👉What are the Data Required Project cost Estimation and Costing
➡️The very fundamental step after preparing your plan is project cost estimation and costing have to be prepared for the further ideas of your building.
➡️There are several types of estimation process that we have learned in earlier posts.
➡️Estimation is the process of finding the required quantity of materials needed for your construction and rate analysis is the method to find the price of each for your constructional unit.
➡️The estimation and costing have done with the help of a project estimator.
▶️For this, you need some data required to prepare the estimate of the building.
🚩Data required to prepare estimation and costing.
🚧1.Drawings of your building plan
▶️The must required data to prepare estimation and consisting is drawings of your building.
▶️The drawings should not rough, all the dimensions and drawing should be clear.
▶️If you want to add some extra drawings after the execution of your estimation The estimation of that extra work is called as Supplementary Estimate.
🚧2.Specifications
▶️Specifications are classified into general and detailed
⏹In general specifications, we talk about needed materials and works in general perspective.
⏹Detailed specifications give you an idea about the quality, quantity, method of preparations and proportions of the work have to be done.
🚧3.Rates
▶️After estimating the drawings and required materials, the next data to be collected is the rate of the materials.To do this we need to make rate analysis of the building.
⏹Rate analysis of materials involves
▶️Finding the rates of each item involved in the construction process Their transportation costs.
▶️The other required rates are the rates of labours, painters, masons, carpenters etc..
🚧4.Lump sum items during project estimation.
▶️We are Construction engineers, but the worst situation comes, when we don’t have much experience in taking other measurements such as electricity, sanitary arrangements etc…
▶️The items which is not related to Construction engineering are called as lump sum items.Some lump sum items are.
▶️Architectural Items Electrical installations such as fan, motor, insulations, light etc..Sanitary arrangements
▶️In order to make correct project cost estimation, you should also make an estimation of lump sum items with the help of estimator working in that field.
🚧5.Work Charge Establishment
▶️During the construction of your dream home, you may need to arrange some skilled temporary workers to do some specific purpose for your building like supervisors, watchmen etc..You also need to fix salaries of these workers and add on to the estimation and costing.
#CostEngineering
@etconp
➡️The very fundamental step after preparing your plan is project cost estimation and costing have to be prepared for the further ideas of your building.
➡️There are several types of estimation process that we have learned in earlier posts.
➡️Estimation is the process of finding the required quantity of materials needed for your construction and rate analysis is the method to find the price of each for your constructional unit.
➡️The estimation and costing have done with the help of a project estimator.
▶️For this, you need some data required to prepare the estimate of the building.
🚩Data required to prepare estimation and costing.
🚧1.Drawings of your building plan
▶️The must required data to prepare estimation and consisting is drawings of your building.
▶️The drawings should not rough, all the dimensions and drawing should be clear.
▶️If you want to add some extra drawings after the execution of your estimation The estimation of that extra work is called as Supplementary Estimate.
🚧2.Specifications
▶️Specifications are classified into general and detailed
⏹In general specifications, we talk about needed materials and works in general perspective.
⏹Detailed specifications give you an idea about the quality, quantity, method of preparations and proportions of the work have to be done.
🚧3.Rates
▶️After estimating the drawings and required materials, the next data to be collected is the rate of the materials.To do this we need to make rate analysis of the building.
⏹Rate analysis of materials involves
▶️Finding the rates of each item involved in the construction process Their transportation costs.
▶️The other required rates are the rates of labours, painters, masons, carpenters etc..
🚧4.Lump sum items during project estimation.
▶️We are Construction engineers, but the worst situation comes, when we don’t have much experience in taking other measurements such as electricity, sanitary arrangements etc…
▶️The items which is not related to Construction engineering are called as lump sum items.Some lump sum items are.
▶️Architectural Items Electrical installations such as fan, motor, insulations, light etc..Sanitary arrangements
▶️In order to make correct project cost estimation, you should also make an estimation of lump sum items with the help of estimator working in that field.
🚧5.Work Charge Establishment
▶️During the construction of your dream home, you may need to arrange some skilled temporary workers to do some specific purpose for your building like supervisors, watchmen etc..You also need to fix salaries of these workers and add on to the estimation and costing.
#CostEngineering
@etconp
👍1
📌Rate Analysis- Civil works Elements, Factor Affecting & Requirement of Rate analysis
👉What is analysis of rate or rate analysis?
➡️The process of determining rate of any work in Construction Engineering project like earthwork, brickwork, plastering, painting etc. is known as analysis of rate or simply rate analysis.
➡️The rate of these works further helps in determining cost of particular work and in turn cost of the project.
➡️The rate of any process or works depends on various factors.
➡️Rate analysis of Construction Works or Building Works is the determination of cost of each construction work per unit quantity.
➡️This cost includes the cost of materials, labours, machinery, contractors profit and other miscellaneous petty expenses required for the particular work to be complete in unit quantity.
🏷Factor affecting Rate analysis
➡️The various factors that are involved in determining rate of any process of work are mentioned below:
🚧Specification of works and material about their quality, proportion and constructional operation method.
▶️Specification of the Construction work and materials such as quality of materials, proportion of mortar or concrete, thickness of plastering, number of coats of painting, depth of excavation, type of soil etc.
🚧Quantity of materials and their costs.
▶️Quantity of materials, number of different types of labours and rates of materials and labours influence the rate analysis.
🚧Cost of labor and their wages different types of labours and rates of materials and labours influence the rate analysis.
🚧Location of the construction site
▶️Distance of construction site from source of materials, availability of labours, availability of water, machinery Also Overhead and establishment charges
🏷Why we need rate analysis?
▪To determine the actual cost per unit.
▪To know the requirements of quantities of labours, materials, machineries and capital to complete the project.
▪ To work out the economical use of materials and processes in completing the particulars item.
▪To calculate the cost of extra items which are not provided in the contract bond, but are to be executed as per the directions of the department.
▪To optimize the use of labour, materials and machineries and to know the alternatives to optimize the resources.
▪ To revise the schedule of rates due to increase in the cost of material and labour or due to change in technique.
🏷Elements of Rate Analysis
➡️Elements which constitute the rate analysis are
⏺A) Material cost inclusive of wastage
⏺B) Labour cost
⏺C) Plant & machinery owning and operating charges
⏺D) Contractor’s overheads and profit Main term on rate analysis
➡️Labour
▶️The rate of labour is based on skill of the labour, such as skilled labour, semi-skilled and unskilled labour.
▶️The cost of materials and labours vary from place to place.
▶️Thus, the cost of each construction work varies from place to place. Labour may be classified into two types
⏺A. Skilled
⏺B. Unskilled
➡️Labour Charges can be obtained from schedules of rate. 30% of the skilled labour in data should be taken 30% as Ist class and remaining 70% as IInd class
➡️Lead statement
▶️The distance between the source of availability of material and construction site is known as lead and is calculated in km.
▶️the conveyance cost of material depends on lead The lead statement will give the total cost of materials per unit item including first cost, conveyance loading-unloading, stacking charges etc.
➡️Lift
▶️Similarly during the earthwork, the average height through which soil has to be lifted from sources to the place of spreading is known as lift
First lift is taken up to 2m
The extra lift is counted for up to 1 m after the first lift and so on
#CostEngineering
@etconp
👉What is analysis of rate or rate analysis?
➡️The process of determining rate of any work in Construction Engineering project like earthwork, brickwork, plastering, painting etc. is known as analysis of rate or simply rate analysis.
➡️The rate of these works further helps in determining cost of particular work and in turn cost of the project.
➡️The rate of any process or works depends on various factors.
➡️Rate analysis of Construction Works or Building Works is the determination of cost of each construction work per unit quantity.
➡️This cost includes the cost of materials, labours, machinery, contractors profit and other miscellaneous petty expenses required for the particular work to be complete in unit quantity.
🏷Factor affecting Rate analysis
➡️The various factors that are involved in determining rate of any process of work are mentioned below:
🚧Specification of works and material about their quality, proportion and constructional operation method.
▶️Specification of the Construction work and materials such as quality of materials, proportion of mortar or concrete, thickness of plastering, number of coats of painting, depth of excavation, type of soil etc.
🚧Quantity of materials and their costs.
▶️Quantity of materials, number of different types of labours and rates of materials and labours influence the rate analysis.
🚧Cost of labor and their wages different types of labours and rates of materials and labours influence the rate analysis.
🚧Location of the construction site
▶️Distance of construction site from source of materials, availability of labours, availability of water, machinery Also Overhead and establishment charges
🏷Why we need rate analysis?
▪To determine the actual cost per unit.
▪To know the requirements of quantities of labours, materials, machineries and capital to complete the project.
▪ To work out the economical use of materials and processes in completing the particulars item.
▪To calculate the cost of extra items which are not provided in the contract bond, but are to be executed as per the directions of the department.
▪To optimize the use of labour, materials and machineries and to know the alternatives to optimize the resources.
▪ To revise the schedule of rates due to increase in the cost of material and labour or due to change in technique.
🏷Elements of Rate Analysis
➡️Elements which constitute the rate analysis are
⏺A) Material cost inclusive of wastage
⏺B) Labour cost
⏺C) Plant & machinery owning and operating charges
⏺D) Contractor’s overheads and profit Main term on rate analysis
➡️Labour
▶️The rate of labour is based on skill of the labour, such as skilled labour, semi-skilled and unskilled labour.
▶️The cost of materials and labours vary from place to place.
▶️Thus, the cost of each construction work varies from place to place. Labour may be classified into two types
⏺A. Skilled
⏺B. Unskilled
➡️Labour Charges can be obtained from schedules of rate. 30% of the skilled labour in data should be taken 30% as Ist class and remaining 70% as IInd class
➡️Lead statement
▶️The distance between the source of availability of material and construction site is known as lead and is calculated in km.
▶️the conveyance cost of material depends on lead The lead statement will give the total cost of materials per unit item including first cost, conveyance loading-unloading, stacking charges etc.
➡️Lift
▶️Similarly during the earthwork, the average height through which soil has to be lifted from sources to the place of spreading is known as lift
First lift is taken up to 2m
The extra lift is counted for up to 1 m after the first lift and so on
#CostEngineering