ጢስ እሳት መንገድ ፕሮጀክትን ቃኝተዋል ።
🚧ፕሮጀክቱ ወደ ጢስ አባይ ፏፏቴ ቱሪስት መዳረሻ የሚወስድ ሲሆን 22.3 ኪሎሜትር እርዝመት ያለው ነው።
🚧የዚህ መንገድ መገንባት የሀገር ውስጥና የውጪ ሀገር ጎብኚዎች ከዚህ ቀደም ይፈጠርባቸው የነበረውን እንግልት በማስቀረት ለአካባቢውም ሆነ ለሀገሪቱ ከፍተኛ የገቢ ምንጭን ይፈጥራል፡፡
🚧የመስክ ቅኝቱ በዋነኝነት የፕሮጀክቶቹን አፈጻጸም ለመገምገምና እና በግንባታ ሂደት እያጋጠሙ ያሉ ከወሰን ማስከበር እና ተያያዥ ችግሮችን እየቀረፉ የግንባታ ስራቸውን ማፋጠን በሚቻልበት ሁኔታ ላይ ከሚመለከታቸው ጋር ለመምከር ነው።
Via ERA
@etconp
➡️የፕሮጀክቱን የስራ እንቅስቃሴ እና የባህርዳር ጢስ እሳት የመንገድ ግንባታ ስራን በዛሬው እለት በትራንስፖርት ሚኒስትር ድኤታው አቶ ካሳሁን ጎፌ ፣በኢመባ ዋና ዳይሬክተር ኢንጅነር ሃብታሙ ተገኘ እና የተቋሙ ከፍተኛ የስራ ሃላፊዎች በመስክ የስራ ቅኘት ተጎብኝቷል።
🚧አዲሱ የአባይ ወንዝ ድልድይ 380 ሜትር ርዝመት እና 43 ሜትር የጎን ስፋት ያለው ድልድይ ነው።
🚧በጉብኝቱ ወቅት ፕሮጀክቱ ላይ በዋነኛነት የድልድይ ተሸካሚ ምሰሶዎችን (piers) ለአርማታ ሙሌት ስራ ማመቻቸት እንዲሁም የድጋፍ ግንቡን ከመሬት በታች የድልድዩ የቋሚ ተሸካሚ መሰረቶች (Abutment piles) ቁፋሮ እና አርማታ ሙሌት ስራ ነው እየተከናወነ የሚገኘው፡፡
🚧ለድልድዩ ከሚያስፈልጉት 4 ቋሚ የድልድይ ተሸካሚ ምሶሶውች የመሰረት ስራቸው ከነ ማቀፊያው ሙሉ ለሙሉ ተጠናቋል::
🚧በተጨማሪም የአንዱ ድልድይ ተሸካሚ ምሶሶ የኮንክሪት ሙሌት ስራ ሙሉ ለሙሉ ሲጠናቀቅ የቀሪዎቹ ሶስት ድልድይ ተሸካሚ ምሶሶ ሙሌት ስራም በመጪዎቹ ሁለት ወራት ውስጥ ለማጠናቀቅ እየተሰራ ነው
🚧ከመሬት በታች የሚቀበሩት የክብ ቅርፅ ያላቸው የድልድዩ የቋሚ ተሸካሚ መሰረቶች በዲዛይኑ መሰረት ከዝቅተኛው 14 ሜትር እስከ ከፍተኛው 23 ሜትር ድረስ ጥልቀት ያላቸው ሲሆኑ የአንዱ የቋሚ ተሸካሚ መሰረት የመሀል መለኪያ ስፋት በድልድዩ የድጋፍ ግንብ ጋር 1.5 ሜትር ሲሆን የመካከል ተሸካሚዎች ጋር ደግሞ 1.8 ሜትር ነው፡፡
🚧380 ሜትር የሚረዝመው አዲሱ የአባይ ወንዝ ድልድይ የግንባታ ስራ ፕሮጀክት በእስካሁኑ አፈፃፀም በአጠቃላይ ድልድዩን ለመሸከም ከሚያስፈልጉ 88 የቋሚ ተሸካሚ መሰረቶች ውስጥ 54 የሚሆኑት የቁፋሮ እና የአርማታ ሙሌት ስራ ሙሉ ለሙሉ ሲጠናቀቁ
🚧የቀሪዎቹን የቋሚ ተሸካሚ መሰረቶችም በአጭር ጊዜ ለማጠናቀቅ እቅድ ተይዞ እየተሰራ ይገኛል፡፡
🚧የድልድዩ ስራ አሁናዊ የግንባታ ስራዎች አራት ቋሚ ተሸካሚ ምሶሶዎች የኮንክሪት ሙሌት እና የብርት ማሰር ስራዎች ተከናውነዋል።
🚧የድልድዩን ዋና ዋና ስራዎችን በእቅዱ መሰረት ለማከናወን አጠቃላይ የግንባታ ሂደቱ በመፍጠን ላይ መሆኑ በስራ ሃላፊዎቹ ተገምግሟል።
🚧የስራ ሃላፊዎቹ በቀጣይ የሚጠበቁ ጉልህ ስራዎችን ኮንትራክተሩ በገባው ውል መሰረት በጥራት እንዲሰራም ቀጣይ የስራ አቅጣጫን ሰተዋል።
🚧ድልድዩ በግራና በቀኝ በአንድ ጊዜ 6 ተሽከርካሪዎችን በተጨማሪም 5 ሜትር የእግረኛ መንገድ እንዲሁም የብስክሌት ተጠቃሚዎችን መስመር ባካተተ መልኩ ነው እየተገነባ የሚገኘው ፡፡
🚧በኢትዮጵያ መንግስት በተመደበ 1.4 ቢሊዮን ብር ግንባታውን እያከናወነ የሚገኘው ቻይና ኮሙኒኬሽን ኮንስትራክሽን ካምፓኒ የተባለው ተቋራጭ ነው።
🚧በባህር ዳር ከተማ ከሚገኘው ነባሩ የአባይ ወንዝ ድልድይ 2 ኪሎ ሜትር ርቀት ላይ እየተገነባ ያለው ይህ ዘመናዊ ድልድይ ተሰርቶ ሲጠናቀቅ ከሚያበረክተው ኢኮኖሚያዊና ማህበራዊ ጠቀሜታ ጎን ለጎን ምቹ የሆነ የትራፊክ ፍሰት እንዲኖር በማድረግና መስመሩን ከአደጋ የፀዳ እንዲሆን ከማስቻሉ ባሻገር ከተማዋ ተጨማሪ ውበት እንድትላበስ ብሎም የሀገሪቱ ወጪና ገቢ ንግድ እንዲያድግ ከፍተኛ አስተዋዕፆ ያበረክታል፡፡
🚧በተያያዘ ዜናም የስራ ሃላፊዎቹ በ ትላንት የመስክ ጉዞቸው የባህርዳር ጢስ እሳት መንገድ ፕሮጀክትን ቃኝተዋል ።
🚧ፕሮጀክቱ ወደ ጢስ አባይ ፏፏቴ ቱሪስት መዳረሻ የሚወስድ ሲሆን 22.3 ኪሎሜትር እርዝመት ያለው ነው።
🚧የዚህ መንገድ መገንባት የሀገር ውስጥና የውጪ ሀገር ጎብኚዎች ከዚህ ቀደም ይፈጠርባቸው የነበረውን እንግልት በማስቀረት ለአካባቢውም ሆነ ለሀገሪቱ ከፍተኛ የገቢ ምንጭን ይፈጥራል፡፡
🚧የመስክ ቅኝቱ በዋነኝነት የፕሮጀክቶቹን አፈጻጸም ለመገምገምና እና በግንባታ ሂደት እያጋጠሙ ያሉ ከወሰን ማስከበር እና ተያያዥ ችግሮችን እየቀረፉ የግንባታ ስራቸውን ማፋጠን በሚቻልበት ሁኔታ ላይ ከሚመለከታቸው ጋር ለመምከር ነው።
Via ERA
@etconp
👉በለገጣፎ-ለገዳዲ ከተማ ከ456 ሚሊዮን ብር በላይ ወጪ የተገነቡ ፕሮጀክቶች ተመረቁ!
➡️የለገጣፎ-ለገዳዲ ከተማ አስተዳደር ከ456 ሚሊዮን ብር በላይ ወጪ የተገነቡ ፕሮጀክቶች ምርቃት የኦሮሚያ ክልላዊ መንግሥት ፕሬዝዳንት አቶ ሽመልስ አብዲሳ በተገኙበት ተካሂዷል።
🚧ለምርቃት ከበቁት የልማት ፕሮጀክቶች መካከል በ300 ሚሊዮን ብር ወጪ የተገነባው የአርሶ አደር ገበያ ማዕከልና በ156 ሚሊዮን ብር ወጪ የተገነባው የከተማ አስተዳደሩ ሕንፃ ይገኙበታል።
🚧ከዚህም በተጨማሪ በለገዳዲ-ለገጣፎ ከተማ አስተዳደር የሚገኘው የአትሌቲክስ ማሰልጠኛ ማዕከል ውስጥ የተገነባው 1.6 ኪ.ሜ የጎዳና ሩጫ መለማመጃ መንደር ከተመረቁት የልማት ፕሮጀክቶች መካከል እንደሚገኙበት ከመርሃ ግብሩ ለመረዳት ተችሏል።
Via ENA
@etconp
➡️የለገጣፎ-ለገዳዲ ከተማ አስተዳደር ከ456 ሚሊዮን ብር በላይ ወጪ የተገነቡ ፕሮጀክቶች ምርቃት የኦሮሚያ ክልላዊ መንግሥት ፕሬዝዳንት አቶ ሽመልስ አብዲሳ በተገኙበት ተካሂዷል።
🚧ለምርቃት ከበቁት የልማት ፕሮጀክቶች መካከል በ300 ሚሊዮን ብር ወጪ የተገነባው የአርሶ አደር ገበያ ማዕከልና በ156 ሚሊዮን ብር ወጪ የተገነባው የከተማ አስተዳደሩ ሕንፃ ይገኙበታል።
🚧ከዚህም በተጨማሪ በለገዳዲ-ለገጣፎ ከተማ አስተዳደር የሚገኘው የአትሌቲክስ ማሰልጠኛ ማዕከል ውስጥ የተገነባው 1.6 ኪ.ሜ የጎዳና ሩጫ መለማመጃ መንደር ከተመረቁት የልማት ፕሮጀክቶች መካከል እንደሚገኙበት ከመርሃ ግብሩ ለመረዳት ተችሏል።
Via ENA
@etconp
FM_Ethio FM.aac
42.8 MB
👉በሀገራችን የተለያዩ ግንባታዎች በሚከናወኑ ወቅት ፕሮጀክቶች በተያዘላቸው ጊዜ እንዳይጠናቀቁ ከሚያደርጉ ዋነኛ ሰው ሰራሽ ችግሮች ምንድናቸው?
➡️ዛሬ ቅዳሜ 14/02/2013 ከ ጠዋት 2 ሰአት እስከ 3 ሰአት ኢትዮ ኤፍኤም 107.8 በውሀ ልክ ፕሮግራም በተጋባዥ የ ኮንስትራክሽን ባለሞያዎች ውይይት እና ገለፃ ተደርገዋል።
🚧ይህንን ውይይት ያመለጣቹ የዚህ ቻናል ቤተሰቦች ከዚህ ፅሁፍ በድምፅ አያይዘንላቹዋል።
📼43MB ስለሆነ WIFI ይጠቀሙ!
@etconp
➡️ዛሬ ቅዳሜ 14/02/2013 ከ ጠዋት 2 ሰአት እስከ 3 ሰአት ኢትዮ ኤፍኤም 107.8 በውሀ ልክ ፕሮግራም በተጋባዥ የ ኮንስትራክሽን ባለሞያዎች ውይይት እና ገለፃ ተደርገዋል።
🚧ይህንን ውይይት ያመለጣቹ የዚህ ቻናል ቤተሰቦች ከዚህ ፅሁፍ በድምፅ አያይዘንላቹዋል።
📼43MB ስለሆነ WIFI ይጠቀሙ!
@etconp
👉HOW TO TAKE 90 DEGREE ANGLE FOR BUILDING LAYOUT
➡️How we can take the 90 degree angle in building layout so after reading this article you will be able to know how to take 90 degree angle during layout at site.
▶️In many projects many students can become the face of this problem that they are not able to take 90 angle for building or room layout at site and keep in your mind that we must take any corner of the building on 90 degree so after that our work will be fine from that.
▶️So the given formula which I am showing you now , this is the manual formula which you can do with the help of measurment tape.
🚧FORMULA TO TAKE 90 DEGREE
*⃣3 AND 4 = 5
▶️Here we have to take one side 3 meter or feet and 2nd side 4
▶️So the other side should be measure 5 meter than it will give us 90 degree angle.
🚧*NOTE:* the above formula we can not use for level machine or any other electronic machine it just used for manual work and we can complete our lay-outing with 90 degree angle with the help of measurement tape.
#ConstructionNotes
@etconp
➡️How we can take the 90 degree angle in building layout so after reading this article you will be able to know how to take 90 degree angle during layout at site.
▶️In many projects many students can become the face of this problem that they are not able to take 90 angle for building or room layout at site and keep in your mind that we must take any corner of the building on 90 degree so after that our work will be fine from that.
▶️So the given formula which I am showing you now , this is the manual formula which you can do with the help of measurment tape.
🚧FORMULA TO TAKE 90 DEGREE
*⃣3 AND 4 = 5
▶️Here we have to take one side 3 meter or feet and 2nd side 4
▶️So the other side should be measure 5 meter than it will give us 90 degree angle.
🚧*NOTE:* the above formula we can not use for level machine or any other electronic machine it just used for manual work and we can complete our lay-outing with 90 degree angle with the help of measurement tape.
#ConstructionNotes
@etconp
This media is not supported in your browser
VIEW IN TELEGRAM
👉EVOLUTION of WORLD'S TALLEST BUILDING
➡️A 3D Size Comparison of the World's Tallest Building as its changed throughout our history!
🚧Hope you will enjoy !
#ConstructionTechnology
@etconp
➡️A 3D Size Comparison of the World's Tallest Building as its changed throughout our history!
🚧Hope you will enjoy !
#ConstructionTechnology
@etconp
📌Rate Analysis- Civil works Elements, Factor Affecting & Requirement of Rate analysis
👉What is analysis of rate or rate analysis?
➡️The process of determining rate of any work in Construction Engineering project like earthwork, brickwork, plastering, painting etc. is known as analysis of rate or simply rate analysis.
➡️The rate of these works further helps in determining cost of particular work and in turn cost of the project.
➡️The rate of any process or works depends on various factors.
➡️Rate analysis of Construction Works or Building Works is the determination of cost of each construction work per unit quantity.
➡️This cost includes the cost of materials, labours, machinery, contractors profit and other miscellaneous petty expenses required for the particular work to be complete in unit quantity.
🏷Factor affecting Rate analysis
➡️The various factors that are involved in determining rate of any process of work are mentioned below:
🚧Specification of works and material about their quality, proportion and constructional operation method.
▶️Specification of the Construction work and materials such as quality of materials, proportion of mortar or concrete, thickness of plastering, number of coats of painting, depth of excavation, type of soil etc.
🚧Quantity of materials and their costs.
▶️Quantity of materials, number of different types of labours and rates of materials and labours influence the rate analysis.
🚧Cost of labor and their wages different types of labours and rates of materials and labours influence the rate analysis.
🚧Location of the construction site
▶️Distance of construction site from source of materials, availability of labours, availability of water, machinery Also Overhead and establishment charges
🏷Why we need rate analysis?
▪To determine the actual cost per unit.
▪To know the requirements of quantities of labours, materials, machineries and capital to complete the project.
▪ To work out the economical use of materials and processes in completing the particulars item.
▪To calculate the cost of extra items which are not provided in the contract bond, but are to be executed as per the directions of the department.
▪To optimize the use of labour, materials and machineries and to know the alternatives to optimize the resources.
▪ To revise the schedule of rates due to increase in the cost of material and labour or due to change in technique.
🏷Elements of Rate Analysis
➡️Elements which constitute the rate analysis are
⏺A) Material cost inclusive of wastage
⏺B) Labour cost
⏺C) Plant & machinery owning and operating charges
⏺D) Contractor’s overheads and profit Main term on rate analysis
➡️Labour
▶️The rate of labour is based on skill of the labour, such as skilled labour, semi-skilled and unskilled labour.
▶️The cost of materials and labours vary from place to place.
▶️Thus, the cost of each construction work varies from place to place. Labour may be classified into two types
⏺A. Skilled
⏺B. Unskilled
➡️Labour Charges can be obtained from schedules of rate. 30% of the skilled labour in data should be taken 30% as Ist class and remaining 70% as IInd class
➡️Lead statement
▶️The distance between the source of availability of material and construction site is known as lead and is calculated in km.
▶️the conveyance cost of material depends on lead The lead statement will give the total cost of materials per unit item including first cost, conveyance loading-unloading, stacking charges etc.
➡️Lift
▶️Similarly during the earthwork, the average height through which soil has to be lifted from sources to the place of spreading is known as lift
First lift is taken up to 2m
The extra lift is counted for up to 1 m after the first lift and so on
#CostEngineering
@etconp
👉What is analysis of rate or rate analysis?
➡️The process of determining rate of any work in Construction Engineering project like earthwork, brickwork, plastering, painting etc. is known as analysis of rate or simply rate analysis.
➡️The rate of these works further helps in determining cost of particular work and in turn cost of the project.
➡️The rate of any process or works depends on various factors.
➡️Rate analysis of Construction Works or Building Works is the determination of cost of each construction work per unit quantity.
➡️This cost includes the cost of materials, labours, machinery, contractors profit and other miscellaneous petty expenses required for the particular work to be complete in unit quantity.
🏷Factor affecting Rate analysis
➡️The various factors that are involved in determining rate of any process of work are mentioned below:
🚧Specification of works and material about their quality, proportion and constructional operation method.
▶️Specification of the Construction work and materials such as quality of materials, proportion of mortar or concrete, thickness of plastering, number of coats of painting, depth of excavation, type of soil etc.
🚧Quantity of materials and their costs.
▶️Quantity of materials, number of different types of labours and rates of materials and labours influence the rate analysis.
🚧Cost of labor and their wages different types of labours and rates of materials and labours influence the rate analysis.
🚧Location of the construction site
▶️Distance of construction site from source of materials, availability of labours, availability of water, machinery Also Overhead and establishment charges
🏷Why we need rate analysis?
▪To determine the actual cost per unit.
▪To know the requirements of quantities of labours, materials, machineries and capital to complete the project.
▪ To work out the economical use of materials and processes in completing the particulars item.
▪To calculate the cost of extra items which are not provided in the contract bond, but are to be executed as per the directions of the department.
▪To optimize the use of labour, materials and machineries and to know the alternatives to optimize the resources.
▪ To revise the schedule of rates due to increase in the cost of material and labour or due to change in technique.
🏷Elements of Rate Analysis
➡️Elements which constitute the rate analysis are
⏺A) Material cost inclusive of wastage
⏺B) Labour cost
⏺C) Plant & machinery owning and operating charges
⏺D) Contractor’s overheads and profit Main term on rate analysis
➡️Labour
▶️The rate of labour is based on skill of the labour, such as skilled labour, semi-skilled and unskilled labour.
▶️The cost of materials and labours vary from place to place.
▶️Thus, the cost of each construction work varies from place to place. Labour may be classified into two types
⏺A. Skilled
⏺B. Unskilled
➡️Labour Charges can be obtained from schedules of rate. 30% of the skilled labour in data should be taken 30% as Ist class and remaining 70% as IInd class
➡️Lead statement
▶️The distance between the source of availability of material and construction site is known as lead and is calculated in km.
▶️the conveyance cost of material depends on lead The lead statement will give the total cost of materials per unit item including first cost, conveyance loading-unloading, stacking charges etc.
➡️Lift
▶️Similarly during the earthwork, the average height through which soil has to be lifted from sources to the place of spreading is known as lift
First lift is taken up to 2m
The extra lift is counted for up to 1 m after the first lift and so on
#CostEngineering
@etconp
👍1
📌BENEFITS OF USING PLASTIC FORM WORKS IN CONCRETE CONSTRUCTION
👉Plastic formworks in concrete construction are used to retain newly arranged concrete in place to provide adequate strength.
➡️Formworks facilitate to manage concrete efficiently and produce different types of shapes and forms.
➡️Various types of materials like timber, steel, and aluminum are applied to develop formworks. Plastic is considered as best for formworks in relation to other materials in terms of strength, cost-effectiveness, and adaptability.
➡️Sufficient time is required to develop the formworks.
➡️Formworks comprise 20 to 25% of the total cost of the structure. The security, cost, quality, and speed of a construction work mainly depend on formworks.
🏷Benefits of Plastic Formworks in Concrete Construction
▶️Plastic formworks provide various benefits like longevity, cost, and flexibility.
▶️Formworks consume huge labor force and total cost of the project. It is recommended that a formwork system should be cost-effective and assembled, disintegrated and managed smoothly by labor.
🏷The plastic formworks provide the following benefits to the concrete construction
⏺Grading of Aggregates
⏺Economical
⏺Labor-friendly
⏺Eco friendly
⏺Low maintenance
⏺Flexible
👉Plastic Formwork System
➡️Certain grade plastics are used to build up formworks.
➡️There are not any chemical reactions among poured material and the plastic form. No patch on the surface of the reinforce concrete element exists.
🚧Leakages
➡️Resist leakages with water or newly arranged concrete from various parts of the form by fitting different parts of the system accurately.
➡️Labor-friendly system
Plastic formworks are considered very labor-friendly system.
➡️It accommodates and plugs smoothly and significantly lightweight with regards to other types of formwork systems.
🚧Nailing and oiling
➡️Nailing and oiling plates are not necessary. Auto-leveling of plugging system can retain plates level automatically. It takes fewer time to install and disassemble.
🚧Cleaning
➡️Plastic forms can be cleansed with water without difficulty. Plastic forms can be broken due to handling in an inefficient manner as well as use of low voltage hot air gun for sealing.
➡️Plastic forms can be easily reprocessed and they are eco-friendly to minimize handling time and great re-usability index.
#ConstructionTechnology
@etconp
👉Plastic formworks in concrete construction are used to retain newly arranged concrete in place to provide adequate strength.
➡️Formworks facilitate to manage concrete efficiently and produce different types of shapes and forms.
➡️Various types of materials like timber, steel, and aluminum are applied to develop formworks. Plastic is considered as best for formworks in relation to other materials in terms of strength, cost-effectiveness, and adaptability.
➡️Sufficient time is required to develop the formworks.
➡️Formworks comprise 20 to 25% of the total cost of the structure. The security, cost, quality, and speed of a construction work mainly depend on formworks.
🏷Benefits of Plastic Formworks in Concrete Construction
▶️Plastic formworks provide various benefits like longevity, cost, and flexibility.
▶️Formworks consume huge labor force and total cost of the project. It is recommended that a formwork system should be cost-effective and assembled, disintegrated and managed smoothly by labor.
🏷The plastic formworks provide the following benefits to the concrete construction
⏺Grading of Aggregates
⏺Economical
⏺Labor-friendly
⏺Eco friendly
⏺Low maintenance
⏺Flexible
👉Plastic Formwork System
➡️Certain grade plastics are used to build up formworks.
➡️There are not any chemical reactions among poured material and the plastic form. No patch on the surface of the reinforce concrete element exists.
🚧Leakages
➡️Resist leakages with water or newly arranged concrete from various parts of the form by fitting different parts of the system accurately.
➡️Labor-friendly system
Plastic formworks are considered very labor-friendly system.
➡️It accommodates and plugs smoothly and significantly lightweight with regards to other types of formwork systems.
🚧Nailing and oiling
➡️Nailing and oiling plates are not necessary. Auto-leveling of plugging system can retain plates level automatically. It takes fewer time to install and disassemble.
🚧Cleaning
➡️Plastic forms can be cleansed with water without difficulty. Plastic forms can be broken due to handling in an inefficient manner as well as use of low voltage hot air gun for sealing.
➡️Plastic forms can be easily reprocessed and they are eco-friendly to minimize handling time and great re-usability index.
#ConstructionTechnology
@etconp
📌Basic terms for Mechanics
🚧1. Torque or Turning Force
➡️It is the total amount of force which is required to create acceleration on moving substance.
🚧2. Couple
➡️Two forces those acts on equally, parallely & oppositely on two separate points of same material.
🚧3. Moment
➡️It is the amount of moving effect which is gained for action of turning force.
🚧4. Stress
➡️It is the force that can prevent equal & opposite force.
➡️That means, it is the preventing force.
➡️If one force acts on outside of a material, then a reactive force automatically acts to protest that force.
➡️The amount of reactive force per unit area is called stress.
➡️For instance:- Tensile Stress, Compressive Stress, Thermal Stress.
🚧5. Strain
➡️If a force acts on a substance, then in that case if the substance would deform.
➡️Then the amount of deformation per unit length of that substance is called strain.
🚧6. Spring
➡️It is one type of device which is being distorted under certain amount of load & also can also go to its original face after the removal of that load.
Its function
⏺i. To store energy
⏺ii. To absorb energy
⏺iii. To control motion of two elements
🚧7. Stiffness
➡️Load per unit deflection. The amount of load required to resist the deflection.
🚧8. Specific Weight
➡️Weight per unit volume of the fluid.
🚧9. Specific Volume
➡️Volume per unit mass of the fluid.
🚧10. Specific Gravity
➡️It is the ratio of specific weight of required substance to specific weight of pure water at 4 degree centigrade temperature.
#Mechanics
@etconp
🚧1. Torque or Turning Force
➡️It is the total amount of force which is required to create acceleration on moving substance.
🚧2. Couple
➡️Two forces those acts on equally, parallely & oppositely on two separate points of same material.
🚧3. Moment
➡️It is the amount of moving effect which is gained for action of turning force.
🚧4. Stress
➡️It is the force that can prevent equal & opposite force.
➡️That means, it is the preventing force.
➡️If one force acts on outside of a material, then a reactive force automatically acts to protest that force.
➡️The amount of reactive force per unit area is called stress.
➡️For instance:- Tensile Stress, Compressive Stress, Thermal Stress.
🚧5. Strain
➡️If a force acts on a substance, then in that case if the substance would deform.
➡️Then the amount of deformation per unit length of that substance is called strain.
🚧6. Spring
➡️It is one type of device which is being distorted under certain amount of load & also can also go to its original face after the removal of that load.
Its function
⏺i. To store energy
⏺ii. To absorb energy
⏺iii. To control motion of two elements
🚧7. Stiffness
➡️Load per unit deflection. The amount of load required to resist the deflection.
🚧8. Specific Weight
➡️Weight per unit volume of the fluid.
🚧9. Specific Volume
➡️Volume per unit mass of the fluid.
🚧10. Specific Gravity
➡️It is the ratio of specific weight of required substance to specific weight of pure water at 4 degree centigrade temperature.
#Mechanics
@etconp
👉ጠቅላይ ሚኒስትር ዶክተር አቢይ አህመድ የሃይቅ - ቢስቲማ - ጭፍራ የአስፋልት ኮንክሪት መንገድ ግንባታ ፕሮጀክትን በይፋ አስጀመሩ❗️
🚧በጠቅላይ ሚኒስትሩ በይፋ የግንባታ ስራው የጀመረው መንገድ 74 ነጥብ 3 ኪሎ ሜትር ርዝመት ይኖረዋል።
🚧የመንገድ ግንባታ ፕሮጀክት ከ2 ነጥብ 1 ቢሊዮን ብር በላይ ወጪ ይጠይቃል።
🚧የመንገድ ግንባታው በአራት ዓመት ጊዜ ውስጥ ይጠናቀቃል ተብሎ የሚጠበቅ ሲሆን ለአመታት የቆየውን የህዝብ የልማት ጥያቄ በመመለስ ለአገራዊ ኢኮኖሚ እድገት የራሱን አስተዋጽኦ እንደሚያበረክት ተነግሯል።
🚧የመንገድ ግንባታውን የሚያከናውኑት ፓወርኮን ሃላፊነቱ የተወሰነ የግል ማህበርና አሰር ኮንስትራክሽን በጋራ ሲሆኑ የግንባታው ወጪ የሚሸፈነው በኢትዮጵያ መንግስት እንደሆነ ታውቋል።
🚧መንገዱ በአሁኑ ወቅት በጠጠር ደረጃ አገልግሎት እየሰጠ ሲሆን የአፋርና የአማራ ክልሎችን የሚያገናኝ ነው።
🚧የዚህ መንገድ ግንባታ ፕሮጀክት ውል በሃምሌ ወር 2012 ዓ.ም ላይ መፈረሙ ይታወሳል።
@etconp
🚧በጠቅላይ ሚኒስትሩ በይፋ የግንባታ ስራው የጀመረው መንገድ 74 ነጥብ 3 ኪሎ ሜትር ርዝመት ይኖረዋል።
🚧የመንገድ ግንባታ ፕሮጀክት ከ2 ነጥብ 1 ቢሊዮን ብር በላይ ወጪ ይጠይቃል።
🚧የመንገድ ግንባታው በአራት ዓመት ጊዜ ውስጥ ይጠናቀቃል ተብሎ የሚጠበቅ ሲሆን ለአመታት የቆየውን የህዝብ የልማት ጥያቄ በመመለስ ለአገራዊ ኢኮኖሚ እድገት የራሱን አስተዋጽኦ እንደሚያበረክት ተነግሯል።
🚧የመንገድ ግንባታውን የሚያከናውኑት ፓወርኮን ሃላፊነቱ የተወሰነ የግል ማህበርና አሰር ኮንስትራክሽን በጋራ ሲሆኑ የግንባታው ወጪ የሚሸፈነው በኢትዮጵያ መንግስት እንደሆነ ታውቋል።
🚧መንገዱ በአሁኑ ወቅት በጠጠር ደረጃ አገልግሎት እየሰጠ ሲሆን የአፋርና የአማራ ክልሎችን የሚያገናኝ ነው።
🚧የዚህ መንገድ ግንባታ ፕሮጀክት ውል በሃምሌ ወር 2012 ዓ.ም ላይ መፈረሙ ይታወሳል።
@etconp
📌Basic terms for Mechanics
🚧1. Torque or Turning Force
➡️It is the total amount of force which is required to create acceleration on moving substance.
🚧2. Couple
➡️Two forces those acts on equally, parallely & oppositely on two separate points of same material.
🚧3. Moment
➡️It is the amount of moving effect which is gained for action of turning force.
🚧4. Stress
➡️It is the force that can prevent equal & opposite force.
➡️That means, it is the preventing force.
➡️If one force acts on outside of a material, then a reactive force automatically acts to protest that force.
➡️The amount of reactive force per unit area is called stress.
➡️For instance:- Tensile Stress, Compressive Stress, Thermal Stress.
🚧5. Strain
➡️If a force acts on a substance, then in that case if the substance would deform.
➡️Then the amount of deformation per unit length of that substance is called strain.
🚧6. Spring
➡️It is one type of device which is being distorted under certain amount of load & also can also go to its original face after the removal of that load.
Its function
⏺i. To store energy
⏺ii. To absorb energy
⏺iii. To control motion of two elements
🚧7. Stiffness
➡️Load per unit deflection. The amount of load required to resist the deflection.
🚧8. Specific Weight
➡️Weight per unit volume of the fluid.
🚧9. Specific Volume
➡️Volume per unit mass of the fluid.
🚧10. Specific Gravity
➡️It is the ratio of specific weight of required substance to specific weight of pure water at 4 degree centigrade temperature.
#Mechanics
#etconp
🚧1. Torque or Turning Force
➡️It is the total amount of force which is required to create acceleration on moving substance.
🚧2. Couple
➡️Two forces those acts on equally, parallely & oppositely on two separate points of same material.
🚧3. Moment
➡️It is the amount of moving effect which is gained for action of turning force.
🚧4. Stress
➡️It is the force that can prevent equal & opposite force.
➡️That means, it is the preventing force.
➡️If one force acts on outside of a material, then a reactive force automatically acts to protest that force.
➡️The amount of reactive force per unit area is called stress.
➡️For instance:- Tensile Stress, Compressive Stress, Thermal Stress.
🚧5. Strain
➡️If a force acts on a substance, then in that case if the substance would deform.
➡️Then the amount of deformation per unit length of that substance is called strain.
🚧6. Spring
➡️It is one type of device which is being distorted under certain amount of load & also can also go to its original face after the removal of that load.
Its function
⏺i. To store energy
⏺ii. To absorb energy
⏺iii. To control motion of two elements
🚧7. Stiffness
➡️Load per unit deflection. The amount of load required to resist the deflection.
🚧8. Specific Weight
➡️Weight per unit volume of the fluid.
🚧9. Specific Volume
➡️Volume per unit mass of the fluid.
🚧10. Specific Gravity
➡️It is the ratio of specific weight of required substance to specific weight of pure water at 4 degree centigrade temperature.
#Mechanics
#etconp
❤1
✋ሰላም አዲስ ለተቀላቀላቹህን የዚህ ቻናል ቤተሰቦች
🔖ይህ ቻናላቹ ዲጂታል ላይብረሪ እንዳለው ያውቃሉ?
📚ይህም ዲጂታል ቤተመፃህፍት በውስጡ የ ኮንስትራክሽን ሶፍትዌር ሴትአፖች ጨምሮ ሙሉ የ ARCH, COTM እና CIVIL መፅሀፍቶችን የያዘ ነው።
🚧ይህ የመጀመሪያ ምዕራፍ ግንባታ ሲሆን ለቀጣይ በአስተያየታችው መሰረት ብዙ ነገር ምናስተካክል ይሆናል።
👉ይህን link በመጫን ወደ ቤተመፃህፍቱ ልትሄዱ ትችላላችሁ።
👇👇👇👇👇👇
👉🏿 https://t.me/ETCONpDigitalLibrary_Bot
🔖ይህ ቻናላቹ ዲጂታል ላይብረሪ እንዳለው ያውቃሉ?
📚ይህም ዲጂታል ቤተመፃህፍት በውስጡ የ ኮንስትራክሽን ሶፍትዌር ሴትአፖች ጨምሮ ሙሉ የ ARCH, COTM እና CIVIL መፅሀፍቶችን የያዘ ነው።
🚧ይህ የመጀመሪያ ምዕራፍ ግንባታ ሲሆን ለቀጣይ በአስተያየታችው መሰረት ብዙ ነገር ምናስተካክል ይሆናል።
👉ይህን link በመጫን ወደ ቤተመፃህፍቱ ልትሄዱ ትችላላችሁ።
👇👇👇👇👇👇
👉🏿 https://t.me/ETCONpDigitalLibrary_Bot
Telegram
ETCONp Digital Library
ማሻሸያ እና አስተያየት ፃፋልን @Philemona7
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
👉ይህ የ ኢትየጵያዊያን የኮንስትራክሽን ስራ ባለሞያዎች ቻናል ዲጅታል ላይብረሪ ቦት ነው፡!
👉ለዛሬ ይቺ ቀለል ያለች ጥያቄ እንወያይባት
➡️ይህ ከላይ በምስሉ የምትመለከቱት ከ አንድ ቤተሰባችን የተላከ ሲሆን በ አንድ የ አስፋልት መንገድ ግንባታ ላይ ከ መሬት ቆረጣ (Earth Work & Excavation) በፊት ሰርቨየሮቹ እየለኩ በተፈላጊ ቦታዎች እንዲህ ግድግዳው ላይ በቀይ ቀለም ቁጥሩ ፅፈውታል።
🏷ጥያቅያችን በግድግዳው ላይ በቀይ ቀለም የተፃፈው 0+260 ምንን ያመለክታል?
💌መልሰቻቹ ከነ ማብራርያ መወያያ ግሩፓቹ ላይ @COTMp ፃፉልን።
📸ሽረ እንዳስላሰ ቀበሌ 03
@etconp
➡️ይህ ከላይ በምስሉ የምትመለከቱት ከ አንድ ቤተሰባችን የተላከ ሲሆን በ አንድ የ አስፋልት መንገድ ግንባታ ላይ ከ መሬት ቆረጣ (Earth Work & Excavation) በፊት ሰርቨየሮቹ እየለኩ በተፈላጊ ቦታዎች እንዲህ ግድግዳው ላይ በቀይ ቀለም ቁጥሩ ፅፈውታል።
🏷ጥያቅያችን በግድግዳው ላይ በቀይ ቀለም የተፃፈው 0+260 ምንን ያመለክታል?
💌መልሰቻቹ ከነ ማብራርያ መወያያ ግሩፓቹ ላይ @COTMp ፃፉልን።
📸ሽረ እንዳስላሰ ቀበሌ 03
@etconp
👍1
👉የኢፌዴሪ ምክትል ጠቅላይ ሚኒስትር አቶ ደመቀ መኮንን የጊምባ-ተንታ-ተንታ-መገንጠያ የአስፋልት ኮንክሪት መንገድ ግንባታስራን ዛሬ በይፋ አስጀመሩ።
➡️ መንግስት በመደበው ከ 2 ነጥብ 1 ቢሊየን ብር በላይ በሆነ ወጪ የሚገነባው የጊምባ -ተንታ-ተንታ መገንጠያ 80.2 ኪ. ሜ የአስፋልት ኮንክሪት መንገድ ግንባታ ፕሮጀክት የህዝቡን የአመታት ጥያቄ ምላሽ የሰጠ ነው ብለዋል ምክትል ጠቅላይ ሚኒስትር ደመቀ መኮንን።
🚧ለረዥም ዓመታት የመንገድ መሰረተ ልማት ባለመኖሩ የዚህ አካባቢ ነዋሪ በከፍተኛ ሁኔታ ሲቸገር እንደቆየም ተናግረዋል።
🚧ምክትል ጠቅላይ ሚኒስትሩ አካባቢውን ፣ ከክልሉ፣ ክልሎችን ከሀገሪቱ የወጪ ገቢ ንግድ ጋር የሚያስተሳስሩ ሌሎች በርካታ ፕሮጀክቶችን ደረጃ በደረጃ እንዲተገበሩ መንግስት አቅጣጫ ማስቀመጡንም አብራርተዋል።
🚧ይህ ፕሮጀክትም ከተያዘለት ጊዜ በፊት እንዲጠናቀቅ የአካባቢው ነዋሪዎች እና የአመራር አካላት በብርታትና በጥንካሬ ከተቋራጮቹ ጋር በመሆን የሚያጋጥሙ የወሰን ማስከበር ችግሮችን ቀድመው እንዲፈቱም አሳስበዋል።
🚧የኢትዮጵያ መንገዶች ባለስልጣን ዋና ዳይሬክተር ኢንጂነር ሀብታሙ ተገኝ በበኩላቸው ፕሮጀክቱን በስኬት ለማጠናቀቅ ተገቢውን የድጋፍ፣ የክትትል እና የቁጥጥር ሥርዓትን እንደሚያደርግ ገልፀዋል።
🚧መላው የአካባቢው ነዋሪ ፣የሥራ ተቋራጩም ሆነ የአማካሪ ድርጅቱ የተጣለባቸውን ከፍተኛ ሀላፊነት በብቃት እንዲወጡም አስገንዝበዋል ።
🚧እንዲሁም ግንባታውን የሚያከናውነው የስራ ተቋራጭ የድርጅቱ ተወካይ በገቡት የኮንትራት ውሉ መሰረት በተቀመጠው የጊዜ ገደብ ፕሮጀክቱን ገንብቶ ለማስረክብ ቃል ገብተዋል።
🏷አጠቃላይ ስለ ፕሮጀክቱ ዝርዝር መረጃ
▶️በአማራ ብሔራዊ ክልላዊ መንግስት ደቡብ ወሎ ዞን ውስጥ ይገኛል።
▶️የጊምባ-ተንታ-ተንታ መገንጠያ የመንገድ ፕሮጀክት ከአዲስ አበባ 568 ኪሎ ሜትር ይርቃል።
▶️የፕሮጀክቱ ስም፦ጊምባ-ተንታ ተንታ መገንጠያ
▶️ርዝመት፦80.2 ኪ. ሜትር
▶️የሥራ ተቋራጭ፡-ጂያንግዢ ዘ ሰከንድ ኮንስትራክሽን የቻይና ስራ ተቋራጭ ነው።
▶️የግንባታው አይነት፡-DDB
▶️አማካሪ ድርጅት፡-ሲቪል ወርክስ ኢንጂነርስ፣የኮሪያ ካምፓኒ ዮሺን ኮርፖሬሽን እንዲሁም ጂ እና ዋይ በጋራ በመተባበር
▶️የግንባታ ወጪ፡- 2,185,228,256.12
▶️የግንባታው ወጪ ሽፋን፡-የኢትዮጵያ መንግስት
▶️የግንባታው ደረጃ ፦አስፋልት ኮንክሪት
▶️ለግንባታው የተሰጠው ጊዜ፡- 3 ዓመት
▶️መንገዱ የሚያቋርጥባቸው ወረዳዎች፦ለጋምቦ፣ተንታ፣ደላንታ በርካታ ቀበሌዎች
▶️በመንገድ ፕሮጀክቱ ውስጥ የሚካተቱ ስራዎች
⏺የአፈር ቆረጣና ሙሌት ሥራ
⏺የአስፋልት ኮንክሪት መንገድ ሥራ
⏺የሁለት ድልድዮች ስራ
⏺ትንንሽና መካከለኛ የተፋሰስ ስራዎች
⏺የመንገድ ዳር ትራፊክ ምልክቶች ግንባታ ሥራ
⏺እንዲሁም በርካታ የስትራክቸር ሥራዎች
🚧የመንገድ ፕሮጀክቱ መገንባት ሁለንተናዊ ፋይዳ በጠጠር ደረጃ የነበረው የመንገዱ ግንባታ ተገንብቶ በሚጠናቀቅበት ወቅት ከዚህ በፊት በአካባቢው የነበረውን የትራንስፖርት ችግር በመቅረፍ ህብረተሰቡ ተሸከርካራዎችን ተጠቅሞ በተመጣጣኝ ዋጋ ወደፈለገው ቦታ የሚንቀሳቀስበትን ሁኔታ ይፈጥራል፡፡
🚧ከዚህ ቀደም ከደሴ ተነስቶ ተንታ ለመድረስ በመንገዱ መበላሸት ሳቢያ ይደርስ የነበረውን የዙሪያ ጥምጥም መንገድ በአንድ ሰዓት ተኩል ይቀንሰዋል።
🚧የመንገድ ፕሮጀክቱ መገንባት ግንባታው ከሚካሄድበት አስራ አምስት ኪሎ ሜትር ወደ ጎን ተገንጥሎ መቅደላ የሚገኘውን የአጼ ቴዎድሮስ ታሪካዊ ሰፍራ የጀግንነት ስፍራ እንዲሁም ለነጻነት ትግል ሲጠቀሙበት የነበረውን ሴባስቴፖል መድፍ ለመጎብኘት ለቱሪስት ምቹ ሁኔታን ከመፍጠርም አልፎ የቱሪዝም ፍሰቱን በመጨመር የውጭ ምንዛሬን ከማምጣት አኳያ ሃገራዊ ፋይዳው የጎላ ነው እንዲሁም የ ገበያ ትስስሩ ይበለጥ ያጠነክረዋል ተብሎ ይጠበቃል።
Via ERA
@etconp
➡️ መንግስት በመደበው ከ 2 ነጥብ 1 ቢሊየን ብር በላይ በሆነ ወጪ የሚገነባው የጊምባ -ተንታ-ተንታ መገንጠያ 80.2 ኪ. ሜ የአስፋልት ኮንክሪት መንገድ ግንባታ ፕሮጀክት የህዝቡን የአመታት ጥያቄ ምላሽ የሰጠ ነው ብለዋል ምክትል ጠቅላይ ሚኒስትር ደመቀ መኮንን።
🚧ለረዥም ዓመታት የመንገድ መሰረተ ልማት ባለመኖሩ የዚህ አካባቢ ነዋሪ በከፍተኛ ሁኔታ ሲቸገር እንደቆየም ተናግረዋል።
🚧ምክትል ጠቅላይ ሚኒስትሩ አካባቢውን ፣ ከክልሉ፣ ክልሎችን ከሀገሪቱ የወጪ ገቢ ንግድ ጋር የሚያስተሳስሩ ሌሎች በርካታ ፕሮጀክቶችን ደረጃ በደረጃ እንዲተገበሩ መንግስት አቅጣጫ ማስቀመጡንም አብራርተዋል።
🚧ይህ ፕሮጀክትም ከተያዘለት ጊዜ በፊት እንዲጠናቀቅ የአካባቢው ነዋሪዎች እና የአመራር አካላት በብርታትና በጥንካሬ ከተቋራጮቹ ጋር በመሆን የሚያጋጥሙ የወሰን ማስከበር ችግሮችን ቀድመው እንዲፈቱም አሳስበዋል።
🚧የኢትዮጵያ መንገዶች ባለስልጣን ዋና ዳይሬክተር ኢንጂነር ሀብታሙ ተገኝ በበኩላቸው ፕሮጀክቱን በስኬት ለማጠናቀቅ ተገቢውን የድጋፍ፣ የክትትል እና የቁጥጥር ሥርዓትን እንደሚያደርግ ገልፀዋል።
🚧መላው የአካባቢው ነዋሪ ፣የሥራ ተቋራጩም ሆነ የአማካሪ ድርጅቱ የተጣለባቸውን ከፍተኛ ሀላፊነት በብቃት እንዲወጡም አስገንዝበዋል ።
🚧እንዲሁም ግንባታውን የሚያከናውነው የስራ ተቋራጭ የድርጅቱ ተወካይ በገቡት የኮንትራት ውሉ መሰረት በተቀመጠው የጊዜ ገደብ ፕሮጀክቱን ገንብቶ ለማስረክብ ቃል ገብተዋል።
🏷አጠቃላይ ስለ ፕሮጀክቱ ዝርዝር መረጃ
▶️በአማራ ብሔራዊ ክልላዊ መንግስት ደቡብ ወሎ ዞን ውስጥ ይገኛል።
▶️የጊምባ-ተንታ-ተንታ መገንጠያ የመንገድ ፕሮጀክት ከአዲስ አበባ 568 ኪሎ ሜትር ይርቃል።
▶️የፕሮጀክቱ ስም፦ጊምባ-ተንታ ተንታ መገንጠያ
▶️ርዝመት፦80.2 ኪ. ሜትር
▶️የሥራ ተቋራጭ፡-ጂያንግዢ ዘ ሰከንድ ኮንስትራክሽን የቻይና ስራ ተቋራጭ ነው።
▶️የግንባታው አይነት፡-DDB
▶️አማካሪ ድርጅት፡-ሲቪል ወርክስ ኢንጂነርስ፣የኮሪያ ካምፓኒ ዮሺን ኮርፖሬሽን እንዲሁም ጂ እና ዋይ በጋራ በመተባበር
▶️የግንባታ ወጪ፡- 2,185,228,256.12
▶️የግንባታው ወጪ ሽፋን፡-የኢትዮጵያ መንግስት
▶️የግንባታው ደረጃ ፦አስፋልት ኮንክሪት
▶️ለግንባታው የተሰጠው ጊዜ፡- 3 ዓመት
▶️መንገዱ የሚያቋርጥባቸው ወረዳዎች፦ለጋምቦ፣ተንታ፣ደላንታ በርካታ ቀበሌዎች
▶️በመንገድ ፕሮጀክቱ ውስጥ የሚካተቱ ስራዎች
⏺የአፈር ቆረጣና ሙሌት ሥራ
⏺የአስፋልት ኮንክሪት መንገድ ሥራ
⏺የሁለት ድልድዮች ስራ
⏺ትንንሽና መካከለኛ የተፋሰስ ስራዎች
⏺የመንገድ ዳር ትራፊክ ምልክቶች ግንባታ ሥራ
⏺እንዲሁም በርካታ የስትራክቸር ሥራዎች
🚧የመንገድ ፕሮጀክቱ መገንባት ሁለንተናዊ ፋይዳ በጠጠር ደረጃ የነበረው የመንገዱ ግንባታ ተገንብቶ በሚጠናቀቅበት ወቅት ከዚህ በፊት በአካባቢው የነበረውን የትራንስፖርት ችግር በመቅረፍ ህብረተሰቡ ተሸከርካራዎችን ተጠቅሞ በተመጣጣኝ ዋጋ ወደፈለገው ቦታ የሚንቀሳቀስበትን ሁኔታ ይፈጥራል፡፡
🚧ከዚህ ቀደም ከደሴ ተነስቶ ተንታ ለመድረስ በመንገዱ መበላሸት ሳቢያ ይደርስ የነበረውን የዙሪያ ጥምጥም መንገድ በአንድ ሰዓት ተኩል ይቀንሰዋል።
🚧የመንገድ ፕሮጀክቱ መገንባት ግንባታው ከሚካሄድበት አስራ አምስት ኪሎ ሜትር ወደ ጎን ተገንጥሎ መቅደላ የሚገኘውን የአጼ ቴዎድሮስ ታሪካዊ ሰፍራ የጀግንነት ስፍራ እንዲሁም ለነጻነት ትግል ሲጠቀሙበት የነበረውን ሴባስቴፖል መድፍ ለመጎብኘት ለቱሪስት ምቹ ሁኔታን ከመፍጠርም አልፎ የቱሪዝም ፍሰቱን በመጨመር የውጭ ምንዛሬን ከማምጣት አኳያ ሃገራዊ ፋይዳው የጎላ ነው እንዲሁም የ ገበያ ትስስሩ ይበለጥ ያጠነክረዋል ተብሎ ይጠበቃል።
Via ERA
@etconp
👉የአዲስ አበባ ከተማ መንገዶች ባለስልጣን 32.8 ሚሊዮን ብር ግምታዊ ዋጋ ያላቸው የግንባታ ግብዓቶችን እንዳመረተ ገለፀ
➡️የአዲስ አበባ ከተማ መንገዶች ባለስልጣን በ2013 በጀት ዓመት የመጀመሪያ ሩብ ዓመት ላይ 32.8 ሚሊዮን ብር ግምታዊ ዋጋ ያላቸው የተለያዩ የግንባታ ግብዓቶችን እንዳመረተ ገለፀ።
🚧ባለስልጣኑ ባለፉት ሶስት ወራት ውስጥ 15.69 ሚሊዮን የካባ ምርት፣10.48 ሚሊዮን የሲሚንቶ ውጤቶች፣ 6.69 ሚሊዮን የአስፋልት ኮንክሪት ምርቶችን አምርቶ በራስ ሀይል ለሚገነቡ የመንገድ ፕሮጀክቶች በግብዓትነት በማዋል ላይ እንደሚገኝ በፌስቡክ ገፁ ላይ ባውጣው መረጃ ገልፅዋል።
🚧የባለስልጣኑ የበጀት እቅድና ስትራቴጂክ ማኔጅመንት ዳይሬክተር አቶ አዲሱ አሰፋ የ2013 በጀት ዓመት የመጀመሪያ ሩብ ዓመት የእቅድ አፈፃፀም ሪፖርት ባቀረቡበት ወቅት እንደገለፁት ከሆነ ባለስልጣኑ ባለፉት ሶስት ወራት 24.3 ኪ.ሜ ልዩ ልዩ የግንባታ ስራዎችን ማከናወኑን ገልፀዋል፡፡
🚧ባለስልጣኑ በተያዘው በጀት ዓመት 281.5 ኪ.ሜትር የግንባታና 525 ኪ.ሜትር የተለያዩ የጥገና ስራዎችን ለማከናወን ዕቅድ መያዙ የሚታወቅ ሲሆን ከዚህም ዉስጥ በሩብ ዓመቱ ውስጥ 4.9 ኪ.ሜ የአስፋልት፣ 7.1 ኪ.ሜ የጠጠር፣ 2.2 ኪ.ሜ የእግረኛ መንገድ እና 117.7 ኪ.ሜ የድሬኔጅ መስመር በድምሩ 132.1 ኪ.ሜ ልዩ ልዩ የጥገና ስራዎች እንደተከናወኑ ገልፅዋል፡፡
🚧እንደ ባለሰልጣን መስሪያ ቤቱ መረጃ መሰረት በ2013 በጀት ዓመት ከሰባት መቶ አርባ ሁለት ሺ 344 ሜትር ኪዩብ በላይ የካባ፣ 55 ሺ 440 ቶን የአስፋልት ኮንክሪት፣ ከ14 ሺ 689 ሜትር ኪዩብ በላይ የሲሚንቶ ኮንክሪት እንዲሁም በቁጥር አንድ መቶ ሶስት ሺ 25 የሚሆኑ ልዩ ልዩ የሲምቶ ውጤቶችን ለማምረት አቅዶ እየሰራ ይገኛል፡፡
@etconp
➡️የአዲስ አበባ ከተማ መንገዶች ባለስልጣን በ2013 በጀት ዓመት የመጀመሪያ ሩብ ዓመት ላይ 32.8 ሚሊዮን ብር ግምታዊ ዋጋ ያላቸው የተለያዩ የግንባታ ግብዓቶችን እንዳመረተ ገለፀ።
🚧ባለስልጣኑ ባለፉት ሶስት ወራት ውስጥ 15.69 ሚሊዮን የካባ ምርት፣10.48 ሚሊዮን የሲሚንቶ ውጤቶች፣ 6.69 ሚሊዮን የአስፋልት ኮንክሪት ምርቶችን አምርቶ በራስ ሀይል ለሚገነቡ የመንገድ ፕሮጀክቶች በግብዓትነት በማዋል ላይ እንደሚገኝ በፌስቡክ ገፁ ላይ ባውጣው መረጃ ገልፅዋል።
🚧የባለስልጣኑ የበጀት እቅድና ስትራቴጂክ ማኔጅመንት ዳይሬክተር አቶ አዲሱ አሰፋ የ2013 በጀት ዓመት የመጀመሪያ ሩብ ዓመት የእቅድ አፈፃፀም ሪፖርት ባቀረቡበት ወቅት እንደገለፁት ከሆነ ባለስልጣኑ ባለፉት ሶስት ወራት 24.3 ኪ.ሜ ልዩ ልዩ የግንባታ ስራዎችን ማከናወኑን ገልፀዋል፡፡
🚧ባለስልጣኑ በተያዘው በጀት ዓመት 281.5 ኪ.ሜትር የግንባታና 525 ኪ.ሜትር የተለያዩ የጥገና ስራዎችን ለማከናወን ዕቅድ መያዙ የሚታወቅ ሲሆን ከዚህም ዉስጥ በሩብ ዓመቱ ውስጥ 4.9 ኪ.ሜ የአስፋልት፣ 7.1 ኪ.ሜ የጠጠር፣ 2.2 ኪ.ሜ የእግረኛ መንገድ እና 117.7 ኪ.ሜ የድሬኔጅ መስመር በድምሩ 132.1 ኪ.ሜ ልዩ ልዩ የጥገና ስራዎች እንደተከናወኑ ገልፅዋል፡፡
🚧እንደ ባለሰልጣን መስሪያ ቤቱ መረጃ መሰረት በ2013 በጀት ዓመት ከሰባት መቶ አርባ ሁለት ሺ 344 ሜትር ኪዩብ በላይ የካባ፣ 55 ሺ 440 ቶን የአስፋልት ኮንክሪት፣ ከ14 ሺ 689 ሜትር ኪዩብ በላይ የሲሚንቶ ኮንክሪት እንዲሁም በቁጥር አንድ መቶ ሶስት ሺ 25 የሚሆኑ ልዩ ልዩ የሲምቶ ውጤቶችን ለማምረት አቅዶ እየሰራ ይገኛል፡፡
@etconp
👉ባለስልጣኑ የአራራት ኮተቤ የአስፓልት መንገድን በተያዘው በጀት ዓመት ለማጠናቀቅ እንደሚሰራ ገለጸ
➡️ግንባታው ከሶስት ዓመት በፊት የተጀመረው የአራራት ኮተቤ የአስፓልት መንገድ በተያዘው በጀት ዓመት ተጠናቆ ለአገልግሎት እንደሚበቃ የአዲስ አበባ መንገዶች ባለስልጣን አስታወቀ።
🚧መንገዱ በሁለት ዓመት ጊዜ ውስጥ ተጠናቆ ለአገልግሎት ክፍት ይሆናል ተብሎ ከሶስት አመት በፊት ድሪባ ደበርሳ እና ተክለብርሃን አንባዬ ተቋራጮች በሲጥም እስካሁን አልተጠናቀቀም።
🚧የግንባታው ሂደት ከታሰበው ጊዜ በላይ በመውሰዱም የአካባቢው ነዋሪ ከጠበቀው በተቃራኒ እንግልትን እንዲሸከም ሆኗል።
🚧በተለይ ሁለተኛው ምዕራፍ ማለትም ከአራራት ኮተቤ ድረስ ያለው መንገድ ተቆፋፍሮ ለእግረኛውም ለተሽከርካሪም አጋዳች እንደሆነ የተመለከተው።
🚧ነዋሪዎችም፤ መንገዱ ተቆፋፍሮ ለረጅም ጊዜ የቆየ በመሆኑ ለተለያዩ ማህበራዊና ኢኮኖሚያዊ ችግሮች ተዳርገናል ብለዋል።
🚧በአካበቢው የሚሰሩ አሽከርካሪዎችም የመንገዱ ወጣ ገባነት የተሽከርካሪ እቃዎችን እየሰበረ ለወጪ መዳረጋቸውንና በስፍራው ለተለየዩ አደጋዎች መከሰትም ምክንያት መሆኑን ገልጸዋል።
🚧በአዲስ አበባ መንገዶች ባለስልጣን ምክትል ዋና ዳሬክተር ኢንጂነር ታከለ ሉላና፥ የመንገድ ግንባታ ፕሮጀክቱ የመጀመሪያው ክፍል በጥሩ ሁኔታ እየተከናወነ መሆኑን በመግለፅ፤ የመንገዱን 2 ነጥብ 8 ኪሎ ሜትር የሚሸፍነው ሁለተኛው ክፍል ግን የአፈጻፀም ችግር እንዳለበት ተናግረዋል።
🚧ተቋራጩ ማስተካከያዎችን እንዲያደርግ ማስጠንቀቂያ በተደጋጋሚ የተሰጠው ቢሆንም ተጨባጭ ለውጥ ባለማምጣቱ የመጨረሻ የሆነውን የማስቆም እርምጃ ተወስዶበት አሁን የመንገዱ ግንባታ በተቋሙ እንደሚጠናቀቅም አስታውቀዋል።
🚧የርክክብ ስራውን በማጠናቀቅ ጎን ለጎን የዝግጅት ግብአቶች እየተሟሉ መሆኑንም አስረድተዋል።
🚧በመሆኑም በበጀት አመቱ መንገዱን አጠናቆ ለአገልግሎት ክፍት ለማድረግ ባለስልጥኑ በትኩረት እየሰራ መሆኑን ጠቅሰው መንገዱ ሲጠናቀቅ የትራፊክ ፍሰቱን እንደሚያስተካክልና የማህበረሰቡን ኢኮኖሚያዊና ማህበራዊ ተጠቃሚነት እንደሚያረጋግጥ ያላቸውን እምነት ገልጸዋል።
🚧5 ነጥብ 9 ኪሎ ሜትር ርዝማኔ ያለው ለዚህ መንገድ ከ260 ሚሊየን ብር በላይ በጀት ተይዞለት ነበር ወደ ስራ የተገባው፡፡
Via FBC
@etconp
➡️ግንባታው ከሶስት ዓመት በፊት የተጀመረው የአራራት ኮተቤ የአስፓልት መንገድ በተያዘው በጀት ዓመት ተጠናቆ ለአገልግሎት እንደሚበቃ የአዲስ አበባ መንገዶች ባለስልጣን አስታወቀ።
🚧መንገዱ በሁለት ዓመት ጊዜ ውስጥ ተጠናቆ ለአገልግሎት ክፍት ይሆናል ተብሎ ከሶስት አመት በፊት ድሪባ ደበርሳ እና ተክለብርሃን አንባዬ ተቋራጮች በሲጥም እስካሁን አልተጠናቀቀም።
🚧የግንባታው ሂደት ከታሰበው ጊዜ በላይ በመውሰዱም የአካባቢው ነዋሪ ከጠበቀው በተቃራኒ እንግልትን እንዲሸከም ሆኗል።
🚧በተለይ ሁለተኛው ምዕራፍ ማለትም ከአራራት ኮተቤ ድረስ ያለው መንገድ ተቆፋፍሮ ለእግረኛውም ለተሽከርካሪም አጋዳች እንደሆነ የተመለከተው።
🚧ነዋሪዎችም፤ መንገዱ ተቆፋፍሮ ለረጅም ጊዜ የቆየ በመሆኑ ለተለያዩ ማህበራዊና ኢኮኖሚያዊ ችግሮች ተዳርገናል ብለዋል።
🚧በአካበቢው የሚሰሩ አሽከርካሪዎችም የመንገዱ ወጣ ገባነት የተሽከርካሪ እቃዎችን እየሰበረ ለወጪ መዳረጋቸውንና በስፍራው ለተለየዩ አደጋዎች መከሰትም ምክንያት መሆኑን ገልጸዋል።
🚧በአዲስ አበባ መንገዶች ባለስልጣን ምክትል ዋና ዳሬክተር ኢንጂነር ታከለ ሉላና፥ የመንገድ ግንባታ ፕሮጀክቱ የመጀመሪያው ክፍል በጥሩ ሁኔታ እየተከናወነ መሆኑን በመግለፅ፤ የመንገዱን 2 ነጥብ 8 ኪሎ ሜትር የሚሸፍነው ሁለተኛው ክፍል ግን የአፈጻፀም ችግር እንዳለበት ተናግረዋል።
🚧ተቋራጩ ማስተካከያዎችን እንዲያደርግ ማስጠንቀቂያ በተደጋጋሚ የተሰጠው ቢሆንም ተጨባጭ ለውጥ ባለማምጣቱ የመጨረሻ የሆነውን የማስቆም እርምጃ ተወስዶበት አሁን የመንገዱ ግንባታ በተቋሙ እንደሚጠናቀቅም አስታውቀዋል።
🚧የርክክብ ስራውን በማጠናቀቅ ጎን ለጎን የዝግጅት ግብአቶች እየተሟሉ መሆኑንም አስረድተዋል።
🚧በመሆኑም በበጀት አመቱ መንገዱን አጠናቆ ለአገልግሎት ክፍት ለማድረግ ባለስልጥኑ በትኩረት እየሰራ መሆኑን ጠቅሰው መንገዱ ሲጠናቀቅ የትራፊክ ፍሰቱን እንደሚያስተካክልና የማህበረሰቡን ኢኮኖሚያዊና ማህበራዊ ተጠቃሚነት እንደሚያረጋግጥ ያላቸውን እምነት ገልጸዋል።
🚧5 ነጥብ 9 ኪሎ ሜትር ርዝማኔ ያለው ለዚህ መንገድ ከ260 ሚሊየን ብር በላይ በጀት ተይዞለት ነበር ወደ ስራ የተገባው፡፡
Via FBC
@etconp
👉What are the advantages of piers constructed monolithically with the bridge deck over usage of bearings?
➡️Basically, piers constructed monolithically with the bridge deck are advantageous in the
following ways:
🚧(i) Movement of the bridge deck is achieved by the bending deformation of long andslender piers.
▶️In this way, it saves the construction cost of bearings by using monolithic construction between bridge deck and piers.
▶️Moreover, it is not necessary to spend extra effort to design for drainage details and access for bearing
replacement.
▶️On the other hand, in maintenance aspect substantial cost and time
savings could be obtained by using monolithic construction instead of using bearings as bridge articulation.
🚧(ii) Monolithic construction possesses the shortest effective Euler buckling length for piers because they are fixed supports at the interface between bridge deck and piers.
⚡️Note: Monolithic construction means that piers are connected to bridge decks without any joints and bearings.
#ConstructionNotes
@etconp
➡️Basically, piers constructed monolithically with the bridge deck are advantageous in the
following ways:
🚧(i) Movement of the bridge deck is achieved by the bending deformation of long andslender piers.
▶️In this way, it saves the construction cost of bearings by using monolithic construction between bridge deck and piers.
▶️Moreover, it is not necessary to spend extra effort to design for drainage details and access for bearing
replacement.
▶️On the other hand, in maintenance aspect substantial cost and time
savings could be obtained by using monolithic construction instead of using bearings as bridge articulation.
🚧(ii) Monolithic construction possesses the shortest effective Euler buckling length for piers because they are fixed supports at the interface between bridge deck and piers.
⚡️Note: Monolithic construction means that piers are connected to bridge decks without any joints and bearings.
#ConstructionNotes