Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
(Earthquake) የመሬት መንቀጥቀጥ እንዴት እንደ LOAD consider እንደሚደረግ እንንገራችሁ።
The SI unit of LOAD is NEWTON(N). And Load is a type force.
የ Load SI unit ኒውተን ነው። እናም the second law of Newton አንድ እውቅ formula አስተዋውቆናል። እሱም
F=m x ā
Where F= force ( load in our case )
m= mass
ā= acceleration
ስለዚህ
👉🏿‘m’ mass= የህንፃው ክብደት (self weight)
👉🏿 ‘ā’ acceleration = wave from epicenter የመሬቱ እርግብግቢት
How do we consider earthquake as a LOAD ?
LOAD is a type of force. The SI unit of LOAD is Newton (N).
Newton introduced us to Force in his second law. That is
F= m x ā
Where m= mass
ā= acceleration
Therefore
👉🏿 m= mass of the building (structure)
👉🏿ā = wave from epicenter
Join us on telegram:- @etconp
@etconp
The SI unit of LOAD is NEWTON(N). And Load is a type force.
የ Load SI unit ኒውተን ነው። እናም the second law of Newton አንድ እውቅ formula አስተዋውቆናል። እሱም
F=m x ā
Where F= force ( load in our case )
m= mass
ā= acceleration
ስለዚህ
👉🏿‘m’ mass= የህንፃው ክብደት (self weight)
👉🏿 ‘ā’ acceleration = wave from epicenter የመሬቱ እርግብግቢት
How do we consider earthquake as a LOAD ?
LOAD is a type of force. The SI unit of LOAD is Newton (N).
Newton introduced us to Force in his second law. That is
F= m x ā
Where m= mass
ā= acceleration
Therefore
👉🏿 m= mass of the building (structure)
👉🏿ā = wave from epicenter
Join us on telegram:- @etconp
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
bridge excavation@etconp.pdf
306.7 KB
Bridge
የድልድይ ስራ ላይ እያለው የከርሰ ምድር ቁፋሮ፣ የ foundation requirement፣ ደህንነት (safety ) በተመለከተ ፅሁፍ ይዘንላችሁ እንመጣለን ባልነው መሰረት እንካችሁ ብለናል።
This presentation contains
1.1 excavation - general
1.2 environmental constraints
1.3 safety
1.4 bridge inspector’s record
1.5 soil materials and ground water
1.6 foundation requirement
1.7 dry structural excavation
1.8 wet structural excavation
1.9 channel excavation
1.10 material disposal
1.11 checklist
እጥር ምጥን ያለች presentation ነች።
#bridge
@etconp
የድልድይ ስራ ላይ እያለው የከርሰ ምድር ቁፋሮ፣ የ foundation requirement፣ ደህንነት (safety ) በተመለከተ ፅሁፍ ይዘንላችሁ እንመጣለን ባልነው መሰረት እንካችሁ ብለናል።
This presentation contains
1.1 excavation - general
1.2 environmental constraints
1.3 safety
1.4 bridge inspector’s record
1.5 soil materials and ground water
1.6 foundation requirement
1.7 dry structural excavation
1.8 wet structural excavation
1.9 channel excavation
1.10 material disposal
1.11 checklist
እጥር ምጥን ያለች presentation ነች።
#bridge
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
corona virus on construction industry@etconp.pdf
98.3 KB
Corona update
የ corona virus እንዴት ኮንስትራክሽን industryው ላይ የሚያሳርፈው ተፅዕኖ።
How corona virus affect the construction industry?
ይህ PDF ያንብቡት 98.2KB ነው።
This pdf is prepared by @etconp.
Pray together. unity always has strength
Wash your hand
sanitize in every 20 minutes
አብረን እንጸልይ አንድነት ጥንካሬ አለው።
እጆን ይታጠቡ!
#pray #sanitize #covid19
@etconp
የ corona virus እንዴት ኮንስትራክሽን industryው ላይ የሚያሳርፈው ተፅዕኖ።
How corona virus affect the construction industry?
ይህ PDF ያንብቡት 98.2KB ነው።
This pdf is prepared by @etconp.
Pray together. unity always has strength
Wash your hand
sanitize in every 20 minutes
አብረን እንጸልይ አንድነት ጥንካሬ አለው።
እጆን ይታጠቡ!
#pray #sanitize #covid19
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
analysis_&_proportioning_of_retaining_wall_example_@etconp.pdf
8.2 MB
👉Analysis and proportioning of retaining wall example 📚
.
👌ይህን ፋይል ሁላችንም ጋር ሊኖር ይገባል ብዬ አሳስባለው።
.
🚧የተሰሩ የretaining wall ጥያቄዎች ...
#retainingwall #analysis #proportioning
@ETCONp
.
👌ይህን ፋይል ሁላችንም ጋር ሊኖር ይገባል ብዬ አሳስባለው።
.
🚧የተሰሩ የretaining wall ጥያቄዎች ...
#retainingwall #analysis #proportioning
@ETCONp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
survying.rar
66.7 MB
Surveying file
Content
1. introduction to surveying
2. Unit of measurement
3. Leveling
4. Measurement of Angle
5. Traverse and traverse computation
6. Area computation
7. Topographic surveying
8. Volumes of earth work
9. GPS presentation
And advanced book ( engineering surveying)
ፋይሉ 67.8MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
ፋይሉ compress ተደርጓል ስለዚህ winRAR ያስፈልጎታል።
በውስጡ 12 PDF ፋይሎች አሉት።
#survying
@etconp
Content
1. introduction to surveying
2. Unit of measurement
3. Leveling
4. Measurement of Angle
5. Traverse and traverse computation
6. Area computation
7. Topographic surveying
8. Volumes of earth work
9. GPS presentation
And advanced book ( engineering surveying)
ፋይሉ 67.8MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
ፋይሉ compress ተደርጓል ስለዚህ winRAR ያስፈልጎታል።
በውስጡ 12 PDF ፋይሎች አሉት።
#survying
@etconp
👍1
Forwarded from Ethio Construction Engineering (Yonathan)
#AlertEpidemics
Standard conditions of contracts about epidemics
▶️
Clause 34 sub-clause(6). Epidemics
In the event of any outbreak of illness of an epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government, or the local medical or sanitary authorities for the purpose of dealing with and overcoming the same.
@etconp
Standard conditions of contracts about epidemics
▶️
Standard condition of contract for construction of civil work projects December, 1994
▶️ fidic part II standard condition of contract 1987Clause 34 sub-clause(6). Epidemics
In the event of any outbreak of illness of an epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government, or the local medical or sanitary authorities for the purpose of dealing with and overcoming the same.
@etconp
Forwarded from Ethio Construction Engineering
➡Hydraulics and water supply Lecture @COTMp
.
👉ለዛሬ ደሞ የ ላየኛው የምድር ውሃ (surface water) ለማጣራት የምንጠቀማቸው ዘዴዎች ኣዘጋጅተናል 👇
.
⓵ስክሪኒንግ (screening) - ይህ የመጀመረርያው የማጣራት
ደረጃ ሲሆን በዚህ የማጣራት ዘዴ ውስጥ በውሃው ላይ የሚንሳፈፉ ግዙፍ አካላትን ለምሳሌ የዛፍ ጉቶ ፣ግንድ፣ ቅጠል እና ልዩ ልዩ የፕላስቲክ ተንሳፋፊ ቁሳቁሶች ወደ ዋናው የማጣሪያ ገንዳ እና ስርዓት
እንዳይገቡ ያግዳል ።
.
⓶ማርጋት (Coagulation )፦ በዚህ የማጣራት ደረጃ ላይ
ለአይን እይታ ያነሱ ጥቃቅን
አካላትን (Particle size 10^-7cm የሚሆኑ) በማርጋት እና
የኬሚካል ቻርጃቸውን ኒውትራላይዝ የሚያረግ ኬሚካል በመጨመር እርስ በእርሳቸው
እንዲሳሳቡ ማድረግ ነው ።
ለዚህ የአልሙኒየም ፖሊመሮች (Alum) እና አይረን (Fe+3)
አገልግሎት ላይ ይውላሉ።
እንደ የቁልቋል ተክል ያሉ የተፈጥሮ አርጊዎች (coagulants) መጠቀምም ይቻላል
.
⓷ጉግለት (Flocculation)፦ ይህ እርከን ፤ ማርጋት
(coagulation ) ወቅት የረጉ ጥቃቅን አካላትን እርስ በእርሳቸው ቦንድ እስኪፈጥሩ እና እርስ በእርሳቸው ተጣብቀው እስኪጓግሉ ውሃው በተለያየ ፍጥነት የሚማሰልበት ነው።
ይህ ዘዴ ሜካኒካል ወይም ማኑዋል በሆነ መልኩ ይተገበራል።
.
⓸መዝቀጥ/ማዝቀጥ (sedimentation) ፦ በፍሎኩሌሽን ወቅት የጓጎለው ጥቃቅን አካላት በዚህን የማጣራት ደረጃ እንዲዘቅጡ ይደረጋል ። ይህ ዘዴ የሚተገበረው የሚጣራው የውሃን ፍጥነት በመቀነስ ግራቪቲን ተጠቅሞ እንዲዘቅጥ ማድረግ ነው።
በግራቪቲ ለማዝቀጥ የሚከብዱ እጅግ ጥቃቅን ቆሻሻዎችን በፍሎኩሌሽን ወቅት ስንጠቀማቸው የነበሩ ኬሚካሎችን በመጠቀም እንዲዘቅጡ ይደረጋል።
.
⓹ ማጥራት (filtration ) ፦ በዚህ የማጥራት ደረጃ ከማዝቀጥ
ደረጃ ያለፉ ጥቃቅን ቆሻሻዎችን እጅግ ጥቃቅን ቀዳዳዎች ባሉት አካል (medium ) እንዲያልፍ በማድረግ የድፍረስነቱን መጠን እጅግ መቀነስ ነው።
.
⓺ማከም (Disinfection) ፦ ከላይ በተጠቀሱ የማጣሪያ ሂደቶች የተጣራው ውሃ
(በዋነኛነት ከተለያዩ ህይወት ከሌላቸው ጥቃቅን ቆሻሻዎች)
ለህብረተሰቡ ለአገልግሎት
ከመድረሱ በፊት በዚህ ሂደት (ዲስኢንፌክሽን) ማለፍ አለበት ።
ምክንያቱም ውሃው ለአገልግሎት የሚቀርበው ከተለያዩ በአይን ከማይታዩ በሽታ አምጪ ተህዋስያን ነፃ መሆኑ ሲረጋገጥ ነው ። ዲስኢንፌክሽን ውሃውን በማፍላት ፣ ሚካኒካል
በሆነ መልኩ ፣ ለጨረር በማጋለጥ (radiation ) እንደሁም በኬሚካል ሊከናወን ይችላል።
በሃገራችን በዋነኛነት
ሃሎጅኖችን (ብሮሚን ክሎሪን እና አይኦዲን ) በመጠቀም
ኬሚካል በመጠቀም ውሃን እናክማለን ።
፟
➡ከዚህ ሁሉ የማጣራት ሂደት በኋላ የተጣራው ውሃ ይጠራቀምና
ለተጠቃሚዎች ይዳረሳል።
.
▶ስለ surface waterን የማጣራት ሂደቶች ጥቂት የሆነ ገለፃን እንዳደረግንላችሁ ተስፋ
እናደርጋለን ። ርእሱ ሰፊ እንደመሆኑ ዳግመኛ በጥልቀት ለመዳሰስ ቃል እንገባለን✌
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
.
👉ለዛሬ ደሞ የ ላየኛው የምድር ውሃ (surface water) ለማጣራት የምንጠቀማቸው ዘዴዎች ኣዘጋጅተናል 👇
.
⓵ስክሪኒንግ (screening) - ይህ የመጀመረርያው የማጣራት
ደረጃ ሲሆን በዚህ የማጣራት ዘዴ ውስጥ በውሃው ላይ የሚንሳፈፉ ግዙፍ አካላትን ለምሳሌ የዛፍ ጉቶ ፣ግንድ፣ ቅጠል እና ልዩ ልዩ የፕላስቲክ ተንሳፋፊ ቁሳቁሶች ወደ ዋናው የማጣሪያ ገንዳ እና ስርዓት
እንዳይገቡ ያግዳል ።
.
⓶ማርጋት (Coagulation )፦ በዚህ የማጣራት ደረጃ ላይ
ለአይን እይታ ያነሱ ጥቃቅን
አካላትን (Particle size 10^-7cm የሚሆኑ) በማርጋት እና
የኬሚካል ቻርጃቸውን ኒውትራላይዝ የሚያረግ ኬሚካል በመጨመር እርስ በእርሳቸው
እንዲሳሳቡ ማድረግ ነው ።
ለዚህ የአልሙኒየም ፖሊመሮች (Alum) እና አይረን (Fe+3)
አገልግሎት ላይ ይውላሉ።
እንደ የቁልቋል ተክል ያሉ የተፈጥሮ አርጊዎች (coagulants) መጠቀምም ይቻላል
.
⓷ጉግለት (Flocculation)፦ ይህ እርከን ፤ ማርጋት
(coagulation ) ወቅት የረጉ ጥቃቅን አካላትን እርስ በእርሳቸው ቦንድ እስኪፈጥሩ እና እርስ በእርሳቸው ተጣብቀው እስኪጓግሉ ውሃው በተለያየ ፍጥነት የሚማሰልበት ነው።
ይህ ዘዴ ሜካኒካል ወይም ማኑዋል በሆነ መልኩ ይተገበራል።
.
⓸መዝቀጥ/ማዝቀጥ (sedimentation) ፦ በፍሎኩሌሽን ወቅት የጓጎለው ጥቃቅን አካላት በዚህን የማጣራት ደረጃ እንዲዘቅጡ ይደረጋል ። ይህ ዘዴ የሚተገበረው የሚጣራው የውሃን ፍጥነት በመቀነስ ግራቪቲን ተጠቅሞ እንዲዘቅጥ ማድረግ ነው።
በግራቪቲ ለማዝቀጥ የሚከብዱ እጅግ ጥቃቅን ቆሻሻዎችን በፍሎኩሌሽን ወቅት ስንጠቀማቸው የነበሩ ኬሚካሎችን በመጠቀም እንዲዘቅጡ ይደረጋል።
.
⓹ ማጥራት (filtration ) ፦ በዚህ የማጥራት ደረጃ ከማዝቀጥ
ደረጃ ያለፉ ጥቃቅን ቆሻሻዎችን እጅግ ጥቃቅን ቀዳዳዎች ባሉት አካል (medium ) እንዲያልፍ በማድረግ የድፍረስነቱን መጠን እጅግ መቀነስ ነው።
.
⓺ማከም (Disinfection) ፦ ከላይ በተጠቀሱ የማጣሪያ ሂደቶች የተጣራው ውሃ
(በዋነኛነት ከተለያዩ ህይወት ከሌላቸው ጥቃቅን ቆሻሻዎች)
ለህብረተሰቡ ለአገልግሎት
ከመድረሱ በፊት በዚህ ሂደት (ዲስኢንፌክሽን) ማለፍ አለበት ።
ምክንያቱም ውሃው ለአገልግሎት የሚቀርበው ከተለያዩ በአይን ከማይታዩ በሽታ አምጪ ተህዋስያን ነፃ መሆኑ ሲረጋገጥ ነው ። ዲስኢንፌክሽን ውሃውን በማፍላት ፣ ሚካኒካል
በሆነ መልኩ ፣ ለጨረር በማጋለጥ (radiation ) እንደሁም በኬሚካል ሊከናወን ይችላል።
በሃገራችን በዋነኛነት
ሃሎጅኖችን (ብሮሚን ክሎሪን እና አይኦዲን ) በመጠቀም
ኬሚካል በመጠቀም ውሃን እናክማለን ።
፟
➡ከዚህ ሁሉ የማጣራት ሂደት በኋላ የተጣራው ውሃ ይጠራቀምና
ለተጠቃሚዎች ይዳረሳል።
.
▶ስለ surface waterን የማጣራት ሂደቶች ጥቂት የሆነ ገለፃን እንዳደረግንላችሁ ተስፋ
እናደርጋለን ። ርእሱ ሰፊ እንደመሆኑ ዳግመኛ በጥልቀት ለመዳሰስ ቃል እንገባለን✌
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
Forwarded from Ethio Construction Engineering
👉Load Combination
.
Load Combination - አንድ ፎቅ ላይ የሚመጡ ሎዶችን Analyze ስናደርግ ሁሉም ሎዶች (LL,DL,EQ,WL, etc)
በተመሳሳይ ሰዓት ይከሰታሉ ተብሎ አይታሰብም እንደዛ ቢሆን ኖሮ ለትንንሽ ፎቆች ትልልቅ size ያላቸው Beam, Column እና
Slab ባስፈለገንና Uneconomical በሆንን ነበር፡፡ እንትን ሎድና እንትን ሎድ አንድ ላይ ሲከሰት ወዘተ እያልን Load
Combination እናወጣለን፡፡ ሎዶቹንም በ Factor እናባዛቸዋለን:: Factor ያስፈለገበትም ምክንያት Load
occurrence probability እና በተለያዩ ምክንያቶች የሚፈጠሩ
Load Uncertainties ለማስወገድ ነው፡፡
.
ስንት Load Combination አለ??
.
.
ብዙ ምሁራን በ Load Combination ብዛት ሲወዛገቡ ይታያል፡፡
አንዳንዶች 2 ነው ይላሉ ፤ ሌሎች 7 ነው ይላሉ ፤ ሌሎሎሎች 5
፤ ሌሎሎሎሎሎች 11……..ለማንኛውም ሰባትና ዘጠኝ ናቸው!!!
.
.
ሰባት የሚሆነው Earth Quake እና Wind Loadን እኛ
ካልኩሌት አድርገን ከሁለቱ Govern የሚያደርገውን ከለየን በኋላ
Governing ሎዱን በቁጥር ለሴፍትዌሩ (SAP/Etabs)
ስንሰጠው ሰባት ነው፡፡
.
.
ዘጠኝ የሚሆነው የ Earth Quake ወይም Wind ሎዱን የተለያዩ ፋክተሮች ለሶፍትዌሩ እንሰጠውና እራሱ ሶፍትዌሩ ሎዱን ካልኩሌት አድርጎ አንዲጠቀም ከፈለግን ዘጠኝ Combo እንጠቀማለን፡፡
.
Load Combination - አንድ ፎቅ ላይ የሚመጡ ሎዶችን Analyze ስናደርግ ሁሉም ሎዶች (LL,DL,EQ,WL, etc)
በተመሳሳይ ሰዓት ይከሰታሉ ተብሎ አይታሰብም እንደዛ ቢሆን ኖሮ ለትንንሽ ፎቆች ትልልቅ size ያላቸው Beam, Column እና
Slab ባስፈለገንና Uneconomical በሆንን ነበር፡፡ እንትን ሎድና እንትን ሎድ አንድ ላይ ሲከሰት ወዘተ እያልን Load
Combination እናወጣለን፡፡ ሎዶቹንም በ Factor እናባዛቸዋለን:: Factor ያስፈለገበትም ምክንያት Load
occurrence probability እና በተለያዩ ምክንያቶች የሚፈጠሩ
Load Uncertainties ለማስወገድ ነው፡፡
.
ስንት Load Combination አለ??
.
.
ብዙ ምሁራን በ Load Combination ብዛት ሲወዛገቡ ይታያል፡፡
አንዳንዶች 2 ነው ይላሉ ፤ ሌሎች 7 ነው ይላሉ ፤ ሌሎሎሎች 5
፤ ሌሎሎሎሎሎች 11……..ለማንኛውም ሰባትና ዘጠኝ ናቸው!!!
.
.
ሰባት የሚሆነው Earth Quake እና Wind Loadን እኛ
ካልኩሌት አድርገን ከሁለቱ Govern የሚያደርገውን ከለየን በኋላ
Governing ሎዱን በቁጥር ለሴፍትዌሩ (SAP/Etabs)
ስንሰጠው ሰባት ነው፡፡
.
.
ዘጠኝ የሚሆነው የ Earth Quake ወይም Wind ሎዱን የተለያዩ ፋክተሮች ለሶፍትዌሩ እንሰጠውና እራሱ ሶፍትዌሩ ሎዱን ካልኩሌት አድርጎ አንዲጠቀም ከፈለግን ዘጠኝ Combo እንጠቀማለን፡፡
Ethio Construction Engineering
👉Load Combination . Load Combination - አንድ ፎቅ ላይ የሚመጡ ሎዶችን Analyze ስናደርግ ሁሉም ሎዶች (LL,DL,EQ,WL, etc) በተመሳሳይ ሰዓት ይከሰታሉ ተብሎ አይታሰብም እንደዛ ቢሆን ኖሮ ለትንንሽ ፎቆች ትልልቅ size ያላቸው Beam, Column እና Slab ባስፈለገንና Uneconomical በሆንን ነበር፡፡ እንትን ሎድና እንትን ሎድ አንድ ላይ ሲከሰት ወዘተ እያልን…
Please this conclusion is not true for accurate analysis specially in seismic regions. According to ES-EN 2015 a minimum of 38 load combinations required for accurate analysis and design for seismic zones.
@etconp
@etconp
Forwarded from Ethio Construction Engineering
👉PROPERTIES OF AGGREGATES FOR CONCRETE @COTMp
.
▶Approximately 75% of the volume of concrete is occupied by aggregates,so
quality of aggregates plays an important role in determining properties of concrete.
*Aggregates come in various shapes, sizes, and materials ranging from fine particles of sand to large, coarse rocks. *Natural aggregates are formed by process of weathering and abrasion or by artificially crushing large parent mass.
Because cement is the most expensive ingredient in making concrete, it is
desirable to minimize the amount of cement used. 70 to 80% of the volume of
concrete is aggregate in order to keep the cost of the concrete low.
*Soft, porous aggregates can result in weak concrete with low wear resistance, while using hard aggregates can make strong concrete with a high resistance to abrasion.
*Aggregates are of two basic types: Coarse: crushed rock, gravel or screenings.
*Fine: fine and coarse sands and crusher fines Aggregates should be clean, hard, and strong.
*The aggregate is usually washed to remove any dust, silt, clay, organic matter, or other impurities that would interfere with
the bonding reaction with the cement paste.
*The choice of aggregate is determined by the proposed use of the concrete.
*Normally sand, gravel, and crushed stone are used as aggregates to make concrete.
*The aggregate should be well-graded to improve packing efficiency and minimize the amount of cement paste needed. Also, this makes the concrete more workable.
Some of the important properties of aggregates are discussed below.
▶PROPERTIES OF AGGREGATES
1. SOUNDNESS:Rocks that undergo volume changes due to wetting and drying are rare. However, aggregate is susceptible to volume change during freezing and thawing cycles.
*Freezing can cause internal stresses to build up as water inside the aggregate freezes and expands.
2. WEAR RESISTANCE
A good aggregate will be hard, dense, strong, and
free of porous material. The abrasion resistance of
aggregate can be tested by the Los Angeles abrasion test; however, this test does not match
well with concrete wear in the field.
3. ALKALI-AGGREGATE
REACTION: An expansive reaction between some reactive forms of silica with the aggregate and alkalis in the cement paste.
*The result is overall cracking in the
structure, manifesting itself in map or pattern cracking at the surface. *This reaction can be
controlled most easily by using low-alkali cements.
However, due to changes in manufacturing, low-
alkali cements may not be feasible.
*A better approach is to avoid aggregate with the potential or proven record of reactivity. A low w/c ratio is very impermeable and will slow down the reaction but not stop it. No adverse reactions will occur without external water.
4. OTHER ALKALI-SILICA
REACTIONS: Sand-gravels found in river systems of Kansas and Nebraska are highly reactive and cause map cracking. *Replacement of 30% of the aggregate with
crushed limestone is effective in reducing the damage. Basically, it results in the separation of flat clay minerals causing very slow expansion.
5. ALKALI-CARBONATE REACTIONS: An expansive reaction involving clayey
carbonate rock. Reaction can be controlled by using low-alkali cements or blending aggregate with other less reactive material.
*ASTM has set standards for deleterious substances in aggregates, which depend on application.
6. IMPURITIES: Solid materials – particles passing a 200- mesh sieve.
*These fine particles may increase water requirements and interfere with surface bonding
between cement and coarse aggregates.
Soluble substances –organic matter may interfere chemically with alkaline cement pastes affecting setting time. *Aggregates obtained from the sea should be thoroughly cleaned
to avoid problems from salt contamination.
7. UNSOUND PARTICLES
Soft particles such as clay lumps, wood, and coal
will cause pitting and scaling at the surface.
Organic compounds can be released which interfere
with setting and hardening. Weak material of low density which have low wear resistance should also be avoided.
https://telegram.me/COTMp
.
▶Approximately 75% of the volume of concrete is occupied by aggregates,so
quality of aggregates plays an important role in determining properties of concrete.
*Aggregates come in various shapes, sizes, and materials ranging from fine particles of sand to large, coarse rocks. *Natural aggregates are formed by process of weathering and abrasion or by artificially crushing large parent mass.
Because cement is the most expensive ingredient in making concrete, it is
desirable to minimize the amount of cement used. 70 to 80% of the volume of
concrete is aggregate in order to keep the cost of the concrete low.
*Soft, porous aggregates can result in weak concrete with low wear resistance, while using hard aggregates can make strong concrete with a high resistance to abrasion.
*Aggregates are of two basic types: Coarse: crushed rock, gravel or screenings.
*Fine: fine and coarse sands and crusher fines Aggregates should be clean, hard, and strong.
*The aggregate is usually washed to remove any dust, silt, clay, organic matter, or other impurities that would interfere with
the bonding reaction with the cement paste.
*The choice of aggregate is determined by the proposed use of the concrete.
*Normally sand, gravel, and crushed stone are used as aggregates to make concrete.
*The aggregate should be well-graded to improve packing efficiency and minimize the amount of cement paste needed. Also, this makes the concrete more workable.
Some of the important properties of aggregates are discussed below.
▶PROPERTIES OF AGGREGATES
1. SOUNDNESS:Rocks that undergo volume changes due to wetting and drying are rare. However, aggregate is susceptible to volume change during freezing and thawing cycles.
*Freezing can cause internal stresses to build up as water inside the aggregate freezes and expands.
2. WEAR RESISTANCE
A good aggregate will be hard, dense, strong, and
free of porous material. The abrasion resistance of
aggregate can be tested by the Los Angeles abrasion test; however, this test does not match
well with concrete wear in the field.
3. ALKALI-AGGREGATE
REACTION: An expansive reaction between some reactive forms of silica with the aggregate and alkalis in the cement paste.
*The result is overall cracking in the
structure, manifesting itself in map or pattern cracking at the surface. *This reaction can be
controlled most easily by using low-alkali cements.
However, due to changes in manufacturing, low-
alkali cements may not be feasible.
*A better approach is to avoid aggregate with the potential or proven record of reactivity. A low w/c ratio is very impermeable and will slow down the reaction but not stop it. No adverse reactions will occur without external water.
4. OTHER ALKALI-SILICA
REACTIONS: Sand-gravels found in river systems of Kansas and Nebraska are highly reactive and cause map cracking. *Replacement of 30% of the aggregate with
crushed limestone is effective in reducing the damage. Basically, it results in the separation of flat clay minerals causing very slow expansion.
5. ALKALI-CARBONATE REACTIONS: An expansive reaction involving clayey
carbonate rock. Reaction can be controlled by using low-alkali cements or blending aggregate with other less reactive material.
*ASTM has set standards for deleterious substances in aggregates, which depend on application.
6. IMPURITIES: Solid materials – particles passing a 200- mesh sieve.
*These fine particles may increase water requirements and interfere with surface bonding
between cement and coarse aggregates.
Soluble substances –organic matter may interfere chemically with alkaline cement pastes affecting setting time. *Aggregates obtained from the sea should be thoroughly cleaned
to avoid problems from salt contamination.
7. UNSOUND PARTICLES
Soft particles such as clay lumps, wood, and coal
will cause pitting and scaling at the surface.
Organic compounds can be released which interfere
with setting and hardening. Weak material of low density which have low wear resistance should also be avoided.
https://telegram.me/COTMp
Telegram
ETCONp Discussion
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
.
📩ለማነኛውም ሀሳብ እና አስተያየት @ETCONpBOT ፃፉልን። እናመሰግናለን🙏
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
.
📩ለማነኛውም ሀሳብ እና አስተያየት @ETCONpBOT ፃፉልን። እናመሰግናለን🙏
Forwarded from Ethio Construction Engineering
👉Morning Lecture @COTMp
.
*Different Ingredients of Cement-Their Proportion,
Functions and Limitations
The Ordinary Portland cement contains different
ingredients with varied proportions. Each ingredients
imparts different property to the cement. To
produce good quality of cement, we must know the
proportions, functions and limitations of different
ingredients of cement.
Proportion of Ingredients of Cement
Different ingredients of cement and their proportions
are as follows:
1. Lime (CaO)
2. Silica (SiO )
3. Alumina(Al O )
4. Iron (Fe O )
5. Magnesia (MgO)
6. Calcium sulfate (CaSO )
7. Sulfur (SO )
8. Alkalis
Functions and Limitations of Cement Ingredients
1. Lime (CaO)
Lime or calcium oxide is the most important
ingredient of cement. The cement contains 60 to
67% of lime in it. It is obtained from limestone,
chalk, shale etc. Adequate quantity of lime in
cement is helpful to form the silicates and
aluminates of calcium.
If lime is added in excess quantity the cement
becomes unsound as well as expansion and
disintegration of cement will occur.
If lime content is lower than the minimum
requirement strength of cement will reduce and also
setting time of cement will decrease.
2. Silica
Silica or silicon dioxide is the second largest
quantity of cement ingredients which is about 17 to
25%. Silica can be obtained from sand, argillaceous
rock etc. Sufficient quantity of silica helps for the
formation of di-calcium and tri-calcium silicates
which imparts strength to the cement.
Excess silica in cement will increase the strength of
cement but at the same time setting time of
cement also increased.
3. Alumina (Al O )
Alumina in cement is present in the form of
aluminum oxide. The range of alumina in cement
should be 3 to 8%. It is obtained from bauxite,
alumina contain clay etc. Alumina imparts quick
setting property to the cement.
In general, high temperature is required to produce
required quality of cement. But alumina when added
with cement ingredients it behaves as a flux and
reduces the clinkering temperature which finally
weakens the cement. So, to maintain the high
temperature alumina should not be used in excess
quantity.
4. Iron oxide (Fe O )
Iron oxide quantity in cement is ranges from 0.5 to
6%.It can be obtained from fly ash, iron ore, scrap
iron etc. The main function of iron oxide is to
impart color to the cement.
At high temperatures, Iron oxide forms tricalcium
aluminoferrite by reacting with aluminum and
calcium. The resultant product imparts the strength
and hardness properties to the cement.
5. Magnesia (MgO)
Cement contains Magnesia or Magnesium oxide in
the range of 0.1 to 3%. Magnesia in cement in
small quantities imparts hardness and color to the
cement.
If it is more than 3%, the cement becomes unsound
and also strength of the cement reduces.
6. Calcium sulfate (CaSO )
Calcium sulfate is present in the form of gypsum in
the cement. It is found together with limestone. It
ranges between 1 to 3%.
The function of calcium sulfate in cement is to
increase the initial setting time of cement.
7. Sulfur (SO )
Sulfur or sulfur trioxide in the cement is about 1 to
3%. Its function is to make the cement sound. If it
is in excess quantity the cement becomes unsound.
8. Alkalis
Alkalis like soda and potash are present in the
cement which normally ranges from 0.1 to 1%.
During manufacturing process of cement most of
the alkalis are carried away by the flue gases at the time of heating. Hence cement contains very small quantities of alkalis in it.
If alkalis content is more than 1% then it will cause
several problems like alkali aggregate reaction,
efflorescence, staining etc.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
.
*Different Ingredients of Cement-Their Proportion,
Functions and Limitations
The Ordinary Portland cement contains different
ingredients with varied proportions. Each ingredients
imparts different property to the cement. To
produce good quality of cement, we must know the
proportions, functions and limitations of different
ingredients of cement.
Proportion of Ingredients of Cement
Different ingredients of cement and their proportions
are as follows:
1. Lime (CaO)
2. Silica (SiO )
3. Alumina(Al O )
4. Iron (Fe O )
5. Magnesia (MgO)
6. Calcium sulfate (CaSO )
7. Sulfur (SO )
8. Alkalis
Functions and Limitations of Cement Ingredients
1. Lime (CaO)
Lime or calcium oxide is the most important
ingredient of cement. The cement contains 60 to
67% of lime in it. It is obtained from limestone,
chalk, shale etc. Adequate quantity of lime in
cement is helpful to form the silicates and
aluminates of calcium.
If lime is added in excess quantity the cement
becomes unsound as well as expansion and
disintegration of cement will occur.
If lime content is lower than the minimum
requirement strength of cement will reduce and also
setting time of cement will decrease.
2. Silica
Silica or silicon dioxide is the second largest
quantity of cement ingredients which is about 17 to
25%. Silica can be obtained from sand, argillaceous
rock etc. Sufficient quantity of silica helps for the
formation of di-calcium and tri-calcium silicates
which imparts strength to the cement.
Excess silica in cement will increase the strength of
cement but at the same time setting time of
cement also increased.
3. Alumina (Al O )
Alumina in cement is present in the form of
aluminum oxide. The range of alumina in cement
should be 3 to 8%. It is obtained from bauxite,
alumina contain clay etc. Alumina imparts quick
setting property to the cement.
In general, high temperature is required to produce
required quality of cement. But alumina when added
with cement ingredients it behaves as a flux and
reduces the clinkering temperature which finally
weakens the cement. So, to maintain the high
temperature alumina should not be used in excess
quantity.
4. Iron oxide (Fe O )
Iron oxide quantity in cement is ranges from 0.5 to
6%.It can be obtained from fly ash, iron ore, scrap
iron etc. The main function of iron oxide is to
impart color to the cement.
At high temperatures, Iron oxide forms tricalcium
aluminoferrite by reacting with aluminum and
calcium. The resultant product imparts the strength
and hardness properties to the cement.
5. Magnesia (MgO)
Cement contains Magnesia or Magnesium oxide in
the range of 0.1 to 3%. Magnesia in cement in
small quantities imparts hardness and color to the
cement.
If it is more than 3%, the cement becomes unsound
and also strength of the cement reduces.
6. Calcium sulfate (CaSO )
Calcium sulfate is present in the form of gypsum in
the cement. It is found together with limestone. It
ranges between 1 to 3%.
The function of calcium sulfate in cement is to
increase the initial setting time of cement.
7. Sulfur (SO )
Sulfur or sulfur trioxide in the cement is about 1 to
3%. Its function is to make the cement sound. If it
is in excess quantity the cement becomes unsound.
8. Alkalis
Alkalis like soda and potash are present in the
cement which normally ranges from 0.1 to 1%.
During manufacturing process of cement most of
the alkalis are carried away by the flue gases at the time of heating. Hence cement contains very small quantities of alkalis in it.
If alkalis content is more than 1% then it will cause
several problems like alkali aggregate reaction,
efflorescence, staining etc.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
❤1
Forwarded from Ethio Construction Engineering
👉BASICS OF CRACKING PROBLEMS: @COTMp
.
▶The subject “ CRACKS “ or “ CRACKING “ in
concrete is indeed much debated. However, there is
inadequate clarity as to the reason for cracking and what may be done to limit its occurrence or
eliminate it altogether.
The phenomenon of the appearance of cracks in
concrete is often a subject that raises several
questions. Either at the initial stage or with time,
cracks may appear in a concrete structure. It should first of all be accepted that cracks of some type or other are inevitable in any concrete. They can be minimized to a large extent by proper practices.
*Cracks may be big or small, structural or non-
structural. All of them can be a nuisance by way of
either marring the appearance or function as a passage for atmospheric polluting gases and
moisture to either the body of concrete and causes
distress.
*Cracks in the concrete structure do not always
mean that the structure is not usable. As cracking
of concrete is inherent, what really matters is the
type of structure and the nature of cracking. Cracks
that are acceptable for building structures may not be acceptable for water relating structures.
Considering that cracking can never be completely
eliminated, it is necessary to be aware of the
causes, evaluation and the methods of repair
whoever required.
CRACKS Cracks are generally of tow types : Structural and nonstructural
*Cracks can occur in hardened or unhardened concrete.
*STRUCTURAL CRACKS
It is fundamental that hardened reinforced concrete cracks in the tensile zone when subjected to externally imposed structural loads. By means of appropriate design and detailing technique, these cracks can be limited to acceptable levels in terms
of structural integrity and aesthetics.
*NON_STRUCTURAL CRACKS
**Concrete is also liable to crack in both the plastic
and hardened states due to the nature of its
constituent materials. These intrinsic cracks are as inevitable as structural cracks. It is often possible
to predict when intrinsic cracks are likely and to
limit them to acceptable levels by means of good
design and/or proper construction techniques.
*DORMANT AND LIVE CRACKS:
Cracks caused by shrinkage, temperature gradient due to hydration and alkali silica reaction ( ASR ) are less dangerous the cracks caused by thermal expansion and loads. This is because shrinkage and hydration temperature gradient result in dormant cracks ( where the width does not vary with time) and other mechanisms result in live
cracks (where the width increases with time
Dormant cracks, especially narrow ones, are more
likely to undergo auto genius healing and
realkalisation. The crack may heal owing to
following conditions:
• carbon dioxide diffusing into the crack leading to
carbonation of the calcium hydroxide and
precipitation of calcium carbonate.
• Cement hydration due to presence of moisture.
• Hydration diffusing from the bulk concrete into the
heaked zone thereby increasing the pH in that area.
Live cracks are more likely than domant ones. They
result in collection of debris at the base owing to movement of the sides on the cracks. This can
impede temporarily the passage of depassivating
substances to the reinforcements. However,
autodeneous healing is unlikely with live cracks.
▶CAUSES OF CRACKING:
Cracking will occur whenever the applied strain exceeds the tensile strain capacity of the concrete.
*The tensile strain capacity of concrete varies with age and with
Age at which cracks may occur.
*Cracks can appear at any time. The age which
some typical can occur are given in the Table.
▶TABLE – AGE AT WHICH CRACKS MAY APPEAR:
*Sr. no. types of cracks Age
1. plastic shrinkage First few minutes or hours after
concreting .
2. plastic settlement First few minutes or hours
after concreting.
3. due to corrosion After one year or many years.
4. due to loads After loads are imposed and the
time duration of loading.
👇👇👇👇👇
.
▶The subject “ CRACKS “ or “ CRACKING “ in
concrete is indeed much debated. However, there is
inadequate clarity as to the reason for cracking and what may be done to limit its occurrence or
eliminate it altogether.
The phenomenon of the appearance of cracks in
concrete is often a subject that raises several
questions. Either at the initial stage or with time,
cracks may appear in a concrete structure. It should first of all be accepted that cracks of some type or other are inevitable in any concrete. They can be minimized to a large extent by proper practices.
*Cracks may be big or small, structural or non-
structural. All of them can be a nuisance by way of
either marring the appearance or function as a passage for atmospheric polluting gases and
moisture to either the body of concrete and causes
distress.
*Cracks in the concrete structure do not always
mean that the structure is not usable. As cracking
of concrete is inherent, what really matters is the
type of structure and the nature of cracking. Cracks
that are acceptable for building structures may not be acceptable for water relating structures.
Considering that cracking can never be completely
eliminated, it is necessary to be aware of the
causes, evaluation and the methods of repair
whoever required.
CRACKS Cracks are generally of tow types : Structural and nonstructural
*Cracks can occur in hardened or unhardened concrete.
*STRUCTURAL CRACKS
It is fundamental that hardened reinforced concrete cracks in the tensile zone when subjected to externally imposed structural loads. By means of appropriate design and detailing technique, these cracks can be limited to acceptable levels in terms
of structural integrity and aesthetics.
*NON_STRUCTURAL CRACKS
**Concrete is also liable to crack in both the plastic
and hardened states due to the nature of its
constituent materials. These intrinsic cracks are as inevitable as structural cracks. It is often possible
to predict when intrinsic cracks are likely and to
limit them to acceptable levels by means of good
design and/or proper construction techniques.
*DORMANT AND LIVE CRACKS:
Cracks caused by shrinkage, temperature gradient due to hydration and alkali silica reaction ( ASR ) are less dangerous the cracks caused by thermal expansion and loads. This is because shrinkage and hydration temperature gradient result in dormant cracks ( where the width does not vary with time) and other mechanisms result in live
cracks (where the width increases with time
Dormant cracks, especially narrow ones, are more
likely to undergo auto genius healing and
realkalisation. The crack may heal owing to
following conditions:
• carbon dioxide diffusing into the crack leading to
carbonation of the calcium hydroxide and
precipitation of calcium carbonate.
• Cement hydration due to presence of moisture.
• Hydration diffusing from the bulk concrete into the
heaked zone thereby increasing the pH in that area.
Live cracks are more likely than domant ones. They
result in collection of debris at the base owing to movement of the sides on the cracks. This can
impede temporarily the passage of depassivating
substances to the reinforcements. However,
autodeneous healing is unlikely with live cracks.
▶CAUSES OF CRACKING:
Cracking will occur whenever the applied strain exceeds the tensile strain capacity of the concrete.
*The tensile strain capacity of concrete varies with age and with
Age at which cracks may occur.
*Cracks can appear at any time. The age which
some typical can occur are given in the Table.
▶TABLE – AGE AT WHICH CRACKS MAY APPEAR:
*Sr. no. types of cracks Age
1. plastic shrinkage First few minutes or hours after
concreting .
2. plastic settlement First few minutes or hours
after concreting.
3. due to corrosion After one year or many years.
4. due to loads After loads are imposed and the
time duration of loading.
👇👇👇👇👇
Forwarded from Ethio Construction Engineering
5. due to weight Just after formwork support are
removed.6. due to chemical changes in hardened concrete After one or many years depending in
chemical attack from outside (sulphate ) Or
chemical reaction from within (ASR)
*CRITICAL CRACK WIDTH:
The most common reasons for controlling crack width are following:
APPERANCE : Unsightly cracking should be avoid
since it may cause concern to the occupants of the external structure. Ti may also contribute to
unsightly staining on exposed external surfaces,
where salts and rust are washed out from the crack.
*DURABILITY: Excessively wide cracks may lead to
corrosion of the reinforcement which in turn may lead to spalling of concrete due to the expansive nature of the corrosion process.
*WATER-TIGHTNESS: This is of importance in water
retaining structures.
In particular instances there may be other reasons for controlling cracking in addition to the three reasons cited above.
Crack width is, generally, to be taken to mean the
measurable width of a crack at the surface of
concrete. Crack width limitation is important from durability considerations. Most structural codes
prescribe maximum allowed crack widths.
Codes normally consider cracking caused by
external imposed conditions such as live loading and provide formula for calculating the crack width in the design phase. Mainly bending and tension or bending and axial load are considered. The direction of such cracks is perpendicular to the direction of the main reinforcement. Plastic
shrinkage cracks follow the line of reinforcement.
According to IS: 456-2000 the surface of the width
of the cracks should not in general exceeds o.3 mm
in members where cracking is not harmful and does not have any serious effect either on the
preservation of reinforcing steel or on the durability
of the structures.
In members, where cracking of the tensile zone is harmful either because they are moisture or in contact with soil or groundwater, an upper limlt of 0.2 mm is suggested.
*For aggressive conditions the surface width of
cracks should not generally exceed 0.1 mm. The crack width conditions the surface width of cracks should not be generally exceed 0.1 mm. The crack width is measured at the surface for the above purposes. However some other codes specify the
width at points near the reinforcement.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
removed.6. due to chemical changes in hardened concrete After one or many years depending in
chemical attack from outside (sulphate ) Or
chemical reaction from within (ASR)
*CRITICAL CRACK WIDTH:
The most common reasons for controlling crack width are following:
APPERANCE : Unsightly cracking should be avoid
since it may cause concern to the occupants of the external structure. Ti may also contribute to
unsightly staining on exposed external surfaces,
where salts and rust are washed out from the crack.
*DURABILITY: Excessively wide cracks may lead to
corrosion of the reinforcement which in turn may lead to spalling of concrete due to the expansive nature of the corrosion process.
*WATER-TIGHTNESS: This is of importance in water
retaining structures.
In particular instances there may be other reasons for controlling cracking in addition to the three reasons cited above.
Crack width is, generally, to be taken to mean the
measurable width of a crack at the surface of
concrete. Crack width limitation is important from durability considerations. Most structural codes
prescribe maximum allowed crack widths.
Codes normally consider cracking caused by
external imposed conditions such as live loading and provide formula for calculating the crack width in the design phase. Mainly bending and tension or bending and axial load are considered. The direction of such cracks is perpendicular to the direction of the main reinforcement. Plastic
shrinkage cracks follow the line of reinforcement.
According to IS: 456-2000 the surface of the width
of the cracks should not in general exceeds o.3 mm
in members where cracking is not harmful and does not have any serious effect either on the
preservation of reinforcing steel or on the durability
of the structures.
In members, where cracking of the tensile zone is harmful either because they are moisture or in contact with soil or groundwater, an upper limlt of 0.2 mm is suggested.
*For aggressive conditions the surface width of
cracks should not generally exceed 0.1 mm. The crack width conditions the surface width of cracks should not be generally exceed 0.1 mm. The crack width is measured at the surface for the above purposes. However some other codes specify the
width at points near the reinforcement.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉Formwork @ETCONp
.
▶️Formwork is the structure, usually temporary, used to contain poured concrete and to mould it to the required dimensions and support until it is able to support itself. It consists primarily of the face contact material and the bearers that directly support the face contact material. Falsework is the more robust structure that holds temporary formwork in place is used in the temporary condition.
Formwork systems used for concrete frame construction have continued to develop significantly since the early 1990s. The major innovations have focused on on-site efficiency of production, health and safety, and environmental issues, driving the concrete construction industry towards ever-increasing efficiency.
*Different formwork systems provide a wide range of concrete construction solutions that can be chosen to suit the needs of a particular development.
Traditional formwork for concrete construction normally consisted of bespoke solutions requiring skilled craftsmen. This type of formwork often had poor safety features and gave slow rates of construction on-site and huge levels of waste.
The main types of formwork systems in use now are:
● System column formwork
● Horizontal panel
● Slipform
● Jumpform
● Vertical panel systems
● Permanent formwork used in some types of hybrid concrete construction
Still in use, but not as common as previously, are the types of forms that require swinging out from the side of the building. This is due to concerns about moving large objects over unprotected spaces:
● Table form/flying forms
● Tunnel form
The modern formwork systems listed above are mostly modular, which are designed for speed and efficiency. They are designed to provide increased accuracy and minimise waste in construction and most have enhanced health and safety features built-in.
.
http://t.me/COTMp
.
▶️Formwork is the structure, usually temporary, used to contain poured concrete and to mould it to the required dimensions and support until it is able to support itself. It consists primarily of the face contact material and the bearers that directly support the face contact material. Falsework is the more robust structure that holds temporary formwork in place is used in the temporary condition.
Formwork systems used for concrete frame construction have continued to develop significantly since the early 1990s. The major innovations have focused on on-site efficiency of production, health and safety, and environmental issues, driving the concrete construction industry towards ever-increasing efficiency.
*Different formwork systems provide a wide range of concrete construction solutions that can be chosen to suit the needs of a particular development.
Traditional formwork for concrete construction normally consisted of bespoke solutions requiring skilled craftsmen. This type of formwork often had poor safety features and gave slow rates of construction on-site and huge levels of waste.
The main types of formwork systems in use now are:
● System column formwork
● Horizontal panel
● Slipform
● Jumpform
● Vertical panel systems
● Permanent formwork used in some types of hybrid concrete construction
Still in use, but not as common as previously, are the types of forms that require swinging out from the side of the building. This is due to concerns about moving large objects over unprotected spaces:
● Table form/flying forms
● Tunnel form
The modern formwork systems listed above are mostly modular, which are designed for speed and efficiency. They are designed to provide increased accuracy and minimise waste in construction and most have enhanced health and safety features built-in.
.
http://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉What Does A Construction Manager Do? @ETCONp
.
PART 1
:
▶️A Construction Manager must ensure a project is completed safely, making sure the project runs on time and within the allocated budget allowance.
They typically come into the process quite early on in the project so they can help the client with preliminary planning. They also help with aspects such as selecting an architect and contractor.
.
▶️Duties of a Construction Manager
**The typical functions of a construction manager include:
1. : This involves planning
the entire project and documenting all the jobs that must be completed. It helps allow for budgeting and access to materials that are required Project Management Planning
2. : The expenses of each project must
be efficiently managed throughout the process to ensure
for adjustments for unexpected issues or difficulties Cost Management
3. : A construction manager must
make sure that the contractors employed for the project are completing it to a high-quality standard. Monitoring the process, costs and quality is all highly critical Quality Management
4. : Extensive contracts with the
client are all part of the project construction process.
The contract provisions must be being met to ensure that all parties involved are satisfied Contract Administration
5. : As a construction site can be a
dangerous place with many safety hazards, the building manager must ensure that correct processes are in place to make sure there are no accidents.
The construction manager needs to ensure that the work meets all the legal requirements and Building Regulations
Safety Management Responsibility of Construction Manage
.
👉Who They Manage and How
Construction managers will be responsible for managing individuals in various roles appropriate for the project. Before
any of the actual building work can take place, the plans
must be discussed with the architect, surveyors and buyers.
These types of managers will be required to hire the relevant
staff needed to complete the project to the client’s standard. It is important that all these members of staff are
managed effectively so that the plans for the project can be
fully understood and developed. The construction manager
will need to hire and organise various contractors and
suppliers, and coordinate the subcontractor’s activities.
:
👉What Skills/Qualifications Are Required?
1. Construction managers have an obligation to
communicate with many different people. Therefore,
are essential. people skills
2. Construction managers must be able to their
team to ensure the project is completed to a high quality
motivate
3. Construction Managers need to be
to overcome any obstacles they may face in the
process. creative in problem- solving
4. Having excellent are
also important so that the project can be both effectively
and efficiently plan to run according to schedule
organisational and planning skills
5. are essential. They will need to have
in-depth knowledge of different building methods and
project management computer software. They need
these core competencies to plan the project and keep the
information and finances updated.
Maths and IT skills
6. An of health and safety is fundamental to
maintain a safe work environment.
awareness To become a construction manager, HNC/HND, a foundation degree, or degree in a related area is usually required.
.
▶️What to Expect as a Construction Manager
1. Construction managers are typically employed by
building companies or specialist subcontractors
2. Will be responsible for running all or part of a
construction site
3. Primary person to contact for sub-contractors and public
4. Senior construction managers will often oversee several
projects at once
5. Project meetings must take place at various intervals to
discuss the progress of the project and any issues or
concerns
6. Diaries and daily logs are kept to keep track of activities
taking place on each job site
.
http://t.me/COTMp
.
PART 1
:
▶️A Construction Manager must ensure a project is completed safely, making sure the project runs on time and within the allocated budget allowance.
They typically come into the process quite early on in the project so they can help the client with preliminary planning. They also help with aspects such as selecting an architect and contractor.
.
▶️Duties of a Construction Manager
**The typical functions of a construction manager include:
1. : This involves planning
the entire project and documenting all the jobs that must be completed. It helps allow for budgeting and access to materials that are required Project Management Planning
2. : The expenses of each project must
be efficiently managed throughout the process to ensure
for adjustments for unexpected issues or difficulties Cost Management
3. : A construction manager must
make sure that the contractors employed for the project are completing it to a high-quality standard. Monitoring the process, costs and quality is all highly critical Quality Management
4. : Extensive contracts with the
client are all part of the project construction process.
The contract provisions must be being met to ensure that all parties involved are satisfied Contract Administration
5. : As a construction site can be a
dangerous place with many safety hazards, the building manager must ensure that correct processes are in place to make sure there are no accidents.
The construction manager needs to ensure that the work meets all the legal requirements and Building Regulations
Safety Management Responsibility of Construction Manage
.
👉Who They Manage and How
Construction managers will be responsible for managing individuals in various roles appropriate for the project. Before
any of the actual building work can take place, the plans
must be discussed with the architect, surveyors and buyers.
These types of managers will be required to hire the relevant
staff needed to complete the project to the client’s standard. It is important that all these members of staff are
managed effectively so that the plans for the project can be
fully understood and developed. The construction manager
will need to hire and organise various contractors and
suppliers, and coordinate the subcontractor’s activities.
:
👉What Skills/Qualifications Are Required?
1. Construction managers have an obligation to
communicate with many different people. Therefore,
are essential. people skills
2. Construction managers must be able to their
team to ensure the project is completed to a high quality
motivate
3. Construction Managers need to be
to overcome any obstacles they may face in the
process. creative in problem- solving
4. Having excellent are
also important so that the project can be both effectively
and efficiently plan to run according to schedule
organisational and planning skills
5. are essential. They will need to have
in-depth knowledge of different building methods and
project management computer software. They need
these core competencies to plan the project and keep the
information and finances updated.
Maths and IT skills
6. An of health and safety is fundamental to
maintain a safe work environment.
awareness To become a construction manager, HNC/HND, a foundation degree, or degree in a related area is usually required.
.
▶️What to Expect as a Construction Manager
1. Construction managers are typically employed by
building companies or specialist subcontractors
2. Will be responsible for running all or part of a
construction site
3. Primary person to contact for sub-contractors and public
4. Senior construction managers will often oversee several
projects at once
5. Project meetings must take place at various intervals to
discuss the progress of the project and any issues or
concerns
6. Diaries and daily logs are kept to keep track of activities
taking place on each job site
.
http://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
❤1
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉What Does A Construction Manager Do? @ETCONp
.
PART 1
:
▶️A Construction Manager must ensure a project is completed safely, making sure the project runs on time and within the allocated budget allowance.
They typically come into the process quite early on in the project so they can help the client with preliminary planning. They also help with aspects such as selecting an architect and contractor.
.
▶️Duties of a Construction Manager
**The typical functions of a construction manager include:
1. : This involves planning
the entire project and documenting all the jobs that must be completed. It helps allow for budgeting and access to materials that are required Project Management Planning
2. : The expenses of each project must
be efficiently managed throughout the process to ensure
for adjustments for unexpected issues or difficulties Cost Management
3. : A construction manager must
make sure that the contractors employed for the project are completing it to a high-quality standard. Monitoring the process, costs and quality is all highly critical Quality Management
4. : Extensive contracts with the
client are all part of the project construction process.
The contract provisions must be being met to ensure that all parties involved are satisfied Contract Administration
5. : As a construction site can be a
dangerous place with many safety hazards, the building manager must ensure that correct processes are in place to make sure there are no accidents.
The construction manager needs to ensure that the work meets all the legal requirements and Building Regulations
Safety Management Responsibility of Construction Manage
.
👉Who They Manage and How
Construction managers will be responsible for managing individuals in various roles appropriate for the project. Before
any of the actual building work can take place, the plans
must be discussed with the architect, surveyors and buyers.
These types of managers will be required to hire the relevant
staff needed to complete the project to the client’s standard. It is important that all these members of staff are
managed effectively so that the plans for the project can be
fully understood and developed. The construction manager
will need to hire and organise various contractors and
suppliers, and coordinate the subcontractor’s activities.
:
👉What Skills/Qualifications Are Required?
1. Construction managers have an obligation to
communicate with many different people. Therefore,
are essential. people skills
2. Construction managers must be able to their
team to ensure the project is completed to a high quality
motivate
3. Construction Managers need to be
to overcome any obstacles they may face in the
process. creative in problem- solving
4. Having excellent are
also important so that the project can be both effectively
and efficiently plan to run according to schedule
organisational and planning skills
5. are essential. They will need to have
in-depth knowledge of different building methods and
project management computer software. They need
these core competencies to plan the project and keep the
information and finances updated.
Maths and IT skills
6. An of health and safety is fundamental to
maintain a safe work environment.
awareness To become a construction manager, HNC/HND, a foundation degree, or degree in a related area is usually required.
.
▶️What to Expect as a Construction Manager
1. Construction managers are typically employed by
building companies or specialist subcontractors
2. Will be responsible for running all or part of a
construction site
3. Primary person to contact for sub-contractors and public
4. Senior construction managers will often oversee several
projects at once
5. Project meetings must take place at various intervals to
discuss the progress of the project and any issues or
concerns
6. Diaries and daily logs are kept to keep track of activities
taking place on each job site
.
http://t.me/COTMp
.
PART 1
:
▶️A Construction Manager must ensure a project is completed safely, making sure the project runs on time and within the allocated budget allowance.
They typically come into the process quite early on in the project so they can help the client with preliminary planning. They also help with aspects such as selecting an architect and contractor.
.
▶️Duties of a Construction Manager
**The typical functions of a construction manager include:
1. : This involves planning
the entire project and documenting all the jobs that must be completed. It helps allow for budgeting and access to materials that are required Project Management Planning
2. : The expenses of each project must
be efficiently managed throughout the process to ensure
for adjustments for unexpected issues or difficulties Cost Management
3. : A construction manager must
make sure that the contractors employed for the project are completing it to a high-quality standard. Monitoring the process, costs and quality is all highly critical Quality Management
4. : Extensive contracts with the
client are all part of the project construction process.
The contract provisions must be being met to ensure that all parties involved are satisfied Contract Administration
5. : As a construction site can be a
dangerous place with many safety hazards, the building manager must ensure that correct processes are in place to make sure there are no accidents.
The construction manager needs to ensure that the work meets all the legal requirements and Building Regulations
Safety Management Responsibility of Construction Manage
.
👉Who They Manage and How
Construction managers will be responsible for managing individuals in various roles appropriate for the project. Before
any of the actual building work can take place, the plans
must be discussed with the architect, surveyors and buyers.
These types of managers will be required to hire the relevant
staff needed to complete the project to the client’s standard. It is important that all these members of staff are
managed effectively so that the plans for the project can be
fully understood and developed. The construction manager
will need to hire and organise various contractors and
suppliers, and coordinate the subcontractor’s activities.
:
👉What Skills/Qualifications Are Required?
1. Construction managers have an obligation to
communicate with many different people. Therefore,
are essential. people skills
2. Construction managers must be able to their
team to ensure the project is completed to a high quality
motivate
3. Construction Managers need to be
to overcome any obstacles they may face in the
process. creative in problem- solving
4. Having excellent are
also important so that the project can be both effectively
and efficiently plan to run according to schedule
organisational and planning skills
5. are essential. They will need to have
in-depth knowledge of different building methods and
project management computer software. They need
these core competencies to plan the project and keep the
information and finances updated.
Maths and IT skills
6. An of health and safety is fundamental to
maintain a safe work environment.
awareness To become a construction manager, HNC/HND, a foundation degree, or degree in a related area is usually required.
.
▶️What to Expect as a Construction Manager
1. Construction managers are typically employed by
building companies or specialist subcontractors
2. Will be responsible for running all or part of a
construction site
3. Primary person to contact for sub-contractors and public
4. Senior construction managers will often oversee several
projects at once
5. Project meetings must take place at various intervals to
discuss the progress of the project and any issues or
concerns
6. Diaries and daily logs are kept to keep track of activities
taking place on each job site
.
http://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉Functions of Construction Management
.
PART TWO
.
▶️Construction and project managers play a huge role in the overall success and development of any project,
leading a project from start to finish. But what steps do they take to ensure a project has been adequately completed?
For those working in this field, there are
*six functions of construction management that need
to be taken care of to ensure the success and quality
of a project. Without these six functions of construction management, finishing a project would be extremely difficult.
:
▶️Project Management Planning
.
*Although it is only one of the six functions of construction management, planning out the entireproject is an essential task as it lays out the stepping stones for completing a project. Before a project can even be started, the project manager must plan out each step of the project.
Project managers must define workers’ tasks, and estimate the duration of each activity.
This information is necessary when planning out a project thoroughly. Without a great construction plan, it is challenging to develop a budget and work schedule.
.
▶️Cost Management
Understanding the costs of a project is a necessary part of managing construction. The second in the six functions of construction management is creating a budget.
Project managers use the budget to determine the total costs and returns expected from a particular project.
*Understanding one’s budget can help build the payment table. Project managers use the budget andplan to determine when steps are complete.
*Sometimes project managers request payment at the completion of each step. This can keep projects more affordable since subcontractors aren’t saddled with the entire cost at the start. Along with the budget comes a cost plan which will outline all the costs of the construction and the costs of the entire project.
*The budget shows the limit of expenses, while the cost plan shows where and when project managers can spend the money, although they seem quite similar.
.
▶️Time Management
Time is something you can never get back once you lose it, thus people make use of their time wisely. In construction, the more time spent on a project equates to higher expenses. The ability to use time wisely and efficiently is an important skill needed for someone in construction management and is the reason that it is considered one of the key functions
of construction management.
*A manager must have these skills: clear and effective communication, delegation, and prioritization. It is even more critical in the field of construction because any single mistake due to miscommunication or any form of time lag can build up the project expenses. Increasing expenses burden subcontractors when they lack proper scheduling and documentation.
:
▶️Quality Management
Project managers are also responsible for project quality, which is why it is one of the functions of construction management. In order to ensure that quality is excellent, construction management will need to analyze their work practices to see if they are up to par, determine if the material used is standard quality, and ensure that the finished product is protected from any potential harm or damage that may come to it. Without quality management it is harder to win bids from other
.
▶️Contract Administration
Contract administration usually begins when the other functions of construction management , such as cost and time management, have already been taken care of. Contract administration is conducted between the owner and the construction management team.
.
▶️Safety Management
Construction is an industry where the smallest mistake could lead to injury or even worse, death. This is why safety management is considered a huge part of the functions of construction management. In order to safely start a project, a manager must first plan ahead and determine all the potential safety hazards for each job. By implementing safety protocols such as personal protective equipment and zoning, managers can prevent injury to both workers and bystanders.
.
http://t.me/COTMp
.
PART TWO
.
▶️Construction and project managers play a huge role in the overall success and development of any project,
leading a project from start to finish. But what steps do they take to ensure a project has been adequately completed?
For those working in this field, there are
*six functions of construction management that need
to be taken care of to ensure the success and quality
of a project. Without these six functions of construction management, finishing a project would be extremely difficult.
:
▶️Project Management Planning
.
*Although it is only one of the six functions of construction management, planning out the entireproject is an essential task as it lays out the stepping stones for completing a project. Before a project can even be started, the project manager must plan out each step of the project.
Project managers must define workers’ tasks, and estimate the duration of each activity.
This information is necessary when planning out a project thoroughly. Without a great construction plan, it is challenging to develop a budget and work schedule.
.
▶️Cost Management
Understanding the costs of a project is a necessary part of managing construction. The second in the six functions of construction management is creating a budget.
Project managers use the budget to determine the total costs and returns expected from a particular project.
*Understanding one’s budget can help build the payment table. Project managers use the budget andplan to determine when steps are complete.
*Sometimes project managers request payment at the completion of each step. This can keep projects more affordable since subcontractors aren’t saddled with the entire cost at the start. Along with the budget comes a cost plan which will outline all the costs of the construction and the costs of the entire project.
*The budget shows the limit of expenses, while the cost plan shows where and when project managers can spend the money, although they seem quite similar.
.
▶️Time Management
Time is something you can never get back once you lose it, thus people make use of their time wisely. In construction, the more time spent on a project equates to higher expenses. The ability to use time wisely and efficiently is an important skill needed for someone in construction management and is the reason that it is considered one of the key functions
of construction management.
*A manager must have these skills: clear and effective communication, delegation, and prioritization. It is even more critical in the field of construction because any single mistake due to miscommunication or any form of time lag can build up the project expenses. Increasing expenses burden subcontractors when they lack proper scheduling and documentation.
:
▶️Quality Management
Project managers are also responsible for project quality, which is why it is one of the functions of construction management. In order to ensure that quality is excellent, construction management will need to analyze their work practices to see if they are up to par, determine if the material used is standard quality, and ensure that the finished product is protected from any potential harm or damage that may come to it. Without quality management it is harder to win bids from other
.
▶️Contract Administration
Contract administration usually begins when the other functions of construction management , such as cost and time management, have already been taken care of. Contract administration is conducted between the owner and the construction management team.
.
▶️Safety Management
Construction is an industry where the smallest mistake could lead to injury or even worse, death. This is why safety management is considered a huge part of the functions of construction management. In order to safely start a project, a manager must first plan ahead and determine all the potential safety hazards for each job. By implementing safety protocols such as personal protective equipment and zoning, managers can prevent injury to both workers and bystanders.
.
http://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👆👆👆👆👆
.
THE LAST - PART 3
:
👉construction also needs to be managed doesnt matter whether the construction is for building or for bridge, it needs to be planned and managed.
.
▶️The Project management/construction management during different phases in building projects involve:-
:
i) Pre-Construction Phase (Before LOA) - Scrutinizing the project and working out various exercises involved in tendering/bidding like calculation of quantities, rate analysis, preparing estimates etc.
:
ii) Pre-Construction Phase (After LOA)- Planning for the project, preparing schedule, deployment plan of required
resources like man, material and machines, costing/budgeting of the project.
:
ii) Construction Phase - Monitoring whether the execution of the project is as per plan, if it is not as per plan then preparation of catch up plans. The site constraints/obstructions faced during execution that has to be tackled.
Controlling the projects as per planned schedule, cost,
quality. Preparing various progress related reports.
*Time to time co-ordination with site engineers for their requirements and that has be arranged within the required time.
*Monitoring the productivity of the deployed resources. Time to time billing of client and sub contractor. Preparing cash flow for smooth transactions of funds to avoid fund related problems in the project.
*The various clauses in the contract agreement with client
should be at the the tip of tongue of a construction
manager to avoid any obligations and for any contractual
claim during variation in the change/modification of scope.
:
iii) Handing Over/Completion of Project Phase- Preparing plan for demobilization of the resources, monitoring the same. Reconciliation of all the items and materials, cross checking the client bill v/s the sub contractor billings (means the quantities certified by the client to us shall be exactly equal to the quantities certified by us to the sub contractor), it is to be ensured that all the scope of work involved in the project has been completed and claimed to client, also if extra works have been done that also have to be claimed and get certified by the client for payment.
*Handing over the project with all compliances as said by the client in contract agreement. Follow up with client for handing over certificate/completion certificate. Preparing the final report for internal management describing the profit/loss, reconciliation statement of materials etc.
.
http://t.me/COTMp
.
THE LAST - PART 3
:
👉construction also needs to be managed doesnt matter whether the construction is for building or for bridge, it needs to be planned and managed.
.
▶️The Project management/construction management during different phases in building projects involve:-
:
i) Pre-Construction Phase (Before LOA) - Scrutinizing the project and working out various exercises involved in tendering/bidding like calculation of quantities, rate analysis, preparing estimates etc.
:
ii) Pre-Construction Phase (After LOA)- Planning for the project, preparing schedule, deployment plan of required
resources like man, material and machines, costing/budgeting of the project.
:
ii) Construction Phase - Monitoring whether the execution of the project is as per plan, if it is not as per plan then preparation of catch up plans. The site constraints/obstructions faced during execution that has to be tackled.
Controlling the projects as per planned schedule, cost,
quality. Preparing various progress related reports.
*Time to time co-ordination with site engineers for their requirements and that has be arranged within the required time.
*Monitoring the productivity of the deployed resources. Time to time billing of client and sub contractor. Preparing cash flow for smooth transactions of funds to avoid fund related problems in the project.
*The various clauses in the contract agreement with client
should be at the the tip of tongue of a construction
manager to avoid any obligations and for any contractual
claim during variation in the change/modification of scope.
:
iii) Handing Over/Completion of Project Phase- Preparing plan for demobilization of the resources, monitoring the same. Reconciliation of all the items and materials, cross checking the client bill v/s the sub contractor billings (means the quantities certified by the client to us shall be exactly equal to the quantities certified by us to the sub contractor), it is to be ensured that all the scope of work involved in the project has been completed and claimed to client, also if extra works have been done that also have to be claimed and get certified by the client for payment.
*Handing over the project with all compliances as said by the client in contract agreement. Follow up with client for handing over certificate/completion certificate. Preparing the final report for internal management describing the profit/loss, reconciliation statement of materials etc.
.
http://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
❤1👍1
Purpose of stirrup
1. It increases the compressive strength of the column (column is compressive member)
2. It can improve the ductility of column
3. Stirrups prevent the buckling of amin reinforcement bar
4. At the time of concreting it prevents the movement of main reinforcement
5. Improve dowel action of column reinforcement
6. In beams stirrups used for lump sum same purpose as in column
7. To provide lateral confinement of longitudinal bars
8. It provide resistance against shear and torsion
9. To hold longitudinal bars during construction
10. It confine the concrete in the core , thus improving ductility and strength
11. It prevents premature buckling of individual bars
👉🏿SHARE IT WITH YOUR FRIENDS
@etconp
1. It increases the compressive strength of the column (column is compressive member)
2. It can improve the ductility of column
3. Stirrups prevent the buckling of amin reinforcement bar
4. At the time of concreting it prevents the movement of main reinforcement
5. Improve dowel action of column reinforcement
6. In beams stirrups used for lump sum same purpose as in column
7. To provide lateral confinement of longitudinal bars
8. It provide resistance against shear and torsion
9. To hold longitudinal bars during construction
10. It confine the concrete in the core , thus improving ductility and strength
11. It prevents premature buckling of individual bars
👉🏿SHARE IT WITH YOUR FRIENDS
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
🏫🗼🏟️ Unit Weight Of Building Materials:
Water- 1000 Kg/ m3
Bricks (broken) - 1420 Kg/ m3
Bricks(common) -1600 Kg/ m3
Cement(ordinary)- 1440 Kg/ m3
Cement (rapid hardening)- 1250 Kg/ m3
Cement Mortar - 2000 Kg/ m3 Cement Concrete (Plain) - 2400 Kg/ m3 Cement Concrete (Reinforced) -2500 Kg/ m3
Glass - 2500 Kg/ m3
Lime Concrete - 1900 Kg/ m3
Cement Plaster - 2000 Kg/ m3
Lime Plaster - 1700 Kg/ m3
Stones (Ballast) - 1720 Kg/ m3
Stones (Aggregates)- 1750 Kg/ m3
Stones (Basalt)- 2850 Kg/ m3
Stones (Granite) - 2450 Kg/ m3
Stones (Marble)- 2650 Kg/ m3
Timber (Oak, Sal) - 510 Kg/ m3 Timber (Mango) - 650 Kg/ m3
Timber (Teak)- 625 Kg/ m3
Coal- 600 Kg/ m3 Plastics- 1250 Kg/ m3
Oils- 800 Kg/ m3 Ashes- 650 Kg/ m3
Clinker- 750 Kg/ m3
Rubber- 1300 Kg/ m3
Slag- 1500 Kg/ m3
Clay Soil- 1900 Kg/ m3
Sand (dry) - 1540 to 1600 Kg/ m3
Sand (wet)- 1760 to 2000 Kg/ m3
Steel- 7850 Kg/ m3
Chalk- 2100 Kg/ m3
Bitumen- 1040 Kg/ m3
Water- 1000 Kg/ m3
Bricks (broken) - 1420 Kg/ m3
Bricks(common) -1600 Kg/ m3
Cement(ordinary)- 1440 Kg/ m3
Cement (rapid hardening)- 1250 Kg/ m3
Cement Mortar - 2000 Kg/ m3 Cement Concrete (Plain) - 2400 Kg/ m3 Cement Concrete (Reinforced) -2500 Kg/ m3
Glass - 2500 Kg/ m3
Lime Concrete - 1900 Kg/ m3
Cement Plaster - 2000 Kg/ m3
Lime Plaster - 1700 Kg/ m3
Stones (Ballast) - 1720 Kg/ m3
Stones (Aggregates)- 1750 Kg/ m3
Stones (Basalt)- 2850 Kg/ m3
Stones (Granite) - 2450 Kg/ m3
Stones (Marble)- 2650 Kg/ m3
Timber (Oak, Sal) - 510 Kg/ m3 Timber (Mango) - 650 Kg/ m3
Timber (Teak)- 625 Kg/ m3
Coal- 600 Kg/ m3 Plastics- 1250 Kg/ m3
Oils- 800 Kg/ m3 Ashes- 650 Kg/ m3
Clinker- 750 Kg/ m3
Rubber- 1300 Kg/ m3
Slag- 1500 Kg/ m3
Clay Soil- 1900 Kg/ m3
Sand (dry) - 1540 to 1600 Kg/ m3
Sand (wet)- 1760 to 2000 Kg/ m3
Steel- 7850 Kg/ m3
Chalk- 2100 Kg/ m3
Bitumen- 1040 Kg/ m3