Isolated Footing Design.pdf
704.7 KB
👉ትላንት በመረጣችሁት መሰረት Isolated Footing Design ኣዘጋጅተናል።
.
☑️ Isolated footing design to ES EN 1992-1-1:2015

👆The pdf Above shows isolated footing design using ES EN 1992-1-1:2015.

If you have any comment don't forget to leave it @COTMp
.
🚩In the document
.
👉Cx is the column dimension in x direction
👉Cy is the column dimension in y direction
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
Interior Planning Tips @COTMp
👆👆👆👆👆
👉ወድ የ @COTMp ቤተሰቦች ኣሁን ደሞ Interior Planning Tips ኣዘጋጅተናል። ለጓደኞችዎ እያጋሩ ይማማሩ።
👉ለዚህ failure ምክንያት ምን ይሆናል?
.
🚩የምትሉትን ነገር በ @COTMp (Discussion) ሃሳባቹ ፃፍልን።
.
▶ተሳተፉ እንማማር እንወቅ...
👉ሸገር ኣዱ ገነት😍
.
🚩ውብ ምሽት ተመኝን @COTMp
👉Morning Tip @COTMp
.
➡Postive bars are provided to resist positive moments, and they are provided at the bottom of the two way slab
.
whereas...
.
➡ negative bars are provided to resist negative moments and they are provided on the top of
the two way slab.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
This media is not supported in your browser
VIEW IN TELEGRAM
👉ቅድምያ ለድህንነትዎ...
.
⚡First Safety @COTMp
Ethio Construction Engineering
Photo
👉ELEMENTS OF AN ASPHALT CONCRETE
PAVEMENT @COTMp
.
➡Asphalt concrete pavements also called flexible pavements are pavements built from asphalt- concrete (asphalt, coarse aggregate, filler (optional) , and fine aggregate).
They transmit loads imposed on the surface through lateral distribution of the applied loads over depth.
.
➡The elements of an asphalt concrete pavement are:👇
.
▶Surfacing: This is the uppermost layer of the
pavement. The primary function of the surfacing is
to provide a safe and comfortable riding surface for the traffic. It is also expected to protect the layers underneath from the effects of natural elements
(wind, rain, ice etc.) as well as the disintegrating
effects from vehicles skidding and braking on the roadway. In this regard, it should be impervious so
as to waterproof the underlying layers. In higher
types of roads, it may consist of two distinct sub
layers known as a wearing course and a base
course.
.
▶ Base: this is the most important and normally the thickest layer of an asphalt concrete pavement on which the surfacing rests. It is the main load
spreading layer of the pavement. It bears the burden of distributing the applied surface loads in such a manner that the bearing Capacity of the subgrade is not exceeded. It should therefore be built from high quality materials capable of withstanding the applied loads on the surface. It consist of either: crushed stone or gravel, gravelly soils, decomposed rocks, sands or sand-clays stabilized with cement, lime or bitumen.
.
▶Sub-base: The sub-base is the secondary load
spreading layer of the pavement underlying the
base. It may or may not be present in a pavement
depending on the purpose for which it is to be
used. It helps to distribute the applied loads to the
subgrade. Its stresses are less than those of the
base. Therefore its materials can be of lower quality than those of the base but must always be stronger than those of the subgrade. It is usually coarse grained or granular to act as a drainage layer for passage of any moisture which falls during
construction or after construction to the highway drainage system.
.
▶Subgrade: this is the upper layer of the natural soil over which the pavement is being built. It may be undisturbed local material exposed by excavation or soil excavated elsewhere and placed into an embankment. It is usually compacted during
construction to give added stability.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
❤2👍1
👉ሸገር ኣዱ ገነት😍
.
🚩ውብ ምሽት ተመኝን @COTMp
👉DIFFERENCE BETWEEN PERT AND CPM @COTMp
.
➡PERT and CPM are most commonly used methods
for project management. In this article, I will discuss the differences between PERT and CPM.
°°°°°°°°°°°°°°°°°°
▶WHAT IS PERT?
*PERT or Programme Evaluation and Review
Technique is an event oriented method of network planning. In it, the emphasis is focused on start and completion events rather than on activities.
The activities taking place between events are not
specified.
*In PERT network, the events fall in logical
sequence. But the logic of events may be different
for different planners. Hence PERT network may
vary from planner to planner depending upon their decision as which event to precede or occur
concurrently.
*In PERT network the start circle is omitted and only
the completed event is recorded. PERT helps in
identifying critical area which threatens the
completion of the work. It provides the means to
determine how resources can be transferred from
one job to another job.
::::::::::::::::::::::::::
▶WHAT IS CPM?
CPM is also network comprising events and
activities. This network is activity based. The
activities are represented by arrowed lines and
events by circles. The activities are connected in
logical sequence. The time allotted to each activity
is related to cost.
➡DIFFERENCE BETWEEN PERT AND CPM:
1. PERT is event oriented whereas CPM is activity
oriented. In simple words, in PERT network interest
is focused upon start or completion of events and
not on activities themselves.
2. In CPM network no allowance is made for
uncertainties in the duration of time involved
whereas in PERT network uncertainty is considered.
3. In PERT, time is not related to cost whereas in
CPM the object is to develop an optimum time
cost relationship. However, PERT has since been
extended in this direction and the line dividing
PERT/CPM is gradually fading out.
4. In CPM duration of activity is estimated with a
fair degree of accuracy. In PERT duration of
activities are not so accurate and definite.
5. In CPM both time and cost can be controlled
during planning. Pert is basically a tool for
planning.
6. PERT is used in research and development
project, basically for non-repetitive type projects.
CPM is widely used in construction projects.
.
👇👇👇👇👇
Join for more updates via the link below;