At the time of bending of a beam, a layer is
neither elongated nor contracted is.
Anonymous Quiz
16%
(a) Axis of symmetry
62%
(b) Neutral axis
13%
(c) Axis of moment
9%
(d) Axis of load
🙏4❤2
The additional cover thickness to be provided
in reinforced concrete member that are total
immersed in sea water is :
Anonymous Quiz
28%
(a) 25 mm
12%
(b) 30 mm
10%
(c) 35 mm
50%
(d) 40 mm
❤3🎉3
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

🔹 Address 1: Signal road, around
      Dinberwa Hospital

🔹 Addres 2: Wellosefer, Infront of
     Dani Plaza
ADVERTISMENT

ታምራት ፕሌት እና ጄ ቦልት አቅራቢ

✅የምንሰጣቸው አገልግሎቶች

🔅 ፕሌት any Size & thickness
🔅 ጄ ቦልት (ጥርስ ማዉጣትና ማጠፍ)

🔅 የተለያዩ  [modefic] ስራዎችን እንሰራለን።

♦️ ማንኛዉንም ብረታ ብረት እንገዛለን።

☎️ስልክ 0904040477 ወይም 0911016833 ደውለው ያግኙን
📱ቴሌግራም ላይ ፦https://t.me/heavenic1

አድራሻ፦  ቁ 1.መርካቶ
                ቁ.2 አየር ጤና  ኪዳነ ምህረት

ጥራትና ታማኝነት መለያችን ነው።
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
❤1👌1
👉HOLLOW CONCRETE BLOCK (HCB) – CLASS B LABORATORY TESTS

💫Class B Hollow Concrete Blocks are used for non-load bearing walls or medium-strength construction.

🚧To certify quality, the following laboratory tests are performed.

✅ 1. Compressive Strength Test

⏺Standard: ASTM C140
Purpose: To measure block strength.

❇️Typical Requirement for Class B HCB:

Minimum compressive strength: 3.5 MPa to 5.0 MPa (varies with project spec)

Test 3 blocks (average value)

✅ 2. Dimension & Shape Tolerance

Standard: ASTM C140 / ES Standard
Purpose: Check if the block meets size and shape requirements.

Requirements (typical):

Length, width, height within ±3 mm tolerance

Faces should be flat and perpendicular

No large cracks or visible defects

✅ 3. Density Test (Dry Density)

Purpose: Confirm block classification (lightweight, medium, or normal).

Typical values:

1400 – 1700 kg/m³ for Class B HCB

✅ 4. Water Absorption

Standard: ASTM C140
Requirement:

Water absorption ≤ 12–15%

High absorption indicates weak block quality.

✅ 5. Block Weight Measurement

Purpose: Ensure consistency and structural performance.

Values depend on block size (e.g., 150 mm, 200 mm thickness).

✅Optional Tests (if required)

Ultrasound pulse velocity test – for uniformity

Efflorescence test – check salt content

Moisture content

📌 Summary Table for Easy Use

Test Purpose Typical Requirement (Class B)

Compressive Strength Strength ≥ 3.5 – 5.0 MPa
Dimensions Size accuracy ± 3 mm tolerance
Density Quality classification 1400–1700 kg/m³
Water Absorption Durability ≤ 12–15%
Weight Consistency As per design block type

@etconp
❤15
👉THE CHEMISTRY OF A CONCRETE MIX

💫When you combine Cement + Water + Aggregates + (Admixtures) a set of chemical reactions begin automatically.

🚧The most important chemical process is hydration — the reaction between cement and water.

🏷1. Chemistry of Cement

Cement is mainly made of four compounds:

*Tricalcium Silicate , C₃S for Early strength + heat
*Dicalcium Silicate, C₂S for Later strength
*Tricalcium Aluminate, C₃A to Controls setting (fast reaction)
*Tetracalcium Aluminoferrite,  C₄AF for Minor strength

Gypsum (CaSO₄·2H₂O) is added to control setting time.

🏷2. When water is added → Hydration begins

Water reacts with cement compounds to form new materials that make the concrete hard and strong.

🧬 A. Main Reaction: Formation of C–S–H Gel

C₃S + Water → C–S–H (Calcium Silicate Hydrate) + Ca(OH)₂

C–S–H gel is the glue that binds everything

Gives strength + durability

Forms 50–60% of the final hardened concrete

C₂S reacts slower:

C₂S + Water → C–S–H + Less Ca(OH)₂

This provides long-term strength.

🧬 B. Formation of Ettringite (Setting Control)

C₃A reacts extremely fast, so gypsum controls the reaction:

C₃A + Gypsum + Water → Ettringite

Ettringite crystals cause initial setting (stiffening).

If gypsum is finished, ettringite converts to monosulfate:

Ettringite → Monosulfate

🧬 C. Reaction of C₄AF

Produces ferrite hydrates that help setting but add little strength.

🏷3. Chemistry of Aggregates

Aggregates do not react much chemically.
Their main role is:

*Fill space
*Provide bulk
*Reduce cement content
*Improve strength by interlocking

But their surface bonds chemically with the C–S–H gel.

🏷4. Water–Cement Ratio (w/c) Chemistry

Lower water = denser hydration products.

Low w/c → more C–S–H, higher strength

High w/c → more pores, weaker concrete


🏷5. Chemistry of Admixtures
Admixtures modify hydration:

*Plasticizers / Superplasticizers

Disperse cement particles

Reduce water demand

Delay or accelerate hydration based on type

*Retarders
Slow down C₃A + C₃S reaction

*Accelerators
Speed up early hydration

🏷6. Chemistry Timeline of Concrete Hydration

*0–2 Hours: Initial setting

-C₃A + Gypsum → Ettringite
-Early C₃S reaction begins

*2–10 Hours: Final setting

-Needle-like crystals lock particles
-Concrete becomes solid

*1–7 Days: Early Strength

-Rapid C–S–H growth from C₃S

*7–28 Days: Major Strength Gain

-Slow hydration of C₂S
-Pore structure becomes tighter

*Months–Years: Long-term Hydration

-Continuous formation of C–S–H gel
-Increase in durability

📌 In simple words:

⏺Concrete gets hard because cement reacts with water and forms glue (C–S–H gel) and crystals that bind sand and stone together.

@etconp
❤8👍2
👉Claim on Additional floor Construction/Addition Works/:

💫A contractor can generally claim for an additional floor construction requested by the client, but it depends on the contract agreement and the change management procedures in place.

🏷How it usually works?

🚧1. Check the Original Contract

If the signed contract was for G+8, and now the client wants to extend to G+10, this is outside the original scope.

The contractor is not obligated to do it without a variation order (VO) or new contract agreement.

🚧2. Variation / Change Order

Most contracts (FIDIC, PPA Ethiopia 2011, etc.) have clauses for variations.

The client (or Engineer/Consultant) issues a variation instruction in writing.

The contractor then submits a claim for:

Additional costs (materials, labor, equipment, subcontractors).

Time extension (because adding two floors increases duration).

🚧3. Contractor’s Right to Claim

The contractor can claim if:

The client formally instructs the change.

The change affects cost and time.

Contractor must submit the claim within the time frame stated in the contract (often 28 days in FIDIC).

🚧4. Evaluation and Approval

The Engineer/Consultant or Client evaluates the claim.

Once approved, the contract price and completion date are adjusted.

🚧5. Risks if No Formal Agreement

If the contractor builds extra floors without written approval, payment disputes may arise.

The client may later refuse to pay, claiming it was not properly instructed.

📜In summary:

⏺The contractor has the right to claim for additional floor construction requested by the client, but it must go through the formal variation/change order process, with clear documentation of cost and time impact.

@etconp
❤8👏3👍2🕊1
#ADVERTISEMENT

👉ለግንባታዎ ውበት እኛን ስለ ምናስፈልግዎ ከግንባታ በኋላ ወደ እኛ ይደውሉ።

💫AR Building Finishing & Water Proofing Works ለህንፃዎች ውበት ፈጣሪዎች ነን

🚧በልዩ ጥራት የፊኒሽንግ ስራውን አጠናቀን ቤትዎ ውበት አጎናፅፈን እናስረክብዎታለን።

🌟ከመኖሪያ ቤት እስከ ትልልቅ ህንፃዎች አሻራችንን አሳርፈናል።
▶️Contextra
▶️Fine quartez
▶️ Water Proofing Chemicals
▶️ Membranes በጥራት እንሰራለን።

🎲በተጨማሪ የ Sales ስራዎች እንሰራለን

📍አድራሻ:—ኡራኤል ሀይላለም ህንፃ
            ስልክ  0977 67 67 90
                      0912 23 04 71

💫AR Building Finishing & Water Proofing Works

📌ቴሌግራም👇

https://t.me/antearb
https://t.me/antearb
https://t.me/antearb
❤2
👉Reuse of Formwork

📌Reuse of Formwork Material — Save Cost, Save Time, Build Smart!

📌Proper cleaning, maintenance, and timely repairs allow shuttering materials to be reused multiple times, reducing project cost and ensuring consistent concrete quality.

📌Reuse of Formwork Materials

📚1. Materials that can be reused

🔗Timber → 5-7 times
🔗Plywood → 10-20 times
🔗Steel→ 100-200 times
🔗Aluminium → 150-300 times
🔗Plastic→ 50-100 times

📚2. How to increase reuse

🔗Apply shuttering oil.
🔗Clean after every use.
🔗 Store in a dry place.
🔗 Handle carefully (no damage).
🔗Repair small defects.

📚3. Benefits

🔗 Saves cost.
🔗 Reduces material waste.
🔗 Faster work.

💫Efficient reuse = Efficient construction.

@etconp
👍5❤3
👉performance-related pay (PRP) in the construction industry, with a focus on Ethiopia and East Africa, and how it connects to global practice.

🚧1. What Performance-Related Pay Means

Performance-related pay (PRP) links an employee’s earnings to measurable results — not just to time worked.
In construction, that means workers, supervisors, or contractors can earn extra pay for doing one or more of the following:

• Finishing work faster than planned (without lowering quality)
• Keeping costs within or below budget
• Maintaining a strong safety record
• Delivering high-quality workmanship
• Meeting specific productivity targets

It’s a way to motivate performance, reward efficiency, and align the worker’s interest with the project’s success.

🚧2. How PRP Works in Global Construction Practice

Around the world, PRP takes several main forms:

a. Bonus and Incentive Schemes
• End-of-project bonuses: Paid when a project is completed early or meets key milestones.
• Safety or quality bonuses: Reward workers or teams for achieving zero accidents or quality rework.
• Performance appraisals: Supervisors and professionals are evaluated yearly, and bonuses are tied to ratings.

b. Piecework (Output-Based Pay)

Common in trades like bricklaying, plastering, roofing, or steel fixing.
Workers are paid per unit of work done — for example, per cubic meter of concrete placed or per square meter of wall finished.

c. Gainsharing and Profit Sharing

Some companies share part of the profit or cost savings with staff when a project performs better than expected.
This is common in big firms in the UK, USA, Australia, and Japan.

d. Performance-Based Contracts

Contractors themselves are paid based on performance — not just completion.
Examples:
• “Target cost” contracts in the UK: If a contractor delivers below the agreed cost, savings are shared with the client.
• “Design-build” or “turnkey” models link final payment to quality and functional performance.

🚧3. Performance-Related Pay in Ethiopia and East Africa

a. Current reality

In Ethiopia, Kenya, Tanzania, and Uganda, construction pay is still mostly time-based (daily, weekly, or monthly wages).
However, some elements of PRP exist — especially in large projects or companies with foreign partnerships.

Examples:
• Site bonuses: When a project finishes early or meets milestones (especially in road and building works funded by international donors).
• Piece-rate work: Common among casual laborers (e.g., masons or painters paid per square meter or cubic meter).
• Engineer or supervisor incentives: Small allowances for meeting project schedules or maintaining safety standards.

b. Government and institutional influence
• In public projects, pay structures follow government salary scales, so PRP is limited.
• In private and international projects, PRP is more flexible — often written into contracts or negotiated individually.
• Chinese and Turkish contractors working in Ethiopia often apply output-based systems or completion bonuses for key staff.

c. Cultural and structural challenges

1. Limited performance data: Hard to measure productivity accurately due to weak documentation and record systems.
2. Low awareness: Many workers are unfamiliar with PRP principles or fear unfair evaluation.
3. Payment delays: Incentives lose meaning if base pay isn’t regular.
4. Collective work patterns: Construction tasks rely on teams, so individual assessment can be tricky.
5. Labor law limits: Some national labor laws don’t clearly define or protect PRP systems.

🚧4. Opportunities and Future Direction

Performance-related pay is slowly gaining attention in East Africa, especially as:
• Construction becomes more industrialized (mechanized, data-based).
• Private developers and international donors push for efficiency and accountability.
• Governments seek to reduce project delays and cost overruns.

@etconp
❤15👍1
👉What is the shear strength?

💫The shear strength of any material can be defined as the capacity of that material to resist those forces which cause the internal layers of the material structure to slide against each other in the direction of the force.

⏺The shear strength of the material can be computed in the either vertical or horizontal direction, by applying a force in the desired direction.

@etconp
❤7👍6
👉Some Important Questions*part 1*

*1: what is Development Length?*

*Ans:* Development length is an extera length of steel, which transter the load from one steel bar to other.

*2: What is Hydration?*

*Ans:* Hydration is reaction b/w cement and water.

*3: What is M20 Grad Concrete?*

*Ans:* “M” Stands for Mix and No (20) is the Compressive strength of concrete in 20N/mm2 after 28 days after laboratory test. and M20 grad concrete we have to use in the RCC slab.

*4: What is Water Cement ratio?*

*Ans:* water–cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

*5: What is Bearing Capacity of Soil?*

*Ans:* Bearing Capacity is the capacity of soil to support the load applied to the ground.

*6: Time to removal of Fromwork for different RCC structures?*

*Ans:* For column/walls, vertical form works should be detached after 16 to 24 hours.

Soffit formwork to slab (formwork is located under the slab), the form works can be removed after 3 days. (props should be reaffixed once the removal is done).

Soffit formwork to beam, the form works can be removed after 7 days. (props should be reaffixed once the removal is done.)

Beam that spans up to 4.5 m (length), the form works can be removed after 7 days.

Beam that spans surpassing 4.5 m (length), the form works can be removed after 14 days.
For footing, the formworks can be removed after 16 to 24 hours.
For staircase, the form works can be removed after 5 days.

7, When we use pile foundation?

Pile foundation is adopted when the Soil Bearing Capacity is less than 24 KN/m3

@etconp
❤10👍7👏1
👉የምዝገባ ጊዜ መራዘሙን ስለማሳወቅ

💫የአዲስ አበባ ቤቶች ልማት ኮርፖሬሽን ከደረጃ 1-7 ላሉ ሥራ ተቋራጮች ያወጣው የጋራ መኖሪያ ቤት ግንባታ የስራ ተቋራጮች ምዝገባ ከተለያዩ ተሳታፊዎች በቀረቡት አስተያየቶች መሰረት የስራ ተቋራጭ ምዝገባ ቀነ-ገደብ ማራዘም አስፈላጊ ሆኖ አግኝተነዋል ፣ በመሆኑም ምዝገባው ከዛሬ ሕዳር 30 ቀን 2018 ዓ.ም ጀምሮ ለተጨማሪ 5 ተከታታይ ቀናት እስከ ታህሳስ 4 ቀን 2018 ዓ.ም ሌሊት 6:00 ሰዓት ድረስ መራዘሙን ኮርፖሬሽኑ ያሳውቃል።

🚧ስለሆነም፣ ሳትመዘገቡ ለዘገያችሁ ተቋራጮች፣ ይህንን የመጨረሻ ዕድል ተጠቅማችሁ በኦንላይን https://aahdcgeneral.et በመግባት እንድትመዘገቡ ጥሪ እናቀርባለን፡፡

🏷በምዝገባው ሂደት እና ከምዝገባ በኋላ ለሚኖራችሁ ጥያቂ፣ ቅሬታ https://aahdcgeneral.et/complaints/create ወይም በቴሌግራም https://t.me/aahdcsupport ማቅረብ የምትችሉ መሆኑን እንገልፃለን።

የአዲስ አበባ ቤቶች ልማት ኮርፖሬሽን

@etconp
❤6🙏1
👉Let Me Tell You About Cement

⭐️The recommended maximum time to store packed cement is 3 months from the date of manufacture if stored in typical site conditions.

⏺With ideal, moisture-proof storage (such as in an airtight container or a completely dry silo), it might last up to 6 months or even a year, but this is less common and strength loss is still a factor. 

🚧Why Cement Has a Limited Shelf Life

⏺Cement is highly hygroscopic, meaning it absorbs moisture from the air, which starts the chemical reaction (hydration) that causes it to harden.

⏺Once this process begins inside the bag, the cement loses its intended binding strength and performance. 
Strength Loss Over Time
If stored for longer periods, the cement's strength decreases significantly: 

🚧After 3 months: May lose 20–30% of its original strength.
🚧After 6 months: May lose up to 40–50% of its strength.
🚧After 12 months: May lose more than 50% of its strength. 
When to Test or Discard

🏷For structural projects (e.g., foundations, beams): It is highly recommended to use fresh cement (within 3 months of the manufacturing date) to ensure structural integrity.

🏷For non-structural projects (e.g., patching, small garden walls): You may use older cement, provided it is still in a fine, free-flowing powder form without hard lumps, but it is best to perform a small test mix first to confirm it sets properly.

⏺If you notice hard lumps in the bag: The cement has likely absorbed too much moisture and should be discarded, as it will not perform as expected. 
Always follow the "First In, First Out" (FIFO) principle when using cement from storage to ensure the oldest bags are used first. 

@etconp
❤9👍5
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

🔹 Address 1: Signal road, around
      Dinberwa Hospital

🔹 Addres 2: Wellosefer, Infront of
     Dani Plaza
❤2👍2
👉FULL STEPS: CONCRETE CUBE TEST (From Beginning up to Testing)

🚧1. Materials & Tools Required

⏺Cement, sand, aggregate, water
⏺Cube moulds (150 mm × 150 mm × 150 mm usually)
⏺Trowel, vibrator or tamping rod
⏺Weighing machine
⏺Curing tank or water container
⏺Compression testing machine (CTM)

🚧2. Preparation of Cube Moulds

⏺Clean the moulds.
⏺Apply oil on all inside surfaces to avoid sticking.
⏺Assemble moulds tightly with bolts.
⏺Place moulds on a flat, rigid surface.

🚧3. Concrete Mixing

🏷A. Measure materials

⏺Cement, sand, aggregate based on mix ratio (e.g., 1:2:4, or M20, M25 etc.).
⏺Measure water using correct water–cement ratio.

🏷B. Mix

⏺Mix thoroughly until uniform (by hand or mixer).

🚧4. Filling the Cube Moulds

⏺Fill the mould in three layers.
⏺Tamp 25 times using tamping rod OR Vibrate for 5–10 seconds Each layer.
⏺Make sure no air voids are left.
⏺Top surface must be leveled with a trowel.

🚧5. Initial Setting / Demoulding

⏺Keep the filled moulds undisturbed for 24 hours in a shaded place.
⏺After 24 hours, remove (demould) the cubes carefully.

🚧6. Curing

⏺Place cubes in a curing tank full of clean water.
⏺Temperature should be 20–27°C.
⚡️Cure for: 7 days test,
14 days test (optional),
28 days test (standard strength)

🚧7. Testing on Compression Machine

📍A. Preparation

⏺Remove cube from water at least 1 hour before testing.
⏺Clean surface and measure dimensions using a vernier caliper (to find exact area).

📍B. Placement in Machine

⏺Place cube on CTM between plates.
⏺Ensure cast/leveled face is on top (smooth face facing upwards).
⏺Center the cube properly.

📍C. Load Application

⏺Start the machine.
Apply load gradually at a rate of: 140 kg/cm² per minute (or ~2.9 kN/s).
⏺Continue until cube fails/cracks.

🏷8. Calculations

❇️For a 150 mm cube:
Area = 150 × 150 = 22500 mm²

⭐️Example:
Load at failure = 450 kN
Strength = 450,000 N / 22,500 mm² = 20 MPa

📜9. Reporting
Include:

⏺Mix ratio / grade
⏺Cube ID number
⏺Age (7 or 28 days)
⏺Load at failure
⏺Compressive strength
Average of 3 cubes
Any visual observations of cracks

@etconp
❤18👍3👏2🙏1👌1
👉To all Ethiopian construction and engineering professionals:

💫A short 5 - 7 minute industry survey has been prepared to help identify the real challenges and opportunities in our construction sector.

🚧Every member’s response is extremely important… the insights collected will directly contribute to improving workflows, communication, and digital practices across the industry.

❇️Please take a few minutes to fill it out and share it with others in the field.

⭐️Your participation will have a real impact. 🙏🏾

📜Survey Link:👇
https://forms.gle/ib3T13VnpCPzX2CZ6
❤7🙏4🔥1
👉Type Of Culvert

🚧1. Pipe Culvert: Circular pipe, used for small drainage flow.

🚧2. Box Culvert: RCC rectangular shape, suitable for large water discharge.

🚧3. Slab Culvert: RCC slab supported on abutments, used for narrow canals.

🚧4. Arch Culvert: Arch-shaped structure, strong and durable for moderate flow.

🚧5. Bridge Culvert: Acts like a small bridge with water passing underneath.

🚧6. Pipe Arch Culvert: Modified pipe culvert with arch shape used where low height is required.

@etconp