๐Ÿ‘‰The FIDIC (Fรฉdรฉration Internationale Des Ingรฉnieurs-Conseils)

๐Ÿšงcontracts are among the most widely used standard forms of contracts in the engineering and construction industry globally.

They provide a framework that outlines the rights and obligations of all parties involved in construction projects.

A critical aspect of project management under FIDIC contracts is the requirement for a detailed programme (schedule) for the execution of the works.

This programme serves as a roadmap for project execution, ensuring that all activities are planned and coordinated effectively.

Initial Programme Submission
Submission Deadline
According to FIDIC conditions, the Contractor is required to submit an initial programme for the execution of the Works within 28 days after receiving the Notice under Sub-Clause 8.1 [Commencement of Works].

This initial programme is essential as it lays down the foundation for the project's timeline and planning.

The 28-day period provides the Contractor with a reasonable timeframe to assess the project's requirements, prepare a detailed plan, and ensure that all stakeholders are aligned before commencing the works.
Programming Software
The programme must be prepared using programming software stated in the Employerโ€™s Requirements.

If the Employerโ€™s Requirements do not specify the software, the Contractor must use software acceptable to the Engineer.

This ensures consistency and compatibility in programme management and review. The use of specified programming software facilitates better integration with the Employer's project management systems, enabling efficient tracking, reporting, and collaboration.

Revised Programme Submission
Reflecting Actual Progress
The Contractor is also obligated to submit a revised programme whenever the current programme ceases to reflect actual progress or becomes inconsistent with the Contractorโ€™s obligations.

This requirement ensures that the programme remains a reliable tool for monitoring project progress and managing changes. Revised programmes are crucial for addressing any deviations from the original plan, allowing for timely corrective actions and ensuring that the project stays on track.
Submission Format
Both the initial and revised programmes must be submitted to the Engineer in one paper copy, one electronic copy, and additional paper copies if specified in the Contract Data.

This ensures that the Engineer and other stakeholders have access to the programme in their preferred formats. The availability of both paper and electronic copies facilitates ease of review, archiving, and dissemination among project teams.

Contents of the Programme
The programme must include several key elements to provide a comprehensive overview of the project plan and progress:
Key Dates Commencement Date and Time for Completion:

This includes the overall project timeline and the timeline for each section, if any. These dates are critical for setting the projectโ€™s start and end points, ensuring that all parties have a clear understanding of the schedule.

Right of Access and Possession Dates: The dates when the Contractor will be given access to and possession of the site or its parts, as stated in the Contract Data or as required by the Contractor.

This information is vital for planning mobilization and ensuring that the Contractor can commence work without delays.

Work Sequence and Timing
Order of Work Execution: This details the sequence in which the Contractor intends to carry out the Works, including design stages, document submissions, procurement, manufacture, delivery to Site, construction, installation, and work by any nominated Subcontractors.

A well-structured order of work execution helps in optimizing resource allocation and minimizing potential conflicts.

Review Periods: Periods specified for the Engineerโ€™s review of submissions under Sub-Clause 5.2.2 and other reviews required by the Employerโ€™s Requirements. Clearly defined review periods help in ensuring timely approvals and avoiding delays.

@etconp
๐Ÿ‘14โค1
๐Ÿ‘‰แ‰ แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ฑ แ‰ แˆ˜แ‹ฒแŠ“แ‰ฝแŠ• แŠฃแ‹ฒแˆต แŠฃแ‰ แ‰ฃ แŠจแŠ แŠ•แ‹ต แˆบ แŠชแˆŽ แˆœแ‰ตแˆญ แ‰ แˆ‹แ‹ญ แ‹จแŒแŠ•แ‰ฃแ‰ณแŠ“ แ‹จแŒฅแŒˆแŠ“ แˆตแˆซแ‹Žแ‰ฝ แ‰ฐแŠจแŠ“แ‹แАแ‹‹แˆ

๐Ÿšงแ‹จแŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แŠจแ‰ฐแˆ› แˆ˜แŠ•แŒˆแ‹ถแ‰ฝ แ‰ฃแˆˆแˆตแˆแŒฃแŠ• แ‰ 2016 แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต 902 แŠชแˆŽ แˆœแ‰ตแˆญ แˆแ‹ฉ แˆแ‹ฉ แ‹จแŒแŠ•แ‰ฃแ‰ณแŠ“ แ‹จแŒฅแŒˆแŠ“ แˆตแˆซแ‹Žแ‰ฝ แˆˆแˆ˜แˆตแˆซแ‰ต แŠ แ‰…แ‹ถ 1145 แŠชแˆŽ แˆœแ‰ตแˆญ แ‰ แˆ›แŠจแŠ“แ‹ˆแŠ• แŠจแ‹•แ‰…แ‹ฑ แ‰ แˆ‹แ‹ญ แˆˆแˆ›แˆณแŠซแ‰ต แ‰ฝแˆแˆแกแก

แ‹จแ‰ฃแˆˆแˆตแˆแŒฃแŠ• แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ฑ แ‹จ2016 แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต แ‹จแ‹•แ‰…แ‹ต แŠ แˆแƒแ€แˆ แŠจ2015 แ‰ฐแˆ˜แˆณแˆณแ‹ญ แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต แŒ‹แˆญ แˆฒแАแƒแ€แˆญแˆ แ‹จ13 แ‰ แˆ˜แ‰ถ แ‰ฐแŒจแˆ›แˆช แ‹•แ‹ตแŒˆแ‰ต แŠ แˆณแ‹ญแ‰ทแˆแกแก
 
แ‰ 2016 แ‰ แŒ€แ‰ต แ‹“แˆ˜แ‰ต แ‹แˆตแŒฅ แŠจแ‰ฐแŠจแŠ“แ‹ˆแŠ‘ แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹Žแ‰ฝ แˆ˜แŠซแŠจแˆ 41 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแŠ แˆตแ‹แˆแ‰ตแฃ 55 แŠชแˆŽ แˆœแ‰ตแˆญ  แ‹จแŒ แŒ แˆญแฃ 8 แŠชแˆŽ แˆœแ‰ตแˆญ  แ‹จแŒ‹แˆซ แˆ˜แŠ–แˆชแ‹ซ แ‰คแ‰ถแ‰ฝ แ‹จแ‹แˆตแŒฅ แˆˆแ‹แˆตแŒฅ แ‹จแŠฎแ‰ฅแˆ แˆ˜แŠ•แŒˆแ‹ถแ‰ฝ แŠฅแŠ“ 64 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแŠฎแ‰ฅแˆ แŠ•แŒฃแ แˆตแˆซแ‹Žแ‰ฝ แ‹ญแŒˆแŠ™แ‰ แ‰ณแˆแกแก

แ‰ แˆŒแˆ‹ แ‰ แŠฉแˆ แ‹ฐแŒแˆž 61 แŠชแˆŽ แˆœแ‰ตแˆญ แАแ‰ฃแˆญ แ‹จแŠฅแŒแˆจแŠ› แˆ˜แŠ•แŒˆแ‹ถแ‰ฝแŠ• แˆˆแˆ›แ‹˜แˆ˜แŠ• แ‹จแˆ˜แˆแˆถ แŒแŠ•แ‰ฃแ‰ณ แˆตแˆซ แŠจแˆ˜แŠจแŠ“แ‹ˆแŠ‘แˆ แ‰ แ‰ฐแŒจแˆ›แˆช 10 แŠชแˆŽ แˆœแ‰ตแˆญ  แˆญแ‰€แ‰ต แ‹จแˆšแˆธแแŠ• แ‹จแ‹แŠ“แ‰ฅ แ‹แˆ€ แˆ˜แ‹แˆฐแˆป แˆ˜แˆตแˆ˜แˆฎแ‰ฝ แŒแŠ•แ‰ฃแ‰ณแฃ 35 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแˆณแ‹ญแŠญแˆ แˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณแฃ 55.5 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแˆ˜แŠ•แŒˆแ‹ต แ‹ณแˆญ แˆ˜แ‰ฅแˆซแ‰ต แ‹จแˆ˜แˆตแˆ˜แˆญ แ‹แˆญแŒ‹แ‰ณแฃ 6 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแˆแŒฃแŠ• แ‰ฃแˆต แˆ˜แˆตแˆ˜แˆญ แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹Žแ‰ฝแŠ• แ‹จแˆšแ‹ซแŠซแ‰ตแ‰ต แˆฒแˆ†แŠ• แ‰ แ‹ตแˆแˆฉแˆ 336 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹ญแˆธแแŠ“แˆ‰แกแก


แ‰ฃแˆˆแˆตแˆแŒฃแŠ• แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ฑ แŠจแŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹Žแ‰ฝ แŒŽแŠ• แˆˆแŒŽแŠ• แ‰ แ‰ฐแˆˆแ‹ซแ‹ฉ แˆแŠญแŠ•แ‹ซแ‰ถแ‰ฝ แˆˆแ‰ฅแˆแˆฝแ‰ต แ‹จแ‰ฐแ‹ณแˆจแŒ‰ 97 แŠช.แˆœ แ‹จแŠ แˆตแ‹แˆแ‰ตแฃ 20 แŠจ.แˆœ แ‹จแŒ แŒ แˆญแฃ 23 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแŠฅแŒแˆจแŠ› แˆ˜แŠ•แŒˆแ‹ต แˆ˜แŠจแˆˆแ‹ซ แŠ แŒฅแˆญ แŠ แ‹ฒแˆต แˆตแˆซแŠ“ แ‹จแŒฅแŒˆแŠ“ แˆตแˆซ  58 แŠช.แˆœ แ‹จแŠฎแ‰ฅแˆ แˆ˜แŠ•แŒˆแ‹ต แŠ•แŒฃแแฃ 395 แŠช.แˆœ แ‹จแ‹ตแˆฌแŠ”แŒ… แˆ˜แˆตแˆ˜แˆฎแ‰ฝ แ…แ‹ณแ‰ตแฃ 8 แŠช.แˆœ แ‹จแ‹ตแˆฌแŠ”แŒ… แˆ˜แˆตแˆ˜แˆญ แ‹•แ‹ตแˆณแ‰ตแŠ“ แŒฅแŒˆแŠ“แฃ 41 แŠช.แˆœ แ‹จแŠฅแŒแˆจแŠ› แˆ˜แŠ•แŒˆแ‹ต แŒฅแŒˆแŠ“แŠ“ แ‹จแŠจแˆญแ‰ญ แˆตแ‰ถแŠ• แˆตแˆซแ‹Žแ‰ฝ แ‰ฐแˆฐแˆญแ‰ฐแ‹‹แˆแกแก

แ‹จแŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แŠจแ‰ฐแˆ› แˆ˜แŠ•แŒˆแ‹ถแ‰ฝ แ‰ฃแˆˆแˆฅแˆแŒฃแŠ•

@etconp
๐Ÿ‘17๐Ÿฅฐ1๐Ÿ™1
Q) If in the harvest season when the river flow is low which method should use for irrigation
Anonymous Quiz
13%
A: Direct Irrigation
57%
B: Storage Irrigation
17%
C: Lift Irrigation
13%
D: Irrigation by wells
๐Ÿ‘29
The clay deposit of thickness 10 cm and void ratio 0.5 undergoes settlement and now its final void ratio is 0.2. The thickness (cm) of the settlement layer.
Anonymous Quiz
21%
1
35%
1.5
24%
2
20%
2.5
๐Ÿ‘9โค6
Q) Which of the following method can be used to determine the water content?
Anonymous Quiz
8%
A: Torsion Balance method
24%
B: Dry Sieve Analysis
7%
C: Chemical Method
61%
D: Hydrometer Method
๐Ÿ‘15
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ‘‰แˆแˆ‰แŠ• แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‹จแˆšแ‹ซแŒˆแŠ™แ‰ แ‰ต แŠฅแŠ“ แˆˆแˆแˆ‰แˆ แ‰…แˆญแ‰ฅ

๐Ÿ”ฐแˆแŠ• แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•

โœ‚๏ธแˆ‹แˆœแˆซ แˆ›แˆตแ‰†แˆซแˆจแŒฅ แˆ›แˆตแ‰ แˆณแ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠจแˆแˆˆแŒ‰  แŠฅแŠ•แ‹ณแ‹ซแˆตแ‰ก แˆแˆ‰แŠ•แˆ แˆ›แˆฝแŠ–แ‰ฝ แŠ แˆตแŒˆแ‰ฅแ‰ฐแŠ“แˆ

๐Ÿ”—แŒแˆฎ (แ‰ถแŠ•แ‹ฒแŠ–) แŒฅแˆญแˆต แˆ›แˆตแ‰ แŒ€แ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠซแˆฐแ‰ก แˆˆแˆฑแˆ แˆ›แˆฝแŠ‘ แ‰ แŒƒแ‰ฝแŠ• แАแ‹‰

๐Ÿ“แˆ›แŠ•แŠ›แ‹‰แŠ•แˆ แ‹จแˆžแ‹ฐแŠแŠญ แˆตแˆซแ‹Žแ‰ฝแŠ• แ‹จแˆšแˆฐแˆฉ แ‰ฅแ‰ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแˆ แŠ แˆ‰แŠ•

โ˜Ž๏ธแ‹ญแ‹ฐแ‹‰แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

แŠ แ‹ตแˆซแˆปแ‰ฝแŠ•แฆ แ‰.1 แŠ แ‹‰แ‰ถแ‰ฅแˆต แ‰ฐแˆซ(แˆ˜แˆณแˆˆแˆšแ‹ซ)
                    แ‰.2 แˆ˜แˆญแŠซแ‰ถ
                    แ‰.3 แ‰ฐแŠญแˆˆแˆ€แ‹ญแˆ›แŠ–แ‰ต

0904040477
0911016833
๐Ÿ‘5
๐Ÿ‘‰T๐—ต๐—ฒ ๐Ÿฑ ๐—ธ๐—ฒ๐˜† ๐˜๐˜†๐—ฝ๐—ฒ๐˜€ ๐—ผ๐—ณ ๐—ฐ๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฐ๐—ผ๐—ป๐˜๐—ฟ๐—ฎ๐—ฐ๐˜๐˜€

๐Ÿ’ซEvery construction project has unique challenges, and different types of contracts lend themselves to various situations.

1. ๐˜ญ๐˜ถ๐˜ฎ๐˜ฑ ๐˜ด๐˜ถ๐˜ฎ ๐˜ค๐˜ฐ๐˜ฏ๐˜ต๐˜ณ๐˜ข๐˜ค๐˜ต๐˜ด
2. ๐˜ต๐˜ช๐˜ฎ๐˜ฆ ๐˜ข๐˜ฏ๐˜ฅ ๐˜ฎ๐˜ข๐˜ต๐˜ฆ๐˜ณ๐˜ช๐˜ข๐˜ญ๐˜ด ๐˜ค๐˜ฐ๐˜ฏ๐˜ต๐˜ณ๐˜ข๐˜ค๐˜ต๐˜ด
3. ๐˜ถ๐˜ฏ๐˜ช๐˜ต ๐˜ฑ๐˜ณ๐˜ช๐˜ค๐˜ฆ ๐˜ค๐˜ฐ๐˜ฏ๐˜ต๐˜ณ๐˜ข๐˜ค๐˜ต๐˜ด
4. ๐˜จ๐˜ถ๐˜ข๐˜ณ๐˜ข๐˜ฏ๐˜ต๐˜ฆ๐˜ฆ๐˜ฅ ๐˜ฎ๐˜ข๐˜น๐˜ช๐˜ฎ๐˜ถ๐˜ฎ ๐˜ฑ๐˜ณ๐˜ช๐˜ค๐˜ฆ (๐˜จ๐˜ฎ๐˜ฑ) ๐˜ค๐˜ฐ๐˜ฏ๐˜ต๐˜ณ๐˜ข๐˜ค๐˜ต๐˜ด
5. ๐˜ค๐˜ฐ๐˜ด๐˜ต-๐˜ฑ๐˜ญ๐˜ถ๐˜ด ๐˜ค๐˜ฐ๐˜ฏ๐˜ต๐˜ณ๐˜ข๐˜ค๐˜ต๐˜ด

@etconp
๐Ÿ‘13๐Ÿ‘Œ7โค2๐Ÿ•Š1
๐Ÿ‘‰แ‹จแŠฅแŠ•แŒ…แ‰ฃแˆซ แ‹ฉแŠ•แ‰จแˆญแˆฒแ‰ฒ แŒแ‹™แ‰ แŒแŠ•แ‰ฃแ‰ณ
=====================
๐Ÿšงแ‰ 2016 แ‹“.แˆ แ‹จแ‰ แŒ€แ‰ต แŠ แˆ˜แ‰ต แŠฅแ‹ซแˆตแŒˆแАแ‰ฃแ‰ธแ‹ แŠจแˆšแŒˆแŠ™ แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ แˆ˜แŠซแŠจแˆ แŠจ7000 แˆฐแ‹ แ‰ แˆ‹แ‹ญ แ‹จแˆšแ‹ญแ‹ แŠ แˆˆแˆ แ‹จแ‹ฐแˆจแˆฐแ‰ แ‰ตแŠ• แ‰ดแŠญแŠ–แˆŽแŒ‚ แ‰ แˆ™แˆ‰ แŒฅแŠ•แ‰…แ‰… แŠ แ‹ตแˆญแŒŽ แ‹ซแˆŸแˆ‹ แŒแ‹™แ แŠ แ‹ณแˆซแˆฝ แŠ แŠ•แ‹ฑ แАแ‹แข

โญ๏ธแŠจแˆถแˆตแ‰ต แ‰ขแˆŠแ‹ฎแŠ• แ‰ฅแˆญ แ‰ แˆ‹แ‹ญ แŠฅแŠ•แ‹ฐแˆšแŒจแˆญแˆต แ‹จแˆšแŒ แ‰ แ‰€แ‹ แ‹ญแˆ… แŠฆแ‹ฒแ‰ดแˆญแ‹จแˆ แ‰ แŠ แˆˆแˆ›แ‰€แ แˆตแ‰ณแŠ•แ‹ณแˆญแ‹ต แŠฅแ‹จแ‰ฐแŒˆแАแ‰ฃ แˆฒแˆ†แŠ• แŒแŠ•แ‰ฃแ‰ณแ‹ แˆฒแŒ แŠ“แ‰€แ‰… แ‹ฉแŠ•แ‰จแˆญแˆตแ‰ฒแ‹แŠ• แ‹จแŠฎแŠ•แˆแˆจแŠ•แˆต แˆ›แ‹•แŠจแˆ แˆˆแˆ›แ‹ตแˆจแŒ แ‹จแˆšแ‹ซแŒแ‹ แ‰ตแˆแ‰… แ•แˆฎแŒ€แŠญแ‰ต แАแ‹แข

@ETCONpWORK
๐Ÿ‘17โค3๐Ÿ˜ข2
โค13๐Ÿ‘1
๐Ÿ‘‰Delay In Construction

๐Ÿšง๐‘ฌ๐’™๐’„๐’–๐’”๐’‚๐’ƒ๐’๐’† ๐’—๐’”. ๐‘ฐ๐’๐’†๐’™๐’„๐’–๐’”๐’‚๐’ƒ๐’๐’† ๐‘ซ๐’†๐’๐’‚๐’š๐’”

โญ๏ธConstruction industry is like a roller coaster as it goes through different phases while completing its journey.

โ–ถ๏ธSo, it is imperative for the contractors to tighten their seat belts while holding the hand carriers carefully.

โ–ถ๏ธThe reason is that construction projects are huge investments & slight negligence can hinder successful projects completion.

๐Ÿ’ซHowever, there comes a time when everything becomes useless & no effort can stop the project from deferment.

โ–ถ๏ธYes, delays are indeed the most significant cause of disputes among the contracting parties.

๐ŸทGenerally, the delays are categorized as excusable & inexcusable based on the circumstances & impact factor.

โ—๐„๐ฑ๐œ๐ฎ๐ฌ๐š๐›๐ฅ๐ž ๐ƒ๐ž๐ฅ๐š๐ฒ๐ฌ

These are referred to the postponements are occur owing to unavoidable/ unforeseen conditions related to environment & legal processes or circumstances beyond human control. The reasons might be foreseeable but can't be escaped.

ใ€‹Causes of Excusable Delays

โ€ขDelay in requirements approvals
โ€ขInability to manage change orders
โ€ขAdverse weather conditions
โ€ขDelays in government permits
โ€ขErrors in project specifications
โ€ขSocial chaos, protests & wars

โ—๐ˆ๐ง๐ž๐ฑ๐œ๐ฎ๐ฌ๐š๐›๐ฅ๐ž ๐ƒ๐ž๐ฅ๐š๐ฒ๐ฌ

โบDelays can be avoided in some cases, are the result of contractorsโ€™ negligence. In this way, the later type of postponements can be avoided, but if not, disputes occur.
So, Inexcusable delays are the ones that could have been easily escaped by the contractor through in-time decisions.

โบNevertheless, disputes aren't favorable for successful projects completion. It can cause acute damages to all parties involved in the projects.

โ–ถ๏ธIt is essential to estimate the impact of delays in terms of money to make the compensation process easier for contracting parties.

ใ€‹Causes of Inexcusable Delays

โ€ขDelay in initiating the project
โ€ขUnavailability of materials
โ€ขShortage of necessary tools
โ€ขPoor scheduling and planning
โ€ขNegligence of contractors
โ€ขDelay in project funds release

@etconp
๐Ÿ‘12
โœจแŠข.แŠฌ.แ‰ฒ แˆดแˆซแˆšแŠญแˆต
๐Ÿ’ฅแˆดแˆซแˆšแŠญ แ‰ณแ‹ญแˆแˆต

โœจแˆˆแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แˆตแˆซแŠ“ แแˆ‹แŒŽแ‰ต แ‰ฐแˆตแˆ›แˆš แˆ†แАแ‹ แ‰ แ‰ฐแˆฐแˆฉ แŠจแแ‰ฐแŠ› แŒฅแˆซแ‰ต แ‰ฃแˆ‹แ‰ธแ‹ แ‹จ แŠข.แŠฌ.แ‰ฒ แˆดแˆซแˆšแŠญแˆต แˆฐแŠ แŠ แˆ›แˆซแŒฎแ‰ฝ แแŒนแˆ แ‹จแˆ†แА แ‹แ‰ แ‰ต แŠฅแŠ“ แŒฅแŠ•แŠซแˆฌแŠ• แ‰ แŠ แŠ•แ‹ต แˆ‹แ‹ญ แ‹ซแŒแŠ™แข แˆแˆญแ‰ถแ‰ปแ‰ฝแŠ•แŠ• แ‹›แˆฌแ‹แŠ‘ แ‹ญแˆ˜แˆแŠจแ‰ฑ แŠฅแŠ“ แ‰คแ‰ตแ‹ŽแŠ• แ‹ˆแ‹ญแˆ แ‰ขแˆฎแ‹ŽแŠ• แŒŠแ‹œ แ‰ แˆ›แ‹ญแˆฝแˆจแ‹ แ‹แ‰ แ‰ต แ‹ซแˆณแˆแˆฉแข

โœจEKT CERAMIS
๐Ÿ’ฅCRAMICS TILES

โœจDiscover the perfect blend of elegance and durability with EKT Ceramics' wide range of high-quality ceramic tiles, designed to suit every style and need. Explore our collection today and elevate your home or office with timeless beauty.

๐Ÿ“Head Office
Location: Derar Mall 9th floor opposite to Sahlite Mihret Church
๐Ÿ“ฑ +251 929 93 0206
๐Ÿ“ฑ +251 929 53 1707
๐Ÿ‘4โค2
๐Ÿ‘‰แ‰ฝแŒแˆฉ แ‹จแ‰ฐแˆแŒ แˆจแ‹ แ‹จแ‰ฑ แŒ‹แˆญ แАแ‹?

๐ŸทแŠจแˆ‹แ‹ญ แŠจแˆแ‰ตแˆ˜แˆˆแŠจแ‰ทแ‰ธแ‹ แˆแˆตแˆŽแ‰ฝ แŠ แŠ•แ‹ฐแŠ›แ‹แŠ“ แ‹จแˆ˜แŒ€แˆ˜แˆชแ‹ซแ‹ แ‰ แŠ แˆญแŠญแ‰ดแŠญแ‰ธแˆฎแ‰ฝ แ‰ฐแ‹˜แŒ‹แŒ…แ‰ถ แˆˆแˆฅแˆซ แ‰ฐแ‰‹แˆซแŒฎแ‰ฝ แ‹จแ‰€แˆจแ‰  แ‹ฒแ‹›แ‹ญแŠ• แˆฒแˆ†แŠ•แฃ แˆแˆˆแ‰ฐแŠ›แ‹ แ‹ฐแŒแˆž แ‰ แˆ˜แŒจแˆจแˆป แŠ แˆธแŠ“แŠแ‹ แˆฅแˆซ แ‰ฐแ‰‹แˆซแŒญ แŒˆแŠ•แ‰ฅแ‰ถ แˆˆแ‹ฐแŠ•แ‰ แŠ›แ‹ แ‹ซแ‰€แˆจแ‰ แ‹ แŒแŠ•แ‰ฃแ‰ณ แАแ‹แข

๐Ÿ’ซแŒ‰แ‹ณแ‹ฉ แ‹จแˆ†แАแ‹ แˆ…แŠ•แ‹ต แˆ€แ‹ญแ‹ฐแˆญแŠ แ‰ฃแ‹ต แ‹แˆตแŒฅ แˆฒแˆ†แŠ•แฃ แ‹จแˆ•แŠ•แƒแ‹ แ‰ฃแˆˆแ‰คแ‰ต "National Fisheries Development Board' แАแ‹แข

๐Ÿšงแ‰ฝแŒแˆฉ แ‹จแ‰ฐแˆแŒ แˆจแ‹ แ‹จแ‰ฑ แŒ‹แˆญ แАแ‹?แ‹ˆแ‹ญแŠ•แˆต แˆแˆˆแ‰ฑ แ‹ˆแˆณแŠ แŠ แŠซแˆ‹แ‰ต แŒจแˆญแˆถแ‹แŠ‘ แŠ แ‹ญแŒแ‰ฃแ‰กแˆ แ‹ˆแ‹ญแˆ แŠ แ‹ญแŠ“แ‰ แ‰ฅแˆ แˆ›แˆˆแ‰ต แАแ‹?

@etconp
๐Ÿ‘4โค1๐Ÿ˜ข1
แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ ( Advance Payment)


๐Ÿ’ซแ‰ แ‹šแˆ… แ…แˆแ แ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แˆแŠ•แ‹ต แАแ‹? แŠ แˆ‹แˆ›แ‹แˆต? แŠ แ‰…แˆซแ‰ขแ‹แŠ“ แ‰ฐแŒ แ‰ƒแˆšแ‹แˆต แˆ›แŠ• แАแ‹? แ‹ซแˆˆแ‰ฃแ‰ธแ‹ แŒแ‹ดแ‰ณแˆต แˆแŠ• แ‹ญแˆ˜แˆตแˆ‹แˆ? แ‹จแˆšแˆ‰แ‰ตแŠ• แАแŒฅแ‰ฆแ‰ฝ แŠฅแŠ•แ‹ณแˆตแˆณแˆˆแŠ•แกแก

๐Ÿšงแ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แ‹‹แˆตแ‰ตแŠ“ แ‰ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‹‰แˆŽแ‰ฝ แŠจแˆšแ‹˜แ‹ˆแ‰ฐแˆฉ แ‹จแ‹‹แˆตแ‰ตแŠ“ แŠ แ‹ญแАแ‰ถแ‰ฝ แŠ แŠ•แ‹ฑแŠ“ แ‹จแ‰ฐแˆˆแˆ˜แ‹ฐแ‹‰ แАแ‹แกแก แАแŒˆแˆญ แŒแŠ• แ‰ แˆ˜แŒ€แˆ˜แˆชแ‹ซ แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แˆแŠ•แ‹ต แАแ‹ แ‹จแˆšแˆˆแ‹แŠ• แŠฅแŠ•แ‹ญแกแก

โญ๏ธแ‰ แˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ข แŠ แ‹‹แŒ แŠ แŠ•แ‰€แ… 48 แˆ‹แ‹ญ แ‰ แˆ˜แŠ•แŒแˆตแ‰ต แŒˆแ‹ฅ แŠ แˆแƒแ€แˆ แŒŠแ‹š แŠ แ‰…แˆซแ‰ขแ‹Žแ‰ฝ แŠจแŠญแแ‹ซแ‹ แŒ‹แˆญ แŠฅแŠฉแˆ แ‹จแˆ†แА แ‹‹แˆตแ‰ตแŠ“ แˆฒแ‹ซแ‰…แˆญแ‰ก แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แŠฅแŠ•แ‹ฐแˆšแˆตแŒฅ แ‹ญแŒˆแˆแƒแˆแกแก

๐Ÿทแ‹ญแˆ… แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ แŠจแŒ แ‰…แˆ‹แˆ‹แ‹ แ‹จแ‹แˆ‰ แ‹‹แŒ‹ แˆฐแˆ‹แˆณ แแˆญแˆฐแŠ•แ‰ต (30%) แˆ˜แ‰ฅแˆˆแŒฅ แŠฅแŠ•แ‹ฐแˆˆแˆˆแ‰ แ‰ตแŠ“ แˆŠแŠจแˆแˆ แ‹จแˆšแ‰ฝแˆˆแ‹ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แˆ˜แŒ แŠ•แˆ แ‰ แŒจแˆจแ‰ณ แˆ˜แˆ˜แˆชแ‹ซแ‹ แˆ‹แ‹ญ แˆ˜แŒˆแˆˆแ… แŠฅแŠ•แ‹ฐแˆšแŒˆแ‰ฃแ‹ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ข แˆ˜แˆ˜แˆชแ‹ซ แŠ แŠ•แ‰€แ… 16.26.1 แ‹ซแˆตแŒˆแ‹ตแ‹ณแˆแกแก

โ–ถ๏ธแ‰ฐแ‹‹แ‹‹แ‹ญ แ‰ฐแ‰‹แˆซแŒฎแ‰ฝแˆ แ‹ญแˆ…แŠ•แŠ• แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ แˆˆแˆ›แŒแŠ˜แ‰ต แŠจแˆ›แˆ˜แˆแŠจแ‰ป แŒ‹แˆญ แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แ‹‹แˆตแ‰ตแŠ“ แŠจแ‰ณแ‹ˆแ‰€ แ‰ฃแŠ•แŠญ แ‹จแ‰ฐแˆจแŒ‹แŒˆแŒ  แ‰ผแŠญ แ‹ˆแ‹ญแˆ แ‰ แˆแŠ”แ‰ณแ‹Žแ‰ฝ แ‹ซแˆแ‰ฐแŒˆแ‹ฐแ‰  แ‹‹แˆตแ‰ตแŠ“ (Unconditional Bank Guarantee) แˆ›แ‰…แˆจแ‰ฅ แ‹ญแŒ แ‰ แ‰…แ‰ฃแ‰ธแ‹‹แˆ แАแŒˆแˆญ แŒแŠ• แ‹จแˆแŒˆแˆญ แ‹แˆตแŒฅ แ‰ฐแ‰‹แˆซแŒฎแ‰ฝ แˆฒแˆ†แŠ‘ แ‰ แˆแŠ”แ‰ณแ‹Žแ‰ฝ แ‹จแ‰ฐแŒˆแ‹ฐแ‰  แ‹‹แˆตแ‰ตแŠ“ แŠจแŠขแŠ•แˆนแˆซแŠ•แˆต แ‰ฐแ‰‹แˆ›แ‰ต แˆ›แ‰…แˆจแ‰ฅ แ‹ญแ‰ฝแˆ‹แˆ‰แกแก

โ–ถ๏ธแ‹จแˆšแ‹ซแ‰€แˆญแ‰กแ‰ตแˆ แ‹‹แˆตแ‰ตแŠ“ แŠจแˆšแŒ แ‹ญแ‰แ‰ต แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ แŒ‹แˆญ แŠฅแŠฉแˆ แˆ˜แˆ†แŠ• แŠ แˆˆแ‰ แ‰ต แ‹ญแˆแŠ• แŠฅแŠ•แŒ‚ แŒฅแ‰ƒแ‰…แŠ•แŠ“ แŠ แАแˆตแ‰ฐแŠ› แŠขแŠ•แ‰ฐแˆญแ•แˆซแ‹ญแ‹žแ‰ฝ แ‰ แ‹‹แˆตแ‰ตแŠ“แ‹ แˆแ‰ตแŠญ แŠจแˆ˜แˆฐแˆจแ‰ณแ‰ธแ‹แŠ“ แŠจแˆšแŠจแ‰ณแ‰ฐแˆ‹แ‰ธแ‹ แ‰ฃแˆˆแˆฐแˆแŒฃแŠ• แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ต แ‹จแˆšแ‹ซแ‰€แˆญแ‰กแ‰ต แ‹ฐแ‰ฅแ‹ณแ‰ค แŠฅแŠ•แ‹ฐ แ‹‹แˆตแ‰ตแŠ“ แ‰ฐแ‰€แ‰ฃแ‹ญแАแ‰ต แ‹ญแŠ–แˆจแ‹‹แˆ แˆฒแˆ แ‹จแˆ˜แˆ˜แˆชแ‹ซแ‹ แŠ แŠ•แ‰€แ… 16.20.5(แˆ) แ‹ญแ‹ฐแАแŒแŒ‹แˆแกแก

โบแŠจแ‹šแˆ…แˆ แ‰ แŠแ‰ต แŒแŠ• แ‰ฐแ‰‹แˆซแŒฉ แ‰ แŒแ‹ข แˆตแА-แˆตแˆญแ‹“แ‰ฑ แ‹ซแˆธแАแˆแ‹แŠ• แ‹‰แˆ แˆ˜แˆแˆจแˆแŠ“ แ‹จแ‹แˆ แˆ›แˆตแŠจแ‰ แˆชแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ แ‹ˆแ‹ญแˆ แ‹‹แˆตแ‰ตแŠ“ แ‹ซแ‰€แˆจแ‰  แˆ˜แˆ†แŠ• แŠ แˆˆแ‰ แ‰ต (แŠ แ‹‹แŒ… แ‰.649/2001แฃ แŠ แŠ•แ‰€แ… 48/2/)แกแก

โบแ‰ แŠ แ‹‹แŒ แŠ แŠ•แ‰€แ… 78(3) แˆ˜แˆฐแˆจแ‰ต แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŒแ‹ข แŠคแŒ€แŠ•แˆฒ แŠ แ‹‹แŒแŠ•แŠ“ แˆ˜แˆ˜แˆชแ‹ซแ‹แŠ• แ‰ฐแŒแ‰ฃแˆซแ‹Š แˆˆแˆ›แ‹ตแˆจแŒ แ‹ซแ‹ˆแŒฃแ‹ แˆ˜แ‹ฐแ‰ แŠ› แ‹จแ‹แˆ แˆ แАแ‹ต แŒ แ‰…แˆ‹แˆ‹ แˆแŠ”แ‰ณ [The Public Procurement Agency Standard Bidding Document: General Condition of Contracts: PPA-2011] แŠญแˆŽแˆต 60(1) แˆ‹แ‹ญ แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซแ‹ แˆˆแ‰ฐแ‰‹แˆซแŒฉ แˆ˜แŠจแˆแˆ แ‹ซแˆˆแ‰ แ‰ต แ‰ฐแ‰‹แˆซแŒฉ แˆตแˆซแ‹แŠ• แˆˆแˆ˜แŒ€แˆ˜แˆญ แ‹จแˆšแ‹ซแ‹ˆแŒฃแ‹แŠ• แ‹ˆแŒช แˆˆแˆ˜แˆธแˆแŠ• แŠฅแАแ‹ฒแˆจแ‹ณแ‹ แ‰ณแˆตแ‰ฆ แˆฒแˆ†แŠ• แ‹ญแˆ…แˆ แ‹จแˆšแŠจแˆแˆˆแ‹ แ‰ฐแ‰‹แˆซแŒฉ แˆˆแŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹ แ‹จแˆšแ‹ซแŒˆแˆˆแŒแˆ‰ แˆ›แˆฝแŠ–แ‰ฝแŠ• แ‹•แ‰ƒแ‹Žแ‰ฝแŠ•แŠ“ แˆ˜แˆณแˆชแ‹ซแ‹Žแ‰ฝแŠ• แˆ˜แŒแ‹›แ‰ฑแŠ• แ‹ˆแ‹ญแˆ แˆ›แ‹˜แ‹™แŠ• แ‹จแˆšแ‹ซแˆณแ‹ญ แˆ˜แˆจแŒƒ แˆฒแ‹ซแ‰€แˆญแ‰ฅ แˆ˜แˆ†แŠ‘แŠ• แ‹ซแˆตแ‰€แˆแŒฃแˆแกแก

โ–ถ๏ธแ‰ แˆตแˆซแ‹ แŒŠแ‹œแ‹ซแ‰ตแˆ แŒˆแŠ•แ‹˜แ‰กแŠ• แŠฅแАแ‹šแˆ…แŠ• แ‹•แ‰ƒแ‹Žแ‰ฝแŠ“ แˆ›แˆฝแŠ–แ‰ฝแŠ• แˆˆแˆ˜แŒแ‹›แ‰ตแŠ“ แ‹ˆแ‹ฐ แŒแŠ•แ‰ฃแ‰ณ แ‰ฆแ‰ณแ‹ แˆˆแˆ›แŠ•แ‰€แˆณแ‰€แˆต/แˆˆแˆ›แ‹˜แ‹‹แ‹ˆแˆญ แ‹จแ‰ฐแŒ แ‰€แˆ˜แ‰ แ‰ต แˆ˜แˆ†แŠ‘แŠ• แ‹จแˆšแ‹ซแˆณแ‹ญ แ‹แŠญแ‰ฑแˆญ/Invoices แˆˆแŠขแŠ•แŒ‚แАแˆฉ แ‰ แˆ›แ‰…แˆจแ‰ฅ แˆ›แˆณแ‹จแ‰ต แ‹ญแŒ แ‰ แ‰…แ‰ แ‰ณแˆแกแก

โบแŠจแ‹šแˆ… แŒ‹แˆญ แ‰ฐแ‹ซแ‹ญแ‹ž แ‰ แ‰ฐแŒจแ‰ฃแŒญ แ‹จแˆšแˆตแ‰ฐแ‹‹แˆˆแ‹ แ‰ฝแŒแˆญ  แ‰ฅแ‹™ แŒŠแ‹œ แ‰ฐแ‰‹แˆซแŒฎแ‰ฝ แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซแ‹แŠ• แˆˆแ‰ณแˆˆแˆ˜แˆˆแ‰ต แŠ แˆ‹แˆ› แŠ แ‹ซแ‹แˆ‰แˆ แ‹จแˆšแˆ แˆฒแˆ†แŠ• แ‹ญแˆ…แˆ แ‰ฝแŒแˆญ แ‰ แ‰ฐแˆˆแ‹ญ แ‰ แŒแŠ•แ‰ฃแ‰ณแ‹ แ‹˜แˆญแ แ‰ แ‰ฐแˆฐแˆ›แˆฉ แŒฅแ‰ƒแ‰…แŠ•แŠ“ แŠ แАแˆตแ‰ฐแŠ› แŠขแŠ•แ‰ฐแˆญแ•แˆซแ‹ญแ‹žแ‰ฝ แˆ‹แ‹ญ แŒŽแˆแ‰ถ แ‹ญแ‰ณแ‹ซแˆแกแก แ‹ญแˆ…แˆ แ‰ตแˆแ‰ แ‰ฝแŒแˆญ แˆ˜แАแˆปแ‹ แŠฅแАแ‹šแˆ… แ‰ฐแ‰‹แˆ›แ‰ต แˆแŠ•แˆ แ‹จแˆšแ‹ซแ‰€แˆญแ‰กแ‰ต แ‹‹แˆตแ‰ตแŠ“ แˆณแ‹ญแŠ–แˆญ แ‰ฃแ‰‹แ‰‹แˆ›แ‰ธแ‹ แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ต แ‹ฐแ‰ฅแ‹ณแ‰ค แˆ‹แ‹ญ แ‰ฅแ‰ป แ‰ฐแˆ›แˆแŠ– แŠญแแ‹ซแ‹ แˆตแˆˆแˆšแˆฐแŒฃแ‰ธแ‹ แАแ‹แกแก แˆˆแ‹šแˆ…แˆ แˆฒแ‰ฃแˆ แŒฅแ‰ƒแ‰…แŠ•แŠ“ แŠ แАแˆตแ‰ฐแŠ› แŠขแŠ•แ‰ฐแˆญแ•แˆซแ‹ญแ‹žแ‰ฝแŠ• แ‹ˆแ‹ญแˆ แ‰ แˆแŠ”แ‰ณแ‹Žแ‰ฝ แˆ‹แ‹ญ แ‹จแ‰ฐแˆ˜แˆฐแˆจแ‰ฐ แ‹จแŠขแŠ•แˆนแˆซแŠ•แˆต แ‹‹แˆตแ‰ตแŠ“ แ‹ซแ‰€แˆจแ‰ก แ‰ฐแ‰‹แˆซแŒฎแ‰ฝแŠ• แŠ แˆฐแˆชแ‹/แ‰ฐแ‹‹แ‹‹แ‹ฉ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แŠ แŠซแˆ แŠ แˆตแˆแˆ‹แŒŠ แˆฒแˆ†แŠ•แก แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซแ‹ แŒˆแ‰ข แ‹จแˆšแ‹ฐแˆจแŒแ‰ แ‰ตแŠ“ แŠจแ‹แˆ‰ แŒ‹แˆญ แˆˆแ‰ฐแ‹ซแ‹ซแ‹™ แ‹ˆแŒชแ‹Žแ‰ฝ แ‰ฅแ‰ป แ‰ แˆ˜แŠ•แŒแˆตแ‰ตแŠ“ แ‰ แŠขแŠ•แ‰ฐแˆจแ•แˆซแ‹ญแ‹™ แ‹ˆแ‹ญแˆ แ‰ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‰ฐแ‹ˆแŠซแ‹ฎแ‰ฝ แ‰ แŒ‹แˆซ แŠแˆญแˆ› แ‹ˆแŒช แ‹จแˆšแ‹ฐแˆจแŒ แ‹จแ‰ฐแˆˆแ‹จ แ‹จแ‰ฃแŠ•แŠญ แŠ แŠซแ‹แŠ•แ‰ต แŠฅแŠ•แ‹ฒแŠจแˆแ‰ต แˆŠแ‹ซแ‹ แ‹ญแ‰ฝแˆ‹แˆแค แŒˆแŠ•แ‹˜แ‰กแˆ แˆˆแ‰ณแˆฐแ‰ แˆˆแ‰ต แŠ แˆ‹แˆ› แ‰ฅแ‰ป แŠฅแŠ•แ‹ฒแ‹แˆ แ‹จแ‰ฐแˆˆแ‹จ แˆตแˆแˆแАแ‰ต แˆ˜แˆแˆซแˆจแˆ แŠ แˆˆแ‰ แ‰ตแกแก

โบแˆตแˆˆแ‹šแˆ… แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แˆ›แˆˆแ‰ต แ‰ฐแ‰‹แˆซแŒฉ แˆˆแˆตแˆซแ‹ แˆ›แˆตแŒ€แˆ˜แˆชแ‹ซ แ‹จแˆšแˆ†แŠ‘แ‰ตแŠ• แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆ˜แˆณแˆชแ‹ซแ‹Žแ‰ฝ แˆ˜แŒแ‹ขแ‹ซแАแ‰ต แ‹จแˆšแ‹แˆ แ‰ แŠ แˆฐแˆชแ‹ แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ต แ‰ แ‰…แ‹ตแˆšแ‹ซ แ‹จแˆšแŠจแˆแˆˆแ‹ แŒˆแŠ•แ‹˜แ‰ฅ แАแ‹แกแก

โบแ‹ญแˆ…แˆ แˆแŠ•แˆ แˆตแˆซ แˆณแ‹ญแˆฐแˆซ แ‹จแˆšแŠจแˆแˆ แŒˆแŠ•แ‹˜แ‰ฅ แˆตแˆˆแˆ†แА แˆˆแ‰ฐแ‰‹แˆซแŒฉ แ‹•แ‹ณ แ‹ˆแ‹ญแˆ แ‰ฅแ‹ตแˆญ แАแ‹ แˆตแˆˆแˆ†แАแˆ แ‰ฐแ‰‹แˆซแŒฉ แ‰ฅแ‹ตแˆฉแŠ• แŠฅแŠ•แ‹ฒแˆแˆแˆต แ‹ญแŒˆแ‹ฐแ‹ณแˆ แˆ›แˆˆแ‰ต แАแ‹แกแก

โบแ‰ แˆ˜แˆ†แŠ‘แˆ แ‰ฐแ‰‹แˆซแŒฉ แ‹ญแˆ…แŠ•แŠ• แ‰ฅแ‹ตแˆญ แŠฅแŠ•แ‹ดแ‰ต แ‹ญแˆ˜แˆแˆณแˆ แ‹จแˆšแˆˆแ‹ แŠ แŠ•แ‹ณแŠ•แ‹ต แŒŠแ‹œ แ‰ แŒแŠ•แ‰ฃแ‰ณ แ‹แˆŽแ‰ฝ แˆ‹แ‹ญ แŠ แˆˆแˆ˜แŒแ‰ฃแ‰ฃแ‰ต แ‹ซแˆตแАแˆณแˆแกแก

โ–ถ๏ธแ‰ แŒแ‹ข แˆ˜แˆ˜แˆชแ‹ซแ‹ แŠ แŠ•แ‰€แ… 16.26.9 แˆ‹แ‹ญ แŠฅแŠ•แ‹ฐแ‰ฐแŒˆแˆˆแ€แ‹ แˆˆแ‰ฐแ‰‹แˆซแŒฎแ‰ฝแŠ“ แˆˆแŒฅแ‰ƒแ‰…แŠ•แŠ“ แŠ แАแˆตแ‰ฐแŠ› แŠขแŠ•แ‰ฐแˆญแ•แˆซแ‹ญแ‹žแ‰ฝ แ‹จแ‰ฐแŠจแˆแˆˆ แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แ‰ แ‹แˆ‰ แŠ แˆแƒแ€แˆ แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แ‹ฐแˆจแŒƒแ‹Žแ‰ฝ แˆ‹แ‹ญ แ‰ แŠญแแ‹ซ แˆฐแˆญแ‰ฐแแŠฌแ‰ต แ€แ‹ตแ‰€แ‹ แŠจแˆšแŠจแˆแˆแ‰ธแ‹ แŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แŠญแแ‹ซแ‹Žแ‰ฝ แˆ‹แ‹ญ แŠฅแ‹จแ‰ฐแ‰€แАแˆฐ แˆ™แˆ‰ แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซแ‹ แŠฅแˆตแŠชแˆ˜แˆแˆต แ‹ตแˆจแˆต แ‹จแˆ˜แŠ•แŒแˆตแ‰ต แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ฑ แ‹ซแˆตแ‰…แˆซแˆ แ‹ญแˆ…แˆ แˆ›แˆˆแ‰ต แ‰ฐแ‰‹แˆซแŒฉ แ‹จแ‹ˆแˆฐแ‹ฐแ‹แŠ• แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แˆ™แˆ‰แ‹แŠ• แŠจแŠ แŠ•แ‹ต แ‹ˆแ‹ญแˆ แŠจแˆแˆˆแ‰ต แŠญแแ‹ซแ‹Žแ‰ฝ แˆ‹แ‹ญ แ‹จแˆ˜แŠญแˆแˆ แŒแ‹ดแ‰ณ แ‹จแˆˆแ‰ แ‰ตแˆแก แŠ แˆฐแˆช แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ฑแˆ แˆ™แˆ‰ แŠญแแ‹ซแ‹แŠ• แŠ แŠ•แ‹ด แ‰€แŠ•แˆถ แˆ›แˆตแ‰€แˆจแ‰ต แŠ แ‹ญแ‰ฝแˆแˆ แˆ›แˆˆแ‰ต แАแ‹แกแก

โ–ถ๏ธแ‹จแˆ˜แŠ•แŒแˆตแ‰ต แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ถแ‰ฝ แŠ แŠ•แ‹ณแ‹ต แŒŠแ‹œ แˆ™แˆ‰ แ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซแ‹แŠ• แ‰ แŠ แŠ•แ‹ด แ‰€แŠ•แˆฐแ‹ แ‰ แˆ›แˆตแ‰€แˆจแ‰ต แŠจแ‰ฐแ‰‹แˆซแŒฎแ‰ฝ แŒ‹ แŠฅแˆฐแŒฃแŒˆแ‰ฃ แˆฒแŒˆแŒฅแˆ™ แ‹ญแˆตแ‰ฐแ‹‹แˆ‹แˆ แ‹ญแˆ… แŠจแˆ…แŒ‰ แŠ แŒแ‰ฃแ‰ฅ แ‹แŒญ แАแ‹แกแก

๐Ÿšงแ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แŒˆแŠ•แ‹˜แ‰ก แˆ™แˆ‰แ‹แŠ• แˆณแ‹ญแˆ˜แˆˆแˆต แ‰ แ‰ฐแˆˆแ‹ซแ‹ฉ แˆแŠญแŠ•แ‹ซแ‰ถแ‰ฝ แ‹แˆ‰ แ‰ขแ‰‹แˆจแŒฅ แ‹จแŠ แˆฐแˆช แˆ˜แˆตแˆชแ‹ซ แ‰คแ‰ฑ แ‹จแŠจแˆแˆˆแ‹แŠ• แŒˆแŠ•แ‹˜แ‰ฅ แˆ›แˆตแˆ˜แˆˆแˆต แŠฅแŠ•แ‹ฒแ‹ซแˆตแ‰ฝแˆˆแ‹ แ‰ฐแ‰‹แˆซแŒฉ แ‹จแˆšแ‹ซแ‰€แˆญแ‰ แ‹ แ‹‹แˆตแ‰ตแŠ“ แŠญแแ‹ซแ‹ แŠฅแˆตแŠชแŒ แŠ“แ‰€แ‰… แ‹ตแˆจแˆต แŠ แˆตแŒˆแ‹ณแŒ…แАแ‰ต แŠฅแŠ•แ‹ฐแˆšแŠ–แ‹แˆ แˆ˜แˆ˜แˆชแ‹ซแ‹ แ‹ญแŒˆแˆแƒแˆแกแก

โ–ถ๏ธแ‹แˆ‰ แ‰ขแ‰‹แˆจแŒฅ แŠฅแŠ•แŠณแŠ• แ‹ซแˆแ‰ฐแŠจแˆแˆˆแ‹แŠ• แ‹จแ‰…แ‹ตแˆšแ‹ซ แŠญแแ‹ซ แ‹‹แˆตแ‰ตแŠ“แ‹ แ‹ˆแ‹ฒแ‹ซแ‹แŠ‘ แŠซแˆˆแˆแŠ•แˆ แˆ˜แ‰ƒแ‹ˆแˆšแ‹ซ แŠฅแŠ•แ‹ฒแŠจแแˆ แ‹ญแŒˆแ‹ฐแ‹ณแˆ แ‹ญแˆ‹แˆ แ‹จแˆ˜แ‹ฐแ‰ แŠ› แ‹จแ‹แˆ แˆ แАแ‹ต แŒ แ‰…แˆ‹แˆ‹ แˆแŠ”แ‰ณ แŠญแˆŽแˆต 60.7แกแก

Via Girum Getu

@etconp
๐Ÿ‘18โค4๐Ÿ™1
๐Ÿ‘‰แ‹จแŒแ‹ดแˆซแˆ แ‰คแ‰ถแ‰ฝ แŠฎแˆญแ–แˆฌแˆฝแŠ• แ‹จแ‰ แˆญแŠซแ‰ณ แŠ แŒˆแˆซแ‰ต แ‰ฃแˆˆแˆ€แ‰ฅแ‰ถแ‰ฝ แŒฅแˆแˆจแ‰ต แŠจแˆ†แАแ‹ แŠจแ‹“แˆˆแˆ แ‹“แ‰€แ‰ แ‹จแŠ•แŒแ‹ตแŠ“ แ‹จแ‹แ‹ญแŠ•แŠ“แˆต แ‰ฐแ‰‹แˆ (Global Trade & Finance) แŒ‹แˆญ แ‹จแˆ˜แŒแ‰ฃแ‰ขแ‹ซ แˆตแˆแˆแАแ‰ต แ‰ฐแˆแˆซแˆญแˆŸแˆแกแก

แˆตแˆแˆแАแ‰ฑแŠ• แ‹จแŒแ‹ดแˆซแˆ แ‰คแ‰ถแ‰ฝ แŠฎแˆญแ–แˆฌแˆฝแŠ• แ‹‹แŠ“ แˆตแˆซ แŠ แˆตแˆแŒปแˆš แŠญแ‰กแˆญ แŠ แ‰ถ แˆจแˆปแ‹ต แŠจแˆ›แˆ แ‹จแ‹“แˆˆแˆ แ‹“แ‰€แ‰ แ‹จแŠ•แŒแ‹ตแŠ“ แ‹จแ‹แ‹ญแŠ•แŠ“แˆต แ‰ฐแ‰‹แˆ แ‹‹แŠ“ แˆฅแˆซ แŠ แˆตแˆแŒปแˆš แˆšแˆตแˆต แŠฌแŒ€ แˆŠ แˆแˆญแˆ˜แ‹‹แˆแกแก

แ‰ แ•แˆฎแŒ€แŠญแ‰ต แ‹แ‹ญแŠ“แŠ•แˆต แฃ แ‰ แ‰คแ‰ต แŒแŠ•แ‰ฃแ‰ณแŠ“ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แ‰ดแŠญแŠ–แˆŽแŒ‚ แŠ แ‰…แˆญแ‰ฆแ‰ต แˆ‹แ‹ญ แŠฅแŠ“ แ‰ แ‰ฌแŠ•แ‰ธแˆญ แŠซแ’แ‰ณแˆ แŠขแŠ•แ‰จแˆตแ‰ตแˆ˜แŠ•แ‰ต  แ‹™แˆชแ‹ซ แŠฎแˆญแ–แˆฌแˆฝแŠ‘ แŠจแ‹“แˆˆแˆ แ‹“แ‰€แ‰ แ‹จแŠ•แŒแ‹ตแŠ“ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‰ฐแ‰‹แˆ แ‹ตแŒ‹แ แ‹จแˆšแ‹ซแŒˆแŠแ‰ แ‰ตแŠ• แŠฅแ‹ตแˆ แ‹จแˆšแˆแŒฅแˆญ แАแ‹แกแก

แ‹จแŒแ‹ดแˆซแˆ แ‰คแ‰ถแ‰ฝ แŠฎแˆญแ–แˆฌแˆฝแŠ• แ‹‹แŠ“ แˆฅแˆซ แŠ แˆตแˆแŒปแˆš แŠญแ‰กแˆญ แŠ แ‰ถ แˆจแˆปแ‹ต แŠจแˆ›แˆ แŠฎแˆญแ–แˆฌแˆฝแŠ‘ แ‹จแˆ˜แŠ–แˆชแ‹ซ แ‰คแ‰ต แŠฅแŒฅแˆจแ‰ตแŠ• แˆˆแˆ˜แ‰…แˆจแแŠ“ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แŠ แ‰…แˆ™แŠ• แˆˆแˆ›แŒ แŠ“แŠจแˆญ แ‰ แˆญแŠซแ‰ณ แ‰ฐแŒแ‰ฃแˆซแ‰ต แŠฅแ‹ซแŠจแŠ“แ‹ˆแА แˆ˜แˆ†แŠ‘แŠ• แŠ แŠ•แˆตแ‰ฐแ‹ แŠจแŒ แŠ•แŠซแˆซ แ‹“แˆˆแˆ แ‹“แ‰€แ  แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แˆแŠ•แŒฎแ‰ฝ แŒ‹แˆญ แ‰ แŒ‹แˆซ แˆˆแˆ˜แˆตแˆซแ‰ต แŒฅแˆจแ‰ต แŠฅแ‹ซแ‹ฐแˆจแŒˆ แˆ˜แˆ†แŠ‘แŠ• แ‰ฐแŠ“แŒแˆจแ‹‹แˆแกแก

แŠจแ‹“แˆˆแˆ แ‹“แ‰€แ‰ แ‹จแŠ•แŒแ‹ตแŠ“ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‰ฐแ‰‹แˆ แŒ‹แˆญแˆ แ‰ แ‰ฐแˆˆแ‹ญ แ‰ แ•แˆฎแŒ€แŠญแ‰ต แ‹แ‹ญแŠ“แŠ•แˆต แ‹™แˆชแ‹ซ แ‰ แŒ‹แˆซ แˆˆแˆ˜แˆตแˆซแ‰ต แŠฎแˆญแ–แˆฌแˆฝแŠ‘ แแˆ‹แŒŽแ‰ต แŠฅแŠ•แ‹ณแˆˆแ‹ แŠญแ‰กแˆญ แŠ แ‰ถ แˆจแˆปแ‹ต แŠจแˆ›แˆ แ‰ฐแŠ“แŒแˆจแ‹‹แˆแกแก 

แ‹จแ‹“แˆˆแˆ แ‹“แ‰€แ‰ แ‹จแŠ•แŒแ‹ตแŠ“ แ‹จแ‹แ‹ญแŠ•แŠ“แˆต แ‰ฐแ‰‹แˆ แ‹‹แŠ“ แˆฅแˆซ แŠ แˆตแˆแŒปแˆš แˆšแˆตแˆต แŠฌแŒ€ แˆŠ  แ‰ แ‹šแˆ แ‹ˆแ‰…แ‰ต แŠฅแŠ•แ‹ฐแ‰ฐแŠ“แŒˆแˆฉแ‰ต แŠฎแˆญแ–แˆฌแˆฝแŠ‘ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹แˆตแŒฅ แˆŠแˆˆแˆ› แ‹จแˆšแ‰ฝแˆ แŒแ‹™แ แˆ€แ‰ฅแ‰ต แ‰ฃแˆˆแ‰คแ‰ต แ‰ แˆ˜แˆ†แŠ‘ แ‰ แ‰‚ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แŠ แ‰…แˆญแ‰ฆแ‰ต แŠฅแŠ•แ‹ฒแŠ–แˆจแ‹ แ‰ฐแ‰‹แˆ›แ‰ธแ‹ แŠฅแŠ•แ‹ฐแˆšแˆฐแˆซแˆ แ‰ฐแŠ“แˆจแ‹‹แˆแกแก

แŠจแ‹šแˆ…แˆ แ‰ แ‰ฐแŒจแˆ›แˆชแˆ แ‰ฐแ‰‹แˆ›แ‰ธแ‹ แŠจแ‰ แˆญแŠซแ‰ณ แˆตแˆ˜ แŒฅแˆญ แ‹“แˆˆแˆ แ‹“แ‰€แ แŠฉแ‰ฃแŠ•แ‹ซแ‹Žแ‰ฝ แŒ‹แˆญ  แ‰ แŒฅแˆแˆจแ‰ต แ‹จแˆšแˆฐแˆซ แ‰ แˆ˜แˆ†แŠ‘  แ‹จแŠฎแˆญแ–แˆฌแˆฝแŠ‘แŠ• แ‰ตแˆซแ‹แˆ›แАแ‰ต แ‰ แˆšแŒจแˆแˆฉ แˆŒแˆŽแ‰ฝ แ‰ฐแŒแ‰ฃแˆซแ‰ตแˆ แ‰ แŒ‹แˆซ แˆˆแˆ˜แˆตแˆซแ‰ต แ‰ฐแ‰‹แˆ›แ‰ธแ‹ แ‰แˆญแŒ แŠ› แˆ˜แˆ†แŠ‘แŠ•  แ‹‹แŠ“ แˆฅแˆซ แŠ แˆตแˆแŒปแˆš แˆšแˆตแˆต แŠฌแŒ€ แˆŠ  แ‰ฐแŠ“แŒแˆจแ‹‹แˆแกแก

@etconp
๐Ÿ‘9โค3
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ‘‰แˆแˆ‰แŠ• แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‹จแˆšแ‹ซแŒˆแŠ™แ‰ แ‰ต แŠฅแŠ“ แˆˆแˆแˆ‰แˆ แ‰…แˆญแ‰ฅ

๐Ÿ”ฐแˆแŠ• แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•

โœ‚๏ธแˆ‹แˆœแˆซ แˆ›แˆตแ‰†แˆซแˆจแŒฅ แˆ›แˆตแ‰ แˆณแ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠจแˆแˆˆแŒ‰  แŠฅแŠ•แ‹ณแ‹ซแˆตแ‰ก แˆแˆ‰แŠ•แˆ แˆ›แˆฝแŠ–แ‰ฝ แŠ แˆตแŒˆแ‰ฅแ‰ฐแŠ“แˆ

๐Ÿ”—แŒแˆฎ (แ‰ถแŠ•แ‹ฒแŠ–) แŒฅแˆญแˆต แˆ›แˆตแ‰ แŒ€แ‰ต แ‹ˆแ‹ญแŠ•แˆ แˆ›แˆณแŒ แ แŠซแˆฐแ‰ก แˆˆแˆฑแˆ แˆ›แˆฝแŠ‘ แ‰ แŒƒแ‰ฝแŠ• แАแ‹‰

๐Ÿ“แˆ›แŠ•แŠ›แ‹‰แŠ•แˆ แ‹จแˆžแ‹ฐแŠแŠญ แˆตแˆซแ‹Žแ‰ฝแŠ• แ‹จแˆšแˆฐแˆฉ แ‰ฅแ‰ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแˆ แŠ แˆ‰แŠ•

โ˜Ž๏ธแ‹ญแ‹ฐแ‹‰แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

แŠ แ‹ตแˆซแˆปแ‰ฝแŠ•แฆ แ‰.1 แŠ แ‹‰แ‰ถแ‰ฅแˆต แ‰ฐแˆซ(แˆ˜แˆณแˆˆแˆšแ‹ซ)
                    แ‰.2 แˆ˜แˆญแŠซแ‰ถ
                    แ‰.3 แ‰ฐแŠญแˆˆแˆ€แ‹ญแˆ›แŠ–แ‰ต

0904040477
0911016833
๐Ÿ‘3
๐Ÿ‘‰Did you know?

๐Ÿ’ซThe reasons for honeycomb in concrete:

1. Inappropriate workability of concrete.

2. Use of stiff concrete mix or the concrete is already set before placing.

3. Improper vibration of concrete in formwork.

4. Over reinforcement.

5. Use of larger size aggregates in excessive amounts.

6. Formwork is not rigid and watertight.

7. Concrete is poured from more than allowable height.

8. Congestion of steel is preventing the concrete to flow over all corners.

@etconp
๐Ÿ‘21โค3
๐Ÿ‘‰แ‰ แŒŽแŠ•แ‹ฐแˆญ แŠจแ‰ฐแˆ› แ‹จแ‹แˆฒแˆ แ‰คแ‰ฐแˆ˜แŠ•แŒแˆตแ‰ต แŠฅแ‹ตแˆณแ‰ต แ‰ฐแŒ€แˆแˆฏแˆแข

๐Ÿšงแ‰ แŒฃแˆ แŒฅแˆฉ แˆแŠ”แ‰ณ แˆ‹แ‹ญแˆ แ‹ญแŒˆแŠ›แˆแข

๐Ÿ’ซแ‰ แŠ แŒญแˆญ แŒแ‹œ แ‹แˆตแŒฅ แ‹แˆฒแˆแŠ• แ‹ˆแ‹ฐ แ‰€แ‹ฐแˆ˜ แŒแˆญแˆ› แˆžแŒˆแˆฑ แŠฅแŠ•แˆ˜แˆแˆฐแ‹‹แˆˆแŠ•แข

๐ŸทRenovation of Fasil Ghebbi has commenced in Gonder city and is progressing very well. In no time, Fasil will be elevated to its former glory.

Via  แŒ /แˆš แŒแˆตแ‰กแŠญ แŒˆแ…

@etconp
โค10๐Ÿ‘6
Organic compounds that are responsible for the formation of tiny bubbles and holes of different sizes in concrete, which form a certain part of the aggregate
concrete, are called:
Anonymous Quiz
13%
Water retarder
14%
Pozolana
14%
Bonding admixture
60%
Air-entrainment agents
๐Ÿ‘19