👉How do I avoid cracks on concrete?
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@etconp
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@etconp
👉እየተወያየን እንማማር
➡️በመንግስት የኮንስትራክሽን ውል አንድ አሰሪ መ/ቤት የግንባታ ግዜው ከመጠናቀቁ በፊት ውል ማቋረጥ ይችላልን?
➡️የማጠናቀቂያ ግዜው አልፎ ነገር ግን ግዜ ለማራዘም በቂ ምክንያት መኖሩ ታምኖበት እያለስ ይሄው ግዜ ሳያልፍስ አሰሪው ውል ማቋረጥ ይችላልን?
➡️ተቋራጩንስ ጥፋተኛ ሊያደርግ የሚችል የህግ ሁኔታ አለ?
📩ሀሳቦቻቹ በ መወያያ ግሩፓቹ ላይ ገብታቹ ፃፉልን።👇
https://t.me/COTMp
➡️በመንግስት የኮንስትራክሽን ውል አንድ አሰሪ መ/ቤት የግንባታ ግዜው ከመጠናቀቁ በፊት ውል ማቋረጥ ይችላልን?
➡️የማጠናቀቂያ ግዜው አልፎ ነገር ግን ግዜ ለማራዘም በቂ ምክንያት መኖሩ ታምኖበት እያለስ ይሄው ግዜ ሳያልፍስ አሰሪው ውል ማቋረጥ ይችላልን?
➡️ተቋራጩንስ ጥፋተኛ ሊያደርግ የሚችል የህግ ሁኔታ አለ?
📩ሀሳቦቻቹ በ መወያያ ግሩፓቹ ላይ ገብታቹ ፃፉልን።👇
https://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
👉What does it mean by 95% compaction?
➡️There are two compaction tests we familiar with, standard Procter and the modified Procter.
*⃣These tests are preformed in a lab on bulk soil samples that are being considered to be used as fill material.
*⃣The test gives the engineer a baseline of how the optimal moisture content and achievable density for a specific compaction effort.
*⃣95% compaction means that the soil on the construction site has been compacted to 95% of the maximum density achieved in the lab.
⏹Remember the test in the lab uses a specific compaction effort so it is possible to achieve compaction above 100% in the field.
⏺I have seen airstrip plans that specified 105% compaction of a modified Marshal Proctor It means that when you conduct compaction test(in the laboratory) on a small soil sample of a particular site You get some value of maximum dry unit weight at certain moisture content.
#GeotechnicalEngineering
@etcono
➡️There are two compaction tests we familiar with, standard Procter and the modified Procter.
*⃣These tests are preformed in a lab on bulk soil samples that are being considered to be used as fill material.
*⃣The test gives the engineer a baseline of how the optimal moisture content and achievable density for a specific compaction effort.
*⃣95% compaction means that the soil on the construction site has been compacted to 95% of the maximum density achieved in the lab.
⏹Remember the test in the lab uses a specific compaction effort so it is possible to achieve compaction above 100% in the field.
⏺I have seen airstrip plans that specified 105% compaction of a modified Marshal Proctor It means that when you conduct compaction test(in the laboratory) on a small soil sample of a particular site You get some value of maximum dry unit weight at certain moisture content.
#GeotechnicalEngineering
@etcono
👉SOME HIGHWAY NOTES
🏷1. Explain The Purpose Of Super Elevation &Widening?
🚧Super elevation used to counterbalance centrifugal force &resists overturning of vehicles.
➡️Factors of supper elevation are👇
⏺Climate condition
⏺Terrain types
⏺Types of area (rural or urban)
⏺Types of facility
🚧Widening used to for visibility of an object on circular curve for psychological & off tracking vehicle.
🏷2. Write The Types Of Terrain & The Difference Between Them?
🚧Types of terrains are
➡️Flat terrain is offer a few obstacle to the construction of road, having continuous unrestricted horizontal & vertical alignment & traverse slope is 0-5%
➡️Rolling ፦slope generally rise & fall moderately ,some restriction in alignment & its traverse slope is 5-25%
➡️Mountainous ፦definet restriction of alignment & ssd ,has steep grade and their traverse slope is 25-50%
➡️Escarpment ፦inclusive of switch back roadway section & traverse slope is >50%
🏷3. Write The Types Of Sight Distance & Explain Them?
🚧SD is distance visible to the driver s o f a passenger’s car.
▶️The types of SD is
⏺SSD is visible to the drivers to stop the passenger’s car before collapsed.
*⃣D=0.278vt+v2/254f
⏺PSD is a minimum SD on the two ways single road way that must be available to enable that the driver of one vehicles to another vehicles safely without interfering with the speed of on coming vehicles at the design speed.
*⃣D1=0.278t1(v-m+at1/2)
*⃣D2=0.278vt2
*⃣D4 =2/3(d2)
⏭PSD=d1+d2 +d3 +d4
⏹where is the speed d/ce b/n passed vehicle & passing vehicles
#HighwayEngineering
@etconp
🏷1. Explain The Purpose Of Super Elevation &Widening?
🚧Super elevation used to counterbalance centrifugal force &resists overturning of vehicles.
➡️Factors of supper elevation are👇
⏺Climate condition
⏺Terrain types
⏺Types of area (rural or urban)
⏺Types of facility
🚧Widening used to for visibility of an object on circular curve for psychological & off tracking vehicle.
🏷2. Write The Types Of Terrain & The Difference Between Them?
🚧Types of terrains are
➡️Flat terrain is offer a few obstacle to the construction of road, having continuous unrestricted horizontal & vertical alignment & traverse slope is 0-5%
➡️Rolling ፦slope generally rise & fall moderately ,some restriction in alignment & its traverse slope is 5-25%
➡️Mountainous ፦definet restriction of alignment & ssd ,has steep grade and their traverse slope is 25-50%
➡️Escarpment ፦inclusive of switch back roadway section & traverse slope is >50%
🏷3. Write The Types Of Sight Distance & Explain Them?
🚧SD is distance visible to the driver s o f a passenger’s car.
▶️The types of SD is
⏺SSD is visible to the drivers to stop the passenger’s car before collapsed.
*⃣D=0.278vt+v2/254f
⏺PSD is a minimum SD on the two ways single road way that must be available to enable that the driver of one vehicles to another vehicles safely without interfering with the speed of on coming vehicles at the design speed.
*⃣D1=0.278t1(v-m+at1/2)
*⃣D2=0.278vt2
*⃣D4 =2/3(d2)
⏭PSD=d1+d2 +d3 +d4
⏹where is the speed d/ce b/n passed vehicle & passing vehicles
#HighwayEngineering
@etconp
Soil mechanics quiz
What’s the active earth pressure for a soil of height 3 meter , unit weight of 20 kN/m³ and angel of internal friction 30⁰ ?
1️⃣. 15kN/m
2️⃣. 20KN/m
3️⃣. 25kN/m
4️⃣. 30kN/m
If more that 5 members participate @cotmp we will attach the answer
ከ 5 በላይ ቤተሰቦች በ @cotmp ከተሳፋችሁ መልሱን እንለቀዋለን
Telegram:- @etconp
Instagram:- https://instagram.com/etconp?igshid=xja0115f44k8
What’s the active earth pressure for a soil of height 3 meter , unit weight of 20 kN/m³ and angel of internal friction 30⁰ ?
1️⃣. 15kN/m
2️⃣. 20KN/m
3️⃣. 25kN/m
4️⃣. 30kN/m
If more that 5 members participate @cotmp we will attach the answer
ከ 5 በላይ ቤተሰቦች በ @cotmp ከተሳፋችሁ መልሱን እንለቀዋለን
Telegram:- @etconp
Instagram:- https://instagram.com/etconp?igshid=xja0115f44k8
👉Some Stress Distributions In Hydraulics
▪Direct Stress Distribution is Uniform At sections Reasonably Away from Point of application of load.
▪Bending stress Distribution is Linear being zero at Neutral axis & maximum at extreme Fibres.
▪Transverse shear stress (Tangential stress) Distribution is Parabolic being Zero at extreme Fibres & Maximum at Neutral axis.
▪Torsional Shear stress Distribution is Linear being zero at neutral axis and Maximum at extreme Fibres.
▪In Turbulent Flow velocity profile is logarithmic.
▪In Laminar Flow velocity profile is Parabolic.
▪Laminar Sublayer Exist In Turbulent zone and the velocity profile in Laminar Sublayer is Parabolic.
▪Shear stress distribution is linear in both Laminar and Turbulent flows.
▪Average shear Stress Distribution is always Uniform (rectangular).
▪Average velocity distribution is always Uniform in both Laminar and Turbulent Flow situations (rectangular).
#StressDistributions
#Hydraulics
@etconp
▪Direct Stress Distribution is Uniform At sections Reasonably Away from Point of application of load.
▪Bending stress Distribution is Linear being zero at Neutral axis & maximum at extreme Fibres.
▪Transverse shear stress (Tangential stress) Distribution is Parabolic being Zero at extreme Fibres & Maximum at Neutral axis.
▪Torsional Shear stress Distribution is Linear being zero at neutral axis and Maximum at extreme Fibres.
▪In Turbulent Flow velocity profile is logarithmic.
▪In Laminar Flow velocity profile is Parabolic.
▪Laminar Sublayer Exist In Turbulent zone and the velocity profile in Laminar Sublayer is Parabolic.
▪Shear stress distribution is linear in both Laminar and Turbulent flows.
▪Average shear Stress Distribution is always Uniform (rectangular).
▪Average velocity distribution is always Uniform in both Laminar and Turbulent Flow situations (rectangular).
#StressDistributions
#Hydraulics
@etconp
👉Factor of safety
➡️Factor of safety is define as the ratio of yield stress to working Stress.
*⃣According to designing point of view, none of the material is 100 % reliable, we design the structure member for given working Stress and keep the Stress in such a way that they can not reached or exceed there permissible values because ones the material of the members reaches to there permissible values then yielding get start and the structure is treated as failed structure.
*⃣When We design the structure member with in the proportional limit and If the materials subjected to the Stress which is equal to permissible values and more than this , Hence structural member get fail.
▶️So as a designer When we design the structure including some factor of safety And design the member in such a way that material of members keeps with in its proportional limit by the help of factors of safety
▶️For example, In case of RCC design the factor of safety for concrete is taken as 1.5 and for steel it is 1.15.
@etconp
➡️Factor of safety is define as the ratio of yield stress to working Stress.
*⃣According to designing point of view, none of the material is 100 % reliable, we design the structure member for given working Stress and keep the Stress in such a way that they can not reached or exceed there permissible values because ones the material of the members reaches to there permissible values then yielding get start and the structure is treated as failed structure.
*⃣When We design the structure member with in the proportional limit and If the materials subjected to the Stress which is equal to permissible values and more than this , Hence structural member get fail.
▶️So as a designer When we design the structure including some factor of safety And design the member in such a way that material of members keeps with in its proportional limit by the help of factors of safety
▶️For example, In case of RCC design the factor of safety for concrete is taken as 1.5 and for steel it is 1.15.
@etconp
👉Some Important Definitions
🚧 Water content : Ratio of the weight of water to the weight of solids.
🚧Void Ratio : Ratio of the volume of voids to the volume of solids.
🚧Porosity : Ratio of the volume of voids to the total volume of the soil.
🚧Degree of saturation : Ratio of the volume of water to the volume of voids.
🚧Air content : Ratio of volume of air voids to the volume of voids.
🚧Percentage air voids : Ratio of the volume of air voids expressed as a percentage of total volume of the soil.
🚧Unit weight : It is the weight per unit volume.
🚧Bulk Unit weight : Total weight of soil mass, per unit of total volume.
🚧Dry unit weight : Weight of solids per unit of total volume.
🚧Saturated unit weight : Ratio of total weight of a fully saturated soil, to its total volume.
🚧Submerged unit weight : Ratio of the submerged weight of soil, to its total volume.
🚧Unit weight of solids : Ratio of the weight of solids, to the volume of solids.
🚧Specific gravity : Ratio of the weight of a given volume of solids to the weight of an equivalent volume of water at 4°C.
🚧Apparent or Mass specific gravity : Ratio of the total weight of a given mass of soil to the weight of an equivalent volume of water.
#ConstructionNotes
#SoilMechanics
@etconp
🚧 Water content : Ratio of the weight of water to the weight of solids.
🚧Void Ratio : Ratio of the volume of voids to the volume of solids.
🚧Porosity : Ratio of the volume of voids to the total volume of the soil.
🚧Degree of saturation : Ratio of the volume of water to the volume of voids.
🚧Air content : Ratio of volume of air voids to the volume of voids.
🚧Percentage air voids : Ratio of the volume of air voids expressed as a percentage of total volume of the soil.
🚧Unit weight : It is the weight per unit volume.
🚧Bulk Unit weight : Total weight of soil mass, per unit of total volume.
🚧Dry unit weight : Weight of solids per unit of total volume.
🚧Saturated unit weight : Ratio of total weight of a fully saturated soil, to its total volume.
🚧Submerged unit weight : Ratio of the submerged weight of soil, to its total volume.
🚧Unit weight of solids : Ratio of the weight of solids, to the volume of solids.
🚧Specific gravity : Ratio of the weight of a given volume of solids to the weight of an equivalent volume of water at 4°C.
🚧Apparent or Mass specific gravity : Ratio of the total weight of a given mass of soil to the weight of an equivalent volume of water.
#ConstructionNotes
#SoilMechanics
@etconp
👉ፓራሜትሪክ ስነ-ህንጻ ንድፍ
➡️ፓራሜትሪክ ስነ-ህንፃ በንድፍ መስፈርቶች እና በዚህ ሂደት የመጨረሻ ንድፍ ውጤት ምርት መካከል ያለውን ግንኙነት የሚገልፁ እና የሚያቀናጁ መለኪያዎች እና ደንቦችን መጠቀም የሚያስችል በአልጎሪዝም መርሃግብር ላይ የተመሠረተ አሁናዊና አለም የደረሰበት የንድፍ ሂደት ነው፡፡
🚧በዚህም ባብላጫው የኮምፒውተር ስሌት እርዳታ የሚያስፈልግ ሲሆን ባገራችን እስካሁን ይሄንን የተገበረ ህንጻ የለም።
🚧የባህር ማዶ ህንጻ ምሳሌ ከላይ ኣያይዘንላቹዋል።
#Architecture
@etconp
➡️ፓራሜትሪክ ስነ-ህንፃ በንድፍ መስፈርቶች እና በዚህ ሂደት የመጨረሻ ንድፍ ውጤት ምርት መካከል ያለውን ግንኙነት የሚገልፁ እና የሚያቀናጁ መለኪያዎች እና ደንቦችን መጠቀም የሚያስችል በአልጎሪዝም መርሃግብር ላይ የተመሠረተ አሁናዊና አለም የደረሰበት የንድፍ ሂደት ነው፡፡
🚧በዚህም ባብላጫው የኮምፒውተር ስሌት እርዳታ የሚያስፈልግ ሲሆን ባገራችን እስካሁን ይሄንን የተገበረ ህንጻ የለም።
🚧የባህር ማዶ ህንጻ ምሳሌ ከላይ ኣያይዘንላቹዋል።
#Architecture
@etconp
👉What Are The Sources of Water-Surface and Subsurface Sources of Water
➡️Water is the main constituent of the earth surface.
➡️You know that the chemical formula of water is H2O Water occurs in liquid, solid(ice) and gas( water vapour).
🚧There are mainly two sources of water, surface source water and subsurface source water.
🏷1.Surface sources of water
⏺Storage reservoirs
*⃣Storage reservoirs are the main sources of water for a city or town Because storage reservoirs always have sufficient amount of water available during the summer and as well as in winter season.
*⃣The capacity of the storage tank is determined by several methods.
⏺Lakes
*⃣The lake water is pure compared to all other sources.
*⃣The fresh water comes from the rock or surrounding area always drive under the filtration of soil So impurities in lakes water will be less.
*⃣Lake water has algae, weeds and other vegetables.
*⃣It is one of the main surface sources of water.
⏺Rivers or streams
*⃣The main use of the river is navigation between land.
*⃣The river water is pure at mountains, but when it approaches plain area it will deteriorate due to the wastes from town or municipal areas.
*⃣The river water flows and it reaches the sea.
*⃣The main source of water to the wells is from runoff.
⏺Oceans
*⃣Ocean is the largest source of water in the earth.
*⃣They cannot be used drinking or construction purpose due to high salinity of the water.
*⃣The normal salt content for drinking purpose is 2 percent, but the salt content in sea water exceeds 3 percentage So sea water damage human kidney system.
⏺Precipitation
*⃣If you don’t know the meaning of precipitation, don’t worry Precipitation is rain.
*⃣Precipitation is also other pure water sources to the earth.
🏷2.Sub Surface sources of water
⏺Infiltration galleries
*⃣A horizontal tunnel usually rectangular in cross section.
*⃣Infiltration galleries have permeable boundaries so that water can be filtrate into them.
⏺Infiltration wells
*⃣It is shallow well constructed in series along the bank of the river.
*⃣The surface water flowing through the river flow towards the well constructed in the bank of the river.
*⃣These wells contain only pure water Because during their movement from the river to infiltration wills, the water purification takes place by filtration of soil.
⏺Well
*⃣Well is the main sub surface sources of water for houses Usually, they are rounded shape and usually having a depth more 8 meters.
*⃣The main sources of water to the wells are from infiltration of water through the soil.
➡️Two types of wells are there
🚧Open wells -They have large diameter and low yield.
🚧Tube wells -They have small diameter, long pipe sunk into the ground intercepting one or more water-bearing strata.
👌we hope you could understand surface and subsurface sources of water.
💌If you have any doubt, don’t shy to comment @ETCONp_Bot
👍If you like this Channel Don’t forget to share with your friends.
#WaterSupply
@etconp
➡️Water is the main constituent of the earth surface.
➡️You know that the chemical formula of water is H2O Water occurs in liquid, solid(ice) and gas( water vapour).
🚧There are mainly two sources of water, surface source water and subsurface source water.
🏷1.Surface sources of water
⏺Storage reservoirs
*⃣Storage reservoirs are the main sources of water for a city or town Because storage reservoirs always have sufficient amount of water available during the summer and as well as in winter season.
*⃣The capacity of the storage tank is determined by several methods.
⏺Lakes
*⃣The lake water is pure compared to all other sources.
*⃣The fresh water comes from the rock or surrounding area always drive under the filtration of soil So impurities in lakes water will be less.
*⃣Lake water has algae, weeds and other vegetables.
*⃣It is one of the main surface sources of water.
⏺Rivers or streams
*⃣The main use of the river is navigation between land.
*⃣The river water is pure at mountains, but when it approaches plain area it will deteriorate due to the wastes from town or municipal areas.
*⃣The river water flows and it reaches the sea.
*⃣The main source of water to the wells is from runoff.
⏺Oceans
*⃣Ocean is the largest source of water in the earth.
*⃣They cannot be used drinking or construction purpose due to high salinity of the water.
*⃣The normal salt content for drinking purpose is 2 percent, but the salt content in sea water exceeds 3 percentage So sea water damage human kidney system.
⏺Precipitation
*⃣If you don’t know the meaning of precipitation, don’t worry Precipitation is rain.
*⃣Precipitation is also other pure water sources to the earth.
🏷2.Sub Surface sources of water
⏺Infiltration galleries
*⃣A horizontal tunnel usually rectangular in cross section.
*⃣Infiltration galleries have permeable boundaries so that water can be filtrate into them.
⏺Infiltration wells
*⃣It is shallow well constructed in series along the bank of the river.
*⃣The surface water flowing through the river flow towards the well constructed in the bank of the river.
*⃣These wells contain only pure water Because during their movement from the river to infiltration wills, the water purification takes place by filtration of soil.
⏺Well
*⃣Well is the main sub surface sources of water for houses Usually, they are rounded shape and usually having a depth more 8 meters.
*⃣The main sources of water to the wells are from infiltration of water through the soil.
➡️Two types of wells are there
🚧Open wells -They have large diameter and low yield.
🚧Tube wells -They have small diameter, long pipe sunk into the ground intercepting one or more water-bearing strata.
👌we hope you could understand surface and subsurface sources of water.
💌If you have any doubt, don’t shy to comment @ETCONp_Bot
👍If you like this Channel Don’t forget to share with your friends.
#WaterSupply
@etconp
👉Terms related to Mass Haul Diagram
🚧Free haul distance
🔷Distance up to which the excavated material is hauled without any extra cost.
🚧Over haul distance
🔷Excess of haul distance beyond the free haul distance.
🚧Borrow
🔷Quantity of material ( in cubic meter) required for the embankment taken from borrow pits.
🚧Haul
🔷Sum of the products of each load by its respective haul distance.
🔷 Unit of haul is cum meter or station-meter.
🔷 1 station-meter is equal to 1 cubic meter of excavated material hauled through one station (30 meter distance)
🚧Economical Overhaul Distance or Limit of economical haul
🔷 Maximum distance to which the excavation obtained may be utilized in filing up any depression.
🔷 L = (B/O)+F
*⃣L = Economical Overhaul Distance
*⃣B = Cost of borrow per cubic meter at station
*⃣O= cost of overhaul per station-meter
*⃣F = Free haul distance
🚧Waste
🔷Material excavated from cuts but not used for embankment.
🚧Balancing line
🔷The horizontal line(base line) drawn on the mass haul diagram.
#ConstructionNotes
#HighwayEngineering
@etconp
🚧Free haul distance
🔷Distance up to which the excavated material is hauled without any extra cost.
🚧Over haul distance
🔷Excess of haul distance beyond the free haul distance.
🚧Borrow
🔷Quantity of material ( in cubic meter) required for the embankment taken from borrow pits.
🚧Haul
🔷Sum of the products of each load by its respective haul distance.
🔷 Unit of haul is cum meter or station-meter.
🔷 1 station-meter is equal to 1 cubic meter of excavated material hauled through one station (30 meter distance)
🚧Economical Overhaul Distance or Limit of economical haul
🔷 Maximum distance to which the excavation obtained may be utilized in filing up any depression.
🔷 L = (B/O)+F
*⃣L = Economical Overhaul Distance
*⃣B = Cost of borrow per cubic meter at station
*⃣O= cost of overhaul per station-meter
*⃣F = Free haul distance
🚧Waste
🔷Material excavated from cuts but not used for embankment.
🚧Balancing line
🔷The horizontal line(base line) drawn on the mass haul diagram.
#ConstructionNotes
#HighwayEngineering
@etconp
👉1. ኪነህንጻ እና ቀለም
🏷1.1 ጥቁርና ነጭ ቀለማት በውስጥ እይታ
▶️ከላይ በምስሉ ላይ የሚታየው በአዲሳባ ከተማ በደንበል ህንጻ ውስጥ የሚገኝ የቶሞካ የቡና መጠጫ ካፌ ነው።
🚧ጥቁርንና ነጭ ቀለምን በመጠቀምና ተቃርኖን በማምጣት ውስጣዊ ስሜቱን ህይወት አላብሰውታል።
🚧በተለይ በእንደዚህ ሰዎች ብዙ ግዜአቸውን በማያጠፉባቸው ቦታዎች ላይ ተቃርኖን መጠቀም ሲመከር ፣ ለመኖርያ ቦታ ውስጣዊ ክፍሎች ግን ተደጋጋፊ ቀለማት ይመረጣሉ።
#Architecture
#ColorAndArchitecture
@etconp
🏷1.1 ጥቁርና ነጭ ቀለማት በውስጥ እይታ
▶️ከላይ በምስሉ ላይ የሚታየው በአዲሳባ ከተማ በደንበል ህንጻ ውስጥ የሚገኝ የቶሞካ የቡና መጠጫ ካፌ ነው።
🚧ጥቁርንና ነጭ ቀለምን በመጠቀምና ተቃርኖን በማምጣት ውስጣዊ ስሜቱን ህይወት አላብሰውታል።
🚧በተለይ በእንደዚህ ሰዎች ብዙ ግዜአቸውን በማያጠፉባቸው ቦታዎች ላይ ተቃርኖን መጠቀም ሲመከር ፣ ለመኖርያ ቦታ ውስጣዊ ክፍሎች ግን ተደጋጋፊ ቀለማት ይመረጣሉ።
#Architecture
#ColorAndArchitecture
@etconp
👉ኪነህንጻ እና ቀለም
🏷1.2. ሙሉ ወይም አብላጫ ጥቁር ቀለም።
🚧ከታች በምስሉ ላይ የሚታየው በሊያን ዲዛይን የተሰራ የመኖርያ ቤት ሲሆን የነጭ ተቃርኖ የሌለው ጥቁር ውስጣዊ እይታ ነው።
🚧የቤት ቁሶቹ፣ የተለያዩ አጃቢዎች እንዲሁም ወለሉ ጥቁሮች ናቸው።
🚧በ ቀን በጸሀይ ብርሀን ረጋ የሚያደርግ ቦታ ሲሆን በማታ ደግሞ በወርቃማ ነጥብ መብራት እጅግ የሚያምር አስደማሚ ድባብ ይፈጥራል።
🚧በአገራችን ጥቁርን እጅግም የሚደፍር ዲዛይነርም ሆነ ደንበኛ እንደሌለ እናውቃለን።
#Architecture
#ColorAndArchitecture
@etconp
🏷1.2. ሙሉ ወይም አብላጫ ጥቁር ቀለም።
🚧ከታች በምስሉ ላይ የሚታየው በሊያን ዲዛይን የተሰራ የመኖርያ ቤት ሲሆን የነጭ ተቃርኖ የሌለው ጥቁር ውስጣዊ እይታ ነው።
🚧የቤት ቁሶቹ፣ የተለያዩ አጃቢዎች እንዲሁም ወለሉ ጥቁሮች ናቸው።
🚧በ ቀን በጸሀይ ብርሀን ረጋ የሚያደርግ ቦታ ሲሆን በማታ ደግሞ በወርቃማ ነጥብ መብራት እጅግ የሚያምር አስደማሚ ድባብ ይፈጥራል።
🚧በአገራችን ጥቁርን እጅግም የሚደፍር ዲዛይነርም ሆነ ደንበኛ እንደሌለ እናውቃለን።
#Architecture
#ColorAndArchitecture
@etconp
👉በ ጥያቄያቹ መሠረት ኣንዳንድ ሳይት ላይ የተለመዱ የ አማርኛ ቃላት ይዘንላቹ ቀርበናል
➡️ሰጌቶ = steel saw
➡️ፈረዮ = someone who works with reinforcements
➡️ግሪላ = reinforcement used for the placement of footing
➡️ፎንዶ (bottom soffit) = used as a form work for beam and slab at the bottom.
➡️ስፖንዳ (side board) = used as form work for beams and slabs on vertical sides
➡️መቀሰቻ (brace) = supports a vertical side form work of beam, and column panel diagonally
➡️ስታፋ (stirrup) = shear resistant bar of the column, beams, and shear walls
➡️ቱምቢ (plumb Bob) = it is used to check the perpendicularity of columns.
➡️ከበሌቶ = used To separate Top reinforcement Bar From Top Reinforcement Bar of slab.
➡️ሞዲኖ (profile) = used for setting out works
➡️ሲባጎ (string) = used to maintain alignments
➡️ክራቫት (Yoke) = used to fix the form works together in their position.
✍የተቀሩት እናንተም በመወያያ ግሩፓቹ @COTMp ላይ ፃፉልን።
@etconp
➡️ሰጌቶ = steel saw
➡️ፈረዮ = someone who works with reinforcements
➡️ግሪላ = reinforcement used for the placement of footing
➡️ፎንዶ (bottom soffit) = used as a form work for beam and slab at the bottom.
➡️ስፖንዳ (side board) = used as form work for beams and slabs on vertical sides
➡️መቀሰቻ (brace) = supports a vertical side form work of beam, and column panel diagonally
➡️ስታፋ (stirrup) = shear resistant bar of the column, beams, and shear walls
➡️ቱምቢ (plumb Bob) = it is used to check the perpendicularity of columns.
➡️ከበሌቶ = used To separate Top reinforcement Bar From Top Reinforcement Bar of slab.
➡️ሞዲኖ (profile) = used for setting out works
➡️ሲባጎ (string) = used to maintain alignments
➡️ክራቫት (Yoke) = used to fix the form works together in their position.
✍የተቀሩት እናንተም በመወያያ ግሩፓቹ @COTMp ላይ ፃፉልን።
@etconp
👉5 Ways to Terminate a
Contract
➡️A contract is a legal document that binds at least two parties to one another and requires them to meet certain obligations detailed in the contract.
➡️In some instances, contract termination can occur that will make the contract void of legal binding.
▶️Only the parties involved in the agreement may terminate a contract.
🚧Impossibility of Performance
⏺A contract typically requires one or more parties to do something, which is called performance.
*⃣For example, a company may hire and sign a contract to have a public speaker talk at a company event Once the public speaker fulfills his duties agreed upon in the contract, it is called performance.
*⃣If for some reason it is impossible for the public speaker to fulfill his duties, it is called impossibility of performance or sometimes "frustration."
*⃣For example, if the speaker were seriously injured and no one could replace him, that would be impossibility of performance.
*⃣The company has the right to terminate the contract in this scenario.
🚧Breach of Contract
➡️When a contract is intentionally not honored by one party, it is called a breach of contract and is grounds for contract termination.
▶️A breach of contract may exist because one party failed to meet his obligations at all or did not meet his obligations fully.
*⃣For example, if you purchased a product that did not arrive until a day after the agreed upon delivery date, that is an immaterial breach of contract.
▶️However, if your order did not come until two weeks after the delivery date and it affected your business, then that is a material breach of contract.
▶️Generally, with a material breach of contract, the injured party has the right to seek monetary damages for his losses as well as cancel the agreement.
🚧Termination By Prior Agreement
➡️You may terminate a contract if you and the other party have a prior written agreement that calls for a contract termination because of a specific reason.
▶️The usual name for this type of provision is a break clause.
▶️The agreement must give the details of what qualifies as a reason for contract termination.
▶️It should also state what actions need to take place for one of the parties to terminate the contract.
▶️In most cases, one party must submit a written notice to the other party to terminate the contract.
🚧Rescission of the Contract
➡️A rescission of a contract is when a contract is terminated because an individual misrepresented themselves, acted illegally fraud for example or made a mistake.
*⃣For example, if you bought a house but after further inspection you discover that the seller intentionally hid the poor physical condition of the home, you may possibly rescind the contract.
▶️A contract rescission may take place if one party is not old enough to enter a contract or if a elderly person is not able to make legal decisions because of incapacity.
🚧Completion of the Contract
➡️A contract is essentially terminated once the obligations outlined in the contract are completed.
▶️Parties should keep documentation showing that they fulfilled their contract duties.
▶️Documentation is helpful if the other party tries to later dispute the fulfillment of your contract obligations.
▶️A court of law will require proof of contract fulfillment if a dispute occurs.
#ConstructionLaw
#ContractTermination
@etconp
Contract
➡️A contract is a legal document that binds at least two parties to one another and requires them to meet certain obligations detailed in the contract.
➡️In some instances, contract termination can occur that will make the contract void of legal binding.
▶️Only the parties involved in the agreement may terminate a contract.
🚧Impossibility of Performance
⏺A contract typically requires one or more parties to do something, which is called performance.
*⃣For example, a company may hire and sign a contract to have a public speaker talk at a company event Once the public speaker fulfills his duties agreed upon in the contract, it is called performance.
*⃣If for some reason it is impossible for the public speaker to fulfill his duties, it is called impossibility of performance or sometimes "frustration."
*⃣For example, if the speaker were seriously injured and no one could replace him, that would be impossibility of performance.
*⃣The company has the right to terminate the contract in this scenario.
🚧Breach of Contract
➡️When a contract is intentionally not honored by one party, it is called a breach of contract and is grounds for contract termination.
▶️A breach of contract may exist because one party failed to meet his obligations at all or did not meet his obligations fully.
*⃣For example, if you purchased a product that did not arrive until a day after the agreed upon delivery date, that is an immaterial breach of contract.
▶️However, if your order did not come until two weeks after the delivery date and it affected your business, then that is a material breach of contract.
▶️Generally, with a material breach of contract, the injured party has the right to seek monetary damages for his losses as well as cancel the agreement.
🚧Termination By Prior Agreement
➡️You may terminate a contract if you and the other party have a prior written agreement that calls for a contract termination because of a specific reason.
▶️The usual name for this type of provision is a break clause.
▶️The agreement must give the details of what qualifies as a reason for contract termination.
▶️It should also state what actions need to take place for one of the parties to terminate the contract.
▶️In most cases, one party must submit a written notice to the other party to terminate the contract.
🚧Rescission of the Contract
➡️A rescission of a contract is when a contract is terminated because an individual misrepresented themselves, acted illegally fraud for example or made a mistake.
*⃣For example, if you bought a house but after further inspection you discover that the seller intentionally hid the poor physical condition of the home, you may possibly rescind the contract.
▶️A contract rescission may take place if one party is not old enough to enter a contract or if a elderly person is not able to make legal decisions because of incapacity.
🚧Completion of the Contract
➡️A contract is essentially terminated once the obligations outlined in the contract are completed.
▶️Parties should keep documentation showing that they fulfilled their contract duties.
▶️Documentation is helpful if the other party tries to later dispute the fulfillment of your contract obligations.
▶️A court of law will require proof of contract fulfillment if a dispute occurs.
#ConstructionLaw
#ContractTermination
@etconp
👉በቁፋሮ ወቅት ሳይት ላይ ሊገኙ ስለሚችሉ አንዳንድ ነገሮች
ኮንስትራክሽን ኮንትራት ውል ምን ይላል???
⏩ለምሳሌ: ወርቅ ወይም ሌላ መዐድን ቢገኝ
🚧ምላሹ ከዚህ ፅሁፍ በምስል አያይዘንላቹዋል።
#ConstructionLaw
@etconp
ኮንስትራክሽን ኮንትራት ውል ምን ይላል???
⏩ለምሳሌ: ወርቅ ወይም ሌላ መዐድን ቢገኝ
🚧ምላሹ ከዚህ ፅሁፍ በምስል አያይዘንላቹዋል።
#ConstructionLaw
@etconp
👉ኦሞቲክ ቢዝነስ ግሩፕ በአርባምንጭ ከተማ የሆቴል ግንባታ ስራ ጀመረ!
🚧ድርጅቱ በተለያዩ አካባቢዎች ለመገንባት ካቀዳቸው ሆቴሎች እና ሎጆች/ሪዞርቶች መካከል አንዱ የሆነውን እና ደረጃውን የጠበቀ አለም አቀፍ ሆቴል በአርባምንጭ ከተማ የግንባታ ስራውን በይፋ ጀምሯል።
🚧ኦሞቲክ ቢዝነስ ግሩፕ በኮንታ ልዩ ወረዳ (ጨበራ ጩርጩራ ፓርክ አከባቢ) እና በኬንያ ማሳይ ማራ ፓርክ አካባቢ የሪዞርት/ሎጅ ግንባታ ለመጀመር በእንቅስቃሴ ላይ ሲሆን በደቡብ ክልል ጅንካ ከተማ የሎጅ/ሪዞርት ግንባታ እያካሄደ ይገኛል።
Via elias meseret
@etconp
🚧ድርጅቱ በተለያዩ አካባቢዎች ለመገንባት ካቀዳቸው ሆቴሎች እና ሎጆች/ሪዞርቶች መካከል አንዱ የሆነውን እና ደረጃውን የጠበቀ አለም አቀፍ ሆቴል በአርባምንጭ ከተማ የግንባታ ስራውን በይፋ ጀምሯል።
🚧ኦሞቲክ ቢዝነስ ግሩፕ በኮንታ ልዩ ወረዳ (ጨበራ ጩርጩራ ፓርክ አከባቢ) እና በኬንያ ማሳይ ማራ ፓርክ አካባቢ የሪዞርት/ሎጅ ግንባታ ለመጀመር በእንቅስቃሴ ላይ ሲሆን በደቡብ ክልል ጅንካ ከተማ የሎጅ/ሪዞርት ግንባታ እያካሄደ ይገኛል።
Via elias meseret
@etconp
What is A 360 excavator used for ?
1️⃣. To lift personnel to elevated work
sites
2️⃣. To dig trench , foundation and
basement excavation
3️⃣. To put the camber on road before
laying asphalt
4️⃣. To dewater trenches
Telegram:- @etconp
Instagram:- https://instagram.com/etconp?igshid=y7azluxtmxyw
1️⃣. To lift personnel to elevated work
sites
2️⃣. To dig trench , foundation and
basement excavation
3️⃣. To put the camber on road before
laying asphalt
4️⃣. To dewater trenches
Telegram:- @etconp
Instagram:- https://instagram.com/etconp?igshid=y7azluxtmxyw