Ethiopian Construction Vacancy & Tender
18.2K subscribers
4.61K photos
56 videos
538 files
3.85K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

📩 @Philemona7
Download Telegram
👉JOB VACANCY

🎲Position: Project Manager

⏺Company: AMEL Design Build Develop

📜Education:Bachelor’s Degree in Civil Engineering or Construction Technology & Management (COTM)

🎲Experience: Proven experience in managing construction or design-build projects (minimum of 2 years of experience)

❇️Additional Requirements

⏺Strong leadership and decision-making skills
Excellent communication and coordination abilities
Deep understanding of the design-build workflow
Strong problem-solving and time management skills

⚡️Deadline: June 7, 2026

📩How to Apply:- Qualified Candidates Apply Through gemechu.robel@gmail.com

@etconp
❤8
👉የኢንጂነሪንግ ወጪና ግምት

⏺ የኢንጂነሪንግ ወጪ እና ግምት ለአንድ ፕሮጀክት የሚያስፈልጉ የፋይናንስ ሀብቶችን ፣ የሰው ኃይል፣ ቁሳቁሶች እና መሳሪያዎች  የመተንበይ ስልታዊ ሂደት ነው።  ግምቶች (-30% እስከ +60% ትክክለኛነት) እስከ ዝርዝር፣ ከታች ወደ ላይ የሚወጡ ወጪዎች ድረስ የምህንድስና ዲዛይኖችን አዋጭነት እና ትርፋማነት መወሰንን ያካትታል። በጀት ለማውጣት፣ ወጪዎችን ለመቆጣጠር እና ኮንትራቶችን ለማስጠበቅ ወሳኝ ነው። ብዙውን ጊዜ ወጪዎችን ወደ ቋሚ፣ ተለዋዋጭ፣ ቀጥተኛ እና ቀጥተኛ ያልሆኑ ዓይነቶች ይመድባል።

➡️የኢንጂነሪንግ ወጪ እና ግምት ቁልፍ ገጽታዎች

⏺ የወጪ ግምቶች ዓይነቶች

ሻካራ/የመጠን ቅደም ተከተል፡ ለመጀመሪያው ተግባራዊነት እና እቅድ ጥቅም ላይ የሚውል፣ ከ -30% እስከ +60% ትክክለኛነት ያለው።

⏺ ከፊል ዝርዝር/ቅድመ-ዝግጅት

በፅንሰ-ሀሳባዊ ዲዛይን ደረጃዎች ውስጥ ለበጀት ማውጣት የሚያገለግል፣ ከ -15% እስከ 20% አካባቢ ትክክለኛነት ያለው


ዝርዝር (ከታች ወደ ላይ)፦ለግንባታ ሰነዶች እና የመጨረሻ ጨረታዎች ጥቅም ላይ የሚውል ሲሆን ከፍተኛውን ትክክለኛነት ይሰጣል ነገር ግን ከፍተኛ ጊዜ እና መረጃ ይጠይቃል።

⏺ የወጪ ምደባዎች

ቀጥታ ወጪዎች፦ ከፕሮጀክቱ ጋር በቀጥታ የተያያዙ ቁሳቁሶች፣ መሳሪያዎች እና የሰው ኃይል ወጪዎች

↔️ ተዘዋዋሪ ወጪዎች፦ ወጪ፣ የአስተዳደር እና የድጋፍ ወጪዎች

↔️ ቋሚ ወጪዎች፦ ከምርት መጠን ጋር የማይለዋወጡ ወጪዎች

↔️ ተለዋዋጭ ወጪዎች፦ ከፕሮጀክት እንቅስቃሴ ጋር የሚለዋወጡ ወጪዎች

⏺ የግምታዊ ቴክኒኮች

↔️ አናሎግ፦ ከተመሳሳይ ቀዳሚ ፕሮጀክቶች ጋር ማወዳደር፣  ፈጣን ግን ምናልባት ያነሰ ትክክለኛ

↔️ ፓራሜትሪክ፦ በታሪካዊ መረጃ እና በፕሮጀክት መለኪያዎች መካከል የስታቲስቲክስ ግንኙነቶችን (የወጪ ግምት ግንኙነቶች - CERs) መጠቀም

↔️ ግንባታ (ዝርዝር)፦ እያንዳንዱን ተግባር፣ ክፍል እና ቁሳቁስ በዝርዝር መተንተን

↔️ የባለሙያ ፍርድ፡- በተለይም ለሠራተኛ እና ለቴክኒካል ውስብስብነት ወጪዎችን ለመገመት የባለሙያዎችን ልምድ መጠቀም

⏺ በግምት ውስጥ ቁልፍ ክፍሎች

↔️ ስዕሎች፦ አቀማመጦችን፣ ከፍታዎችን እና መዋቅራዊ ዝርዝሮችን ጨምሮ

↔️ ዝርዝር ዝርዝሮች፡- የቁሳቁስ ጥራትን እና የስራ ችሎታን መግለጽ

↔️ የዋጋዎች መርሃ ግብር፡- ለሠራተኛ እና ለቁሳቁሶች የአሁኑን ተመኖች መጠቀም

⏺ አስፈላጊነት

⏹ ትክክለኛ የወጪ ግምት የፕሮጀክት ውድቀትን ለመከላከል፣ በአፈፃፀም ወቅት ወጪዎችን ለመቆጣጠር እና የፕሮጀክት ትርፋማነትን ለማረጋገጥ ወሳኝ ነው። ለኢንቨስትመንት ውሳኔዎች እና ለጨረታ ማቅረቢያዎች መሠረት ሆኖ ያገለግላል፣ እና እንደ ማኑፋክቸሪንግ፣ ግንባታ እና ዘይት እና ጋዝ ባሉ ኢንዱስትሪዎች ውስጥ ጥቅም ላይ ይውላል።

@etconp
❤7👏2
👉JOB VACANCY

How to Apply: 📝 Submit your CV and application letter to OVID Road Work HR, Block 5, Floor 8, hr@ovid-road.com. 📧 All documents must be enclosed with a single PDF file.

📄 The employee shall be engaged on a project-based contract, with a permanent assignment at the Head Office.

🏢 Please ensure that the title of the position is clearly written in the Subject Line and within 7(Seven) working days of this announcement. ⏳

OVID Road Works 🚧

@etconp
❤4👍3
catalogue_of_solutions_2026-2029.pdf
35.5 MB
👉አዲስ መጽሀፍ

💫UN-Habitat የ2026 - 2029 የመፍትሄዎች ካታሎግ መጽሀፍ

​አካታች፣ ፅኑ እና ቀጣይነት ያላቸውን ከተሞች ለመገንባት ምን ያስፈልጋል?

​የUN-Habitat የ2026 - 2029 የመፍትሄዎች ካታሎግ፤ መንግስታት፣ ማህበረሰቦች እና አጋሮች የዛሬዎቹን አስቸጋሪ የከተማ ተግዳሮቶች እንዲወጡ ለመርዳት የተሞከሩ መሳሪያዎችን፣ የተረጋገጡ ዘዴዎችን እና አለምአቀፍ ልምዶችን በአንድ ላይ አሰባስቧል።

​ከ2030 አጀንዳ፣ ከአዲሱ የከተሞች አጀንዳ (New Urban Agenda) እና ከUN-Habitat የ2026–2029 ስትራቴጂካዊ እቅድ ጋር የተጣጣመው ይህ ካታሎግ፣ ለሚከተሉት አካላት እንደ ተግባራዊ ግብዓት እንዲያገለግል ተደርጎ የተዘጋጀ ነው፦
• ​ለአባል ሀገራት፣ ለብሔራዊ እና ለክልል/ለአካባቢ መንግስታት
• ​ለቴክኒክ ክፍሎች እና ለከተማ አመራሮች
• ​ለገንዘብ ድጋፍ ሰጪ አጋሮች እና ለለጋሾች እና
• ​ለተባበሩት መንግስታት ድርጅቶች እና ለእርዳታ ሰጪ ድርጅት  አስተባባሪዎች (Resident Coordinators)

​ካታሎጉ በሶስቱ ዋና ዋና አምዶች ማለትም በስትራቴጂካዊ ትኩረት፣ በውጤት ዘርፎቻችን እና በትግበራ መንገዶቻችን ላይ የተዋቀረ ነው።

እነዚህም የሚከተሉትን ተጨባጭ መፍትሄዎች ያካትታሉ፦
​🏘 ቤት እና መሬት
🛖 መደበኛ ያልሆኑ ሰፈራዎች ( slum )
🚰 መሰረታዊ የከተማ አገልግሎቶች
📈 ዝግጁነት፣ ምላሽ አሰጣጥ፣ ማገገም እና መልሶ ግንባታ
🌱 አካባቢ እና የአየር ንብረት እርምጃ
🏗 የተቀናጀ የከተማ እና የቦታ ፕላን፣ አስተዳደር፣ ኢንቨስትመንት እና ፋይናንስ
📊 አሳታፊ ባለብዙ-ደረጃ አስተዳደር እና የዘላቂ ልማት ግቦችን (SDGs) በአካባቢ ደረጃ መተግበር
🧑‍🏫 እውቀት፣ መረጃ፣ ዲጂታላይዜሽን እና የአቅም ግንባታ

@etconp
❤7👍1👏1
ኖህ ሪል ስቴት በእንቁላል ፋብሪካ ሳይት የገነባቸውን 1,341 ቤቶች አስረከበ

ኖህ ሪል ስቴት በእንቁላል ፋብሪካ ሳይት ያስገነባቸውን 1,341 መኖሪያ ቤቶች እና የንግድ ሱቆች ዛሬው ግንቦት 1 ቀን 2018 ዓ.ም. በተከናወነው የርክክብ ሥነ ሥርዓት ላይ የአዲስ አበባ ከተማ አስተዳደር ዋና ሥራ አስኪያጅ ኢንጂነር ወንድሙ ሴታ እና ሌሎች ጥሪ የተደረገላቸው እንግዶች ተገኝተዋል።

የድርጅቱ የማኔጅመንት አባል አቶ አቤል ኃይለማርያም በወቅቱ እንደገለጹት፤ ተቋሙ ባለፉት 13 ዓመታት 33 ፕሮጀክቶችን በማልማት ወደ 11 ሺህ የሚጠጉ መኖሪያ ቤቶችን ለተጠቃሚዎች ማድረስ ችሏል።

ድርጅቱ በቀጣይም ዘመናዊና ተመጣጣኝ ዋጋ ያላቸው የመኖሪያ መንደሮችን ለከተማዋ ነዋሪዎች ተደራሽ ለማድረግ እየሠራ እንደሚገኝ ጠቁመዋል። አክለውም በቦሌ ክፍለ ከተማ 'ቦሌ ሆምስ' ተብሎ በሚጠራው አካባቢ ከ2,500 በላይ ቤቶችን ለመገንባት ዲዛይን ተጠናቆ ወደ ሥራ ለመግባት ዝግጅት መደረጉን ይፋ አድርገዋል።

የአዲስ አበባ ከተማ አስተዳደር ዋና ሥራ አስኪያጅ ኢንጂነር ወንድሙ ሴታ በበኩላቸው፤ የግሉ ዘርፍ ለከተማዋ ዕድገት ቁልፍ አጋር መሆኑን ገልጸው፣ የቤቶቹ መገንባት የተቋሙን የማስፈጸም አቅም የሚያሳይ መሆኑን ተናግረዋል።

ኖህ ሪል ስቴት በቀጣይ አንድ ዓመት ውስጥ ተጨማሪ 3 ሺህ ቤቶችን አጠናቆ ለማስረከብ የያዘው ዕቅድ ለከተማዋና ለሀገሪቱ ኢኮኖሚ ትልቅ ትርጉም እንዳለውም ኢንጂነር ወንድሙ ገልጸዋል።

በመርሐ-ግብሩ ማጠቃለያ ላይ የኖህ ሪል ስቴት መስራችና ዋና ሥራ አስፈጻሚ አቶ ቴዎድሮስ ዘሪሁን ለከተማ አስተዳደሩ ላሳየው ትብብርና ቁርጠኝነት እውቅና በመስጠት ለኢንጂነር ወንድሙ ሴታ ስጦታ አበርክተዋል።

Via Ahadu Radio

@etconp
❤8👍5
ዱርዬው አሸዋ

የነዳጅ እጥረት ከፈጠረብን አንዳጅ ድርጊቶች መካከል ዱርዬው አሸዋ ንግድ መስፋፋትና የአሸዋ ልኬት ቅሸባ ይገኝበታል።

በተለምዶ ዱርዬው_አሸዋ የሚባለው ከወንዝ ከሚገኘው የታጠበ አሸዋ ሳይሆን በተለምዶ ዳካ የሚባለውን ከአለምጤና አካባቢ ተቆፍሮ የሚጫን አሸዋ መሰል ነገር ነው። ይህ አሸዋ በርካሽ ዋጋ አዲስ አበባ ይመጣል።  የመተሃራና ሌሎች የወንዝ አሸዋም  ይመጣና ሜዳ ላይ ይገለበጣል። ከዛም እንደ ግዢው ሁኔታ እየተቀላቀለ በሲኖዎች ላይ ይጫንና እላዩ ላይ ውሃ እስኪጠግብ ይለቀቅበትና ከመተሃራ ወይ ከአንዱ የወንዝ የመጣ አሸዋ ተብሎ በየፕሮጀክቱ ይራገፋል። በዚህም ይገነባል። አደጋ አለው!

ይህ የአሸዋ ንግድን በስሱ እንዳጠናሁት በሚከተለው መልክ የገበያ ስርዓት ልኬትና ስያሜ ወጥቶለት የሚከናወን ነው ። ገዢው አያውቅም። አሸዋ አቅራቢ ሹፌሮች ተግባብተው ይተገብሩታል።

ለእንባቢ ለማሳየት ያህል የሚከተሉት የአሸዋ ግብይት ቋንቋቸውና መለያቸው አቅርቤያለሁ:-
፩) ዳካ በዳካ :- ሙሉ ለሙሉ የዳካ ( ድክሞ) አሸዋ ውሃ ተርከፍክፎበት  ለተንከራፈፈ ኮንቴ ወይም ምታም ለሆነ ፐርቼዘር በርካሽ በወቅታዊ ዋጋ 110,000.00 ብር አካባቢ ይሸጣል።

፪) ዳካ በበለጬ :- እዚህ ቦታ ላይ  "በለጬ"  የበርጫው ሳይሆን የዳካ አሸዋን ነጣና ገርጣ ያለ ቀለም የሚቀይር ቀጠንጠን ያለች አሸዋ መጠሪያ ነው።  ይቺ በለጬ የምትባል አሸዋ ዳካው ላይ ተጨምራ ተማስሎ ውሃ ጠጥቶ ለገበያ ይቀርባል።

፫) 20 በ 80:- የሚባለው 20% የወንዝ አሸዋ 80% ዳካ ተቀላቅሎ የሚሸጥ

፬) 50 በ 50 :- ይህ ግማሽ የወንዝ አሸዋ ግማሽ የ ዳካ አሸዋ ቅልቅል ሲሆን ውሃ ጠግቦ መቀላቀሉ ለመለየት በሚከብድ ሁኔታ ለፕሮጀክት የሚቀርብ ሲሆን ከ 120ሺህ-130ሺህ ብር ለሳይቶች ይቀርባል።

ሌላም....ሌላም ድብልቅልቅ ...... ፈተና ነው።አደጋ አለው!

ወገኖቼ ይሄ ተግባር በድብቅ የሚከናወን ሳይሆን በቀን በጠራራው ጸሃይ ሳይቀር በሃላል እየተከናወነ ያለ ማንም ሰው ከጋርመንት ቱሉዲምቱ ሲሄድ ኮዬ አካባቢ ሲኖዎች እንደ ነዳጅ ቀጂ ተሰልፈው ወጠምሻ ወጣቶች በአካፋ እየቀላቀሉ የሚጭኑት አንዳንዶችም በሎደር ቀላቅላው ሲጭኑ እዛው ወንዝ ገብተው ውሃ አጠጥተው በሸራ ሸፍነው ወደ መሃል ከተማ ሲወስዱት የሚታይ ጉዳይ ነው።

ይህንን ለመጻፍ የወሰንኩት ሰሞኑን በኮዬ መስመር ስጓዝ ከአሸዋ ማቀላቀያ ቦታዎች ጭኖ የወጣ መኪና ከፊት ለፊታችን ተጉዞ አንድ የተዘጋጀ አርማታ (Ready Mix)  አቅራቢ ግቢ ሲገባ በመመልከቴ ነው።

እንደ አንድ መሃንዲስ በዚህ መሰል አሸዋ የተሰራ ህንጻ በቸርነቱ እንጂ በስትራክቸሩ እንደማይቆም እርግጠኛ ነኝ።

በተጨማሪም አንድ የአሸዋ ቅሸባ ላክልና ልውጣ። በትክክለኛው ልኬት የብዙዎቹ የሲኖ አሸዋ ልኬት 16.7 ሜኩብ አካባቢ ነው። ነገር ግን ጥቂት የማይባሉት የዱርዬው አሸዋ አቅራቢዎች መጫኛቸው ላይ በላሜራ የተለበጠ መቀነሻ አሰርተውበት የሚያቀርቡት አሸዋ ልኬት ከ12ሜኩብ አይበልጥም። ይህም በእያንዳንዱ ቢያጆ እስከ አራት ሜኩብ አሸዋ ይቀሸባል ማለት ነው። ይህም 25% ቅሸባ ነው።

እናማ ገንቢና አስገንቢ ወገኔ ሆይ!!!

አሸዋ ስትገዙ በተቻለ መጠን ከወንዝ መምጣቱን ተከታተሉ ከተራገፈ በኋላም ለክታችሁ ክፈሉ።

በጥራትም በመጠንም እትቀሸቡ ንቁ!


ምንጭ:- ደሳለኝ ከበደ
ሲቪል መሀንዲስ፣ ገንቢ፣ አማካሪ

@etconp
❤24👏7
👉 National Competative Bidding

https://t.me/ETCONpWORK

@etconp
❤3👏1
👉There are two major Pavement Design Methods

1. Empirical Design
This is most used in the United States, developed by AASHTO.

This method is based on historical performance data.

It analyzes what worked in the past and assumes it to work under similar conditions.

For example, AASHTO 1993 uses traffic load (ESALs), subgrade CBR, Subgrade numbers, and layer coefficients for the design of pavements.

2. Mechanistic-Empirical Design (e.g., MEPDG)
This combines mechanics (stress, strain) with empirical calibration to local conditions.

It simulates how pavement layers deform or crack under traffic and climate.

Helps design cost-effective pavements with longer service life.

@etconp
❤8
👉በኢትዮጵያ የመደበኛ የጨረታ ሰነድ (Standard Bidding Document – SBD) ውስጥ የኮንትራት ሁኔታዎች በአብዛኛው በሁለት ዋና ክፍሎች ይከፈላሉ:-

1.  GCC (General Conditions of Contract) — አጠቃላይ የኮንትራት ሁኔታዎች

2.  PCC (Particular Conditions of Contract) — ልዩ የኮንትራት ሁኔታዎች
እነዚህ ሁለት ሰነዶች በአንድነት ይሰራሉ። GCC አጠቃላይ የሕግና የአስተዳደር መሠረት ሲያቀርብ፣ PCC ደግሞ ለተወሰነ ፕሮጀክት የተለዩ ማሻሻያዎችንና ተጨማሪ መመሪያዎችን ያካትታል።

1. GCC (General Conditions of Contract)
GCC ማለት በሁሉም የግንባታ ኮንትራቶች ላይ በአጠቃላይ የሚተገበሩ መደበኛ የኮንትራት ውሎች (standard contractual clauses) ማለት ነው።
ይህ ሰነድ፦
•  የሕግ ግዴታዎችን (legal obligations)
•  የአስተዳደር ሂደቶችን (administrative procedures)
•  የአደጋ ኃላፊነት ክፍፍልን (risk allocation)
•  የክፍያ ሥርዓቶችን (payment procedures)
•  የክርክር መፍቻ ሥርዓቶችን (dispute resolution mechanisms)
•  የሥራ አፈጻጸም መመሪያዎችን
ይወስናል።
GCC ብዙ ጊዜ ከ፦
•  FIDIC የኮንትራት መርሆች
•  የኢትዮጵያ የመንግስት ግዥ ህጎች
•  ዓለም አቀፍ የግንባታ ውል መርሆች
ተነስቶ ይዘጋጃል።

GCC ዋና ዓላማ
GCC የሚያደርገው፦
•  የኮንትራቱን የሕግ መሠረት መፍጠር
•  የተዋዋይ ወገኖችን መብትና ግዴታ መግለጽ
•  የአሠሪውን (Employer) እና የተቋራጩን (Contractor) ጥቅም መጠበቅ
•  የሕግ እና የቴክኒክ ግልጽነት መፍጠር
•  በሁሉም ፕሮጀክቶች ተመሳሳይ የውል ሥርዓት መፍጠር
ነው።

GCC የሚያካትታቸው ዋና ዋና ክፍሎች

A. Definitions and Interpretation
(ትርጓሜዎች እና የቃላት ትርጓሜ)
ይህ ክፍል በኮንትራቱ ውስጥ የሚጠቀሙ ቃላትን ይገልጻል።
ምሳሌዎች፦
•  Employer — አሠሪ
•  Contractor — ተቋራጭ
•  Engineer — መሐንዲስ
•  Contract Price — የኮንትራት ዋጋ
•  Site — የሥራ ቦታ
•  Variation — የሥራ ለውጥ
•  Defect Liability Period — የጉድለት ኃላፊነት ጊዜ
•  Interim Payment Certificate (IPC) — የጊዜያዊ ክፍያ ማረጋገጫ
ይህ ክፍል በጣም አስፈላጊ ነው፤ ምክንያቱም ብዙ የኮንትራት ክርክሮች የሚመጡት ከቃላት የተሳሳተ ትርጓሜ ነው።

B. Priority of Contract Documents
(የኮንትራት ሰነዶች ቅድሚያ)
ይህ ክፍል ሁለት ሰነዶች ቢጋጩ የትኛው እንደሚቀድም ይወስናል።
ብዙ ጊዜ ቅደም ተከተሉ፦
1.  Contract Agreement
2.  Letter of Acceptance
3.  PCC
4.  GCC
5.  Specifications
6.  Drawings
7.  BOQ
8.  Contractor’s Bid
አስፈላጊ ነጥብ፦
PCC ከGCC ጋር ቢጋጭ PCC ይቀድማል።

C. Scope of Works
(የሥራው ወሰን)
ይህ ክፍል፦
•  ተቋራጩ ምን እንደሚገነባ
•  የሚከተለው የጥራት ደረጃ
•  የሚተገበሩ መመሪያዎች
•  የቴክኒክ መስፈርቶች
ይገልጻል።

D. Responsibilities of Parties
(የተዋዋይ ወገኖች ኃላፊነቶች)
1. Employer Responsibilities
(የአሠሪው ኃላፊነቶች)
•  የሥራ ቦታ ማስረከብ
•  ክፍያ መፈጸም
•  ዲዛይን ማጽደቅ
•  Engineer መመደብ
•  መዳረሻ መስጠት
2. Contractor Responsibilities
(የተቋራጩ ኃላፊነቶች)
•  ሥራውን ማከናወን
•  ቁሳቁስና ማሽን ማቅረብ
•  የጥራት ቁጥጥር
•  የደህንነት ጥበቃ
•  የአካባቢ ጥበቃ
•  ሕጎችን መከተል

E. Time Control and Completion
(የጊዜ ቁጥጥር እና ማጠናቀቅ)
ይህ ክፍል፦
•  Commencement Date (የሥራ መጀመሪያ ቀን)
•  Completion Period (የማጠናቀቂያ ጊዜ)
•  Extension of Time – EOT (የጊዜ ማራዘሚያ)
•  Delay (መዘግየት)
•  Suspension (ሥራ ማቆም)
ይቆጣጠራል።

F. Payment Provisions
(የክፍያ ድንጋጌዎች)
በጣም አስፈላጊ ክፍል ነው።
ይዟል፦
•  Contract Price
•  Interim Payment
•  Advance Payment
•  Retention Money
•  Final Payment
Interim Payment
በሥራ ሂደት ውስጥ የሚፈጸም ጊዜያዊ ክፍያ።
Retention
ጉድለት እንዲስተካከል በጊዜያዊነት የሚያዝ የገንዘብ መጠን።
Advance Payment
ሥራ ከመጀመሩ በፊት ለሞቢላይዜሽን (mobilization) የሚሰጥ ቅድመ ክፍያ።

G. Variations and Change Orders
(የሥራ ለውጦች)
በግንባታ ፕሮጀክቶች ላይ ለውጦች መኖራቸው የተለመደ ነው።
ይህ ክፍል፦
•  ለውጥ እንዴት እንደሚታዘዝ
•  የዋጋ ግምገማ
•  የጊዜ ተፅእኖ
•  የማጽደቅ ሂደት
ይገልጻል።
Variation ሊሆን የሚችለው፦
•  የብዛት መጨመር
•  የብዛት መቀነስ
•  ተጨማሪ ሥራ
•  የዲዛይን ለውጥ

H. Quality Control and Testing
(የጥራት ቁጥጥር እና ሙከራ)
ይህ ክፍል፦
•  Inspection (ምርመራ)
•  Laboratory Testing (የላብራቶሪ ሙከራ)
•  Defective Work Rejection (ጉድለት ያለበት ሥራ መከልከል)
ይዟል።
Engineer የሚኖረው ሥልጣን፦
•  ሥራ መመርመር
•  ደረጃ ያልጠበቀ ሥራ ማስወገድ
•  ድጋሚ ሙከራ ማድረግ

I. Defects Liability
(የጉድለት ኃላፊነት)
ይህ ክፍል፦
•  Defect Liability Period
•  የጥገና ግዴታ
•  ጉድለት ሪፖርት ሂደት
ይገልጻል።
በአብዛኛው በዚህ ጊዜ ውስጥ የሚገኙ ጉድለቶች በተቋራጩ ወጪ ይስተካከላሉ።

J. Insurance and Risks
(ኢንሹራንስ እና አደጋ ኃላፊነት)
የሚፈለጉ ኢንሹራንሶች፦
•  Works Insurance
•  Workers Insurance
•  Third Party Liability Insurance
•  Equipment Insurance
እንዲሁም አደጋዎች በማን እንደሚሸፈኑ ይወስናል።

K. Health, Safety and Environment (HSE)
ይህ ክፍል፦
•  የሰራተኛ ደህንነት
•  የትራፊክ ቁጥጥር
•  የአካባቢ ጥበቃ
•  የአደጋ ሪፖርት
ያካትታል።

L. Force Majeure / Exceptional Events
(ከቁጥጥር ውጭ የሆኑ ክስተቶች)
ምሳሌዎች፦
•  ጦርነት
•  ጎርፍ
•  መሬት መንቀጥቀጥ
•  ወረርሽኝ
ይህ ክፍል፦
•  ኃላፊነት እፎይታ
•  EOT
•  ሥራ ማቆም
•  ኮንትራት ማቋረጥ
ይወስናል።

M. Termination
(የኮንትራት ማቋረጥ)
በEmployer
•  ሥራ መተው
•  ኪሳራ (bankruptcy)
•  ደካማ አፈጻጸም
•  ከፍተኛ መዘግየት
በContractor
•  ክፍያ አለመፈጸም
•  ረጅም የሥራ ማቆም
•  ከባድ የEmployer ጥፋት

@etconp
❤29👏7
የንግድ ቤት ጨረታ 1ኛ ደረጃ አሸናፊዎች

ሸያጭ ውል ጥሪ ማስታወቂያ

ተቋማችን የአዲስ አበባ ቤቶች ልማት ኮርፖሬሽን  በ40/60 የቤት ልማት ኘሮግራም ያስገነባቸው የጋራ መኖሪያ ህንፃ ስር የሚገኙ ንግድ ቤቶችን እና በካፒታል ፕሮጀክት የተገነቡ ንግድ ቤቶችን በጨረታ ለተጠቃሚዎች ለማስተላለፍ 8ኛ እና 2ኛ ዙር ግልፅ ጨረታ በተመሳሳይ ቀን በአንድ የጨረታ ሰነድ ማውጣቱ እና የጨረታ አሸናፊዎችን በኮርፖሬሽኑ የቴሌግራም እና ፌስቡክ ገጽ ላይ ይፋ በማረግ በውጤቱ ላይ ቅሬታ ያላችሁ ተጫዋቾች  በተሰጣችሁ ጊዜ ገደብ ውስጥ ያቀረባችሁ ተጫራችን ቅሬታ በመቀበል በኮርፖሬሽኑ  የቴሌግራም እና ፌስቡክ ገጽ ላይ የቅሬታ ምላሽ ያሳወቅን መሆኑ ይታወቃል ።

ስለሆነም ቅሬታችሁ ተቀባይነት ያገኛችሁ ጭምር የጨረታው 1ኛ ደረጃ አሸናፊዎች ከግንቦት 05 ቀን 2018 ዓ/ም ጀምሮ ባሉት 15 ተከታታይ የስራ ቀናት ( ቅዳሜን ሙሉ ቀን ጨምሮ ) እስከ ግንቦት 22 ቀን 2018 ዓ/ም ከዚህ በታች ባለው ሰንጠረዥ በተገለጸው የመዋዋያ ቦታ በአካል ወይም በህጋዊ ወኪሎቻችሁ በኩል የሚጠበቅባችሁን ቅድመ ሁኔታ በማሟላት በተገለጸው የሽያጭ ውል ጊዜ ገደብ ውስጥ ውል መፈፀም እንድትችሉ ጥሪ የቀረበላችሁ መሆኑን እናሳውቃለን ::

ግንቦት 03 ቀን 2018 ዓ/ም

@etconp
❤1
ጨረታ

አዲስ ዘመን  ግንቦት 3 ቀን 2018
ዓ. ም ዕትም ላይ የተወሰደ

https://t.me/ETCONpWORK

@etconp
ጨረታ

አዲስ ዘመን  ግንቦት 3 ቀን 2018
ዓ. ም ዕትም ላይ የተወሰደ

https://t.me/ETCONpWORK

@etconp
❤1😢1
ጨረታ

አዲስ ዘመን  ግንቦት 1 ቀን 2018
ዓ. ም ዕትም ላይ የተወሰደ

https://t.me/ETCONpWORK

@etconp
❤1
ጨረታ

አዲስ ዘመን  ግንቦት 1 ቀን 2018
ዓ. ም ዕትም ላይ የተወሰደ

https://t.me/ETCONpWORK

@etconp
👍2
ጨረታ

ሪፖርተር ግንቦት 2 ቀን 2018
ዓ. ም ዕትም ላይ የተወሰደ

https://t.me/ETCONpWORK

@etconp
❤1
ጨረታ

ሪፖርተር ግንቦት 2 ቀን 2018
ዓ. ም ዕትም ላይ የተወሰደ

https://t.me/ETCONpWORK

@etconp
👍2❤1
_@etconp_2018_3rd_QUARTER_CONSTRUCTION_WORKS_ONLY_DIRECT_COST_PDF.pdf
26.5 MB
🏷በ2018 ዓ.ም ሶስተኛ ሩብ ዓመት ተግባራዊ የሚደረግ የግንባታ ሥራዎች ይፋዊ ቀጥተኛ ዋጋ ተመን (3rd Quarter Construction Works of Direct Cost)

🔑በተለይ የዋጋ ተመን (BOQ - Priced bill of Quantities) ለምታወጡ የዲዛይን አማካሪዎች እና የፕሮጀክት መሐንዲሶች ይጠማችኋል።

💫በሌሎች የሀገሪቱ ክፍሎች የምትገኙ የኮንስትራክሽን ባለሙያዎችም እንደመነሻ ሀሳብ ይጠቅማችኋል።


🏷YouTube👇
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG

🌟Vacancy And Tender👇
https://t.me/ETCONpWORK

@etconp
👍7❤1