Just for discussion:

For defining of earthquake loading some designers are under doubt about user coefficient and response spectrum. What about your view from different requirements......

@etconp
Sunrise Kempinski Hotel

Official name :- Sunrise Kempinski Hotel

Status :- completed

Country :- China 🇨🇳

Building purpose :- HOTEL 🏨

Construction started:- 2012 GC

Completion :- 2014 GC

Owner :- Beijing Enterprises International Conference Metropolis Real Estate Co., Ltd.

Architectural design structural design and MEP design :- Shanghai Huadu Architect Design Company

Contractor:- Beijing Urban Construction Group Co., Ltd

Height :- 77 meters

Floor above the ground :- 20

Floors below the ground:- 2

Built up area :- 35,582 m²

@etconp
👉ስለ ብሎኬት @COTMp
.
⏩Hollow Concret Block (HCB) ወይም የግድግዳ ብሎኬት/Wall HCB/ በመባል ይታወቃል።
*የብሎኬት ምርት ሲደረግ ጠቀሜታው ለሁለት ጉዳይ ነው
1. ሸክም መቌቌም የሚችል/Load Bearing/
2. ሸክም መቌቌም የማይችል /Non-Load Bearing/
*ይሄንን መሰረት ያደረገም የደረጃ ክፍፍል/Class/ ይኖራቸዋል።
*ሸክም መቌቌም የሚችሉት ብሎኬቶች "ክላስ ኤ እና ቢ" /
Class A and B/ በመባል ሲመደቡ ሸክም መቌቌም
የማይችሉት የብሎኬቶች ደግሞ "ክላስ ሲ" /Class C/ በመባል
ይመደባሉ።
➡ብሎኬት በተለምዶ በመጠናቸው ባለ10፣ ባለ15 እና ባለ 20 በመባል ይለያሉ::
ርዝመት x ስፋት x ቁመት/ Length x width x depth/
ማለትም Standard Dimenssion
*40x20x20cm
*40x15x20cm
*40x10x20cm
➡እያንዳንዱ ብሎኬት ሸክም የመቌቌም አቅማቸው
በሜጋ ፓስካል(Mpa) ይለካል ከዚህ በላይ 👆 በምስል አስደግፈናል።
*Note:
1 kilogram per square centimetre = 0.0981 mega pascal

*Class A=3.8mpa
*Class B=3.2mpa
*Class C=1.8mpa
.
⚡ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👍1
Key brick or Keystone: The voussoir located at the crown of the arch. Also called the key.

Spring Line: A horizontal line which intersects the springing.

Extrados: The curve which bounds the upper edge of the arch.

Intrados: The curve which bounds the lower edge of the arch. The distinction between soffit and intrados is that the intrados is a line, while the soffit is a surface.

The point at which the bisector crosses the centre line is the centre or striking point for the segmental arch

Pier or span: The horizontal clear dimension between abutments.

Voussoir: One masonry unit of an arch.

Regarding arch brick construction we come up with some 📹


@etconp
Components of Project cost

♦️ Indirect cost :- Outage loss + Overheads

♦️ Direct project cost :- These include labour cost, material cost, equipment cost etc.

♦️ Normal time :- Normal time is the standard time that an estimator would usually allow for an activity.

♦️ Crash time :- Crash time is the minimum possible time which an activity can be completed by employing extra resources

♦️ Normal cost :- This is direct cost required to complete the activity in normal time duration.

♦️ Crash cost :- This is direct cost corresponding to the completion of the activity within crash time.

Join us @ETCONP
Instrument used in surveying👇
♦️ Clinometer:- measuring angles of slopes
♦️subtence bar:- measure horizontal distance
♦️Box sextant:- measuring horizontal angle
♦️Planimeter:- measuring area on map
♦️pentagraph:- enlarging or reducing area on map
♦️line Ranger:- ranging a chain line
♦️Hand level:- Making contour & Cross section of preliminary work
♦️Ceylon ghat tracer:- Measuring angles of slopes & setting out grade contours.

@ETCONP
_*📌▪BENEFITS OF USING PLASTIC FORMWORKS IN CONCRETE CONSTRUCTION▪*_


Plastic formworks in concrete construction are used to retain newly arranged concrete in place to provide adequate strength. Formworks facilitate to manage concrete efficiently and produce different types of shapes and forms.

Various types of materials like timber, steel, and aluminum are applied to develop formworks. Plastic is considered as best for formworks in relation to other materials in terms of strength, cost-effectiveness, and adaptability.

Sufficient time is required to develop the formworks. Formworks comprise 20 to 25% of the total cost of the structure. The security, cost, quality, and speed of a construction work mainly depend on formworks.

*Benefits of Plastic Formworks in Concrete Construction*

Plastic formworks provide various benefits like longevity, cost, and flexibility. Formworks consume huge labor force and total cost of the project. It is recommended that a formwork system should be cost-effective and assembled, disintegrated and managed smoothly by labor.


*The plastic formworks provide the following benefits to the concrete construction:*

Grading of Aggregates

Economical

Labor-friendly

Eco friendly

Low maintenance

Flexible


*Plastic Formwork System*

Certain grade plastics are used to build up formworks. There are not any chemical reactions among poured material and the plastic form. No patch on the surface of the reinforce concrete element exists.

*Leakages*

Resist leakages with water or newly arranged concrete from various parts of the form by fitting different parts of the system accurately.

Labor-friendly system
Plastic formworks are considered very labor-friendly system. It accommodates and plugs smoothly and significantly lightweight with regards to other types of formwork systems.

*Nailing and oiling*

Nailing and oiling plates are not necessary. Auto-leveling of plugging system can retain plates level automatically. It takes fewer time to install and disassemble.

*Cleaning*

Plastic forms can be cleansed with water without difficulty. Plastic forms can be broken due to handling in an inefficient manner as well as use of low voltage hot air gun for sealing.

Plastic forms can be easily reprocessed and they are eco-friendly to minimize handling time and great re-usability index.

For more concepts of civil engineering

Join us on telegram:- @ETCONP

Follow us on Instagram:- @etconp
👉ፎርምወርክ/Formwork/ @COTMp
➡በምን ያህል ቀን ማፍረስ ይቻላል?👇
.
⏩ ለቌሚ ፎርምወርክ 16ሰዓት
⏩ ለወለል እና ደረጃ /ሶሌታ/ ፎርምወረክ 21 ቀን
⏩ ተጨማሪ ለቢም/beam/ እና ወለል/slab/ ድጋፍ የሚገባ
14ቀን
⚡ የፎርም ወርክ ክፍያን በተመለከተ ባትኮዳ/Batcoda/ ከዚህ በታች የተዘረዘሩትን ነጥቦች ይጠቅሳል።
1. ከ 0.25ካ.ሜ በታች የሆነ ክፍት/opening/ ፎርሞርክ ክፍያ
ላይ ሊቀነስ አይገባም።
2. በተለየ ሁኔታ ካልተጠቀሰ በስተቀር በካ. ሜ ሊለካ ይገባል።
3. የወለል ጠርዝ፣ የደረጃ መወጣጫ እና የጎን ፎርምወረክ
ጥልቀቱን በመጥቀስ በሜትር ሊለኩ ይገባል።
.
🚩ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
🔖አስደሳች ዜና ከ @ETCONp
.
👌ሰላም ውድ የቻናላችን ቤተሰቦች ላለፉት ወራት አንድ DIGITAL LIBRARY BOT ግንባታ ላይ ነበርን።
.
📚ይህም ዲጂታል ቤተመፃህፍት በውስጡ የ SOFTWARE SETUP, የ ARCH, COTM እና CIVIL መፅሀፍቶችን የያዘ ነው።

🚧ይህ የመጀመሪያ ምዕራፍ ግንባታ ሲሆን ለቀጣይ በአስተያየታችው መሰረት ብዙ ነገር ምናስተካክል ይሆናል።

👉ይህን link በመጫን ወደ ቤተመፃህፍቱ ልትሄዱ ትችላላችሁ።
👇👇👇👇👇👇
👉🏿 https://t.me/ETCONpDigitalLibrary_Bot

Good News from @ETCONP

👉🏿 For the last few months we have been developing digital library bot which consists ARCHITECTURE, Construction technology management and civil engineering books

👉🏿 This is the first phase of development base one tour request we will expand it In the future

👉🏿Tap the link below to access the digital library 📚👇🏾👇🏾👇🏾

👉🏿 @ETCONpDigitalLibrary_Bot
Siporex precast wall

STEEL REINFORCED  WALL PANELS

WV are reinforced units, for load bearing applications as either external or internal walls in a wide variety of low and medium rise buildings. They can also be used as non-load bearing cladding for steel or concrete framed structures. They may have single mat or double mat reinforcements depending on the structural requirements.

Siporex floor/roof slabs are reinforced aerated concrete products which are produced in accordance with international standards.

Siporex slabs attain their design strengths during the high-pressure steam curing process in the autoclaves. Thus, after delivery, slabs can be erected immediately within a very short period and ready for occupancy use.

Submerged beam is one that has the same elevation as the top of the slab as well as the bottom of the slab. In most cases a submerged beam is called hidden.

@etconp
👍1
Ethio Construction Engineering
Photo
👆👆👆ይህ የምትመለከቱት ቤት የተሰራው በ siporex precast wall የተሰራ loaf bearing structure ነው። እናም የ real estate’ሁ ባለቤቶች የ ሳውዲ አረቢያ ሰዎች ስለሆኑ ይህንን Strucral module ከሳውዲ አስጭነውት ነበር። ነገር ግን ከ ኢትዮጵያ አየር ሁኔታ ጋር በ ጭራሽ friendly ሊሆን አልቻለም ይህ material እንደ sponge ነው። ውሃ በጣም absorb ያደረጋል። እናም የ workmanship ችግርም ነበረበት የተለመደ ስላልሆነ።

@etconp
What’s your comment ?

What shall be done ?

ስለዚህ ምን ትላላችሁ?
.
📩ሀሳባቹ @COTMp ላይ ፃፉልን

@etconp
Forwarded from Deleted Account
in a closed traverse, the sum of South latitude exceeds the sum of north latitudes and the sum of east departure exceeds the sum of west departures. The closing line will lie in the
Anonymous Quiz
19%
Northwest quadrant
26%
Northeast quadrant
46%
Southeast quadrant
9%
South west quadrant
👉ስለ ክርስቲ @COTMp
.
👆ይህ ከላይ በምስሉ ላይ የሚታየው ክርስቲ ይባላል - ቢሙ ካስት ሲደረግ በዋነኝነት የቢሙን ሎድ የሚሸከም በአራት አጠናዎች የተዋቀረ ነው፡፡
‹ ዋ › ፊደልን ይመስላል፡፡
.
ቢም ካስት ከማድረጋችን በፊት የምንከተላቸውን እስቴፖች
ቀጥለን እንመለከታለን፡፡
.
1. በመጀመሪያ ጎማ ውሃ ልክ አዙረን ቢሙ የሚያርፍበትን ቦታ
already ካስት የተደረጉ ኮለኖች ላይ ምልክት እናደርጋለን፡፡
.
2. በኮለኖች መሃል ምልክት የተደረገባቸውን ቦታዎች በሲባጎ
እናገናኛለን - ሲባጎው የሚያርፍበት ቦታ የቢሙ ስር ወይም ቂጥ ነው
.
3. በሁለት ኮለኖች መሃል - ኮለኖቹ ጥግ ላይ ሁለት ክርስቲ
አቁመን ወገባቸውን እናሲዛለን
.
4. በሁለት ኮለኖች መሃል የሚያስፈልገውን ያህል ክርስቲ
እንደረድርና በዳርኞቹ ክርስቲዎች ውስጥ ሁለት ማገሮች እናስገባለን፡፡ በመቀጠልም መሃል ላይ ያሉትን ወይም ወገባቸውን
ያልያዙትን ክርስቲዎች ከማገሩ ውጪ በማድረግ ወገባቸውን
በሚስማር እናሲዛለን
.
5. ክርስቲዎቹ አናት ላይ በሁለቱም በኩል ማገር እንመታለን
.
6. ሌላ ትይዩ ቢም ካለ ከእስቴፕ 1-5 ያለውን እንሰራለትና
ከዚኛው የክርስቲ ግሩፖች ጋር በማገር እናያይዛቸዋለን
.
7. በተወሰነ ርቀት ላይ ስላቡ የሚያርፍበትን ቋሚዎች እናቆማለን
.
8. ለውሃ ልክ የዘረጋነው ሲባጎና የክርስቲው አናት ልክ ከመጣልን
እንደዛው እንተወዋለን - ልክ ካልመጣ ግን ‹ ኩኞ › በክርስቲውና
በሲባጎው (ፎንዶው ስር) መሃል እናስገባለን
.
9. ፎንዶውን የቢሙን alignment ጠብቀን እናስቀምጣለን
.
10. ስፖንዳ እንመታለን - እስፖንዳውን በአጠና እንደግፈዋለን
.
11. የቢሙን reinforcement አስገብተን ቢሙን ካስት
እናደርጋለን
.
--ኩኞ -ቁርጥራጭ አጠና
-ፎንዶ - ቀጥታ ከቢሙ ስር የሚያርፍ ተሸካሚ ፎርም ዎርክ
-እስፖንዳ - ቢሙን ከጎን የሚይዝልን ፎርም ዎርክ
.
Join for more updates via the link below;
t.me/COTMp
Ethio Construction Engineering
Photo
This media is not supported in your browser
VIEW IN TELEGRAM
Precast wall assembly animation

@etconp
Aeolian soil is related to

1. Wind

2. Sea

3. River

4. Gravitation


Reference

👉🏿 https://t.me/ETCONP/3655

@etconp