Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.2K links
πŸ”¨ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

πŸ“¨ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
πŸ‘‰ Dead Load vs Live Load (ACI Code)

🟩 Dead Load (DL):

⏺Permanent load on a structure.

⏺Includes self-weight of beams, slabs, columns, walls, and finishes.

⏺Does not change during building life.

⏺ACI Factor (USD): 1.2 Γ— DL

πŸŸ₯ Live Load (LL):

▢️Temporary or movable load.

πŸ“Includes weight of people, furniture, vehicles, wind, or snow.

πŸ”°Varies with usage or time.

▢️ACI Factor (USD): 1.6 Γ— LL

βœ… Design Load Combination (ACI 318): 1.2 DL + 1.6 LL

πŸ“˜ Summary:

▢️DL = Permanent load (structure weight)

🎲LL = Variable load (occupancy & use)

#CivilEngineering
#StructuralDesign
#ConstructionKnowledge
#BuildingDesignTips
#CivilWorks
#EngineeringBasics
#EducationalContent
#EngineeringVibes
#LearnCivilEngineering

@etconp
❀14πŸ™5
πŸ‘‰What is Slump Test and Why It Matters?

πŸ“ŒDefinition: The Slump Test is a simple test used to measure the workability and consistency
of fresh concrete before placing it in formwork.

πŸ’«Purpose:

β€’ To check the uniformity of concrete from batch to batch.

β€’ To ensure proper water-cement ratio and desired workability.
Equipment Used:

β€’ Slump cone (300mm high, 200mm bottom dia, 100mm top dia)

β€’ Tamping rod (16mm dia, 600mm long)

β€’ Base plate and measuring scale

πŸ“œProcedure:

1. Fill the cone with fresh concrete in 3 layers, each tamped 25 times.

2. Remove the cone vertically and measure the subsidence (slump) of concrete.

3. The difference in height gives the slump value (in mm).

⭐️Types of Slump:

β€’ True Slump – Concrete subsides uniformly.
β€’ Shear Slump – Concrete slides sideways (indicates poor cohesion).
β€’ Collapse Slump – Concrete completely collapses (too wet mix).
Typical Slump Values:
β€’ Mass Concrete: 25–50 mm
β€’ Reinforced Foundation: 50–100 mm
β€’ Slabs & Beams: 75–125 mm
β€’ Pumped Concrete: 100–150 mm

πŸ’₯Importance:

⏺The slump test ensures proper workability, reduces segregation risk, and confirms concrete quality before casting.

#SlumpTest #ConcreteTesting #WorkabilityTest #CivilEngineering #QualityControl
#ConstructionSite #FreshConcrete #SiteEngineer #ConcreteWork
#EngineeringKnowledge

@etconp
❀18πŸ‘2πŸ₯°1
πŸ‘‰α‹¨αŠ αˆˆαˆ αˆŽαˆ¬α‰΅ αˆœα‰΅αˆ­ αŠ αˆ­α‰²αˆ΅α‰΅ αŠ αˆα‹ˆαˆ­α‰… α‰°αŠ­αˆŒ ቀቡ α‹ˆα‹­αˆ α‰ͺαˆ‹ αŠ αˆα‹ αŠ₯α‹΅αˆ³α‰΅ αˆ˜αŒ αŠ“α‰€α‰ α‰°αŒˆαˆˆαŒΈ

πŸ’«α‹¨αŠ αˆˆαˆ αˆŽαˆ¬α‰΅ αˆœα‰΅αˆ­ αŠ αˆ­α‰²αˆ΅α‰΅ αŠ αˆα‹ˆαˆ­α‰… α‰°αŠ­αˆŒ ቀቡ α‹ˆα‹­αˆ α‰ͺαˆ‹ αŠ αˆα‹ αŠ₯ሡከ αŒ₯α‰…αˆα‰΅ 2018 αˆˆαˆ•α‹α‰₯ αŠ­αα‰΅ α‹­αˆ†αŠ“αˆ α‰’α‰£αˆαˆα€ αŠ­αα‰΅ αŠ¨αˆ˜α‹°αˆ¨αŒ‰ α‰ αŠα‰΅ αˆ˜αˆ°αˆ«α‰΅ α‹«αˆˆα‰£α‰Έα‹ αˆ₯αˆ«α‹Žα‰½ αŒˆαŠ“ α‰£αˆˆαˆ˜αŒ αŠ“α‰€α‰ƒα‰Έα‹ αŠ₯ሡከ αˆšα‹«α‹šα‹« α‹ˆαˆ­ αˆŠα‰†α‹­ αŠ₯αŠ•α‹°αˆšα‰½αˆ αŠα‹ α‹¨α‰°αŒˆαˆαŒΏαˆα‘α‘

α‹¨α‰°αŠ¨α‰ αˆ© α‹¨αŠ αˆˆαˆ αˆŽαˆ¬α‰΅ αˆœα‰΅αˆ­ αŠ αˆ­α‰²αˆ΅α‰΅ αŠ αˆα‹ˆαˆ­α‰… α‰°αŠ­αˆŒ α‰ αˆšα‹«α‹šα‹« 2 α‰€αŠ• 2004 α‹“.ም αŠ«αˆ¨α‰ α‰ αŠ‹αˆ‹ α‹αŒ αˆ†αŠ– αŠ₯αˆ΅αŠ«αˆαŠ• α‹¨α‹˜αˆˆα‰€α‹ α‰ͺαˆ‹ αŠ αˆα‹α€ α‹¨α‰°αˆˆα‹«α‹© የαŒ₯αŒˆαŠ“ αˆ₯αˆ«α‹Žα‰½ αŠ₯α‹¨α‰°αˆ°αˆ©αˆˆα‰΅ αŠα‹ α‰’α‰£αˆαˆ αŒαŠ• αˆˆαˆ•α‹α‰₯ αŠ₯ይታ α‰°αŠ¨αˆαŠ­αˆŽ 14αŠ› α‹“αˆ˜α‰±αŠ• α‹­α‹Ÿαˆα‘α‘

α‰ͺαˆ‹ αŠ αˆα‹ የαŒ₯αŒˆαŠ“ αˆ₯αˆ«α‹ αŠ¨αˆ˜αŒ€αˆ˜αˆ© α‰ αŠα‰΅ α‹αˆ΅αŒ‘ α‹«αˆ‰α‰΅ α‰°αŠ•α‰€αˆ³α‰ƒαˆ½ የαŒ₯α‰ α‰₯ αˆ₯αˆ«α‹Žα‰½ αŠ₯αŠ“ αˆŒαˆŽα‰½αˆ αŠ•α‰₯αˆ¨α‰Άα‰½ α‹ˆα‹° α‰…αˆ­αˆ΅ α‰£αˆˆ-αˆ΅αˆαŒ£αŠ• መሡαˆͺα‹« ቀቱ αŠ₯αŠ•α‹²αˆ„α‹± α‰°α‹°αˆ­αŒŽ αŠ₯αŠ•α‹°αŠα‰ αˆ­αˆ α‹¨αˆšα‰³α‹ˆαˆ΅ αŠα‹α‘α‘

αŠ¨αˆ˜αˆ¬α‰΅ በታች α‰ αˆšα‹ˆαŒ£ αŠ₯αŠ“ αŠ¨αˆ‹α‹­ α‰ αˆšα‹˜αŠ•α‰₯ α‹αŠ“α‰₯ α‰ͺαˆ‹ αŠ αˆα‹ α‰ αŒ£αˆ α‰°αŒŽα‹΅α‰Ά αŠα‰ αˆ­α€ αŠ αˆαŠ• αˆ‹α‹­ αŒαŠ• αŠ¨α‹αŒ­ αˆ€αŒˆαˆ«α‰΅αˆ α‹­αˆαŠ• αŠ¨αˆ€αŒˆαˆ­ α‹αˆ΅αŒ₯ α‹¨αŠ αˆ­α‰²αˆ΅α‰±αŠ• αˆ₯αˆ«α‹Žα‰½ αŠ₯α‹¨α‰°αˆ˜αˆˆαŠ¨α‰± α‰£αˆˆαˆ™α‹«α‹Žα‰½ α‰΅αˆαˆ…αˆ­α‰΅ αˆˆαˆ˜α‹αˆ°α‹΅ α‰ αˆšα‰½αˆ‰α‰ α‰΅ α‹°αˆ¨αŒƒ αŒ₯αŒˆαŠ“α‹ α‰°α‹°αˆ­αŒ“αˆ αŠα‹ α‹¨α‰°α‰£αˆˆα‹α‘α‘

αŠ₯αŠ•α‹° αˆ™α‹šα‹¨αˆ α‹¨αˆšα‹°αˆ«αŒ… α‰ αˆ˜αˆ†αŠ‘ αŒŠα‹œ αŠ₯αŠ•α‹°α‹ˆαˆ°α‹°αˆ αŠα‹ α‹¨α‰°αŒˆαˆˆαŒΈα‹α‘α‘

የαŠ₯α‹΅αˆ³α‰± αˆ₯ራ α‰°αŒ αŠ“α‰† α‹¨αˆ­αŠ­αŠ­α‰₯ αŠ₯αŠ“ α‰…αˆ­αˆΆα‰½αŠ• በቦታቸው α‹¨αˆ˜αˆ˜αˆˆαˆ΅ αˆ₯αˆ«α‹Žα‰½ α‰₯ቻ α‰€αˆ­α‰·αˆ αˆ²αˆ‰αˆ የα‰₯αˆ„αˆ«α‹Š αˆ™α‹šα‹¨αˆ መαˆͺ ሡራ አሡፈጻሚ αŠ α‰Ά αŠ αŠ•α‹·αˆˆαˆ αŒαˆ­αˆ›α‹­ αˆˆαŠ αˆα‹± α‰°αŠ“αŒαˆ¨α‹‹αˆα‘α‘

"የαŠ₯α‹΅αˆ³α‰± αˆ₯ራ αŒ₯αŠ•α‰ƒα‰„α‹Žα‰½αŠ• α‹¨αˆšαŒ α‹­α‰… αŠα‰ αˆ­" α‹«αˆ‰α‰΅ αŠ α‰Ά αŠ₯αŠ•α‹·αˆˆαˆα€ α‹¨αˆ­αŠ­αŠ­α‰₯ αˆ₯αˆ«α‹Žα‰½ αˆ²αŒ αŠ“α‰€α‰ α‰ͺαˆ‹ αŠ αˆα‹αŠ• α‰ 2018 αŠ₯ሡከ αˆšα‹«α‹šα‹« α‹ˆαˆ­ ለαŠ₯ይታ αŠ­αα‰΅ αˆˆαˆ›α‹΅αˆ¨αŒ α‰³αˆ΅α‰§αˆ αŠα‹ α‹«αˆ‰α‰΅α‘α‘

የαŠ₯α‹΅αˆ³α‰΅ αˆ₯αˆ«α‹ 65 αˆšαˆŠα‹¨αŠ• α‰₯ር αŠ₯αŠ•α‹³αˆ΅α‹ˆαŒ£ αŠ¨α‹šαˆ… α‰ αŠα‰΅ α‹¨α‹ˆαŒ‘ αˆ˜αˆ¨αŒƒα‹Žα‰½ α‹«αˆ˜αˆˆαŠ­α‰³αˆ‰α‘α‹¨αŠ₯α‹΅αˆ³α‰΅ αˆ₯αˆ«α‹ α‰ αˆα‹•αˆ«αŽα‰½ α‹¨α‰°αŠ¨α‹αˆαˆˆ αŠα‰ αˆ­ αŠα‹ α‹¨α‰°α‰£αˆˆα‹α‘α‘

@etconp
❀9πŸ‘1πŸ₯°1
πŸ‘‰TESTS FOR SAND

πŸ’«1. Sieve Analysis Test

⏺Used to determine the particle size distribution of sand. Pass sand through sieves
(4.75 mm to 150 Β΅m). Helps to classify as fine, medium, or coarse.

πŸ’«2. Silt Content Test

⏺Determines the percentage of silt or clay in sand.
⏺Mix 50 ml sand with 50 ml water in a cylinder, shake, and settle for 3–4 hours.
⏺Silt should not exceed 8%.

πŸ’«3. Bulking of Sand Test

⏺Checks the increase in sand volume due to moisture.
⏺Add small amount of water
and note the volume change. Normal bulking = 10–25%.

πŸ’«4. Specific Gravity Test

⏺Determines density ratio of sand compared to water. Ideal specific gravity = 2.6 –2.7.

πŸ’«5. Organic Impurities Test

⏺Checks for organic matter or clay.
⏺Mix sand with NaOH solution; brown color indicates impurities.

πŸ’«6. Moisture Content Test

⏺Finds the amount of water in sand.
⏺Dry the sample at 110°C and calculate moisture % using weight difference.

πŸ’«7. Fineness Modulus Test

⏺Indicates sand quality and gradation.
⏺FM = (Cumulative % retained on sieves) /100. Fine sand = 2.2–2.6, Coarse = 2.6–2.9.

🏷Good quality sand ensures strong and durable concrete.

#MaterialTesting
#SandTesting
#QualityControl
#LabTesting
#SoilAndSand
#BuildingMaterialsTest
#ConstructionTesting
#ConcreteQuality
#SiltContentTest
#SieveAnalysis

@etconp
1❀16πŸ‘9πŸ‘2😱1πŸ™1
A project has a negative Schedule Performance Index (SPI < 1) and a negative Cost Performance Index (CPI < 1). This indicates:
Anonymous Quiz
18%
A. Project is ahead of schedule and under budget
50%
B. Project is behind schedule and over budget
12%
C. Project is ahead of schedule but over budget
20%
D. Project is behind schedule but under budget
πŸ‘11❀2
Which standard covers the specification for Portland cement?
Anonymous Quiz
51%
A) ASTM C150
33%
B) ISO 9001
8%
C) IS 456
9%
D) BS 8110
❀15πŸ‘2
Which of the following methods allows for both time-cost trade-off and resource analysis?
Anonymous Quiz
50%
A) Gantt chart
18%
B) Line of Balance
22%
C) Time-Scaled Network
11%
D) Precedence Diagramming Method
πŸ‘Œ6❀5πŸ‘1
What is the value of minimum nominal clear cover for slab?
Anonymous Quiz
54%
15
17%
20
26%
25
3%
30
πŸ™11❀4
The propagation of shear crack in a prestressed concrete member depends on :
Anonymous Quiz
18%
Tensile reinforcement
23%
Compression reinforcement
47%
Shear reinforcement
12%
Shape of the cross section of beam
πŸ‘5❀3
What is the loading rate used in compressive strength test?
Anonymous Quiz
23%
14 N/mmΒ² per hour
52%
14 N/mmΒ² per minute
14%
Both a and b
10%
None of the above
❀8
What is the total percentage of aggregates in concrete in terms of volume?
Anonymous Quiz
25%
65%-80%
5%
90%
59%
60%-75%
12%
40%
πŸ‘Œ5❀4
If the foundation of the structure is to be divided into two or more independent units, the ___ may be provided to take care of unequal settlement.
Anonymous Quiz
21%
Slip joints
52%
Strap joints
17%
Base plate
10%
Joists
❀4πŸŽ‰2
Which of the following pavement is capable of resisting small tensile strength?
Anonymous Quiz
41%
Flexible pavement
35%
Rigid pavement
15%
Semi-flexible pavement
9%
All of the mentioned
❀12
Which type of foundation should be adopted in a clayey or lose type of soil which considerably swells and shrinks by variation in the moisture content.
Anonymous Quiz
77%
Raft foundation
10%
Inverted arch foundation
7%
Cantilever foundation
5%
Grillage foundation
❀13
An analysis of the condition of complete bearing capacity failure is usually termed as ___
Anonymous Quiz
27%
General shear failure
21%
Terzaghi’s analysis
28%
Bearing failure
24%
All of the mentioned
πŸ‘8❀6
πŸ‘‰Construction Sequence of a Building – Step by Step

1. Site Preparation: Clear vegetation, mark layout, and level site.

2. Excavation: Excavate to required depth for foundation.

3. Foundation: Place footing, concrete, and reinforcement as per design.

4. Plinth Beam: Cast plinth beam and fill up to floor level.

5. Superstructure: Construct columns, beams, and slabs (RCC work).

6. Brickwork: Build walls between columns for rooms and partitions.

7. Lintel & Roof: Cast lintel and roof slab; apply waterproofing.

8. Plastering: Apply internal and external plaster for smooth surface.

9. Flooring: Lay tiles, marble, or granite flooring.

10. Doors & Windows: Fix frames and shutters properly.

11. Electrical & Plumbing: Install wiring, piping, and fixtures.

12. Painting & Finishing: Paint walls, install fittings and polish surfaces.

13. Final Inspection: Quality check and handover to owner.

#CivilEngineering #BuildingConstruction #SiteWork #constructionsite #constructionsequence #Civil

https://t.me/ETCONpWORK

@etconp
❀17πŸ‘3