๐Ÿ‘‰Do You know that

1.A structural member experiences

concrete cancer when the reinforcement steel embedded inside of the component begins to corrode.However, due to the rusting of the reinforcement, it tends to displace the concrete around it thereby causing it to be brittle which usually accelerate the spalling defect in the slab which in most times could attributed to bad workmanship.

2.Capping beam:

Capping beams  for piles aims at transferring loads from
closely spaced columns or
walls into a row of piles.

3.Silo

Silo used to store dry, bulk cement. It is a cylindrical container mounted on stilts. The cement is fed into the silo by air pumps to the top of the bin and drawn from the bottom through a port operated by a powerful motor.

4.We use Marsh Cone Test to determine the admixture content in concrete. This method is normally used for finding the amount of plasticizer and superplasticizer.

5. Staggering the reinforcement means separating the locations of the lapping lengths so that the laps do not coincide along the span.The length of the lap fluctuates according to the concrete strength, the rebar grade, size, and spacing.

@etconp
โค5
๐Ÿ‘‰ INTERCON Construction Chemicals 

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Wall Putty, Prime Coat
โ— Concrete Repair Mortar
โ— Floor hardener, Epoxy
โ— Grout, Self-level mortar
โ— Quartz paint, Contextra
โ— Tile Adhesive & Tile Joint Fillers 
โ— Geotextiles and other construction chemicals and materials

โ˜Ž๏ธ Tel: 0961955555

๐Ÿ”น Address 1: Signal road, around
Dinberwa Hospital

๐Ÿ”น Addres 2: Wellosefer, Infront of
Dani Plaza
โค1
๐Ÿ‘‰What Is Water Proof Membrane

๐Ÿ’ซA waterproof membrane in building construction is a thin, continuous layer of material applied to surfaces (like slabs, roofs, foundations, or bathrooms) to prevent water from penetrating into the structure.

๐Ÿ” What it looks like

Youโ€™ll usually see it as:
A sheet (roll) like bitumen membrane
Or a liquid coating that dries into a rubber-like layer

๐ŸŽฏ Main Purpose of Waterproof Membrane

1. Prevent Water Leakage
Stops water from entering slabs, roofs, basements, and walls
Very important in bathrooms, roofs, and underground structures
2. Protect Structural Elements
Prevents water reaching reinforcement steel
Reduces risk of corrosion (rusting) โ†’ increases building life
3. Avoid Cracks & Damage
Water causes expansion, shrinkage, and cracking
Membrane acts as a protective barrier
4. Improve Durability
Keeps concrete dry โ†’ stronger and longer-lasting structure
5. Prevent Dampness & Mold
Stops moisture inside walls and rooms
Improves health and indoor air quality

๐Ÿ“ Where It Is Used

Roof slabs
Toilets & bathrooms
Water tanks
Basements & foundations
Balconies

@etconp
โค6
๐Ÿ‘‰แ‹จแˆฐแˆ›แ‹ญ แˆ‹แ‹ญ แŒˆแŠ•แ‹ณแฆ (Marina Bay Sands)

แ‹ตแŠ•แ‰… แ‹จแˆแˆ…แŠ•แ‹ตแˆตแŠ“ แ‹แŒคแ‰ต Singapore ๐Ÿ‡ธ๐Ÿ‡ฌ

แ‰ แˆ˜แˆญแŠจแ‰ฅ แ‰…แˆญแ… แ‹จแˆšแ‰ณแ‹ˆแ‰€แ‹ แ‹จแˆฒแŠ•แŒ‹แ–แˆญ แ‹แАแŠ› แˆ…แŠ•แƒ

โ€ข แŒแ‹™แ แ‹จแˆ˜แ‹‹แŠ› แŒˆแŠ•แ‹ณแฆ แ‰ แˆ…แŠ•แƒแ‹ แŠ แŠ“แ‰ต แˆ‹แ‹ญ แ‰ แ‹“แˆˆแˆ›แ‰ฝแŠ• แˆจแŒ…แˆ™ (200 แˆœแ‰ตแˆญ แŠจแแ‰ณ แˆ‹แ‹ญ) แ‹จแˆšแŒˆแŠ แŠญแแ‰ต แ‹จแ‹‹แŠ“ แŒˆแŠ•แ‹ณ แŠ แˆˆแ‹แข

โ€ข แ‹จแˆ˜แˆญแŠจแ‰ฅ แ‰…แˆญแ… แ‹ซแˆˆแ‹ แŒฃแˆชแ‹ซแฆ แˆฆแˆตแ‰ฑแŠ• แŽแ‰†แ‰ฝ แ‹จแˆšแ‹ซแŒˆแŠ“แŠ˜แ‹ แ‹จแˆ‹แ‹ญแŠ›แ‹ แŠญแแˆ "แˆตแŠซแ‹ญ แ“แˆญแŠญ" (Sky Park) แ‹จแˆšแ‰ฃแˆ แˆฒแˆ†แŠ•แฃ แˆญแ‹แˆ˜แ‰ฑ แŠจแ“แˆชแˆฑ แŠคแแˆ แ‰ณแ‹ˆแˆญ แ‹ญแ‰ แˆแŒฃแˆแข

โ€ข แ‹จแŠซแˆญแ‰ณ แŒจแ‹‹แ‰ณ แˆ˜แАแˆปแฆ แ‹ฒแ‹›แ‹ญแŠ‘ แ‹จแ‰ฐแˆฐแˆซแ‹ แ‰ แŒ แˆจแŒดแ‹› แˆ‹แ‹ญ แ‹จแ‰ฐแ‹˜แˆจแŒ‰ แ‹จแŠซแˆญแ‰ณ แ‹ตแˆญแ‹ตแˆญแŠ• (deck of cards) แ‰ แˆแˆณแˆŒแАแ‰ต แ‰ แˆ˜แ‹แˆฐแ‹ต แАแ‹แข

โ€ข แŠจแแ‰ฐแŠ› แ‹ˆแŒชแฆ แˆˆแˆ˜แŒˆแŠ•แ‰ฃแ‰ต 8 แ‰ขแˆŠแ‹ฎแŠ• แ‹จแˆฒแŠ•แŒ‹แ–แˆญ แ‹ถแˆ‹แˆญ แ‹จแˆแŒ€ แˆฒแˆ†แŠ•แฃ แ‰ แ‹ˆแ‰…แ‰ฑ แ‰ แ‹“แˆˆแˆ›แ‰ฝแŠ• แ‹แ‹ต แ‹จแАแ‰ แˆจ แ‹จแˆ˜แ‹แŠ“แŠ› แˆตแแˆซ แАแ‹แข

โ€ข แ‹จแ‹แŠ“แ‰ฅ แ‹แˆƒ แŠ แŒ แ‰ƒแ‰€แˆแฆ แŠจแŠแ‰ต แˆˆแŠแ‰ฑ แ‹ซแˆˆแ‹ แ‹จแˆŽแ‰ฐแˆต แŠ แ‰ แ‰ฃ แ‰…แˆญแ… แ‹ซแˆˆแ‹ แˆ™แ‹šแ‹จแˆ แ‹จแ‹แŠ“แ‰ฅ แ‹แˆƒแŠ• แˆฐแ‰ฅแˆตแ‰ฆ แˆˆแˆ…แŠ•แƒแ‹ แˆ˜แŒธแ‹ณแŒƒ แ‰คแ‰ถแ‰ฝ แŠ แŒˆแˆแŒแˆŽแ‰ต แŠฅแŠ•แ‹ฒแ‹แˆ แ‹ซแ‹ฐแˆญแŒ‹แˆแข

โ€ข แ‹แˆตแŒฃแ‹Š แ‹จแŒ€แˆแ‰ฃ แŒ‰แ‹žแฆ แ‰ แˆ…แŠ•แƒแ‹ แ‹แˆตแŒฅ แ‰ฃแˆˆแ‹ แ‹จแŒˆแ‰ แ‹ซ แˆ›แ‹•แŠจแˆ (Mall) แˆ˜แŠซแŠจแˆ แˆฐแ‹ แˆฐแˆซแˆฝ แ‰ฆแ‹ญ แ‹ซแˆˆ แˆฒแˆ†แŠ• แ‰ แŒ€แˆแ‰ฃ แˆ˜แ‹˜แ‹‹แ‹ˆแˆญ แ‹ญแ‰ปแˆ‹แˆแข

@etconp
โค14๐Ÿ‘3๐Ÿ‘1
๐Ÿ‘‰แ‹จแˆชแ‰ดแŠ•แˆฝแŠ• (Retention) แŒˆแŠ•แ‹˜แ‰ฅแก แ‹“แˆ‹แˆ›แฃ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แˆ˜แŒ แŠ• แŒˆแ‹ฐแ‰ฅ แŠฅแŠ“ แŠ แ‹ˆแŒฃแŒฅ

แ‰ แŒแ‹ดแˆซแˆ แ‹จแˆ˜แŠ•แŒแˆฅแ‰ต แŒแ‹ฅแŠ“ แŠ•แ‰ฅแˆจแ‰ต แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แŠคแŒ€แŠ•แˆฒ แ‹จแŒจแˆจแ‰ณ แˆฐแАแ‹ต (SBD-Works) แˆ˜แˆ แˆจแ‰ตแฃ แ‹จแˆชแ‰ดแŠ•แˆฝแŠ• (Retention) แŒˆแŠ•แ‹˜แ‰ฅ แˆ›แˆˆแ‰ต แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹จแŒˆแ‰ฃแ‹แŠ• แ‹แˆ แ‰ แ‰ตแŠญแŠญแˆ แˆ˜แˆแŒธแˆ™แŠ• แˆˆแˆ›แˆจแŒ‹แŒˆแŒฅ แŠฅแŠ“ แ‹จแˆ˜แŒจแˆจแˆป แˆ‚แˆณแ‰ฅ แŠจแˆ˜แ‹ˆแˆซแˆจแ‹ฑ แ‰ แŠแ‰ต แˆˆแˆšแ‰ณแ‹ฉ แŒ‰แ‹ตแˆˆแ‰ถแ‰ฝ แŠฅแŠ•แ‹ฐ แ‹‹แˆตแ‰ตแŠ“ แŠฅแŠ•แ‹ฒแ‹ซแŒˆแˆˆแŒแˆ แŠ แˆฐแˆชแ‹ (Employer) แŠจแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แŠญแแ‹ซ แˆ‹แ‹ญ แ‰€แŠ•แˆถ แ‹จแˆšแ‹ซแˆตแ‰€แˆจแ‹ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แˆ˜แŒ แŠ• แАแ‹แข

แ‹จแ‰…แŠ“แˆฝ แŠ แˆฐแˆซแˆญ (GCC Clause 61)
แ‰ GCC แŠ แŠ•แ‰€แŒฝ 64.1 (แˆ)แˆ˜แˆ แˆจแ‰ตแฃ แ‰ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹จแˆšแ‰€แˆญแ‰ก แ‹จแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แŒŠแ‹œแ‹ซแ‹Š แ‹จแŠญแแ‹ซ แˆฐแˆญแ‰ฐแŠแŠฌแ‰ถแ‰ฝ (Interim Payment Certificates) แ‰ GCC แŠ แŠ•แ‰€แŒฝ 61 แ‰ แ‰ฐแŒ แ‰€แˆฐแ‹ แˆ˜แˆ แˆจแ‰ต แ‹จแˆชแ‰ดแŠ•แˆฝแŠ• แ‰…แŠ“แˆฝ แ‹ญแ‹ฐแˆจแŒแ‰ฃแ‰ธแ‹‹แˆแข แ‹ญแˆ… แŠ แˆฐแˆซแˆญ แŠ แˆฐแˆชแ‹ แ‰ แˆฅแˆซแ‹ แˆ‚แ‹ฐแ‰ต แ‹แˆตแŒฅ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‹‹แˆตแ‰ตแŠ“ แŠฅแŠ•แ‹ฒแŠ–แˆจแ‹ แ‹ซแˆตแ‰ฝแˆˆแ‹‹แˆแข

แ‹จแ‰ฐแ‰€แŠ“แˆฝ แˆ˜แŒ แŠ• แŒˆแ‹ฐแ‰ฅ (based on SCC)
แ‰ แ‹แˆ‰ แˆแ‹ฉ แˆแŠ”แ‰ณแ‹Žแ‰ฝ (SCC) แˆ‹แ‹ญ แ‹จแˆšแ‰€แАแˆฐแ‹ แˆ˜แ‰ถแŠ› แ‹จแˆšแ‹ˆแˆฐแŠ• แ‰ขแˆ†แŠ•แˆแฃ แŠ แ‰ฅแ‹›แŠ›แ‹แŠ• แŒŠแ‹œ แŠจแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แŒŠแ‹œแ‹ซแ‹Š แŠญแแ‹ซ (IP) แˆ‹แ‹ญ 5% แ‹จแˆ˜แ‰€แАแˆต แŠ แˆฐแˆซแˆญ แ‹จแ‰ฐแˆˆแˆ˜แ‹ฐ แˆฒแˆ†แŠ•แฃ แ‰  GCC แŠ แŠ•แ‰€แŒฝ 61 แˆ˜แˆ แˆจแ‰ต แŒแŠ• แ‹จแˆšแŒ แˆซแ‰€แˆ˜แ‹ แŒ แ‰…แˆ‹แˆ‹ แ‹จแˆชแ‰ดแŠ•แˆฝแŠ• แˆ˜แŒ แŠ• แ‰ แˆ›แŠ•แŠ›แ‹แˆ แˆแŠ”แ‰ณ แŠจแŒ แ‰…แˆ‹แˆ‹ แ‹จแ‹แˆ แ‹‹แŒ‹แ‹ 10% แˆ˜แ‰ฅแˆˆแŒฅ แŠฅแŠ•แ‹ฐแˆŒแˆˆแ‰ แ‰ต แ‰ แŒฅแ‰ฅแ‰… แ‰ฐแ‹ฐแŠ•แŒแŒ“แˆแข

แ‹จแˆชแ‰ดแŠ•แˆฝแŠ• (Retention) แŒˆแŠ•แ‹˜แ‰ฅ แˆ˜แ‰ฝ แ‹ญแˆˆแ‰€แ‰ƒแˆ??

1โƒฃFirst releaseแฆแŒŠแ‹œแ‹ซแ‹Š แˆญแŠญแŠญแ‰ฅ (Provisional Acceptance) แ‰ฐแˆแŒฝแˆž แ‹จแˆแˆตแŠญแˆญ แ‹ˆแˆจแ‰€แ‰ต แˆฒแˆฐแŒฅแฃ แ‹จแ‰ฐแŒ แˆซแ‰€แˆ˜แ‹ แ‹จแˆชแ‰ดแŠ•แˆฝแŠ• แŒˆแŠ•แ‹˜แ‰ฅ 50 แ‰ แˆ˜แ‰ถแ‹ (แŒแˆ›แˆน) แˆˆแŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹ญแˆˆแ‰€แ‰ƒแˆแข

2โƒฃFinal Releaseแฆแ‰ GCC แŠ แŠ•แ‰€แŒฝ 89 แˆ˜แˆ แˆจแ‰ต แ‹จแˆ˜แŒจแˆจแˆป แˆญแŠญแŠญแ‰ฅ (Final Acceptance) แ‰ฐแˆแŒฝแˆž แ‹จแˆแˆตแŠญแˆญ แ‹ˆแˆจแ‰€แ‰ต แˆฒแˆฐแŒฅ แŠฅแŠ“ แ‹จแŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แŒแ‹ดแ‰ณแ‹Žแ‰ฝ แ‰ แˆ™แˆ‰ แˆฒแŒ แŠ“แ‰€แ‰ แ‰€แˆชแ‹ 50 แ‰ แˆ˜แ‰ถ แ‹ญแˆˆแ‰€แ‰ƒแˆแข


แ‰ แ‰ฃแŠ•แŠญ แ‹‹แˆตแ‰ตแŠ“ (Bank Guarantee) แˆ˜แ‰ฐแŠซแ‰ต แ‰ แ‹แˆ แˆแ‹ฉ แˆแŠ”แ‰ณแ‹Žแ‰ฝ (SCC) แˆ‹แ‹ญ แŠจแ‰ฐแˆแ‰€แ‹ฐแฃ แŠ แˆฐแˆชแ‹ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แˆแˆˆแ‰ฐแŠ›แ‹แŠ• 50 แ‰ แˆ˜แ‰ถ แ‹จแˆชแ‰ดแŠ•แˆฝแŠ• แŒˆแŠ•แ‹˜แ‰ฅ แ‹ซแˆˆแˆแŠ•แˆ แ‰…แ‹ตแˆ˜ แˆแŠ”แ‰ณ แ‰ แˆšแ‰€แˆญแ‰ฅ แ‹จแ‰ฃแŠ•แŠญ แ‹‹แˆตแ‰ตแŠ“ (Unconditional Bank Guarantee) แŠฅแŠ•แ‹ฒแ‰ฐแŠซ แˆŠแˆแ‰…แ‹ต แ‹ญแ‰ฝแˆ‹แˆแข แ‹ญแˆ…แˆ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹จแ‰ฐแ‹ซแ‹˜แ‰ แ‰ตแŠ• แŒˆแŠ•แ‹˜แ‰ฅ แŠ แˆตแ‰€แ‹ตแˆž แ‰ แˆ›แ‹แŒฃแ‰ต แˆˆแˆฅแˆซ แˆ›แˆตแŠฌแŒƒ แŠฅแŠ•แ‹ฒแŒ แ‰€แˆ แ‹ญแˆจแ‹ณแ‹‹แˆแข

#ContractAdministration #ConstructionEngineering #EthiopianConstruction #RetentionMoney #FPPA #SBD #NCB #ContractLaw #EngineeringTips #ProjectFinance

@etconp
โค15๐ŸŽ‰1
#ADVERTISEMENT

Twenty Seven Waterproofing Construction Materials & Chemicals

๐Ÿ—๏ธ แˆˆแˆแˆ‰แˆ แ‹“แ‹ญแАแ‰ต แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹Žแ‰ฝ (Building, Finishing, Maintenance) แ‹จแˆšแ‹ซแˆตแˆแˆแŒ‰ แŒฅแˆซแ‰ณแ‰ธแ‹แŠ• แ‹จแŒ แ‰ แ‰ แ‹จConstruction Chemicals แŠฅแŠ“ แŠฅแ‰ƒแ‹Žแ‰ฝ แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‰ แˆ™แˆ‰ แŠ แŒˆแˆแŒแˆŽแ‰ต!

๐Ÿ”น แ‹จแˆแŠ“แ‰€แˆญแ‰ฃแ‰ธแ‹ แ‹จแ‰ณแ‹ˆแ‰ แ‰ฅแˆซแŠ•แ‹ถแ‰ฝ:
            โ–บSika ๐ŸŽ–
            โ–บMC (MC-Bauchemie)
            โ–บDarma
            โ–บSimentek
๐Ÿ”น แ‹จแˆแŠ“แ‰€แˆญแ‰ฃแ‰ธแ‹ แŠฅแ‰ƒแ‹Žแ‰ฝ:
Membrane
Sealant
Silicone
Waterproof
     -Acrylic
     -Cementicious
     -Membrane
Tile Adhesives & Tile Filler Materials
Grouts Tile
Concrete Admixtures
   -Plasticizers
   -Accelerators,
   - Retarders
Repair & Strengthening Products
Protective Coatings
Bonding Agents
Crack Repair Solutions

แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แ‰ฅแ‹™ แ‹˜แˆ˜แŠ“แ‹Š แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆ˜แแ‰ตแˆ„แ‹Žแ‰ฝ
Contractors
Builders
Engineers
แ‹จแŒแˆ แ‰คแ‰ต แˆฐแˆชแ‹Žแ‰ฝ
Proforma & Direct Sale

        โœ… แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹
        โœ… แˆ™แ‹ซแ‹Š แˆแŠญแˆญ แŠฅแŠ“ แ‹จแ‰ดแŠญแŠ’แŠญ แ‹ตแŒ‹แ
        โœ… แˆˆแ‰ฅแ‹›แ‰ต แŒแ‹ฅ แ‰ แ‰‚ แŠ แ‰…แˆญแ‰ฆแ‰ต
        โœ… แˆแŒฃแŠ• แŠ แŒˆแˆแŒแˆŽแ‰ต แŠฅแŠ“ แ‰ณแˆ›แŠแАแ‰ต

๐Ÿ“ฆ แˆˆแ•แˆฎแŒ€แŠญแ‰ต แŠ แ‰…แˆญแ‰ฆแ‰ต แ‹แŒแŒ แАแŠ•!
๐Ÿ“ž +251929616411/+251940362640
๐Ÿ“ Jackros

To join our Telegram channel ๐Ÿ‘‡
https://t.me/twentysevenwaterproofing
โค3๐Ÿฅฐ1
๐Ÿ‘‰แ‹จแˆแˆ…แŠ•แ‹ฒแˆตแŠ“ แŒแˆแ‰ต
/Engineering Estimation/

๐Ÿ’ซแ‹จแˆแˆ…แŠ•แ‹ฒแˆตแŠ“ แŒแˆแ‰ต/Engineering Estimation/ แ‹จแ‹ˆแ‰…แ‰ฑ แ‹จแŒˆแ‰ แ‹ซ แ‹‹แŒ‹ แ‰ณแˆณแ‰ข แ‹ซแ‹ฐแˆจแŒˆ แˆ˜แˆ†แŠ• แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแข แ‹ญแˆ… แŠซแˆแˆ†แА แŒแ‹ฅ แŠ แˆแƒแ€แˆ แˆ˜แˆ˜แˆชแ‹ซ แ‰แŒฅแˆญ 70/2017 แŠ แŠ•แ‰€แŒฝ 2 แŠ•แ‹‘แˆต แŠ แŠ•แ‰€แŒฝ 7แฃ 8 แŠฅแŠ“ 9 แˆ˜แˆฐแˆจแ‰ต แŠจแˆ˜แŒ แŠ• แ‰ แˆ‹แ‹ญ แ‹จแ‰ฐแŒ‹แАแА แ‹จแŒจแˆจแ‰ณ แ‹‹แŒ‹(excessively high bid price)แฃ แ‹จแ‰ฐแˆฐแ‰ แˆจ แ‹จแŒจแˆจแ‰ณ แ‹‹แŒ‹(unusually low bid price) แŠฅแŠ“ แŠฅแŒ…แŒ แ‹จแ‰ฐแˆฐแ‰ แˆจ แ‹จแŒจแˆจแ‰ณ แ‹‹แŒ‹(excessive low bid price) แ‰ แ‰ตแŠญแŠญแˆ แˆ˜แˆˆแ‹จแ‰ต แŠ แ‹ญแ‰ปแˆแˆแข

โญ๏ธแ‹จแ‰ฐแˆฐแ‰ แˆจ แ‹จแŒจแˆจแ‰ณ แ‹‹แŒ‹ แŠฅแŠ“ แŠฅแŒ…แŒ แ‹จแ‰ฐแˆฐแ‰ แˆจ แ‹จแŒจแˆจแ‰ณ แ‹‹แŒ‹ แˆˆแˆ˜แˆˆแ‹จแ‰ต แŒแ‹ฅ แˆแƒแˆšแ‹ แˆ˜/แ‰คแ‰ต แˆˆแŒแŠ•แ‰ฃแ‰ณ แˆฅแˆซแ‹ แ‰ แŒฅแŠ“แ‰ต แ‹จแŒˆแˆ˜แ‰ฐแ‹ แŒ แ‰…แˆ‹แˆ‹ แ‹‹แŒ‹ แŠ แŒˆแˆแŒแˆŽแ‰ต แˆ‹แ‹ญ แŠฅแŠ•แ‹ฐแˆšแ‹แˆ แ‰ แŒแˆแŒฝ แ‰ฐแ‹ฐแŠ•แŒแŒ“แˆแข

๐Ÿšงแ‰ แŒฅแŠ“แ‰ต แ‹จแ‰ฐแŒˆแˆ˜แ‰ฐ แ‹‹แŒ‹ แˆ›แˆˆแ‰ต แˆแŠ• แˆ›แˆˆแ‰ต แŠฅแŠ•แ‹ฐแˆ†แА แŒแˆแŒฝ แАแ‹แข

แ‹จแˆแˆ…แŠ•แ‹ฒแˆตแŠ“ แŒแˆแ‰ฑ แ‰ แŒฅแŠ“แ‰ต แ‹จแ‰ฐแŒˆแˆ˜แ‰ฐ แ‰ตแŠญแŠญแˆˆแŠ› แ‹ˆแ‰…แ‰ณแ‹Š แ‹จแŒˆแ‰ แ‹ซ แ‹‹แŒ‹ แˆ˜แˆ†แŠ• แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแข

แАแŒˆแˆญ แŒแŠ• แŠ แŠ•แ‹ณแŠ•แ‹ต แˆ˜/แ‰คแ‰ถแ‰ฝ แ‹ˆแ‰…แ‰ณแ‹Š แ‹ซแˆแˆ†แА แ‹จแˆแˆ…แŠ•แ‹ฒแˆตแŠ“ แŒแˆแ‰ต แ‰ แˆ˜แŒ แ‰€แˆ แ‰ฐแŒซแˆซแ‰พแ‰ฝแŠ• แŠจแŒจแˆจแ‰ณ แ‹แŒช แˆˆแˆ›แ‹ตแˆจแŒ แ‹ญแˆžแŠญแˆซแˆ‰แข

แ‰ แ‰ฐแŒซแˆซแ‰น แ‹‹แŒ‹ แˆ‹แ‹ญ แแˆจแŒƒ แŠจแˆ˜แ‹ฐแˆจแŒ‰ แ‰ แŠแ‰ต แ‰ตแŠญแŠญแˆˆแŠ› แ‹ˆแ‰…แ‰ณแ‹Š แ‹จแŒˆแ‰ แ‹ซ แ‹‹แŒ‹ แŒฅแŠ“แ‰ต แŠฅแŠ“ แ‹ˆแ‰…แ‰ณแ‹Š แ‹จแˆแˆ…แŠ•แ‹ฒแˆตแŠ“ แŒแˆแ‰ต แˆ˜แŠ–แˆญ แŠ แˆˆแ‰ แ‰ตแข

แ‹จแˆแˆ…แŠ•แ‹ฒแˆตแŠ“ แŒแˆแ‰ตแŠ• แ‰ แ‰ฐแˆ˜แˆˆแŠจแ‰ฐ แŒแ‹ฅ แˆแƒแˆš แˆ˜/แ‰คแ‰ถแ‰ฝ แŒฅแŠ•แ‰ƒแ‰„ แ‰ขแ‹ซแ‹ฐแˆญแŒ‰ แˆ˜แˆแŠซแˆ แАแ‹แข

๐Ÿ‘‰Please Subscribe Our Youtube Channel๐Ÿ‘‡

https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG

@etconp
โค9
แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‰ตแŒˆแАแ‰ฃแˆˆแ‰ฝ! ๐Ÿ—๏ธ๐Ÿ‡ช๐Ÿ‡น

แ‹จแˆ€แŒˆแˆซแ‰ฝแŠ•แŠ• แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ•แŠ“ แ‹จแˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แŒˆแŒฝแ‰ณ แ‹จแˆšแ‰€แ‹ญแˆญ แ‰ณแˆ‹แ‰… แˆณแˆแŠ•แ‰ต แ‰ฐแ‹ฐแŒแˆทแˆแข

แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ตแŠ“ แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆณแˆแŠ•แ‰ต "แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‰ตแŒˆแАแ‰ฃแˆˆแ‰ฝ!" แ‰ แˆšแˆ แˆ˜แˆช แ‰ƒแˆ แŠจแАแŒˆ แˆ›แˆˆแ‰ตแˆ แŠจแˆšแ‹ซแ‹šแ‹ซ 9/ 2018 แŒ€แˆแˆฎ แŠฅแˆตแŠจ แˆšแ‹ซแ‹แ‹ซ  12 แ‰€แŠ• 2018 แ‹“.แˆ แ‹ตแˆจแˆต แ‰ แŠ แ‹ฒแˆต แŠขแŠ•แ‰ฐแˆญแŠ“แˆฝแŠ“แˆ แŠฎแŠ•แ‰ฌแŠ•แˆฝแŠ• แˆ›แ‹•แŠจแˆ  แ‹ฐแˆ›แ‰… แ‹แŒแŒ…แ‰ต แŠฅแŠ•แ‹ฐแˆšแŠซแˆ„แ‹ต แ‹จแŠจแ‰ฐแˆ›แŠ“ แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แˆšแŠ’แˆตแ‰ดแˆญ แŠ แˆตแ‰ณแ‹แ‰‹แˆแข

แ‹ญแˆ… แ‰ณแˆ‹แ‰… แˆ˜แ‹ตแˆจแŠญ :-

๐Ÿ”น แ‹จแ‰ดแŠญแŠ–แˆŽแŒ‚ แˆ›แ‹•แŠจแˆแฆ แŠจแŒแŠ•แ‰ฃแ‰ณ แŠฅแ‰ƒแ‹Žแ‰ฝ แŠฅแˆตแŠจ แŒแ‹™แ แˆ›แˆบแАแˆชแ‹Žแ‰ฝแฃ แ‹˜แˆ˜แŠ“แ‹Š แ‹ฒแŒ‚แ‰ณแˆ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‰ดแŠญแŠ–แˆŽแŒ‚แ‹Žแ‰ฝแŠ“ แ‹˜แˆ‹แ‰‚ แˆ˜แแ‰ตแˆ”แ‹Žแ‰ฝ แˆˆแ‹•แ‹ญแ‰ณ แ‹ญแ‰€แˆญแ‰ฃแˆ‰แข

๐Ÿ”น แ‹จแŒˆแ‰ แ‹ซ แ‰ตแˆตแˆตแˆญแฆ แ‹จแˆ€แŒˆแˆญ แ‹แˆตแŒฅ แŠ แˆแˆซแ‰พแ‰ฝ แˆแˆญแ‰ถแ‰ปแ‰ธแ‹แŠ• แ‹จแˆšแ‹ซแˆตแ‰ฐแ‹‹แ‹แ‰แ‰ แ‰ตแŠ“ แ‹“แˆˆแˆ แŠ แ‰€แ แŠฉแ‰ฃแŠ•แ‹ซแ‹Žแ‰ฝ แ‰ แแŒฅแАแ‰ต แ‰ แˆ›แ‹ฐแŒ แˆ‹แ‹ญ แ‹ˆแ‹ณแˆˆแ‹ แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แŒˆแ‰ แ‹ซ แ‹จแˆšแŒˆแ‰กแ‰ แ‰ต แˆแ‰น แˆแŠ”แ‰ณ แ‹ญแˆแŒ แˆซแˆแข

๐Ÿ”น แ‹•แ‹แ‰€แ‰ตแŠ“ แˆแŒ แˆซแฆ แ‹จแ‹˜แˆญแ‰ แ‰ฐแ‹‹แŠ“แ‹ฎแ‰ฝแŠ“ แ‹จแˆแŒ แˆซ แ‰ฃแˆˆแ‰คแ‰ถแ‰ฝ แˆแˆแ‹ต แ‹จแˆšแˆˆแ‹‹แ‹ˆแŒกแ‰ แ‰ตแŠ“ แŠ แ‹ณแ‹ฒแˆต แŠ แˆฐแˆซแˆฎแ‰ฝแŠ• แ‹จแˆšแ‰€แˆตแˆ™แ‰ แ‰ต แˆ˜แ‹ตแˆจแŠญ แАแ‹แข

๐Ÿ”น แˆฅแˆซ แ‹•แ‹ตแˆแฆ แŠจแแ‰ฐแŠ› แ‹จแŠขแŠฎแŠ–แˆš แŠฅแŠ•แ‰…แˆตแ‰ƒแˆด แ‹จแˆšแ‰ณแ‹ญแ‰ แ‰ตแŠ“ แˆˆแ‹œแŒŽแ‰ฝ แˆฐแŠ แ‹จแˆฅแˆซ แ‹•แ‹ตแˆ แ‹จแˆšแˆแŒฅแˆจแ‹ แ‹ญแˆ… แ‹˜แˆญแ แ‹ซแˆˆแ‰ แ‰ต แ‹ฐแˆจแŒƒ แ‰ แ‹แˆญแ‹แˆญ แ‹ญแ‰ƒแŠ›แˆแข

แŠญแ‰ฅแˆญแ‰ต แˆšแŠ’แˆตแ‰ตแˆญ แ‹ˆ/แˆฎ แŒซแˆแ‰ฑ แˆณแŠ’ แ‰ แˆ˜แŒแˆˆแŒซแ‰ธแ‹ แŠฅแŠ•แ‹ฐแŒ แ‰€แˆฑแ‰ตแค แ‹แŒแŒ…แ‰ฑ แ‹จแŒแŠ•แ‰ฃแ‰ณ แŒแ‰ฅแ‹“แ‰ถแ‰ฝแŠ• แ‰ แˆ€แŒˆแˆญ แ‹แˆตแŒฅ แˆแˆญแ‰ต แˆˆแˆ˜แ‰ฐแŠซแ‰ตแŠ“ แแ‰ตแˆแ‹Š แ‹จแˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แ‰ฐแ‹ฐแˆซแˆฝแАแ‰ตแŠ• แˆˆแˆ›แˆจแŒ‹แŒˆแŒฅ แ‹จแˆšแ‹ฐแˆจแŒˆแ‹แŠ• แŒ‰แ‹ž แ‹จแˆšแ‹ซแ‹แŒฅแŠ• แАแ‹แข แˆตแˆˆแˆ†แАแˆ แˆ˜แˆ‹แ‹ แ‹จแˆ›แˆ…แ‰ แˆซแ‰ฝแŠ• แŠ แ‰ฃแˆ‹แ‰ถแ‰ฝ
แ‹จแ‹˜แˆญแ‰ แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝแฃ แ‰ฃแˆˆแˆ€แ‰ฅแ‰ถแ‰ฝแŠ“ แŒแŠ•แ‰ฃแ‰ณ แ‹ˆแ‹ณแ‹ถแ‰ฝ แ‰ แˆ™แˆ‰ แ‰€แŒ แˆฏแ‰ฝแˆ แ‰ แ‹šแˆ แŠคแŒแ‹šแ‰ฅแˆฝแŠ• แŠฅแŠ•แ‹ฒแˆ†แŠ• แŠฅแŠ•แŒ‹แ‰ฅแ‹›แˆˆแŠ•!

@etconp
โค8
๐Ÿ—๏ธโšก๐Ÿ‡ช๐Ÿ‡น Ethiopia Electric Utility Headquarters โ€“ Rising Above Addis Ababa

๐Ÿ“ Location: Mexico Square, Addis Ababa
๐Ÿข Structure: 5B + G + 2M + 63 Floors + 7 Upper Floors
๐Ÿ“ Height: 327.5 meters (300m+ landmark)

๐Ÿ‘ทโ€โ™‚๏ธ Consultant: Khatib & Alami Consulting Engineers
๐Ÿข Sub-Consultant: ETG Designers & Consultants S.C.

๐Ÿ’ฐ Estimated Cost: 7 Billion Birr
๐Ÿ“ Plot Size: 20,792 mยฒ
๐Ÿ—๏ธ Total Floor Area: 208,724 mยฒ (subject to change)

The Ethiopian Electric Power Headquarters is a monumental 63-story skyscraper currently under construction at Mexico Square. Designed to serve as the central administrative hub for Ethiopian Electric Power (EEP), this iconic tower will play a vital role in managing the nationโ€™s electricity generation, transmission, and distribution.

๐ŸŒ Once completed, it is set to become one of the tallest buildings in Sub-Saharan Africaโ€”redefining Addis Ababaโ€™s skyline and symbolizing Ethiopiaโ€™s growing infrastructure.

@etconp
โค14๐Ÿ‘1
ADVERTISMENT

แ‰ณแˆแˆซแ‰ต แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„ แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

โœ…แ‹จแˆแŠ•แˆฐแŒฃแ‰ธแ‹ แŠ แŒˆแˆแŒแˆŽแ‰ถแ‰ฝ

๐Ÿ”… แ•แˆŒแ‰ต any Size & thickness
๐Ÿ”… แŒ„ แ‰ฆแˆแ‰ต (แŒฅแˆญแˆต แˆ›แ‹‰แŒฃแ‰ตแŠ“ แˆ›แŒ แ)

๐Ÿ”… แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ  [modefic] แˆตแˆซแ‹Žแ‰ฝแŠ• แŠฅแŠ•แˆฐแˆซแˆˆแŠ•แข

โ™ฆ๏ธ แˆ›แŠ•แŠ›แ‹‰แŠ•แˆ แ‰ฅแˆจแ‰ณ แ‰ฅแˆจแ‰ต แŠฅแŠ•แŒˆแ‹›แˆˆแŠ•แข

โ˜Ž๏ธแˆตแˆแŠญ 0904040477 แ‹ˆแ‹ญแˆ 0911016833 แ‹ฐแ‹แˆˆแ‹ แ‹ซแŒแŠ™แŠ•
๐Ÿ“ฑแ‰ดแˆŒแŒแˆซแˆ แˆ‹แ‹ญ แฆhttps://t.me/heavenic1

แŠ แ‹ตแˆซแˆปแฆ  แ‰ 1.แˆ˜แˆญแŠซแ‰ถ
                แ‰.2 แŠ แ‹จแˆญ แŒคแŠ“  แŠชแ‹ณแА แˆแˆ…แˆจแ‰ต

แŒฅแˆซแ‰ตแŠ“ แ‰ณแˆ›แŠแАแ‰ต แˆ˜แˆˆแ‹ซแ‰ฝแŠ• แАแ‹แข
แ‰ณแˆแˆซแ‰ต แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„ แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข
โค3
๐Ÿ‘‰Concrete Mixing Process

๐ŸšงImportant 10 Q&A for Civil Engineering Student

1. What is Concrete Mixing?

Concrete mixing is the process of combining cement, sand, aggregate, and water to form a uniform mix.

2. What are the basic ingredients of concrete?

Cement, fine aggregate (sand), coarse aggregate, and water.

3. What is the purpose of mixing concrete?

To achieve a uniform and workable mixture with proper strength.

4. What is the correct mixing sequence?

Dry mix cement + sand + aggregate first, then add water gradually.

5. What is Water-Cement Ratio?

It is the ratio of water to cement, which controls strength and durability.

6. What is Workability?

Workability is the ease of placing and compacting concrete.

7. What is Hand Mixing?

Mixing concrete manually on a platform using tools like a shovel.

8. What is Machine Mixing?

Mixing concrete using a concrete mixer machine for better uniformity.

9. What happens if too much water is added?

It reduces strength and durability of concrete.

10. How to check proper mixing?

Concrete should be uniform in color and consistency without segregation.

#ConcreteMixing #ConcreteWork #CivilEngineering #ConstructionLife #BuildingConstruction #SiteWork
#MixDesign #ConcreteTechnology #CivilSiteEngineer #ConstructionTips #EngineeringBasics

@etconp
โค11
๐Ÿ‘‰Vacancy Announcement

๐Ÿšงoffice engineer

โบPosition Title: office engineer
๐Ÿ“Location: Addis Ababa, Ethiopia
โบEmployment Type: Full-Time

๐Ÿ“œPosition Summary

โบWe are seeking a highly competent and detail-oriented Engineer capable of performing both structural design and quantity surveying tasks.

โ–ถ๏ธThe ideal candidate must demonstrate strong structural design skills, cost control awareness, and practical understanding of construction processes.

๐Ÿ”ฐKey Responsibilities

-Prepare structural analysis and design for reinforced concrete and steel structures.
-Perform load calculations in accordance with relevant design codes.
-Develop structural drawings and details.
-Review and verify shop drawings.
-Conduct site inspections related to structural works.
Quantity Surveying skils
-Prepare detailed BOQs and material take-offs.
-Conduct cost estimation and budgeting.
-Evaluate contractor payment certificates.
-Analyze variation orders and prepare cost comparisons.
-Monitor material quantities against project execution.

๐Ÿ“œQualifications & Requirements

-BSc/MSc in Civil Engineering (Structural specialization preferred).
-3โ€“7 years of relevant experience in structural design and quantity surveying.
-Proficiency in structural software (e.g., ETABS, SAFE, SAP2000).
-Strong knowledge of reinforced concrete and steel design principles.
-Experience in BOQ preparation and cost analysis.
-Proficiency in AutoCAD and MS Excel.
-Good understanding of construction contracts and site practices.
-Ability to work independently and meet deadlines.

๐ŸŽฒRequired Competencies

-High attention to detail.
-Strong analytical and problem-solving skills.
-Integrity and accountability.
-Effective communication and reporting skills.

โ‡๏ธApplication Requirements

-Interested applicants shall submit:
-Updated CV
-Portfolio of structural design works
-List of projects with clear description of role

โนOnly shortlisted candidates will be contacted.

๐Ÿ“ฉSend to @natanabiy with the subject-office engineer

@etconp
โค1
๐Ÿ‘‰JOB VACANCY

โญ๏ธJob Title:Sanitary Engineer

๐Ÿ“Location: Remote

โบEmployment Type:Full-Time / Contract

๐Ÿ”ฐAbout the Role:

โบWe are seeking a qualified and detail-oriented Sanitary Engineer to join our team remotely.
โบThe ideal candidate will be responsible for designing, reviewing, and supervising water supply, drainage, and sanitation systems for various projects.
โบThis role requires strong technical expertise, coordination skills, and the ability to work independently in a remote environment.

โ‡๏ธKey Responsibilities:

* Design and review plumbing, drainage, and sanitation systems in compliance with relevant codes and standards
* Prepare technical drawings, specifications, and BOQs
* Coordinate with architects, structural engineers, and MEP teams
* Review shop drawings and material submittals
* Provide technical support during construction and resolve site-related issues remotely
* Ensure all designs meet safety, environmental, and regulatory requirements
* Conduct system analysis and recommend improvements where necessary

๐Ÿ“œQualifications and Requirements:

* Bachelorโ€™s degree in Sanitary Engineering, Civil Engineering, or related field
* Minimum 4 years of relevant experience in building services or infrastructure projects
* Strong knowledge of plumbing systems, water supply, drainage, and wastewater management
* Proficiency in design software (AutoCAD, Revit, or similar)
* Familiarity with international standards and local codes
* Excellent communication and coordination skills
* Ability to work independently and meet deadlines in a remote setting

๐ŸŽฒPreferred Skills:

* Experience with large-scale or mixed-use developments
* Knowledge of sustainable and water-efficient design practices
* Experience in remote project coordination

๐ŸทWhat We Offer:

* Flexible remote working environment
* Competitive compensation
* Opportunity to work on diverse and challenging projects
* Collaborative and professional team environment

๐Ÿ“ฉHow to Apply:

โบInterested candidates should submit their CV, portfolio (if applicable), and a brief cover letter outlining their experience and suitability for the role send at @natanabiy

โบSubject: Sanitary Engineer

@etconp
โค6๐Ÿ‘3
๐Ÿ‘‰ INTERCON Construction Chemicals 

โ— Concrete Admixtures
โ— Bonding Agents
โ— Waterproofings
โ— Wall Putty, Prime Coat
โ— Concrete Repair Mortar
โ— Floor hardener, Epoxy
โ— Grout, Self-level mortar
โ— Quartz paint, Contextra
โ— Tile Adhesive & Tile Joint Fillers 
โ— Geotextiles and other construction chemicals and materials

โ˜Ž๏ธ Tel: 0961955555

๐Ÿ”น Address 1: Signal road, around
Dinberwa Hospital

๐Ÿ”น Addres 2: Wellosefer, Infront of
Dani Plaza
โค3
๐Ÿ‘‰แ‹จแˆ˜แ‹‹แ‰…แˆญ แ‹แ‹ตแ‰€แ‰ต (Structural Failure) แˆ›แˆˆแ‰ต แŠ แŠ•แ‹ต แˆ˜แ‹‹แ‰…แˆญ แ‹ˆแ‹ญแˆ แ‹จแˆ˜แ‹‹แ‰…แˆฉ แŠญแแˆ แ‹จแ‰ฐแˆแˆˆแŒˆแ‹แŠ• แˆฅแˆซ แ‰ แ‹ฐแˆ…แŠ“ แˆแŠ”แ‰ณ แˆ›แŠจแŠ“แ‹ˆแŠ• แˆฒแ‹ซแ‰…แ‰ฐแ‹ แАแ‹แข

๐ŸšงFailure แˆ›แˆˆแ‰ต แˆแˆแŒŠแ‹œ แˆ™แˆ‰ แ‹แ‹ตแ‰€แ‰ต (collapse) แˆ›แˆˆแ‰ต แˆ‹แ‹ญแˆ†แŠ•แˆ แˆŠแˆ†แŠ•แˆ แ‹ญแ‰ฝแˆ‹แˆ แ‹แˆญแ‹แˆฉแŠ• แŠฅแŠ•แˆ˜แˆแŠจแ‰ตแข

๐ŸทแŠฅแАแ‹šแˆ…แŠ•แˆ แˆŠแŒจแˆแˆญ แ‹ญแ‰ฝแˆ‹แˆแฆ

โ˜‘๏ธ แŠจแˆ˜แŒ แŠ• แ‰ แˆ‹แ‹ญ แˆ˜แ‰ณแŒ แ (deformation)
โ˜‘๏ธ แˆตแŠ•แŒฅแ‰… (cracking)
โ˜‘๏ธ แŠ แˆˆแˆ˜แˆจแŒ‹แŒ‹แ‰ต (instability)
โ˜‘๏ธ แ‰€แˆต แ‰ แ‰€แˆต แŒ‰แ‹ณแ‰ต (progressive damage)

1. Flexural Failure (แ‹จแˆ˜แ‰ณแŒ แ แ‹แ‹ตแ‰€แ‰ต)
แ‹จแˆ˜แ‰ณแŒ แ แŒญแАแ‰ต (bending moment) แŠจแŠ แ‰ฃแˆ‰ แŠ แ‰…แˆ แ‰ แˆ‹แ‹ญ แˆฒแˆ†แŠ• แ‹ญแŠจแˆฐแ‰ณแˆแข
แ‰ แ‰ฐแˆˆแˆแ‹ถ:
โ˜‘๏ธ แ‰ขแˆžแ‰ฝ (Beams)
โ˜‘๏ธ แˆตแˆ‹แ‰ฆแ‰ฝ (Slabs)
โ˜‘๏ธ Girders

โœ…แˆแŠญแŠ•แ‹ซแ‰ถแ‰ฝ
โ˜‘๏ธ แ‹ฐแŠซแˆ› แ‹ฒแ‹›แ‹ญแŠ•
โ˜‘๏ธ แŠจแˆ˜แŒ แŠ• แ‰ แˆ‹แ‹ญ แŒญแАแ‰ต
โ˜‘๏ธ แ‰ แ‰‚ แ‰ฅแˆจแ‰ต แŠ แˆˆแˆ˜แŠ–แˆญ

โœ…แˆแˆแŠญแ‰ถแ‰ฝ
โ˜‘๏ธ แŠจแˆ˜แŒ แŠ• แ‰ แˆ‹แ‹ญ แˆ˜แŒŽแŠ•แ‰ แˆต
โ˜‘๏ธ แˆตแŠ•แŒฅแ‰…
โ˜‘๏ธ Sagging

2. Shear Failure (แ‹จแˆธแˆญ แ‹แ‹ตแ‰€แ‰ต)
Shear stress แŠจแˆ˜แ‰‹แ‰‹แˆ แŠ แ‰…แˆ แˆฒแ‰ แˆแŒฅแข
แ‹“แ‹ญแАแ‰ถแ‰ฝ
โ˜‘๏ธ Diagonal Tension Failure
โ˜‘๏ธ แˆฐแ‹ซแ แˆตแŠ•แŒฅแ‰… แ‹ญแˆแŒ แˆซแˆแข
โ˜‘๏ธ Shear Compression Failure
แŠฎแŠ•แŠญแˆชแ‰ต แˆ˜แˆแˆญแŠจแˆตแข
โ˜‘๏ธ Punching Shear Failure
แ‰ Flat slab แŠจแŠฎแˆŽแŠ• แŠ แŠซแ‰ฃแ‰ขแข

3. Compression Failure (แ‹จแŒแŠแ‰ต แ‹แ‹ตแ‰€แ‰ต)
Compressive stress แŠจแŠ แ‰…แˆ แ‰ แˆ‹แ‹ญ แˆฒแˆ†แŠ•แข
แˆˆแˆแˆณแˆŒ:
โ˜‘๏ธ แŠฎแŠ•แŠญแˆชแ‰ต แˆ˜แˆแˆญแŠจแˆต/แˆ˜แ‹ฐแˆญแˆ˜แˆต
โ˜‘๏ธ แŠฎแˆŽแŠ• แ‹แ‹ตแ‰€แ‰ต

4. Tension Failure (แ‹จแˆ˜แŒŽแ‰ฐแ‰ต แ‹แ‹ตแ‰€แ‰ต)
Tensile stress แŠจแŠ แ‰…แˆ แ‰ แˆ‹แ‹ญแข
แˆˆแˆแˆณแˆŒ:
โ˜‘๏ธ แ‰ฅแˆจแ‰ต แˆ˜แ‰†แˆจแŒฅ
Reinforcement rupture

5. Buckling Failure (แ‹จแˆ˜แ‰ณแŒ แ แŠ แˆˆแˆ˜แˆจแŒ‹แŒ‹แ‰ต)
แ‰ Compression member แˆ‹แ‹ญ แ‹จแˆšแŠจแˆฐแ‰ต instability.
แ‰ แ‰ฐแˆˆแˆแ‹ถ:
โ˜‘๏ธ Columns
Steel members
โœ… Euler Buckling P_cr=(ฯ€^2 EI)/(KL)^2 โ”ค

6. Torsional Failure (แ‹จแˆ˜แŒ แˆแ‹˜แ‹ แ‹แ‹ตแ‰€แ‰ต)
Twisting stress แŠจแŠ แ‰…แˆ แ‰ แˆ‹แ‹ญแข
แˆแˆแŠญแ‰ถแ‰ฝ:
โ˜‘๏ธ Spiral cracking
โ˜‘๏ธ Twisting

7. Fatigue Failure (แ‹จแ‰ฐแ‹ฐแŒ‹แŒ‹แˆš แŒญแАแ‰ต แ‹แ‹ตแ‰€แ‰ต)
Repeated loading แˆแŠญแŠ•แ‹ซแ‰ตแข
แˆˆแˆแˆณแˆŒ:
โ˜‘๏ธ แ‰ตแˆซแŠแŠญ แŒญแАแ‰ต
โ˜‘๏ธ แŠ•แ‹แˆต
โ˜‘๏ธ แˆ›แˆฝแŠ• vibration

8. Creep Failure
แˆจแŒ…แˆ แŒŠแ‹œ sustained load แˆแŠญแŠ•แ‹ซแ‰ต deformation.
แ‰ แŠฎแŠ•แŠญแˆชแ‰ต แ‹ญแ‰ณแ‹ซแˆแข

9. Fracture Failure
โ˜‘๏ธ แˆ˜แˆฐแ‰ แˆญแข
Brittle Fracture
แ‹ตแŠ•แŒˆแ‰ฐแŠ›
โ˜‘๏ธ Ductile Fracture
แˆ›แˆตแŒ แŠ•แ‰€แ‰‚แ‹ซ แ‹ซแˆˆแ‹

10. Connection Failure
โ˜‘๏ธ Bolts failure
โ˜‘๏ธ Weld failure
โ˜‘๏ธ Anchorage pullout
แŠ แ‰ฅแ‹›แŠ›แ‹แŠ• แŒŠแ‹œ แ‹‹แŠ“แ‹ แŠ แ‹ญแ‹ˆแ‹ตแ‰…แˆโ€”
connection แАแ‹ แ‹จแˆšแ‹ˆแ‹ตแ‰€แ‹แข

11. Foundation Failure
โ˜‘๏ธ (แŠจGeotechnical Engineering แŒ‹แˆญ แ‹จแ‰ฐแ‹ซแ‹ซแ‹˜)
Bearing Failure
โ˜‘๏ธ แŠ แˆแˆญ แŒญแАแ‰ต แˆ›แˆธแŠจแˆ แˆฒแ‹ซแ‰…แ‰ต
โ˜‘๏ธ Settlement Failure
โ˜‘๏ธ Differential settlement
โ˜‘๏ธ Sliding Failure
แˆ˜แŠ•แˆธแˆซแ‰ฐแ‰ต
โ˜‘๏ธ Overturning Failure
แˆ˜แŒˆแˆแ‰ แŒฅ

12. Progressive Collapse
แŠ แŠ•แ‹ต แŠญแแˆ แ‹แ‹ตแ‰€แ‰ต แˆŒแˆ‹แŠ• แ‹ญแŠจแ‰ฐแˆ‹แˆแข
Column fails โ†’ Floor fails โ†’ Entire collapse

13. Corrosion Failure
โ˜‘๏ธ Rebar Corrosion
โ˜‘๏ธ Rust expansion
โ˜‘๏ธ Concrete cracking
โ˜‘๏ธ Spalling
โ˜‘๏ธ Steel Corrosion
โ˜‘๏ธ Section loss

14. Serviceability Failure
Collapse แ‰ฃแ‹ญแˆ†แŠ•แˆ structure แ‰ฐแŒแ‰ฃแˆฉแŠ• แˆฒแ‹ซแ‰…แ‰ตแข
โ˜‘๏ธ Excessive deflection
โ˜‘๏ธ Excessive vibration
โ˜‘๏ธ Leakage
โ˜‘๏ธ Crack limits exceeded

15. Dynamic / Extreme Load Failures
โ˜‘๏ธ Earthquake Failure
โ˜‘๏ธ Soft story collapse
โ˜‘๏ธ Shear failure
โ˜‘๏ธ Wind Failure
โ˜‘๏ธ Roof uplift
โ˜‘๏ธ Fire Failure
แŠจแแ‰ฐแŠ› แˆ™แ‰€แ‰ต แˆแŠญแŠ•แ‹ซแ‰ต strength loss.

16. Construction Stage Failure
แ‰ แŒแŠ•แ‰ฃแ‰ณ แŒŠแ‹œ แ‹จแˆšแŠจแˆฐแ‰ต:
โ˜‘๏ธ Formwork แ‰ แแŒฅแАแ‰ต แˆ›แŠ•แˆณแ‰ต
โ˜‘๏ธ Poor shoring
โ˜‘๏ธ Construction sequence errors

17. Design Failure
แ‹จแ‰ฐแˆณแˆณแ‰ฐ:
โ˜‘๏ธ Load assumptions
โ˜‘๏ธ Analysis
โ˜‘๏ธ Detailing
แ‰ฅแ‹™ แ‹แ‹ตแ‰€แ‰ถแ‰ฝ แ‹‹แŠ“ แˆแŠญแŠ•แ‹ซแ‰ณแ‰ธแ‹ แ‹ญแˆ… แАแ‹แข
แˆแ‹ตแ‰ฆแ‰ฝ
โœ… Strength Failures
โ˜‘๏ธ Flexure
โ˜‘๏ธ Shear
โ˜‘๏ธ Compression
โ˜‘๏ธ Tension
โ˜‘๏ธ Torsion
โœ… Stability Failures
โ˜‘๏ธ Buckling
โ˜‘๏ธ Sliding
โ˜‘๏ธ Overturning
โœ… Material Failures
โ˜‘๏ธ Fatigue
โ˜‘๏ธ Creep
โ˜‘๏ธ Fracture
โ˜‘๏ธ Corrosion
โœ… System Failures
โ˜‘๏ธ Connection Failure
โ˜‘๏ธ Progressive Collapse
โ˜‘๏ธGround Failures
โ˜‘๏ธ Bearing
โ˜‘๏ธ Settlement
โ˜‘๏ธExtreme Event Failures
โ˜‘๏ธ Earthquake
โ˜‘๏ธ Fire
โ˜‘๏ธ Wind
โ˜‘๏ธ Impact

Via Mekamu

@etconp
โค14๐Ÿ‘8
๐Ÿ‘‰Types of Beams in Construction Engineering

1. Simply Supported Beam
- Supported at both ends.
- Transfers load directly to supports.
- Common in bridges and simple structures.

2. Fixed Beam
- Both ends are rigidly fixed.
- No rotation at supports.
- Provides higher stability and less deflection.

3. Overhanging Beam
- Extends beyond one or both supports.
- Used in balconies and projections.
- Creates cantilever-like behavior.

4. Continuous Beam
- Extends over multiple supports.
- Distributes load efficiently.
- Common in long-span bridges and multi-support structures.

5. Propped Cantilever Beam
- Cantilever beam with an extra support.
- Reduces deflection compared to a pure cantilever.
- Often used in retaining walls.

6. T-Beam
- T-shaped cross-section with slab.
- Provides strength in bending.
- Common in reinforced concrete floors.

7. L-Beam
- L-shaped edge beam.
- Used at corners of slabs.
- Provides support along slab edges.

8. Deep Beam
- Large depth compared to span.
- Carries heavy loads.
- Used in foundations and transfer girders.

#StructuralDesign #BeamTypes #ConstructionKnowledge #ConcreteAndSteel #EngineeringEducation #StructuralEngineering #BuildingDesign #ConstructionBasics

@etconp
โค15๐Ÿ‘1
#ADVERTISEMENT

Twenty Seven Waterproofing Construction Materials & Chemicals

๐Ÿ—๏ธ แˆˆแˆแˆ‰แˆ แ‹“แ‹ญแАแ‰ต แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆตแˆซแ‹Žแ‰ฝ (Building, Finishing, Maintenance) แ‹จแˆšแ‹ซแˆตแˆแˆแŒ‰ แŒฅแˆซแ‰ณแ‰ธแ‹แŠ• แ‹จแŒ แ‰ แ‰ แ‹จConstruction Chemicals แŠฅแŠ“ แŠฅแ‰ƒแ‹Žแ‰ฝ แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‰ แˆ™แˆ‰ แŠ แŒˆแˆแŒแˆŽแ‰ต!

๐Ÿ”น แ‹จแˆแŠ“แ‰€แˆญแ‰ฃแ‰ธแ‹ แ‹จแ‰ณแ‹ˆแ‰ แ‰ฅแˆซแŠ•แ‹ถแ‰ฝ:
            โ–บSika ๐ŸŽ–
            โ–บMC (MC-Bauchemie)
            โ–บDarma
            โ–บSimentek
๐Ÿ”น แ‹จแˆแŠ“แ‰€แˆญแ‰ฃแ‰ธแ‹ แŠฅแ‰ƒแ‹Žแ‰ฝ:
Membrane
Sealant
Silicone
Waterproof
     -Acrylic
     -Cementicious
     -Membrane
Tile Adhesives & Tile Filler Materials
Grouts Tile
Concrete Admixtures
   -Plasticizers
   -Accelerators,
   - Retarders
Repair & Strengthening Products
Protective Coatings
Bonding Agents
Crack Repair Solutions

แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แ‰ฅแ‹™ แ‹˜แˆ˜แŠ“แ‹Š แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆ˜แแ‰ตแˆ„แ‹Žแ‰ฝ
Contractors
Builders
Engineers
แ‹จแŒแˆ แ‰คแ‰ต แˆฐแˆชแ‹Žแ‰ฝ
Proforma & Direct Sale

        โœ… แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹
        โœ… แˆ™แ‹ซแ‹Š แˆแŠญแˆญ แŠฅแŠ“ แ‹จแ‰ดแŠญแŠ’แŠญ แ‹ตแŒ‹แ
        โœ… แˆˆแ‰ฅแ‹›แ‰ต แŒแ‹ฅ แ‰ แ‰‚ แŠ แ‰…แˆญแ‰ฆแ‰ต
        โœ… แˆแŒฃแŠ• แŠ แŒˆแˆแŒแˆŽแ‰ต แŠฅแŠ“ แ‰ณแˆ›แŠแАแ‰ต

๐Ÿ“ฆ แˆˆแ•แˆฎแŒ€แŠญแ‰ต แŠ แ‰…แˆญแ‰ฆแ‰ต แ‹แŒแŒ แАแŠ•!
๐Ÿ“ž +251929616411/+251940362640
๐Ÿ“ Jackros

To join our Telegram channel ๐Ÿ‘‡
https://t.me/twentysevenwaterproofing
โค6๐Ÿฅฐ1
๐Ÿ  Carpet Area

- Definition: The usable area inside the walls of your flat/house. This includes bedrooms, living room, kitchen, bathrooms, and balconies (if enclosed).
- Excludes: Wall thickness, common areas like lobbies, lifts, or staircases.
- Quick Formula: Carpet Area โ‰ˆ 70% of Built-Up Area.
- Example: If Built-Up Area is 1000 sq. ft., Carpet Area is about 700 sq. ft.

๐Ÿงฑ Built-Up Area

- Definition: Carpet Area plus the thickness of walls and other usable spaces like balconies.
- Includes: Carpet Area + Wall thickness + Utility areas.
- Quick Formula: Built-Up Area โ‰ˆ Carpet Area รท 0.7.
- Example: If Carpet Area is 1000 sq. ft., Built-Up Area is about 1428 sq. ft.

๐Ÿข Super Built-Up Area

- Definition: Built-Up Area plus proportionate share of common spaces such as staircases, lobbies, lifts, corridors, clubhouse, etc.
- Purpose: Used by builders to calculate saleable area.
- Quick Formula: Super Built-Up Area โ‰ˆ Built-Up Area ร— 1.25.
- Example: If Built-Up Area is 1428 sq. ft., Super Built-Up Area is about 1785 sq. ft.

๐Ÿ”‘ Key Takeaway
- Carpet Area: What you actually use.
- Built-Up Area: Carpet + walls + balconies.
- Super Built-Up Area: Built-Up + common spaces (used for pricing).

#ConcreteAndSteel #PropertyEvaluation #CarpetArea #BuiltUpArea #SuperBuiltUpArea #ConstructionDetails #EngineeringEducation #RealEstateBasics #SiteEngineerGuide

@etconp
โค6
๐Ÿ‘‰Types Of Road Interchange

1. Cloverleaf Interchange ๐Ÿ€

Loop ramps in all four corners. Allows free-flow traffic but causes weaving issues.

2. Stack Interchange ๐Ÿ—๏ธ

Multi-level (flyovers). No crossing conflictsโ€”best for heavy traffic but expensive.

3. Diamond Interchange ๐Ÿ’Ž

Simple design with four ramps. Common on highways with lowโ€“moderate traffic.

4. Partial Cloverleaf (Parclo)

Combination of loops + straight ramps. Reduces weaving compared to full cloverleaf.

5. Single-Point Urban Interchange (SPUI)

All movements controlled by one traffic signal. Efficient for urban areas.

6. Turbine Interchange ๐ŸŒ€

Curved, spiral ramps. Smooth traffic flow with less weaving.

7. Diverging Diamond Interchange (DDI)

Traffic briefly switches sides. Improves left-turn efficiency and safety.

8. Trumpet Interchange ๐ŸŽบ

Used where one road ends into another (T-junction). Requires only one loop.

@etconp
โค6
โญ๏ธTo speed up the setting time of ready-mix concrete, you add a set accelerator.

๐Ÿ’ซCommon Chemicals Used as Accelerators

๐Ÿ“œHere are the most widely used types:

1. Calcium Chloride (CaClโ‚‚)

Very effective and inexpensive.

Fastest accelerator.

BUT not recommended for reinforced concrete because it increases the risk of steel corrosion.


2. Non-Chloride Accelerators (Safe for Reinforcement)

These are commonly used in structural works:

Calcium Nitrate

Calcium Formate

Calcium Nitrite

Sodium Nitrate

Triethanolamine (TEA) (usually in blended admixtures)

Commercial names include: MasterSet, Set-X, Mapeplast, Sika Rapid, etc.

When to Use Accelerators?

๐Ÿ‘‰Cold weather concreting (low temperature slows setting)

๐Ÿ‘‰Early stripping of formwork

๐Ÿ‘‰Early strength gain needed

๐Ÿ‘‰Emergency repairs


๐ŸŽฒImportant Notes

Dosage must follow the manufacturerโ€™s recommendation (usually 0.5โ€“2% by weight of cement).

โœ…Too much accelerator causes cracks, flash setting, and reduced strength.