Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.2K links
๐Ÿ”จ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

๐Ÿ“จ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
2975. A basic type of failure at a finite slope may occur due to
Anonymous Quiz
46%
(a) Slope failure and Base failure
25%
(b) Toe failure
6%
(c) None of the mentioned
23%
(d) All of the mentioned
๐Ÿ‘Œ5โค2
2973. A long natural slope of cohesion-less soil is inclined at 12ยฐ to the horizontal. What will be the factor of safety of the slope if ฯ† = 30ยฐ?
Anonymous Quiz
28%
(a) 1.6
38%
(b) 2.7
20%
(c) 0.13
13%
(d) 0.4
๐Ÿ‘4โค1
2972. If the soil properties for all identical depths below the surface are constant, it is a
Anonymous Quiz
38%
(a) Finite slope
24%
(b) Infinite slope
20%
(c) Planar failure surface
18%
(d) All of the mentioned
๐Ÿ™3
2959. Compaction is a process in which change in volume due to
Anonymous Quiz
9%
(a) Remove of Water
48%
(b) Remove of Air
4%
(c) Remove of Soil Particles
39%
(d) All of the Above
๐Ÿ‘3โค2
2927. By providing sufficient edge distance, which of the following failures of bolted joint can be avoided?
Anonymous Quiz
22%
(a) Tension failure of the plate
27%
(b) Shear failure of the bolt
34%
(c) Shear failure of the plate
17%
(d) Bearing failure of the bolt
โค2๐Ÿ‘2
๐Ÿ‘‰How Many Blocks Are Required for 1 mยฒ Wall Area?

๐Ÿ’ซLet's explain how to calculate the number of concrete blocks needed to build a 1 square meter wall using standard block dimensions.

๐Ÿ”น Block Size
Each block measures:
400 mm length (0.40 m)
200 mm height (0.20 m)
200 mm width (0.20 m)

๐Ÿ”น Area Covered by One Block
Area = 0.40 m ร— 0.20 m
= 0.08 mยฒ per block

๐Ÿ”น Wall Area
A 1 m ร— 1 m wall has an area of 1.00 mยฒ

๐Ÿ”น Number of Blocks Required
1.00 mยฒ รท 0.08 mยฒ
= 12.5 โ‰ˆ 13 blocks

โœ… Final Answer
To construct 1 mยฒ of wall area, you need 13 concrete blocks of size 200 ร— 200 ร— 400 mm.

@etconp
โค22
๐Ÿ‘‰ INTERCON Construction Chemicals 

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Wall Putty, Prime Coat
โ— Concrete Repair Mortar
โ— Floor hardener, Epoxy
โ— Grout, Self-level mortar
โ— Quartz paint, Contextra
โ— Tile Adhesive & Tile Joint Fillers 
โ— Geotextiles and other construction chemicals and materials

โ˜Ž๏ธ Tel: 0961955555

๐Ÿ”น Address 1: Signal road, around
Dinberwa Hospital

๐Ÿ”น Addres 2: Wellosefer, Infront of
Dani Plaza
โค5๐Ÿ‘1
#ADVERTISEMENT

#แ‰ดแˆแˆญแ•แˆฎแแˆญแ‰ฒแˆต #แŠฅแАแˆ†_แŠ แ‹ฒแˆตแˆณแ‹ญแ‰ต

๐Ÿ“ แˆณแˆญ แ‰คแ‰ต
#แ‰ 35%แ‰…แŠ“แˆฝ! (แ‰ 100% แŠญแแ‹ซ)
๐Ÿ‘‰ แ‰ฃแˆˆ 2 แˆ˜แŠแ‰ณ = 81แŠซแˆฌ = 6แˆšแˆŠแ‹ฎแŠ•
๐Ÿ‘‰ แ‰ฃแˆˆ 2 แˆ˜แŠแ‰ณ = 106แŠซแˆฌ = 7.9แˆšแˆŠแ‹ฎแŠ•
๐Ÿ‘‰ แ‰ฃแˆˆ 3 แˆ˜แŠแ‰ณ = 153แŠซแˆฌ = 11.4แˆšแˆŠแ‹ฎแŠ•

#แ‰ 20% แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ (แ‰ แŒแŠ•แ‰ฃแ‰ณ แˆ‚แ‹ฐแ‰ต แˆˆแˆšแŠจแแˆ‰)
๐Ÿ‘‰ 81แŠซแˆฌ = แˆ™แˆ‰ แŠญแแ‹ซ = 9.3แˆšแˆŠแ‹ฎแŠ•
                 แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ = 20% (1.8แˆšแˆŠแ‹ฎแŠ•)
๐Ÿ‘‰ 139แŠซแˆฌ = แˆ™แˆ‰ แŠญแแ‹ซ = 15.9แˆšแˆŠแ‹ฎแŠ•
                 แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ = 20% (3.1แˆšแˆŠแ‹ฎแŠ•)

๐Ÿ“ แŠ แ‹‹แˆฌ
#แ‰ 35%แ‰…แŠ“แˆฝ! (แ‰ 100% แŠญแแ‹ซ)
๐Ÿ‘‰ แ‰ฃแˆˆ 1 แˆ˜แŠแ‰ณ = 78แŠซแˆฌ = 5.5แˆšแˆŠแ‹ฎแŠ•
๐Ÿ‘‰ แ‰ฃแˆˆ 3 แˆ˜แŠแ‰ณ = 117แŠซแˆฌ = 8.3แˆšแˆŠแ‹ฎแŠ•
๐Ÿ‘‰ แ‰ฃแˆˆ 3 แˆ˜แŠแ‰ณ = 145แŠซแˆฌ = 10.3แˆšแˆŠแ‹ฎแŠ•

#แ‰ 20% แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ (แ‰ แŒแŠ•แ‰ฃแ‰ณ แˆ‚แ‹ฐแ‰ต แˆˆแˆšแŠจแแˆ‰)
๐Ÿ‘‰ 78แŠซแˆฌ = แˆ™แˆ‰ แŠญแแ‹ซ = 8.5แˆšแˆŠแ‹ฎแŠ•
                 แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ = 20% (1.7แˆšแˆŠแ‹ฎแŠ•)
๐Ÿ‘‰135 แŠซแˆฌ = แˆ™แˆ‰ แŠญแแ‹ซ = 14.8แˆšแˆŠแ‹ฎแŠ•
                 แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ = 20% (2.9แˆšแˆŠแ‹ฎแŠ•)

แˆˆแ‰ แˆˆแŒ  แˆ˜แˆจแŒƒ
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
+251924479891
251924479891
WhatsApp https://wa.me/251924479891
Telgram=https://t.me/tizuaz
โค8
๐Ÿ‘‰Cost Estimation of a Building

๐Ÿ’ซis the process of calculating the total expected cost required to construct a building before construction starts.

โบIt helps in budgeting, planning, approval, and cost control of a project.

๐Ÿ“œDefinition

โบBuilding cost estimation is the systematic calculation of material, labor, equipment, overhead, and profit costs needed to complete a building project as per drawings and specifications.

๐Ÿ”น Purpose of Cost Estimation
Cost estimation is done to:

๐Ÿ’ฐ Know the total project cost
๐Ÿ“Š Prepare project budget
๐Ÿ“‘ Get client approval
๐Ÿฆ Apply for bank loans
๐Ÿ› ๏ธ Control construction costs
๐Ÿ“ Prepare BOQ (Bill of Quantities)
๐Ÿ“ˆ Compare contractor bids

๐Ÿ”น Main Components of Building Cost Estimation

๐ŸŒŸMaterial Cost

โบCement, sand, aggregate
Steel reinforcement
Blocks, bricks, finishes, fittings

๐ŸŒŸLabor Cost

โบMasons
โบCarpenters
โบSteel fixers
โบElectricians, plumbers

๐ŸŒŸEquipment / Machinery Cost

โบMixers
โบVibrators
โบScaffolding
โบTools

๐ŸŒŸOverhead Cost

โบSite office
โบWater and electricity
โบSupervision
โบTransportation

๐ŸŽฒProfit:-Contractorโ€™s margin (usually 10โ€“20%)

๐Ÿ”น Types of Building Cost Estimation

1๏ธโƒฃ Preliminary (Rough) Estimate
Based on plinth area or floor area
Used at planning stage
2๏ธโƒฃ Detailed Estimate
Based on detailed drawings
Includes BOQ and rate analysis
Most accurate
3๏ธโƒฃ Revised Estimate
Prepared when cost exceeds original estimate
4๏ธโƒฃ Supplementary Estimate
For additional works not included initially

๐Ÿ”น Methods of Building Cost Estimation

โบPlinth Area Method
โบFloor Area Method
โบUnit Rate Method
โบDetailed Quantity Take-off Method

@etconp
โค10๐Ÿ‘Œ5
๐Ÿ‘‰STEP-BY-STEP COST ESTIMATION OF A BUILDING

๐ŸšงSTEP ONE: STUDY THE DRAWINGS

โบFirst, carefully review all architectural, structural, and service drawings.
โบThis helps you understand the building size, layout, materials, and construction method.

๐ŸšงSTEP TWO: READ THE SPECIFICATIONS

โบCheck the project specifications to know the required quality of materials, type of concrete, steel, blocks, finishes, and workmanship standards.

๐ŸšงSTEP THREE: BREAK THE BUILDING INTO WORK ITEMS

โบDivide the building into clear construction parts such as foundation works, structural works, wall works, finishing works, and service installations.

โบThis makes estimation organized and systematic.

๐ŸšงSTEP FOUR: MEASURE THE WORK

โบMeasure each construction item from the drawings.
Measurements are taken for excavation, concrete, reinforcement, masonry, plaster, flooring, and other works based on standard measurement practice.

๐ŸšงSTEP FIVE: PREPARE QUANTITY SHEETS

โบWrite all measured items clearly in quantity sheets.
This helps to keep measurements accurate and avoids missing any work.

๐ŸšงSTEP SIX: ANALYZE RATES

โบDetermine the cost of each work item by considering material cost, labor cost, equipment use, transportation, and wastage.

โบThis step gives the unit cost of each activity.

๐ŸšงSTEP SEVEN: APPLY RATES TO QUANTITIES

โบMultiply the measured quantities by their respective rates to find the cost of each work item.

๐ŸšงSTEP EIGHT: PREPARE BILL OF QUANTITIES

โบList all work items with their descriptions, units, quantities, and costs in a Bill of Quantities.

โบThis document is used for budgeting and contractor bidding.

๐ŸšงSTEP NINE: ADD OVERHEADS AND PROFIT

โบInclude site expenses such as supervision, utilities, temporary works, and the contractorโ€™s profit.

๐ŸšงSTEP TEN: PREPARE FINAL COST ESTIMATE

โบCombine all costs to get the total estimated cost of the building.

โบThis final figure is used for approval, budgeting, and construction planning.

๐Ÿ“œFINAL RESULT

โบThe cost estimation process produces a clear and organized document that shows the expected cost of constructing the building before work starts.

@etconp
โค18๐Ÿ‘7๐Ÿ‘4๐ŸŽ‰1
๐Ÿ‘‰แŠ แˆตแ‹ฐแˆณแ‰ฝ แ‹œแŠ“ แˆˆแ‹šแˆ… แ‰ปแŠ“แˆ แ‰คแ‰ฐแˆฐแ‰ฆแ‰ฝ

๐Ÿ’ซแ‹จ "Quantity Surveying" Full Course แ‰  แŠฆแŠ•แˆ‹แ‹ญแŠ• แˆ˜แˆ›แˆญ แ‹จแˆแ‰ตแˆแˆแŒ‰ แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แŠฅแŠ“ แ‹จ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‰ฃแˆˆแˆžแ‹ซแ‹Žแ‰ฝ 4แ‰ฐแŠ› แ‹™แˆญ แ‰ แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹ แˆˆแŒฅแ‰‚แ‰ต แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แˆแ‹แŒˆแ‰ฃ แŒ€แˆแˆจแŠ“แˆโค

โญ๏ธแ‹จ แˆแ‹ฐแ‰ต แ‰ แ‹“แˆ แ‰ แˆ›แˆตแˆ˜แˆแŠจแ‰ต แ‹จ 25 % แ‰…แŠ“แˆฝ แŠ แˆญแŒˆแŠ“แˆโค

๐Ÿ“ฉแˆ˜แˆ˜แ‹แŒˆแ‰ฅ แ‹จแˆแ‰ตแˆแˆแŒ‰ @Philemona7 แ‹ˆแ‹ญแˆ แˆˆแ‰ แˆˆแŒ  แˆ˜แˆจแŒƒ แ‰  0925446661 แ‹ฐแ‹แˆˆแ‹ แ‹ซแŒแŠ™แŠ•๐Ÿ™

๐ŸŽฒแŠฎแˆญแˆฑ แˆฒแ‹ซแŒ แŠ“แ‰…แ‰ แˆฐแˆญแ‰ตแแŠฌแ‰ต แ‹ญแˆฐแŒฆแ‰ณแˆโ—๏ธ

@etconp
โค10๐ŸŽ‰2
#ADVERTISEMENT

Ab Con General Waterproofing Works

แ‹จแ‹แˆƒ แŠ แ‰…แˆญแ‰ฆแ‰ตแ‹ŽแŠ• แ‰ แŠจแแ‰ฐแŠ› แ‹ฐแˆจแŒƒ แˆˆแˆ˜แŒจแˆ˜แˆญ แ‰ แ‹แ‹ญแ‰ แˆญแŒแˆ‹แˆต แ‹จแ‹แˆƒ แˆ›แŒ แˆซแ‰€แˆšแ‹ซ แˆดแ•แ‰ฒแŠญ แ‰ณแŠ•แŠญ แˆตแˆญแ‹“แ‰ณแ‰ต แ‹ญแŒ แ‰€แˆ™ !!!

โ—‡ แ‰ แ‹แ‹ญแ‰ แˆญแŒแˆ‹แˆต  แ‹จแ‰ฐแˆฐแˆซ แ‹จแ‹แˆƒ แˆดแ•แ‰ฒแŠญ แ‰ณแŠ•แŠญ แ‰ แŒ‰แ‹ตแŒ“แ‹ต แ‹‰แˆตแŒฅ แŠจแˆšแˆ˜แŒฃ แ‹จแˆฝแŠ•แ‰ต แ‰คแ‰ต แแˆณแˆพแ‰ฝ แˆ™แˆ‰ แˆˆแˆ™แˆ‰ แ‹จแ‰ฐแŠจแˆˆแˆˆ แˆตแˆˆแˆšแˆ†แŠ• แˆˆแ‹‰แˆ€ แ‰ฅแŠญแˆˆแ‰ต  แŠ แˆตแ‰ฐแˆ›แˆ›แŠ แАแ‹‰ แข
โ—‡แ‰ แ‹แ‹ญแ‰ แˆญแŒแˆ‹แˆต  แ‹จแ‰ฐแˆฐแˆซ แ‹จแ‹แˆƒ แˆดแ•แ‰ฒแŠญ แ‰ณแŠ•แŠญ แˆ˜แ‰ แˆตแ‰ แˆต แŠฅแŠ“ แˆ˜แˆฐแАแŒฃแŒ แ‰… แ‹จแˆšแ‰ฃแˆ แАแŒˆแˆญ แˆแ…แˆž แŠ แ‹ญแ‰ณแˆฐแ‰ฅแˆแข
โ—‡แ‰ แ‹แ‹ญแ‰ แˆญแŒแˆ‹แˆต แ‹จแ‰ฐแˆฐแˆซ แ‹จแ‹แˆƒ แˆดแ•แ‰ฒแŠญ แ‰ณแŠ•แŠญ แˆˆแˆ›แ…แ‹ณแ‰ต แ‰ แ‰€แˆ‹แˆ‰ แ‹จแˆšแˆ˜แ‰ฝ แˆฒแˆ†แŠ• แฃ แ‰ แ‹‰แˆ€ แ‹‰แˆตแŒฅ แ‰ แแŒฅแАแ‰ต แˆˆแˆšแˆซแ‰ฃแ‹‰ แŠ แˆแŒŒ แ‹ฐแŒแˆž แˆแ…แˆž แ‹จแˆ›แ‹ญแˆ˜แ‰ฝ แАแ‹‰ แข
โ—‡แ‰ แ‹แ‹ญแ‰ แˆญแŒแˆ‹แˆต  แ‹จแ‰ฐแˆฐแˆซ แ‹จแ‹แˆƒ แˆดแ•แ‰ฒแŠญ แ‰ณแŠ•แŠญ แŠจแˆ˜แˆฌแ‰ต แ‰ แ‰ณแ‰ฝ แ‰ แŒ‰แ‹ตแŒŽแ‹ต แ‹‰แˆตแŒฅ แˆตแˆˆแˆšแˆฐแˆซ แ‰ฆแ‰ณ แ‰†แŒฃแ‰ข แАแ‹‰แข
โ—‡แˆˆแˆ˜แ‹‹แŠ› แŒˆแŠ•แ‹ณ

โ—‡ แˆˆแˆ˜แŠ–แˆชแ‹ซ แ‰คแ‰ถแ‰ฝ แฃแคแˆชแˆ แŠฅแˆตแ‰ดแ‰ถแ‰ฝ แคแ‹ตแˆญแŒ…แ‰ถแ‰ฝ แคแˆ†แˆตแ’แ‰ณแˆŽแ‰ฝแฅ แˆ†แ‰ดแˆŽแ‰ฝ แฅ แŠคแˆแ‰ฃแˆฒแ‹Žแ‰ฝแฅแ‹จแŠฅแˆญแˆป แ‰ฆแ‰ณแ‹Žแ‰ฝ แฅแŠขแŠ•แ‹ฑแˆตแ‰ตแˆช แ“แˆญแŠฎแ‰ฝ แ‹ˆแ‹˜แ‰ฐ แ‹จแŠ› แ‰ฐแŒ แ‰ƒแˆšแ‹Žแ‰ฝ แŠ“แ‰ธแ‹‰แข

๐Ÿคณ0913967277
     0968966602
โค6