👉Construction Notes

🚧Prestressed concrete with its use
.
📌Before getting into prestressed concrete, let us go back to the basics first.
.
▶️We all know that concrete is strong in compression and weak in tension.
*This is reason for providing reinforcement (in the form of steel bars) to resist tension/tensile force acting on beams columns/slabs etc.
.
▶️RCC structures under service load undergoes deflection causing the bottom of the beam (tensile zone) to elongate, causing cracks.
.
▶️Generally, steel bars are provided to limit the crack widths and resist the tensile force which the concrete lacks.
*Here, the rebar acts as ‘passive reinforcement’. Rebars (steel reinforcement) provided at the bottom of the bar, does not carry any forces until the concrete has already deflected enough to crack.
.
📌How it is used?
.
▶️This is where prestressing comes into action.
*The principle behind prestressed concrete is that compressive stresses induced by high-strength steel tendons in a concrete member before loads are applied will balance the tensile stresses imposed in the member during service.
.
▶️Simply, Permanent pre compression is produced in the areas subjected to tension using high tensile strength steel wires or alloys.
*Now, a portion of tensile stress is counteracted, thereby reducing the cross sectional area of steel reinforcement.
.
*As as result, the concrete does not crack because the pre-stressing has reduced the tensile stress in the section below cracking stress.
*hence concrete is treated as a elastic material.
.
▶️Now, the concrete is said to have two compressive force:
.
1. Internal prestressing force
2. External forces (Dead load, Live load etc.)
.
▶️These two forces must counteract each other.
.
*When loads are applied, reinforcing steel takes on more stress and the compressive force in the concrete is reduced greatly, so that it doesn’t become a tensile force.
As a result the concrete is less prone to cracks or failures because it is always under compression.

📌Definition:
.
▶️Prestressed concrete is concrete that has had internal stresses introduced to counteract, to the degree desired.
*the tensile stresses that will be imposed in service. The stress is usually imposed by tendons of individual hard-drawn wires, cables of hard-drawn wires, or bars of high strength alloy steel.
.
▶️Prestressing may be achieved either by pretensioning or by post tensioning.
.
▶️Prestressed concrete structures can be classified in a number of ways depending upon the feature of designs and constructions.
.
🔹 1. Pre-tensioning:

▶️As the name says, the steel wires or tendons are tensioned first and the concrete is poured later. *Tendons are temporarily anchored and tensioned and the prestress is transferred to the concrete after it is hardened.

*Then the tendon tries to shrink back to the original length, but resisted by the bond between the concrete thereby inducing ! compressive force in it.

🔹 2. Post-tensioning:
.
▶️Post- tensioning similar to pre-tensioning, where concrete is poured first, allowed to harden and the tendons is tensioned later. Tendons are placed in sheathing at suitable places in the member before casting and later after hardening of concrete.
.
📌Uses:

▶️Longer spans constructions

▶️Unique designs: irregular shapes

▶️Shorter construction cycles

▶️Cost reduction

▶️Shorter floor-to-floor heights

▶️Superior structural performance

#ConstructionNotes

@etconp
This media is not supported in your browser
VIEW IN TELEGRAM
👉Bridge construction using post tension technique and pile foundation.
.
@etconp
Dear @etconp members we are preparing to present you 100 tallest building structure in the world 🌎 are you ready ? We will post one presentation in descending order daily for 100 days so that you will be familiar with 100 tallest building on earth

ውድ የቻናላችን ቤተሰቦች በአለማችን ያሉ 100 ረዣዥም ህንፃዎችን በቅደም ተከተል ለ100 ቀን ልናቀርብላችተሁ አስበናል ምን ታስባላችሁ?

@etconp
Ethio Construction Engineering via @like
Dear @etconp members we are preparing to present you 100 tallest building structure in the world 🌎 are you ready ? We will post one presentation in descending order daily for 100 days so that you will be familiar with 100 tallest building on earth ውድ የቻናላችን…
Introduction

High rise building is multistory structure.
From legendary tower of bible (in the land of shinar) to iconic burj khlifa humans have always aspire to build to ever greater height .
👉🏿 This is to celebrate our cultures
👉🏿 to challenge our innovative skills

Different statutory bodies define a high rise structure differently

Emporis standards

👉🏿 high-rise is multi-story structure between 35-100 meters tall or a building of unknown height from 12-39 floors (according to Emporis high rise is defined like this)

👉🏿 skyscrapers is multistory building in which it’s architectural height is at least 100meters (330feet)
✅ super-tall skyscrapers are those
buildings above a height of
300meters (984feet)
✅ mega tall skyscrapers are those
buildings above a height
600meters(1,969feet)

Indian standards 🇮🇳

👉🏿 As per NBC( national building code of
India) structure having 15meters height or
above is called high rise.
👉🏿 As per BMC (Bombay Municipal
Corporation) a high rise is above
24meters
👉🏿 As per NMMC2006(Navi Mumbai
Municipal Corporation) high rise is
above 16meters

@etconp

High rise ሲባል ወደ አምሯችን ሚመጣው ብዙ ፎቆች ያሉት ህንፃ ነው። የሰው ልጅ ከባቢሎን ግንብ በ ሰናዖር ምድር ከተሰራው አንስቶ(ዘፍጥረት11) እስከ burj kahlifa (dubai) የረዛዘሙ ህንፃዎችን የመገንባት መሻት አለው።
የተለያዩ ደረጃ መዳቢዎች highrise ለማለት ወይም skyscraper 🏙 ለማለት ያስቀመጧቸው መስፈርቶች አሉ። እላይ👆🏾👆🏾 በ ኢንጊልዘኛ ቋንቋ መስፈርቶቹን ማንበብ ከፈለጋችሁ ተፅፎላችኋል።
ከዚህም በ መቀጠል አለማችን ውስጥ ያሉ 100 ረዣዥም ህንፃዎችን በቅደም ተከተል ለ 100 ተከታታይ ቀናት እናቀርብላችኋለን።

#share
Join us on telegram:-@etconp
Follow us on Instagram :-https://www.instagram.com/etconp
Ethio Construction Engineering
Introduction High rise building is multistory structure. From legendary tower of bible (in the land of shinar) to iconic burj khlifa humans have always aspire to build to ever greater height . 👉🏿 This is to celebrate our cultures 👉🏿 to challenge our innovative…
The top 100 countries countries with the tallest building (CBE headquarter is not included because it not finished yet )

Join us on telegram:-@etconp

Follow us on Instagram:- https://www.instagram.com/etconp
የአደይ አበባ ብሔራዊ ስቴዲዬም የሁለተኛ ምዕራፍ ግንባታ የማስጀመሪያ ስነ-ስርዓት ዛሬ ተከናውኗል!

62,000 ተመልካቾችን የሚያስተናግደው እና 8 ቢሊዬን ብር ወጪ የሚደረግበት ይህ ስቴዲየም በቻይና የኮንስትራክሽን ኩባንያ እና በኢትዮጵያዊዉ ኤም ኤች ኢንጂነሪንግ አማካሪነት ግንባታው እየተከናወነ ይገኛል።

Via ልዩ ስፖርት-Taye Worku
.
@etconp
👉Design Procedure of foundation
.
▶️Good design must not only be safe but must aim to save construction costs, time and materials.
*The following procedures should help to achieve this and an ‘educated’ client will recognize the importance of funding this work with a realistic fee.

1. DECIDE THE LOCATION OF COLUMNS & FOUNDATION AND TYPE OF LOADS ACTING ON THEM Such as DEAD LOAD,  LIVE LOAD OR WIND LOAD)
.
▶️On the building plan, the position of columns and load bearing walls should be marked, and any other induced loadings and bending moments.
*The loads should be classified into dead, imposed and wind loadings, giving the appropriate partial safety factors for these loads.

2. ESTIMATE ALLOWABLE BEARING PRESSURE OF SOIL USING GROUND INVESTIGATION REPORT.

▶️From a study of the site ground investigation (if available), the strength of the soil at various depths or strata below foundation level should be studied, to determine the safe bearing capacity at various levels. These values or presumed bearing values (from any standards or codes) in the absence of a site investigation – are used to estimate the allowable bearing pressure.

3. DECIDE DEPTH OF FOUNDATION

▶️The invert level (underside) of the foundation is determined by either the minimum depth below ground level unaffected by temperature, moisture content variation or erosion this can be as low as 450 mm in granular soils but, depending on the site and ground conditions, can exceed 1 m or by the depth of basement, boiler house, service ducts or similar.

4. CALCULATE FOUNDATION AREA

▶️The foundation area required is determined from the characteristic (working) loads and estimated allowable pressure.
*This determines the preliminary design of the types or combination of types of foundation. The selection is usually based on economics, speed and build ability of construction.

5. DETERMINE VARIATION IN VERTICAL STRESSES

▶️The variation of vertical stress w.r.t depth is determined, to check for possible over-stressing of any underlying weak strata.

6. CALCULATE SETTLEMENT

▶️Settlement calculations should be carried out to check that the total and differential settlements are acceptable.
*If these are unacceptable then a revised allowable bearing pressure should be determined, and the foundation design amended to increase its area, or the foundations should be taken down to a deeper and stronger stratum.

7. COST CONTROL

▶️Before finalizing the choice of foundation type, the preliminary costing of alternative superstructure designs should be made, to determine the economics of increasing superstructure costs in order to reduce foundation costs.
.
8. CONSIDER TIME

▶️Alternative safe designs should be checked for economy, speed and simplicity of construction. Speed and economy can conflict in foundation construction an initial low-cost solution may increase the construction period. *Time is often of the essence for a client needing early return on capital investment.
*A fast-track programme for superstructure construction can be negated by slow foundation construction.

9. VARIATION IN GROUND CONDITION

▶️The design office should be prepared to amend the design, if excavation shows variation in ground conditions from those predicted from the site soil survey and investigation.

 @etconp
👉What Is The Effect Of Tree Roots On Building?
.
▶️Fast growing trees close to buildings can cause unequal settlement when active tree roots dry out the soil causing differential soil shrinkage.
.
🚧Shrinking clays affect the bearing capacity and lead to movement in the building, especially in shallow foundations.
.
🚧Tree roots can extend over a considerable distance and can extract moisture from as deep as 6 m below the surface.
*It is, therefore, necessary to make an accurate survey of their position and obtain details of the type of tree, and at the same time establish that the tree is the cause of the damage .

@etconp
Ethio Construction Engineering
The top 100 countries countries with the tallest building (CBE headquarter is not included because it not finished yet ) Join us on telegram:-@etconp Follow us on Instagram:- https://www.instagram.com/etconp
#1. Burj Khalifa

👉🏿Height :- 828 meters
👉🏿Floor count:- 154 floor + 9
maintenance
👉🏿 Number if lift shaft:- 57
👉🏿 Floor area :- 309,473 m²
👉🏿 Structural system:- buttressed core (RC , steel and aluminum)
👉🏿 Number of below ground floor:-1
👉🏿 Number of floor above ground
floor :- 163
👉🏿 Top elevator speed :- 10m/s
👉🏿 Construction started:-
6 January 2004
👉🏿 Completed:- 1 October 2009
👉🏿 Cost :- $1.5 billion
👉🏿 Owner :- emmar properties

👉🏿 Architect :- Adrian Smith
👉🏿 Structural engineer:- Bill Baker
👉🏿 Main contractor :- Samsung C&T

Dubai UAE 🇦🇪

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
Ethio Construction Engineering
👉What Is The Effect Of Tree Roots On Building? . ▶️Fast growing trees close to buildings can cause unequal settlement when active tree roots dry out the soil causing differential soil shrinkage. . 🚧Shrinking clays affect the bearing capacity and lead to movement…
👉በህንፃዎች ላይ የዛፍ ሥሮች ተፅእኖ ምንድነው?
.
▶️በ ህንፃዎች ኣጠገብ ተተክለው በፍጥነት የሚያድጉ ዛፎች ልዩ የሆነ የአፈር መበላሸትን የሚያስከትሉ ናቸው።
.
🚧የዛፍ ሥሮች መሬቱን ሲያደርቁ እኩል ያልሆነ ሰፈራ ሊፈጥሩ ይችላሉ ይህም በመሸከም አቅም ላይ ተጽዕኖ ያሳድራሉ እንዲሁም በህንፃው ውስጥ በተለይም ወደ ጥልቅ መሠረቶች ይንቀሳቀሳሉ፡፡
.
🚧የዛፍ ሥሮች ከ 6 ሜትር ያህል ጥልቀት ካለው ቦታ እርጥበት የመሳብ ኣቅም ኣላቸው ስለሆነም ስለ አቋማቸው ትክክለኛ ምርመራ ማካሄድ እና የዛፉን ዓይነት ዝርዝሮች ማግኘት አስፈላጊ ነው ፣ በተመሳሳይ ጊዜም ዛፉ ለህንፃው የጉዳት መንስኤ መሆኑን ማወቅ ይኖርበታል ፡፡

@etconp
👉የእስልምና ሃይማኖት ተከታይ ለሆናችሁ የቻናላችን ቤተሰቦች እንዲሁም ለመላው ሙስሊም ኢትዮጵያውያን መልካም የኢድ አል አድሃ (አረፋ) በዓል እንዲሆንላችሁ እንመኛለን። ኢድ ሙባረክ።

@etconp
👉አረንጓዴ ኮንክሪት ያውቃሉ?
.
📌በምርት ውስጥ አነስተኛ ኃይል የሚጠቀም እና ከተለመደው ኮንክሪት ያነሰ ካርቦን ዳይኦክሳይድን የሚያመነጭ ኮንክሪት አረንጓዴ ኮንክሪት ነው፡፡
.
▶️ይህ ኮንክሪት የአካባቢ ኣየር የማይበክል እጅግ ተስማሚ ነው
.
📌ለምን አረንጓዴ ኮንክሪት?
.
▶️በኮንክሪት ውስጥ ዋነኛው ንጥረ ነገር ሲሚንቶ ሲሆን በውስጡም የኖራ ድንጋይ ወይም ካልሲየም ካርቦሃይድሬት (CaCO3) ነው፡፡
*ሲሚንቶ በሚሠራበት ጊዜ ንጥረ ነገሮቹን ከ 800 - 10000 ዲግሪ ሴንት ግሬድ ድረስ ይሞቃሉ፡፡ *በዚህ ሂደት ውስጥ ካርቦን ዳይኦክሳይድ ይወገዳል፡፡
*በኣማካይ 1 ኪ.ግ. ሲሚንቶ ወደ 900 ጋms ካርቦን ዳይኦክሳይድ ወደ ከባቢ አየር ይልቃል፡፡
*ስለዚህ የካርቦን ዳይኦክሳይድን ልቀትን ለመቀነስ አረንጓዴ ኮንክሪት ተፈጠረ፡፡
.
 📌የአረንጓዴ ኮንክሪት ቁሳቁሶች
.
1- በአከባቢ የሚገኝ-የግንባታ ቁሳቁሶች፣አካላት እና ስርዓቶች በአከባቢ ወይም በክልል የተገኙ የኃይል አቅርቦቶች እና ሀብቶች ወደ ፕሮጄክት ጣቢያው የሚጓዙት ፡፡

2- የዳነ፣እንደገና የተገነባ፣ወይም በድጋሚ የተሰራ-አንድን ዕቃ ከማደስ ፣ የአንድ ምርትን ማሻሻል ያካትታል ፡፡

3- በቀላሉ እንደገና ጥቅም ላይ ሊውሉ የሚችሉ ቁሳቁሶችን ይምረጡ።

4- እንደገና ጥቅም ላይ የዋለው የዴሞክራቲክ ፍሳሽ ቆሻሻ ስብስብ

5- እንደገና ጥቅም ላይ የዋለ የኮንክሪት ውህድ

6- ነበልባል የእሳት Slag

7- የተሠራ አሸዋ

8- የመስታወት ስብስብ

9- አመድ
.
📌ድብልቅ ንድፍ
.
1- የንጥል ተመጣጣኝነትን እና የቁሳቁሶችን ማሸግ በተዋሃዶች መካከል ባዶ ቦታን ያመቻቻል። ይህ ይበልጥ ውጤታማ የሆነውን የሲሚንቶን ጋዝ አጠቃቀም ያደርገዋል ፡፡

2- ተወካዮች የተስተካከለ መረጋጋትን ፣ ቅነሳን ለመቀነስ እና ጥንካሬን ለመጨመር ሲሉ ከመጠን በላይ የሲሚንቶውን ንጣፍ ይተካሉ።

3 - አነስተኛ ሲሚንቶ እንዲሁ አነስተኛ የማሞቂያ ሙቀትን ያስገኛል ፡፡

4- የኮንክሪት ተንሸራታች እና ፍሰቱ የቅርፁ እና የቁጥር ውህደቱ ተቀዳሚ መጠን ነው።

5- የበለጠ ጥራት ያለው አጠቃላይ አጠቃቀምን ከፍ ማድረግ ከፍተኛ ፍሰት እና ፍሰት ይሰጣል ስለዚህ የተጣራ እና አጠቃላይ ሚዛን በሁለቱም ትኩስ እና ጠንካራ በሆነ የኮንክሪት ደረጃ ውስጥ በጥሩ ሁኔታ መገኘት አለበት ፡፡

📌የተሻሻሉ ባሕሪዎች
.
1- በተጨባጭ ኮንክሪት ላይ ከፍተኛ የመከላከል ደረጃን ስለሚያስከትለው በኮንክሪት አወቃቀሩ ውስጥ የተቀነሰ ልጣጭ መጠን ሊቀንስ ይችላል ፡፡

2- ከፍተኛ ጥንካሬ በአንድ ኪሎግራም ሲሚንቶ

3- ዘላቂነት እና ዝቅተኛ የመቋቋም ችሎታ

4- ተጨማሪ ውህዶች በተለምዶ የመለጠጥ ሞዱል ማለት ነው።

📌ጥቅሞች
.
1 - ለተጠቃሚ ተስማሚ

2- የተመቻቹ ድብልቅ ዲዛይኖች ማለት ቀላል አያያዝ ፣ የተሻለ ወጥነት እና ቀላል የማጠናቀቂያ ሂደት ይከተላል።

3- ማሽቆልቆል እና ፍሰት መቀነስ

4- አረንጓዴ ኮንክሪት ውስጥ አካባቢያዊ እና እንደገና ጥቅም ላይ የዋሉ ቁሳቁሶችን ይጠቀማል፡፡

5- የአረንጓዴ ኮንክሪት ሙቀት ማሞቂያ ከባህላዊው ኮንክሪት በእጅጉ ያነሰ ነው

6- ይህ ለአረንጓዴ ኮንክሪት ልዩ ጠቀሜታ ያለው ትልቅ የኮንክሪት ማፍሰሻ ዝቅተኛ የሙቀት መጨመር ያስከትላል፡፡

መልካም በአል

@etconp
👉Different Types Of Loads On Building
.
📌Types of loads

▶️External loads on a structure may be classified in several different ways.
.
🚧In one classification, they may be considered as static or dynamic.
.
🔵Static loads are forces that are applied slowly and then remain nearly constant.
.
🚧One example is the weight, or dead load, of a floor or roof system.
.
🔵Dynamic loads vary with time.
*They include repeated and impact loads.
.
➡️Repeated loads are forces that are applied a number of times, causing a variation in the magnitude, and sometimes also in the sense, of the internal forces.
*A good example is an off balance motor.
.
➡️Impact loads are forces that require a structure or its components to absorb energy in a short interval of time.
*An example is the dropping of a heavy weight on a floor slab, or the shock wave from an explosion striking the walls and roof of a building.

🚧External forces may also be classified as uniformly distributed and concentrated.

🟠Uniformly distributed loads are forces that are, or for practical purposes may be considered, constant over a surface area of the supporting member.
*Dead weight of a rolled steel beam is a good example.
.
🟠Concentrated loads are forces that have such a small contact area as to be negligible compared with the entire surface area of the supporting member.
*A beam supported on a girder, for example, may be considered, for all practical purposes, a concentrated load on the girder.
.
⏩Another common classification for external forces labels them axial, eccentric, and torsional.
.
⏺An axial load is a force whose resultant passes through the centroid of a section under consideration and is perpendicular to the plane of the section.
.
⏺An eccentric load is a force perpendicular to the plane of the section under consideration but not passing through the centroid of the section, thus bending the supporting member.
.
⏺Torsional loads are forces that are offset from the shear center of the section under consideration and are inclined to or in the plane of the section, thus twisting the supporting member.

📌Also, building codes classify loads in accordance with the nature of the source.
.
🚧Dead loads include materials, equipment, constructions, or other elements of weight supported in, on, or by a building, including its own weight, that are intended to remain permanently in place.
.
🚧Live loads include all occupants, materials, equipment, constructions, or other elements of weight supported in, on, or by a building and that will or are likely to be moved or relocated during the expected life of the building.
.
🚧Impact loads are a fraction of the live loads used to account for additional stresses and deflections resulting from movement of the live loads.
.
🚧Wind loads are maximum forces that may be applied to a building by wind in a mean recurrence interval, or a set of forces that will produce equivalent stresses.
.
🚧Snow loads are maximum forces that may be applied by snow accumulation in a mean recurrence interval.
.
🚧Seismic loads are forces that produce maximum stresses or deformations in a building during an earthquake.

@etconp
Ethio Construction Engineering
Photo
#2 . Shanghai Tower

➪ Height :- 632 meters
➪ Floor count :- 134
➪ Floor above the ground :- 130
➪ Floor below the ground :- 3
➪ Number of lift shaft :- 97
➪ Floor area :- 380,000 m²
➪ Structural system:- composite
structure RC and steel
➪ Elevator speed :- 76 km/h
➪ Construction started :- 21 November
2008
➪ Completed :- 2 September 2014
➪ Cost :- CN¥15.7 billion
➪ Architect :- jun xia
➪ Engineer:- Thornton Tomasetti
Cosentini Associates
➪ Contractor:- Shanghai Construction
Group
➪ Owner :- Shanghai Tower Construction and Development

Shanghai China 🇨🇳

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
❤1
👉የመስቀል አደባባይ ፕሮጀክት በታቀደለት ጊዜ ለመጨረስ ለሊትም ጭምር እየተሰራ ነው።

@etconp
👉ማስተር ፕላን ምንድነው?
.
🚧ማስተር ፕላን ወይም የልማት ዕቅድ አሁን ያሉትን ሁኔታዎች ለማሻሻል እና የከተማዋን የወደፊት ዕድገት በተቀናጀ ሁኔታ ለመቆጣጠር የታቀዱ የተለያዩ ሀሳቦችን ሰማያዊ እትም ነው።
.
▶️ለተሳካ የከተማ ፕላን መላውን ከተማ እንደ አንድ ነጠላ አካል የሚገጥም እቅድ መኖር አለበት፡፡
.
▶️የከተማውን አጠቃላይ ሁኔታ በተቀናጀ ሁኔታ ለማሳካት ይህ አስፈላጊ ነው፡፡
.
▶️የከተሞች ልማት ወይም መስፋፋት ረጅም ጊዜ ይወስዳል፣ስለሆነም በእቅዱ መሠረት በማንኛውም ጊዜ ዕድገቱ ቁጥጥር ማድረግ ይጠበቅበታል፡፡
.
📌እንዲህ ዓይነቱ ዕቅድ ‹ማስተር ፕላን› ይባላል
.
▶️የከተማው የግለሰቦችን ማንነት በመጠበቅ ረገድ እንዲህ ያለ ዕቅድ ተጨባጭና የታሰበ መሆን አለበት፡፡
.
▶️የከተሞች ልማት ረጅም ሂደት ስለሆነ እቅዶቹ ጠንካራ መሆን አለባቸው እንጂ በተመሳሳይ ጊዜ በአዲሶቹ የልማት ለውጦች ውስጥ ያሉትን ፍላጎቶች ለማርካት ከጊዜ ወደ ጊዜ ማሻሻያ ማድረግ አለባቸው፡፡
.
▶️ማስተር ፕላኑ በአጠቃላይ የከተማዋን የድሮ ሁኔታ ለማሻሻል ይዘጋጃል ነገር ግን ለአዲሶቹ ከተሞች በድቅድቅ መሬት ላይ እንዲታቀፉ እና እንዲገነቡም እንዲሁ አስፈላጊ ነው፡፡

@etconp
👉Why corner columns have higher values of moments than other columns?
.
📌The corner columns are Axially loaded column with Biaxial Bending Moment.
.
🚧As interior columns have balanced bending moments because of adjacent loading conditions so the their bending moments gets compensated, but There are no such bending moments available to compensate the bending moments of corner columns.

@etconp
Ethio Construction Engineering
#2 . Shanghai Tower ➪ Height :- 632 meters ➪ Floor count :- 134 ➪ Floor above the ground :- 130 ➪ Floor below the ground :- 3 ➪ Number of lift shaft :- 97 ➪ Floor area :- 380,000 m² ➪ Structural system:- composite structure RC and steel ➪ Elevator…
#3. Abraj Al Bait

➪ Height:- 601 meters
➪ Number of story:- 124
➪ Number of lift :- 96
➪ Floor area :- 1,575,815 m2
➪ Structural system:- core structure (composite of RC and steel structure)
➪ Elevator speed:- 6m/s
➪ Floors below ground :- 3
➪ Floors above the ground:- 120
➪ Construction started:- 2004 G.C
➪ Completed:- 2012
➪ Cost :- $15 billion
➪ Architect and structural engineer :- SL Rasch GmbH and Dar Al-Handasah
➪ Contractor:- Saudi Binladin Group
➪ Client:- Saudi Arabia government

Mecca 🕋, Saudi Arabia 🇸🇦

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉What will happen if the concrete will not be vibrated?
.
📌This is what happens when you do not properly compact concrete
.
▶️The reason behind this is the improper compaction.
.
▶️The height of column is minimum 3 m (considering single storey) and they are usually cast from floor to roof level as a single member in one stage (without any intermediate joints) So the concrete has to pass all the reinforcements and form homogeneous mixture to prevent honeycomb.
.
🚧So we compact the concrete by giving external energy to the mixture to eliminate the air voids.
.
📌Honeycomb also occurs due to bleeding of concrete from the sides and bottom of the formwork.
.
▶️Excess compaction also causes bleeding. So the compaction must be done neither too short (duration) nor too long.

@etconp