Ethiopian Construction Vacancy & Tender
18.1K subscribers
4.57K photos
56 videos
536 files
3.78K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

๐Ÿ“ฉ @Philemona7
Download Telegram
๐ŸŒŸแŠ แ‹ฒแˆต แŠ แˆ˜แ‰ต แˆแŠญแŠ•แ‹ซแ‰ต แ‰ แˆ›แˆจแŒ แ‹จ Ms Project แŠฅแŠ“ Quantity Surveying แŠฆแŠ•แˆ‹แ‹ญแŠ• แ‰ตแˆแˆ…แˆญแ‰ถแ‰ฝ แŠจ แŒทแŒแˆœแŠ• 1 แŒ€แˆแˆฎ แŠฅแˆตแŠจ แŒทแŒแˆœแŠ• 5 แ‹จแˆšแ‰†แ‹ญ แ‹จ 25% แ‰…แŠ“แˆฝ แŠ แˆญแŒˆแŠ• แŠฅแŠ•แ‹ฐแАแ‰ แˆญแŠ• แŠฅแŠ“ แŠฎแˆญแˆฑ แˆˆแˆšแ‹ˆแˆตแ‹ฑ แ‹จ ETABS แŠฎแˆญแˆต แ‰ แАแƒ แŠฅแ‹จแˆ˜แˆจแ‰…แŠ• แŠฅแŠ•แ‹ฐแАแ‰ แˆญ แ‹ญแ‰ณแ‹ˆแ‰ƒแˆ แˆตแˆˆแ‹šแˆ… แŠ แˆแŠ• แ‰…แŠ“แˆน แ‹แŒ แˆแАแ‹‹แˆโ—๏ธ

ใ€ฝ๏ธแ‹‹แŒ‹ EDIT แŠฅแˆตแŠชแ‹ฐแˆจแŒ แ‰ แ‹šแˆ… แˆ˜แŒแ‰ฃแ‰ต แ‰ตแ‰ฝแˆ‹แˆ‹แ‰น๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp

แˆ˜แˆแŠซแˆ แŠ แ‹ฒแˆต แŠ แˆ˜แ‰ต๐Ÿ™

@etconp
๐Ÿ™3๐Ÿฅฐ1
๐ŸŒผ๐ŸŒผ2019๐ŸŒผ๐ŸŒผ

แˆˆแˆ˜แˆ‹แ‹ แ‹จแ‰ปแŠ“แˆ‹แ‰ฝแŠ• แ‰คแ‰ฐแˆฐแ‰ฆแ‰ฝ แŠฅแŠ•แŠณแŠ• แˆˆ2019 แ‹“.แˆ แŠ แ‹ฒแˆต แŠ แˆ˜แ‰ต แ‰ แˆฐแˆ‹แˆ แŠ แ‹ฐแˆจแˆณแ‰ฝแˆแข

แŠ แ‹ฒแˆฑ แŠ แˆ˜แ‰ต ...

๐ŸŒป แ‹จแˆฐแˆ‹แˆแฃ แ‹จแแ‰…แˆญแฃ แ‹จแˆตแŠฌแ‰ตแŠ“ แ‹จแˆ˜แ‰ฐแˆณแˆฐแ‰ฅ แ‹ซแ‹ตแˆญแŒแˆแŠ•แข
๐ŸŒป แˆแˆ‹แ‰ฝแŠ•แˆ แ‹จแˆแŠ•แŠ“แแ‰€แ‹แŠ• แ‹จแˆ€แŒˆแˆซแ‰ฝแŠ•แŠ• แˆฐแˆ‹แˆ แ‹ญแˆ˜แˆแˆตแˆแŠ•แข

๐ŸŒผ๐ŸŒผ แˆ˜แˆแŠซแˆ แŠ แ‹ฒแˆต แŠ แˆ˜แ‰ต ๐ŸŒผ๐ŸŒผ

@etconp
โค3๐Ÿฅฐ2๐Ÿ‘1
๐Ÿ‘‰แ‹จ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‹แˆ แŠฅแŠ“ แŠฃแ‹ญแАแ‰ถแ‰น

๐Ÿšง1. Lump sum contract

๐Ÿ’ซแ‹จแŠ แŠ•แ‹ต แŒŠแ‹œ แ‹ตแˆแˆญ แ‹แˆ แ‰ แŠ แŠ•แ‹ต แŒŠแ‹œ แŠฎแŠ•แ‰ตแˆซแ‰ต แ‹แˆตแŒฅ แ‹จแˆแˆ‰แˆ แˆตแˆซแ‹Žแ‰ฝ แŠ แŒ แ‰ƒแˆ‹แ‹ญ แ‹‹แŒ‹ แ•แˆฎแŒ€แŠญแ‰ฑ แŠจแˆ˜แŒ€แˆ˜แˆฉ แ‰ แŠแ‰ต แŠ แˆตแ‰€แ‹ตแˆž แ‰ฐแ‹ˆแˆตแŠ—แˆ::

แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ•แˆฎแŒ€แŠญแ‰ฑแŠ• แ‰ แ‰‹แˆš แ‹‹แŒ‹ แˆˆแˆ›แŒ แŠ“แ‰€แ‰… แ‰ฐแˆตแˆ›แˆแ‰ทแˆ แ‹ญแˆ…แˆ แ‰ แŠ แŒ แ‰ƒแˆ‹แ‹ญ แ‹จแˆฅแˆซ แ‹ˆแˆฐแŠ• แŠฅแŠ“ แ‹แˆญแ‹แˆญ แˆ˜แŒแˆˆแŒซแ‹Žแ‰ฝ แˆ‹แ‹ญ แ‹จแ‰ฐแˆ˜แˆฐแˆจแ‰ฐ แАแ‹::

แ‰ แ•แˆฎแŒ€แŠญแ‰ฑ แˆ‹แ‹ญ แ‹จแˆšแ‹ฐแˆจแŒ‰ แˆ›แŠ“แ‰ธแ‹แˆ แˆˆแ‹แŒฆแ‰ฝ แ‹ˆแ‹ญแˆ แˆ›แˆปแˆปแ‹ซแ‹Žแ‰ฝ แ‰ฐแŒจแˆ›แˆช แ‹ˆแŒชแ‹Žแ‰ฝแŠ• แˆŠแ‹ซแˆตแŠจแ‰ตแˆ‰ แŠฅแŠ“ แ‹จแˆˆแ‹แŒฅ แ‰ตแ‹•แ‹›แ‹ แˆŠแˆแˆแŒ‰ แ‹ญแ‰ฝแˆ‹แˆ‰แข

๐Ÿšง2.Bill of Quantity Or Unit Rate Contract

๐Ÿ’ซแ‹จแ‰ขแˆ แˆ˜แŒ แŠ–แ‰ฝ แ‹ˆแ‹ญแˆ แ‹จแŠ•แŒฅแˆ แ‰ฐแˆ˜แŠ• แŠฎแŠ•แ‰ตแˆซแ‰ต: แ‰ แˆ˜แŒ แŠ• แ‹ˆแ‹ญแˆ แ‰ แŠญแแˆ แ‰ฐแˆ˜แŠ• แ‹แˆ แ‹แˆตแŒฅ แ•แˆฎแŒ€แŠญแ‰ฑ แ‹ˆแ‹ฐ แ‰ฐแˆˆแ‹ซแ‹ฉ แŠญแแˆŽแ‰ฝ แ‹จแ‰ฐแŠจแ‹แˆแˆˆ แˆฒแˆ†แŠ• แˆˆแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แŠ แŠซแˆ แ‹จแ‰ฐแ‹ˆแˆฐแА แˆ˜แŒ แŠ• แŠฅแŠ“ แ‹จแŠญแแˆ แ‰ฐแˆ˜แŠ–แ‰ฝ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹จแˆšแŠจแˆแˆˆแ‹ แ‰ แ‰ฐแŒ แŠ“แ‰€แ‰€แ‹ แ‹จแˆฅแˆซ แˆ˜แŒ แŠ• แˆ‹แ‹ญ แ‰ แˆ˜แˆ˜แˆตแˆจแ‰ต แ‰ แŠญแแˆ แ‰ฐแˆ˜แŠ–แ‰ฝ แ‰ฐแ‰ฃแ‹แ‰ถ แАแ‹แข

แ‹ญแˆ… แ‹“แ‹ญแАแ‰ฑ แ‹แˆ แ‰ แ‹‹แŒ‹ แŠ แ‹ˆแŒฃแŒฅ แˆ‹แ‹ญ แ‹จแ‰ แˆˆแŒ  แ‰ฐแˆˆแ‹‹แ‹‹แŒญแАแ‰ต แŠฅแŠ“ แŒแˆแŒฝแАแ‰ต แ‹ญแˆฐแŒฃแˆแข

๐Ÿšง3.Cost Plus Fixed Fee Contract

๐Ÿ’ซแ‹จแ‹ˆแŒช แŠฅแŠ“ แ‰‹แˆš แŠญแแ‹ซ แ‹แˆ แ‰ แ‹ˆแŒช แŠฅแŠ“ แ‰‹แˆš แŠญแแ‹ซ แ‹แˆ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ•แˆฎแŒ€แŠญแ‰ฑแŠ• แˆˆแˆ›แŒ แŠ“แ‰€แ‰… แˆˆแ‹ˆแŒฃแ‹ แ‰ตแŠญแŠญแˆˆแŠ› แ‹ˆแŒช แŠฅแŠ“ แŠ แˆตแ‰€แ‹ตแˆž แ‹จแ‰ฐแ‹ˆแˆฐแА แŠญแแ‹ซ แ‹ˆแ‹ญแˆ แ‹จแ‰ตแˆญแ แˆ…แ‹ณแŒ แ‹ญแŠจแˆแˆ‹แˆแข

แ‹ญแˆ… แ‹“แ‹ญแАแ‰ฑ แ‹แˆ แ‰ แ‰ฐแˆˆแˆแ‹ถ แ‹จแˆฅแˆซแ‹ แ‹ˆแˆฐแŠ• แŠฅแˆญแŒแŒ แŠ› แ‰ แˆ›แ‹ญแˆ†แŠ•แ‰ แ‰ต แŒŠแ‹œ แ‹ˆแ‹ญแˆ แ‰ แˆ›แ‹ฐแŒ แˆ‹แ‹ญ แ‰ แˆšแˆ†แŠ•แ‰ แ‰ต แŒŠแ‹œ แŒฅแ‰…แˆ แˆ‹แ‹ญ แ‹ญแ‹แˆ‹แˆ แŠฅแŠ“ แ‹จแ‹ˆแŒช แˆ˜แŒจแŠ“แАแ‰… แŠ แ‹ฐแŒ‹แŠ• แ‹ˆแ‹ฐ แ‰ฃแˆˆแ‰คแ‰ฑ แ‹ญแˆˆแ‹แŒฃแˆ.

๐Ÿšง4. Cost Plus Percentage of Cost Contract

๐Ÿ’ซแ‹จแ‹ˆแŒช แŠฎแŠ•แ‰ตแˆซแ‰ต แˆ˜แ‰ถแŠ› แ‰ แ‹ˆแŒช แŠฅแŠ“ แ‹จแ‹ˆแŒช แ‹แˆ แˆ˜แ‰ถแŠ› แฃ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ•แˆฎแŒ€แŠญแ‰ฑแŠ• แˆˆแˆ›แŒ แŠ“แ‰€แ‰… แˆˆแ‹ˆแŒฃแ‹ แ‰ตแŠญแŠญแˆˆแŠ› แ‹ˆแŒช แŠฅแŠ“ แŠจแŒ แ‰…แˆ‹แˆ‹ แ‹ˆแŒชแ‹Žแ‰ฝ แˆ˜แ‰ถแŠ› แŠฅแŠ•แ‹ฐ แ‰ตแˆญแ แˆ…แ‹ณแŒ แ‹ญแŠจแˆแˆ‹แˆแข

แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‰ตแˆญแ‹แ‰ธแ‹แŠ• แˆˆแˆ˜แŒจแˆ˜แˆญ แ‹ˆแŒชแ‹Žแ‰ฝแŠ• แˆˆแˆ˜แŒจแˆ˜แˆญ แˆ›แ‰ แˆจแ‰ณแ‰ป แˆŠแŠ–แˆจแ‹ แˆตแˆˆแˆšแ‰ฝแˆ แ‹ญแˆ… แ‹“แ‹ญแАแ‰ฑ แ‹แˆ แ‹จแŒฅแ‰…แˆ แŒแŒญแ‰ต แ‹จแˆ˜แแŒ แˆญ แŠ แ‰…แˆ แŠ แˆˆแ‹แข

๐Ÿšง5. Item Rate or Schedule of Rates Contract

๐Ÿ’ซแ‹จแŠ•แŒฅแˆ แ‰ฐแˆ˜แŠ• แ‹ˆแ‹ญแˆ แ‹จแ‹‹แŒ‹ แˆ˜แˆญแˆƒ แŒแ‰ฅแˆญ แŠฎแŠ•แ‰ตแˆซแ‰ต แ‰ แŠ•แŒฅแˆ แ‰ฐแˆ˜แŠ• แ‹ˆแ‹ญแˆ แ‹จแ‹‹แŒ‹ แˆ˜แˆญแˆƒ แŒแ‰ฅแˆญ แ‹แˆ แ‹แˆตแŒฅ แฃ แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แ‹จแˆตแˆซ แŠฅแ‰ƒแ‹Žแ‰ฝ แ‹‹แŒ‹ แ‰ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‰ แ‰€แˆจแ‰ แ‹ แ‹จแŒŠแ‹œ แˆฐแˆŒแ‹ณ แ‹แˆตแŒฅ แŠ แˆตแ‰€แ‹ตแˆž แ‹จแ‰ฐแŒˆแˆˆแŒน แŠ“แ‰ธแ‹แข

แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹จแˆšแŠจแˆแˆˆแ‹ แ‰ แŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แ‹จแ‰ฐแŒ แŠ“แ‰€แ‰€แ‹ แ‹จแˆฅแˆซ แ‹•แ‰ƒ แˆ˜แŒ แŠ• แ‰ แˆšแˆ˜แˆˆแŠจแ‰ณแ‰ธแ‹ แ‰ฐแˆ˜แŠ–แ‰ฝ แ‰ฐแ‰ฃแ‹แ‰ถ แАแ‹แข

แ‹ญแˆ… แ‹“แ‹ญแАแ‰ฑ แ‹แˆ แˆˆแ‰ฐแˆˆแ‹ซแ‹ฉ แ‹จแ•แˆฎแŒ€แŠญแ‰ฑ แŠ แŠซแˆ‹แ‰ต แ‹จแ‹‹แŒ‹ แŠ แˆฐแŒฃแŒฅ แˆ‹แ‹ญ แŒแˆแŒฝแАแ‰ต แ‹ญแˆฐแŒฃแˆ::

๐Ÿšง6.Labour Contract

๐Ÿ’ซแ‹จแˆ แˆซแ‰ฐแŠ› แ‹แˆ - แ‰ แˆ แˆซแ‰ฐแŠ› แ‹แˆ แ‹แˆตแŒฅ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹จแˆ แˆซแ‰ฐแŠ› แŠ แŒˆแˆแŒแˆŽแ‰ถแ‰ฝแŠ• แ‰ฅแ‰ป แ‹ญแˆฐแŒฃแˆ แŠฅแŠ“ แˆˆแ•แˆฎแŒ€แŠญแ‰ฑ แ‹จแˆšแ‹ซแˆตแˆแˆแŒ‰ แ‰แˆณแ‰แˆถแ‰ฝ แŠฅแŠ“ แˆ˜แˆณแˆชแ‹ซแ‹Žแ‰ฝ แ‰ แ‰ฃแˆˆแ‰คแ‰ฑ แ‹ญแˆฐแŒฃแˆ‰::

แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฉ แ‹จแˆšแŠจแˆแˆˆแ‹ แ‰ แ‰ฐแˆตแˆ›แˆ™แ‰ต แ‹จแˆฐแ‹“แ‰ต แ‰ฐแˆ˜แŠ–แ‰ฝ แ‹ˆแ‹ญแˆ แˆˆแˆšแˆฐแŒ แ‹ แ‹จแˆ แˆซแ‰ฐแŠ› แŠ แŒˆแˆแŒแˆŽแ‰ต แ‹ฐแˆžแ‹ แАแ‹แข

๐Ÿšง7.Hybrid Contract

๐Ÿ’ซแ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แ‹จแŠฎแŠ•แ‰ตแˆซแ‰ต แ‹“แ‹ญแАแ‰ถแ‰ฝแŠ• แŠ แŠซแˆ‹แ‰ตแŠ• แ‰ แˆ›แŒฃแˆ˜แˆญ แ‹จแ•แˆฎแŒ€แŠญแ‰ฑแŠ• แˆแ‹ฉ แแˆ‹แŒŽแ‰ต แˆˆแˆ›แˆŸแˆ‹แ‰ต แˆˆแˆแˆณแˆŒ แ‹จแˆแˆˆแ‰ฑแ‰ต แ‹จแ‰ฐแˆˆแ‹ซแ‹ฉ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฎแ‰ฝ แ‹จแŠ แŠ•แ‹ต แŒŠแ‹œ แ‹ตแˆแˆญ แ‹แˆ แŠฅแŠ“ แ‹จแ‹ˆแŒช แŠฅแŠ“ แ‹จแ‰‹แˆš แŠญแแ‹ซ แ‹แˆแŠ• แˆŠแ‹ซแŠซแ‰ตแ‰ต แ‹ญแ‰ฝแˆ‹แˆแข

แ‹ญแˆ… แ‹“แ‹ญแАแ‰ฑ แ‹แˆ แ‰ แ‹‹แŒ‹ แŠฅแŠ“ แ‰ แŠ แ‹ฐแŒ‹ แˆแ‹ฐแ‰ฃ แˆ‹แ‹ญ แ‰ฐแˆˆแ‹‹แ‹‹แŒญแАแ‰ตแŠ• แ‹ญแˆแ‰…แ‹ณแˆแข

๐Ÿšง8. Special Contract

๐Ÿ’ซแˆแ‹ฉ แ‹แˆ - แˆแ‹ฉ แ‹แˆ แˆˆแŠ แŠ•แ‹ต แ‹จแ‰ฐแ‹ˆแˆฐแА แ•แˆฎแŒ€แŠญแ‰ต แˆแ‹ฉ แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝ แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แ‹แˆ แАแ‹แข

แˆแ‹ฉ แŠฎแŠ•แ‰ตแˆซแ‰ถแ‰ฝ แ‰ แˆ˜แ‹ฐแ‰ แŠ› แ‹จแŠฎแŠ•แ‰ตแˆซแ‰ต แ‰…แŒพแ‰ฝ แ‹แˆตแŒฅ แ‹จแˆ›แ‹ญแŒˆแŠ™ แ‹จแ‰ฐแ‹ˆแˆฐแŠ‘ แŠ แŠ•แ‰€แŒพแ‰ฝแŠ• แฃ แ‹แˆŽแ‰ฝแŠ• แŠฅแŠ“ แˆแŠ”แ‰ณแ‹Žแ‰ฝแŠ• แˆŠแ‹ซแŠซแ‰ตแ‰ฑ แ‹ญแ‰ฝแˆ‹แˆ‰แข

แ‹ญแˆ… แ‹“แ‹ญแАแ‰ฑ แ‹แˆ แ‹จแ‰ฐแ‹ˆแˆฐแŠ‘ แ‹จแ•แˆฎแŒ€แŠญแ‰ต แแˆ‹แŒŽแ‰ถแ‰ฝแŠ• แŠฅแŠ“ แ‰ณแˆณแ‰ขแ‹Žแ‰ฝแŠ• แˆˆแˆ›แˆตแ‰ฐแŠ“แŒˆแ‹ต แ‹ซแˆตแ‰ฝแˆ‹แˆแข

โ˜„แˆตแˆˆ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‹แˆ แ‹ญแ‰ แˆแŒฅ แˆˆแˆ˜แˆจแ‹ณแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
โค6๐Ÿฅฐ3
๐Ÿ›แˆ›แŠ•แŠ›แ‹แˆ แ‹จแˆแŠ“แˆตแ‰ฐแ‹ณแ‹ตแˆจแ‹ แ‹จแˆฒแ‰ชแˆ แˆตแˆซ แ‹ˆแ‹ญแˆ แŒแŠ•แ‰ฃแ‰ณ แˆณแ‹ญแ‰ต แˆ‹แ‹ญ แ‰ฅแ‰ป แˆแˆแŠจแ‰ณ แ‰ แˆ›แ‹ตแˆจแŒ แ‹จแŠ แŠซแˆ‹แ‹Š (PHYSICAL) แŠฅแŠ“ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ (FINANCIAL) แ‹จแˆฅแˆซ แ‹ฐแˆจแŒƒ (Percentage) แŠฅแŠ•แ‹ดแ‰ต แ‰ แ‰ตแŠญแŠญแˆ แ‹จแ‹จแˆตแˆซแ‹ แˆ˜แŒ แŠ• แ‰ แแˆญแˆฐแŠ•แ‰ต แ‰ แˆแ‰  แˆ™แˆ‰แАแ‰ต แˆ˜แŠ“แŒˆแˆญ แŠฅแŠ•แ‰ฝแˆ‹แˆˆแŠ•?

๐Ÿ”ท PHYSICAL COMPOSITION แŠฅแŠ“ FINANCIAL COMPOSITION แ‰ฐแˆ˜แˆณแˆณแ‹ญ แАแŒˆแˆฎแ‰ฝ แŠ แ‹ญแ‹ฐแˆ‰แˆแข
๐Ÿ”น Physical Weight โ†’ แ‰ แŒฃแ‰ขแ‹ซแ‹ แˆ‹แ‹ญ แ‰ แŠ แŠซแˆ แ‹จแ‰ฐแŠจแŠ“แ‹ˆแАแ‹แŠ• แ‹จแˆฅแˆซ แˆ˜แŒ แŠ• แ‹ญแ‹ˆแŠญแˆ‹แˆแข
๐Ÿ”น Financial Weight โ†’ แ‹จแ‰ฐแŠจแŠ“แ‹ˆแАแ‹ แˆฅแˆซ แŠจแŒ แ‰…แˆ‹แˆ‹แ‹ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‹ˆแŒช แ‹แˆตแŒฅ แ‹จแˆšแ‹ˆแŠญแˆˆแ‹แŠ• แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แ‹‹แŒ‹ แ‹ญแ‹ˆแŠญแˆ‹แˆแข
๐Ÿ‘‰ แŠ แŠ•แ‹ต แˆฅแˆซ แ‰ แŠ แŠซแˆ แ‰ตแˆแ‰… แˆŠแˆ†แŠ• แ‰ขแ‰ฝแˆแˆ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แŠญแ‰ฅแ‹ฐแ‰ฑ แ‹แ‰…แ‰ฐแŠ› แˆŠแˆ†แŠ• แ‹ญแ‰ฝแˆ‹แˆแข
๐Ÿ‘‰ แ‰ แ‰ฐแ‰ƒแˆซแŠ’แ‹ แ‰ แŠ แŠซแˆ แ‰ตแŠ•แˆฝ แ‹จแˆšแ‰ณแ‹ญ แˆฅแˆซ แŠจแแ‰ฐแŠ› แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แŠญแ‰ฅแ‹ฐแ‰ต แˆŠแŠ–แˆจแ‹ แ‹ญแ‰ฝแˆ‹แˆแข

1๏ธโƒฃ แ‹‹แŠ“ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‹จแˆฅแˆซ แ‰…แ‹ฐแˆ แ‰ฐแŠจแ‰ฐแˆ
๐Ÿ“ SITE PREPARATION
โฌ‡๏ธ
๐Ÿ“ EARTHWORK
โฌ‡๏ธ
๐Ÿ“ FOUNDATION
โฌ‡๏ธ
๐Ÿ“ STRUCTURAL WORKS
โฌ‡๏ธ
๐Ÿ“ MASONRY
โฌ‡๏ธ
๐Ÿ“ PLASTERING
โฌ‡๏ธ
๐Ÿ“ FINISHING
โฌ‡๏ธ
๐Ÿ“ MEP SERVICES
โฌ‡๏ธ
๐Ÿ“ EXTERNAL WORKS

๐Ÿ‘‰ แ‹ญแˆ… แ‹จแŒแŠ•แ‰ฃแ‰ณแ‹แŠ• Physical Construction Sequence แ‹จแˆšแ‹ซแˆณแ‹ญ แ‹‹แŠ“ แˆ‚แ‹ฐแ‰ต แАแ‹แข

2๏ธโƒฃ แŠจแแ‰ฐแŠ› แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แŠญแ‰ฅแ‹ฐแ‰ต แ‹ซแˆ‹แ‰ธแ‹ แ‹‹แŠ“ แ‹จแˆฅแˆซ แŠญแแˆŽแ‰ฝ
โ‘  FOUNDATION + STRUCTURAL WORKS
โ‰ˆ 30โ€“40%
๐Ÿ”ธ Foundation & Footing
๐Ÿ”ธ Column
๐Ÿ”ธ Beam
๐Ÿ”ธ Slab
๐Ÿ”ธ Staircase
๐Ÿ”ธ Reinforcement Steel
๐Ÿ”ธ Concrete
๐Ÿ”ธ Formwork
๐Ÿ‘‰ แ‰ แ‰ฅแ‹™ RC แˆ…แŠ•แƒแ‹Žแ‰ฝ แ‹แˆตแŒฅ แ‹ญแˆ… แŠจแแ‰ฐแŠ› แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แŠฅแŠ“ แ‹จแ‰ดแŠญแŠ’แŠญ แŠญแ‰ฅแ‹ฐแ‰ต แŠซแˆ‹แ‰ธแ‹ แ‹จแˆฅแˆซ แŠญแแˆŽแ‰ฝ แ‹‹แАแŠ›แ‹ แАแ‹แข
โ‘ก MASONRY + PLASTERING
โ‰ˆ 15โ€“20%
๐Ÿ”ธ Blockwork / Brickwork
๐Ÿ”ธ Internal Partition
๐Ÿ”ธ External Wall
๐Ÿ”ธ Internal Plaster
๐Ÿ”ธ External Plaster
๐Ÿ”ธ Rendering
๐Ÿ‘‰ แ‹จแ‹แˆตแŒฅแŠ“ แ‹จแ‹แŒญ แŒแ‹ตแŒแ‹ณ แˆฅแˆซแ‹Žแ‰ฝ แŠฅแŠ“ แ•แˆ‹แˆตแ‰ฐแˆญ แ‹จแˆ…แŠ•แƒแ‹แŠ• แŠ แŒ แ‰ƒแˆ‹แ‹ญ แŒˆแŒฝแ‰ณ แŠฅแŠ“ แŒฅแˆซแ‰ต แ‰ แ‰€แŒฅแ‰ณ แ‹ญแАแŠซแˆ‰แข
โ‘ข FINISHING WORKS
โ‰ˆ 15โ€“25%
๐Ÿ”ธ Floor Finishes
๐Ÿ”ธ Wall Finishes
๐Ÿ”ธ Ceramic Tiles
๐Ÿ”ธ Granite / Stone
๐Ÿ”ธ Ceiling Works
๐Ÿ”ธ Painting
๐Ÿ”ธ Decorative Works
๐Ÿ”ฅ Finishing Works แ‰ แŒแŠ•แ‰ฃแ‰ณแ‹ แˆ˜แŒจแˆจแˆป แ‰ขแŠจแŠ“แ‹ˆแŠ‘แˆ แ‰ แŒ แ‰…แˆ‹แˆ‹ แ‹จแ•แˆฎแŒ€แŠญแ‰ฑ แ‹ˆแŒช แˆ‹แ‹ญ แ‰ตแˆแ‰… แ‰ฐแ…แ‹•แŠ– แˆŠแŠ–แˆซแ‰ธแ‹ แ‹ญแ‰ฝแˆ‹แˆแข
โ‘ฃ DOORS + WINDOWS
โ‰ˆ 5โ€“8%
๐Ÿ”ธ Doors
๐Ÿ”ธ Windows
๐Ÿ”ธ Aluminum Works
๐Ÿ”ธ Glazing
๐Ÿ”ธ Ironmongery
โ‘ค MEP SERVICES
โ‰ˆ 10โ€“15%
MEP = Mechanical + Electrical + Plumbing
๐Ÿ”ธ Electrical Installation
๐Ÿ”ธ Lighting System
๐Ÿ”ธ Power Outlets
๐Ÿ”ธ Water Supply
๐Ÿ”ธ Sanitary Installation
๐Ÿ”ธ Drainage
๐Ÿ”ธ Plumbing Fixtures
๐Ÿ”ธ Mechanical Systems
แ‰ แ‹˜แˆ˜แŠ“แ‹Š แŠฅแŠ“ แ‹แˆตแ‰ฅแˆตแ‰ฅ แˆ…แŠ•แƒแ‹Žแ‰ฝ MEP แ‹จแ•แˆฎแŒ€แŠญแ‰ฑแŠ• แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แŠญแ‰ฅแ‹ฐแ‰ต แ‰ แŠจแแ‰ฐแŠ› แ‹ฐแˆจแŒƒ แˆŠแŒจแˆแˆญ แ‹ญแ‰ฝแˆ‹แˆแข
โ‘ฅ ROOFING + WATERPROOFING
โ‰ˆ 4โ€“7%
๐Ÿ”ธ Roof Construction
๐Ÿ”ธ Roof Covering
๐Ÿ”ธ Waterproofing
๐Ÿ”ธ Roof Drainage
๐Ÿ”ธ Damp-proofing
โ‘ฆ EXTERNAL WORKS
โ‰ˆ 4โ€“8%
๐Ÿ”ธ External Pavement
๐Ÿ”ธ Walkways
๐Ÿ”ธ Compound Works
๐Ÿ”ธ Drainage
๐Ÿ”ธ Fence
๐Ÿ”ธ Landscaping
๐Ÿ”ธ External Utilities
โ‘ง SITE PREPARATION + EARTHWORK
โ‰ˆ 3โ€“5%
๐Ÿ”ธ Site Clearing
๐Ÿ”ธ Excavation
๐Ÿ”ธ Filling
๐Ÿ”ธ Backfilling
๐Ÿ”ธ Compaction
๐Ÿ”ธ Disposal of Surplus Soil

3๏ธโƒฃ แ‰ แ‰ฐแˆˆแ‹ญ แ‹จSite Civil Engineer แ‰ตแŠฉแˆจแ‰ต แ‹จแˆšแˆน แˆฅแˆซแ‹Žแ‰ฝ
โญ๏ธ Foundation & Structural Works
โญ๏ธ Reinforcement Steel
โญ๏ธ Concrete Works
โญ๏ธ Formwork
โญ๏ธ Masonry & Plastering
โญ๏ธ Floor & Wall Finishes
โญ๏ธ Doors & Windows
โญ๏ธ Electrical & Plumbing Coordination
โญ๏ธ Waterproofing & Roofing
โญ๏ธ External Works

๐Ÿ‘‰ แŠฅแАแ‹šแˆ… แ‹จแˆฅแˆซ แŠญแแˆŽแ‰ฝ แ‰ แ‰€แŒฅแ‰ณแฆ
โžก๏ธ Physical Progress
โžก๏ธ Financial Progress
โžก๏ธ Quality
โžก๏ธ Cost Control
โžก๏ธ Time Control
แˆ‹แ‹ญ แ‰ฐแ…แ‹•แŠ– แ‹ซแˆณแ‹ตแˆซแˆ‰แข

4๏ธโƒฃ แ‹จFINANCIAL WEIGHT แˆ˜แˆ แˆจแ‰ณแ‹Š แˆ˜แˆญแˆ…
๐Ÿ”น Measured Quantity ร— BOQ Rate = Work Value
๐Ÿ”น Work Value รท Total Contract Value = Financial Weight

๐Ÿ‘‰ แˆตแˆˆแ‹šแˆ… แ‹จFinancial Progress แˆ˜แ‹ˆแˆฐแŠ›แ‹ แ‰ แ‹“แ‹ญแŠ• แ‹จแˆšแ‰ณแ‹จแ‹ แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆ˜แŒ แŠ• แ‰ฅแ‰ป แˆณแ‹ญแˆ†แŠ•แฃ BOQ + Approved Rates + Measured Quantities + Contract Value แАแ‹แข

5๏ธโƒฃ แŠ แˆตแˆแˆ‹แŒŠ แ‹จแˆ™แ‹ซ แˆ›แˆตแ‰ณแ‹ˆแˆป
โ—๏ธ แŠจแˆ‹แ‹ญ แ‹จแ‰ฐแŒ แ‰€แˆฑแ‰ต แˆ˜แ‰ถแŠ›แ‹Žแ‰ฝ Indicative / Planning Benchmarks แŠ“แ‰ธแ‹แข
โ—๏ธ แŠฅแАแ‹šแˆ… แ‰ EBCS แ‹ˆแ‹ญแˆ แ‰ แˆŒแˆ‹ แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‹ฐแˆจแŒƒ แ‹จแ‰ฐแ‹ฐแАแŒˆแŒ‰ แ‰‹แˆš แˆ˜แ‰ถแŠ›แ‹Žแ‰ฝ แŠ แ‹ญแ‹ฐแˆ‰แˆแข
แ‰ตแŠญแŠญแˆˆแŠ›แ‹ แ‹จแ•แˆฎแŒ€แŠญแ‰ต แ‹จPhysical แŠฅแŠ“ Financial Weight แ‹จแˆšแ‹ˆแˆฐแАแ‹ แ‰ แฆ
๐Ÿ”ธ BOQ
๐Ÿ”ธ Drawings
๐Ÿ”ธ Specifications
๐Ÿ”ธ Contract Rates
๐Ÿ”ธ Measured Quantities
๐Ÿ”ธ Approved Progress Measurement System
แˆ˜แˆ แˆจแ‰ต แАแ‹แข

6๏ธโƒฃ แŠ แŠ•แ‹ต แ‰ฅแ‰ SITE CIVIL ENGINEER แˆแŠ• แˆ˜แ‰†แŒฃแŒ แˆญ แŠ แˆˆแ‰ แ‰ต?
แŠ แŠ•แ‹ต แ‰ฃแˆˆแˆ™แ‹ซ Site Civil Engineer แŒแŠ•แ‰ฃแ‰ณแ‹ แˆแŠ• แ‹ซแˆ…แˆ แŠฅแŠ•แ‹ฐแ‰ฐแˆฐแˆซ แ‰ฅแ‰ป แŠ แ‹ญแˆ˜แˆˆแŠจแ‰ตแˆแข
แŠจแ‹šแˆ… แ‰ แˆ‹แ‹ญ แ‹จแˆšแŠจแ‰ณแ‰ฐแˆˆแ‹แฆ
๐Ÿ”น PHYSICAL PROGRESS โ€” แˆแŠ• แ‹ซแˆ…แˆ แ‰ฐแˆฐแˆญแ‰ทแˆ?
๐Ÿ”น QUANTITY โ€” แˆแŠ• แ‹ซแˆ…แˆ แˆ˜แŒ แŠ• แ‰ฐแˆฐแˆญแ‰ทแˆ?
๐Ÿ”น FINANCIAL VALUE โ€” แ‹จแ‰ฐแˆฐแˆซแ‹ แˆฅแˆซ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แ‹‹แŒ‹ แˆตแŠ•แ‰ต แАแ‹?
๐Ÿ”น QUALITY โ€” แ‰ แ‰ฐแˆแˆˆแŒˆแ‹ แ‹ฐแˆจแŒƒ แ‰ฐแˆฐแˆญแ‰ทแˆ?
๐Ÿ”น TIME โ€” แ‰ แ‰ฐแ‹ซแ‹˜แ‹ แŒŠแ‹œ แŠฅแ‹จแ‰ฐแˆฐแˆซ แАแ‹?
๐Ÿ”น SAFETY โ€” แ‰ แ‹ฐแˆ…แŠ•แАแ‰ต แŠฅแ‹จแ‰ฐแŠจแŠ“แ‹ˆแА แАแ‹?

๐Ÿ‘‰ แ‹‹แŠ“ แ‹จแˆ™แ‹ซ แˆ˜แˆญแˆ…
REAL PROJECT CONTROL
= PHYSICAL PROGRESS + QUANTITY + FINANCIAL VALUE + QUALITY
๐Ÿ‘‰ แ‹จแŠฅแ‹แАแ‰ฐแŠ› แ‹จแ•แˆฎแŒ€แŠญแ‰ต แ‰แŒฅแŒฅแˆญ แˆ›แˆˆแ‰ต แŠ แŠซแˆ‹แ‹Š แŠฅแ‹ตแŒˆแ‰ตแŠ•แฃ แ‹จแˆฅแˆซ แˆ˜แŒ แŠ•แŠ•แฃ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แ‹‹แŒ‹แŠ• แŠฅแŠ“ แŒฅแˆซแ‰ตแŠ• แ‰ แŠ แŠ•แ‹ต แˆ‹แ‹ญ แˆ˜แ‰†แŒฃแŒ แˆญ แАแ‹แข

แ‰ แŠ แŒญแˆฉ
PHYSICAL WEIGHT
โžก๏ธ แ‰ แŠฅแ‹แАแ‰ต แ‰ แŒฃแ‰ขแ‹ซแ‹ แˆ‹แ‹ญ แ‹จแ‰ฐแˆฐแˆซแ‹ แˆฅแˆซ แˆ˜แŒ แŠ•แข
FINANCIAL WEIGHT
โžก๏ธ แ‹จแ‰ฐแˆฐแˆซแ‹ แˆฅแˆซ แ‰ แŒ แ‰…แˆ‹แˆ‹ แ‹จแ•แˆฎแŒ€แŠญแ‰ฑ แ‹ˆแŒช แ‹แˆตแŒฅ แ‹จแˆšแ‹ˆแŠญแˆˆแ‹ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แ‹‹แŒ‹แข
๐Ÿ‘‰ PROFESSIONAL SITE ENGINEER
โžก๏ธ แŒแŠ•แ‰ฃแ‰ณแŠ• แ‰ แŠ แŠซแˆ แ‰ฅแ‰ป แŠ แ‹ญแˆ˜แˆˆแŠจแ‰ตแˆแค Technical + Physical + Quantity + Financial + Quality + Time แ‰ แŠ แŠ•แ‹ต แˆ‹แ‹ญ แ‹ญแ‰†แŒฃแŒ แˆซแˆแข

๐Ÿ‘‰ BUILD IT RIGHT.
MEASURE IT RIGHT.
VALUE IT RIGHT.
CONTROL IT RIGHT.
โ€” MEKAMU ENGINEERING โ€”

@etconp
โค9๐Ÿฅฐ2
๐Ÿ‘‰แ‹จแˆตแˆซ แ‰…แŒฅแˆญ แˆ›แˆตแ‰ณแ‹ˆแ‰‚แ‹ซ

(CCCC) แ‰ปแ‹ญแŠ“ แŠฎแˆ™แŠ’แŠฌแˆฝแŠ• แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แŠฎแˆแ’แŠ’

โœ… แ‰ฆแ‰ณ 1แก แŠคแŠญแˆตแŠซแ‰ซแ‰ฐแˆญ แŠฆแแˆฌแ‰ฐแˆญ

โ€ข แ‹จแˆšแˆแˆˆแŒ แ‰แŒฅแˆญแก 500

โœ… แ‰ฆแ‰ณ 2แก แˆฎแˆˆแˆญ แŠฆแแˆฌแ‰ฐแˆญ

โ€ข แ‹จแˆšแˆแˆˆแŒ แ‰แŒฅแˆญแก 100

โœ… แ‰ฆแ‰ณ 3แก แˆŽแ‹ฐแˆญ แŠฆแแˆฌแ‰ฐแˆญ

โ€ข แ‹จแˆšแˆแˆˆแŒ แ‰แŒฅแˆญแก 100

โœ… แ‰ฆแ‰ณ 4แก แŒแˆฌแ‹ฐแˆญ แŠฆแแˆฌแ‰ฐแˆญ

แ‹จแˆšแˆแˆˆแŒ แ‰แŒฅแˆญแก 100

โœ… แ‰ฆแ‰ณ 5แก แ‹ถแ‹˜แˆญ แŠฆแแˆฌแ‰ฐแˆญ

โ€ข แ‹จแˆšแˆแˆˆแŒ แ‰แŒฅแˆญแก 100

โœ… แ‰ฆแ‰ณ 6แก แ‹จ แŒˆแˆแ‰ฃแŒญ แŠ แˆฝแŠจแˆญแŠจแˆช

โ€ข แ‹จแˆšแˆแˆˆแŒ แ‰แŒฅแˆญแก 2000

โœ… แ‰ฆแ‰ณ 7แก แ‹แˆƒ แ‰ฆแ‰ฒ  แŠ แˆฝแŠจแˆญแŠจแˆช

โ€ข แ‹จแˆšแˆแˆˆแŒ แ‰แŒฅแˆญแก 50

โ–ช๏ธŽแ‹จแˆฅแˆซ แ‰ฆแ‰ณแก
แ‰ขแˆพแแ‰ฑ แŠ แ‹ฒแˆต แŠ แ‹จแˆญ แˆ›แˆจแŠแ‹ซ แ•แˆฎแŒ€แŠญแ‰ต

โ™ฆแ‹จแŒŠแ‹œ แŒˆแ‹ฐแ‰ฅแก แˆฐแ•แ‰ฐแˆแ‰ แˆญ 18, 2026

แŠ แ‹ตแˆซแˆปแก - CCCC แ‰ขแˆพแแ‰ฑ แŠ แˆˆแˆ แŠ แ‰€แ แŠ แ‹ฒแˆต แŒแŠ•แ‰ฃแ‰ณ แ•แˆฎแŒ€แŠญแ‰ต แ‹ˆแ‹ญแˆ แ‰ขแˆพแแ‰ฑ
แŠ แˆฝแŠ“แ‹Š แŠ แ‹จแˆญ แˆ›แˆจแŠแ‹ซ

แ‰ขแˆพแแ‰ฑ แ‹ˆแ‹ญแˆ แ‰ แˆปแŠซแ‰บ แˆ†แ‰ดแˆ แ‹ˆแ‹ญแˆ แ‹ฉแŠ’แ‹ฎแŠ• แ‰ขแˆแ‹ฒแŠ•แŒ แŠ แŒ แŒˆแ‰ฅ แ‹จแˆ˜แŒ แˆˆแ‹ซ แˆ˜แˆจแŒƒ แˆšแŠ’แˆตแ‰ดแˆญ แŒŽแŠ•
แŠ แ‹ตแˆซแˆป

0942441888
0913428635
0972260078

@etconp
โค8๐Ÿ‘2
๐Ÿ‘‰แ‰ แ‰ แˆฎแ‰ฝแŠ“ แˆ˜แˆตแŠฎแ‰ถแ‰ฝ แ‰ แˆ‹แ‹ญ แ‹จแˆšแˆฐแˆซแ‹ แˆŠแŠ•แ‰ฐแˆ แ‰ขแˆ (Lintel Beam) แŒฅแ‰…แˆ๐Ÿ—๏ธ

๐Ÿšฅโ€‹แ‰ แˆแˆตแˆ‰ แˆ‹แ‹ญ แŠฅแŠ•แ‹ฐแˆšแ‰ณแ‹จแ‹ แ‰ แ‰ แˆฎแ‰ฝแฃ แ‰ แŠฎแˆชแ‹ฐแˆฎแ‰ฝ แ‹ˆแ‹ญแˆ แ‰ แˆ˜แˆตแŠฎแ‰ถแ‰ฝ แŠญแแ‰ต แ‰ฆแ‰ณแ‹Žแ‰ฝ แ‰ แˆ‹แ‹ญ แ‹จแˆšแˆฐแˆซแ‹ แŠ แŒแ‹ตแˆ แ‹จแŠฎแŠ•แŠญแˆชแ‰ต แˆ˜แ‹‹แ‰…แˆญ แˆŠแŠ•แ‰ฐแˆ แ‰ขแˆ (Lintel Beam) แ‹ญแ‰ฃแˆ‹แˆแข

๐ŸŒŸแ‹จแ‹šแˆ… แ‰ขแˆ แ‹‹แŠ“ แ‹‹แŠ“ แ‹จแˆแˆ…แŠ•แ‹ตแˆตแŠ“ แŒฅแ‰…แˆžแ‰ฝแฆ

โ€‹1๏ธโƒฃ แ‹จแŒแ‹ตแŒแ‹ณ แŠญแ‰ฅแ‹ฐแ‰ตแŠ• แˆ›แˆตแ‰ฐแˆ‹แˆˆแแฆ แŠจแ‰ แˆฉ แ‰ แˆ‹แ‹ญ แ‹จแˆšแŒˆแАแ‰ฃแ‹แŠ• แ‹จแŒกแ‰ฅ แŒแ‹ตแŒแ‹ณ แŠญแ‰ฅแ‹ฐแ‰ต แ‰ฐแˆธแŠญแˆž แ‹ˆแ‹ฐ แŒŽแŠ• แŒแ‹ตแŒแ‹ณแ‹Žแ‰ฝ แ‹ซแˆตแ‰ฐแˆ‹แˆแ‹แˆแข

2๏ธโƒฃ แ‹จแ‰ แˆญ แแˆฌแˆžแ‰ฝแŠ• แˆ˜แŠจแˆ‹แŠจแˆแฆ แ‰ แˆ‹แ‹ญแŠ›แ‹ แŒแ‹ตแŒแ‹ณ แˆแŠญแŠ•แ‹ซแ‰ต แ‹จแˆšแˆ˜แŒฃแ‹ แŒซแŠ“ แ‹จแ‰ แˆญ แŠฅแŠ“ แ‹จแˆ˜แˆตแŠฎแ‰ต แแˆฌแˆžแ‰ฝแŠ• แŠฅแŠ•แ‹ณแ‹ซแŒ แ‹ แ‹ซแ‹ฐแˆญแŒ‹แˆแข

3๏ธโƒฃ แ‹จแŒแ‹ตแŒแ‹ณ แˆตแŠ•แŒฅแ‰…แŠ• แˆ˜แŠจแˆ‹แŠจแˆแฆ แ‰ แ‰ แˆฎแ‰ฝ แˆ›แ‹•แ‹˜แŠ“แ‰ต แŠ แŠซแ‰ฃแ‰ข แ‹จแˆšแˆแŒ แˆฉ แ‹จแ‹แˆ‹ แˆตแŠ•แŒฅแ‰†แ‰ฝแŠ• (Diagonal Cracks) แ‹ญแŠจแˆ‹แŠจแˆ‹แˆแข

โ€‹แ‹จแˆ…แŠ•แƒแ‹Ž แ‹ฐแˆ…แŠ•แАแ‰ต แŠฅแŠ“ แŒฅแˆซแ‰ต แ‰ แ‹จแ‹ฐแˆจแŒƒแ‹ แ‰ แˆšแŠจแŠ“แ‹ˆแŠ‘ แ‰ตแŠญแŠญแˆˆแŠ› แ‹จแˆแˆ…แŠ•แ‹ตแˆตแŠ“ แˆตแˆซแ‹Žแ‰ฝ แ‹ญแˆจแŒ‹แŒˆแŒฃแˆ๐Ÿค

โ€‹๐Ÿ’ก แ‰ฐแˆ˜แˆณแˆณแ‹ญ แ‹จแˆณแ‹ญแ‰ต แŠขแŠ•แŒ‚แАแˆชแŠ•แŒ แˆ˜แˆจแŒƒแ‹Žแ‰ฝแŠ• แˆˆแˆ›แŒแŠ˜แ‰ต แ‹จแŒแˆตแ‰กแŠญ แŒˆแƒแ‰ฝแŠ• Follow แ‹ซแ‹ตแˆญแŒ‰๐Ÿ‘‡

https://www.facebook.com/profile.php?id=61592085774934

@โ€‹etconp
โค5๐Ÿ”ฅ3๐Ÿ™2
๐Ÿ‘‰STEEL CALCULATION SHORTCUTS ๐Ÿ—๏ธ๐Ÿ”ฉ

๐ŸŒŸSave this useful Steel Calculation Shortcuts guide for quick estimation and reinforcement calculations on site.

๐Ÿ“Œ 1. Steel Weight Formula
Weight (kg) = Dยฒ / 162 ร— Length (m)
Where D = bar diameter in mm.

๐Ÿ“Œ 2. Quick Unit Weight Table
Common bar weights:
8 mm = 0.395 kg/m
10 mm = 0.617 kg/m
12 mm = 0.89 kg/m
16 mm = 1.58 kg/m
20 mm = 2.47 kg/m
25 mm = 3.86 kg/m
32 mm = 6.32 kg/m

๐Ÿ“Œ 3. Number of Bars
No. of Bars = (Width รท Spacing) + 1

๐Ÿ“Œ 4. Lap Length Shortcut (RCC)
Tension Lap โ‰ˆ 50D
Compression Lap โ‰ˆ 40D

๐Ÿ“Œ 5. Development Length
Ld โ‰ˆ 40D to 50D
Depending on steel grade and design code.

๐Ÿ“Œ 6. Approximate Steel Quantity
Slab: 0.8โ€“1% of concrete volume
Beam: 1โ€“2% of concrete volume
Column: 1โ€“3% of concrete volume

๐Ÿ“Œ 7. Bar Bending Allowance
45ยฐ Bend = 1D
90ยฐ Bend = 2D
180ยฐ Hook = 9D

๐Ÿ“Œ 8. Bundle Weight
Bundle Weight = Number of Bars ร— Length ร— Unit Weight

๐Ÿ’ก Remember: Dยฒ รท 162 is the fastest shortcut for calculating steel weight per metre.

@etconp
โค11๐Ÿ‘2
๐Ÿ“… What is Construction Management?

Construction management is the process of planning, coordinating and controlling a construction project from start to finish. It ensures project delivery on time, within budget and to required quality standards.

๐Ÿ— Construction Management?

โ€ข Helps deliver projects efficiently and professionally
โ€ข Balances time, cost, scope and quality
โ€ข Reduces risks and delays through proactive planning
โ€ข Coordinates work among contractors, suppliers and consultants

๐Ÿงฑ Key Functions
โ€ข Planning โ€“ Define work scope, schedule, and resources
โ€ข Scheduling โ€“ Set timelines, milestones, and activity sequences
โ€ข Cost Estimating โ€“ Predict total project cost and control budget
โ€ข Procurement โ€“ Select suppliers and secure materials/services
โ€ข Quality Management โ€“ Ensure standards are met during execution
โ€ข Risk Management โ€“ Identify and minimize project threats

๐Ÿงฐ Common Tools
โ€ข Bar Chart (Gantt Chart): Shows tasks vs. time visually
โ€ข Critical Path Method (CPM): Identifies time-sensitive activities
โ€ข Work Breakdown Structure (WBS): Breaks project into manageable parts
โ€ข S-Curve: Tracks progress and cumulative cost over time

๐Ÿ“Š Construction Phases
โ€ข Initiation: Client sets goals and budget
โ€ข Planning: Design, scheduling, estimating, resource planning
โ€ข Execution: Actual construction, supervision and monitoring
โ€ข Monitoring & Control: Compare actual vs planned performance
โ€ข Closure: Final delivery, handover and documentation

โš ๏ธ Common Challenges
โ€ข Time delays due to design changes or poor coordination
โ€ข Cost overrun from inflation, material shortage, or rework
โ€ข Communication gaps among stakeholders
โ€ข Inaccurate or unrealistic project planning

โ€‹๐ŸŒแˆˆแ‰ฐแŒจแˆ›แˆช แˆ˜แˆจแŒƒ แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‹˜แˆญแ แ‹œแŠ“แ‹Žแ‰ฝ แ‹จ YouTube แŒˆแƒแ‰ฝแŠ• แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‰ แˆ˜แŒแ‰ฃแ‰ต SubScribe แŠ แˆญแŒˆแ‹ แ‰คแ‰ฐแˆฐแ‰ฅ แ‹ญแˆแŠ‘๐Ÿ‘‡

https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
‎
‎@etconp
โค4๐Ÿฅฐ2๐Ÿ‘2๐Ÿ”ฅ1
๐Ÿ‘‰แ‰  Steel Structure แ‹จแ‰ฐแˆฐแˆซ Warehouse (แˆ˜แŒ‹แ‹˜แŠ• แˆ…แŠ•แƒ)
๐Ÿ“แˆ™แˆ‰ Design + Shop Drawing
๐Ÿ“Elevation แŒจแˆแˆฎ Detail Drawings
๐Ÿ’ป Editable .DWG Files
๐Ÿ‘ท แˆˆแˆ˜แˆแŠ•แ‹ฒแˆถแ‰ฝแฃแŠ แˆญแŠญแ‰ดแŠญแ‰ถแ‰ฝ แŠฅแŠ“ แŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฎแ‰ฝ แ‹จแˆšแˆ†แŠ• แˆแˆญแŒฅ แ‹แ‹ญแˆ แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a98fa511d0af_etconp
โค2๐Ÿฅฐ2
๐Ÿ‘‰แ‹จแˆ˜แˆฌแ‰ต แˆ˜แ‹ฐแˆญแˆ˜แˆต แŠ แ‹ฐแŒ‹แŠ• แ‰ แˆแˆ…แŠ•แ‹ตแˆตแŠ“ แŠฅแŠ•แ‹ดแ‰ต แˆ˜แŠจแˆ‹แŠจแˆ แ‹ญแ‰ปแˆ‹แˆ?

๐ŸŒŸแ‹จแˆ˜แˆฌแ‰ต แˆ˜แ‹ฐแˆญแˆ˜แˆต (Landslide) แ‰ แŠ แ‰ฅแ‹›แŠ›แ‹ แ‹จแˆ˜แˆฌแ‰ต แ‹แŠ•แ‰ฃแˆŒ แˆ˜แŒจแˆ˜แˆญแฃ แŠจแแ‰ฐแŠ› แ‹แŠ“แ‰ฅแฃ แ‹จแŠ แˆแˆญ แ‹แˆƒ แˆ˜แŒจแˆ˜แˆญแฃ แ‹จแ‹แˆƒ แแˆฐแ‰ต แŠ แˆˆแˆ˜แ‰†แŒฃแŒ แˆญแฃ แ‹จแˆ˜แŠ•แŒˆแ‹ต แ‰แ‹แˆฎแฃ แ‹จแŠ แˆแˆญ แˆ˜แ‰†แˆจแŒฅแŠ“ แ‹จแ‰ฐแˆแŒฅแˆฎ แ‹จแŠฅแ…แ‹‹แ‰ต แˆฝแ‹แŠ• แˆ˜แŒฅแ‹แ‰ต แ‹จแˆ˜แˆณแˆฐแˆ‰ แˆแŠ”แ‰ณแ‹Žแ‰ฝ แˆฒแŒฃแˆ˜แˆฉ แˆŠแŠจแˆฐแ‰ต แ‹ญแ‰ฝแˆ‹แˆแข

1๏ธโƒฃ แ‹จแŒ‚แŠฆแ‰ดแŠญแŠ’แŠซแˆ แŒฅแŠ“แ‰ต แˆ›แŠซแˆ„แ‹ต

แŠจแˆ›แŠ•แŠ›แ‹แˆ แ‹จแˆ˜แŠจแˆ‹แŠจแ‹ซ แˆฅแˆซ แ‰ แŠแ‰ต แ‹จแ‰ฆแ‰ณแ‹แŠ• แ‹จแŠ แˆแˆญแŠ“ แ‹จแ‹ตแŠ•แŒ‹แ‹ญ แˆแŠ”แ‰ณ แˆ˜แˆˆแ‹จแ‰ต แ‹ˆแˆณแŠ แАแ‹แข
๐Ÿ”น แ‹จแŠ แˆแˆญ แŠ แ‹ญแАแ‰ตแŠ“ แ‹จแˆ˜แˆธแŠจแˆ แ‰ฃแˆ…แˆช
๐Ÿ”น แ‹จแˆ˜แˆฌแ‰ต แ‹แŠ•แ‰ฃแˆŒ (Slope)
๐Ÿ”น แ‹จGroundwater แ‹ฐแˆจแŒƒ
๐Ÿ”น แ‹จShear Strength แˆ˜แˆˆแŠชแ‹ซแ‹Žแ‰ฝ
๐Ÿ”น แ‹จGeological discontinuities
๐Ÿ”น แ‹จแАแ‰ฃแˆญ แ‹จแˆ˜แˆฌแ‰ต แˆ˜แŠ•แ‰€แˆณแ‰€แˆต แˆแˆแŠญแ‰ถแ‰ฝ
แ‰ แˆ˜แˆˆแ‹จแ‰ต แ‹จSlope Stability Analysis แˆ˜แŠซแˆ„แ‹ต แŠ แˆˆแ‰ แ‰ตแข

2๏ธโƒฃ  แ‹จแ‹แˆƒ แแˆฐแ‰ตแŠ• แ‰ แ‰ตแŠญแŠญแˆ แˆ˜แ‰†แŒฃแŒ แˆญ
แ‰ แˆ˜แˆฌแ‰ต แˆ˜แ‹ฐแˆญแˆ˜แˆต แ‹แˆตแŒฅ แ‹แˆƒ แŠจแ‹‹แŠ“ แˆแŠญแŠ•แ‹ซแ‰ถแ‰ฝ แŠ แŠ•แ‹ฑ แАแ‹แข แ‹แˆƒ แ‹ˆแ‹ฐ แŠ แˆแˆญ แˆฒแŒˆแ‰ฃ แ‹จpore-water pressure แ‹ญแŒจแˆแˆซแˆแค แ‹ญแˆ…แˆ แ‹จแŠ แˆแˆญแŠ• shear strength แ‰ แˆ˜แ‰€แАแˆต slope stability แŠฅแŠ•แ‹ฒแ‹ˆแˆญแ‹ต แ‹ซแ‹ฐแˆญแŒ‹แˆแข
แˆตแˆˆแ‹šแˆ…แฆ
๐Ÿ”น Catch drain / interceptor drain
๐Ÿ”น Surface drainage channel
๐Ÿ”น Subsurface drainage
๐Ÿ”น French drain
๐Ÿ”น Toe drain
๐Ÿ”น Culvert แŠฅแŠ“ cross-drainage structures
แ‰ แ‰ฐแŒˆแ‰ขแ‹ แ‹ฒแ‹›แ‹ญแŠ• แˆ˜แŒˆแŠ•แ‰ฃแ‰ต แ‹ญแŒˆแ‰ฃแˆแข

3๏ธโƒฃ   แ‹จSlope แ‹แŠ•แ‰ฃแˆŒแŠ• แˆ˜แ‰€แАแˆต

แ‰ แŒฃแˆ แ‰แˆแ‰แˆ แ‹จแˆ†แА slope แ‹จแˆ˜แ‹ฐแˆญแˆ˜แˆต แˆตแŒ‹แ‰ตแŠ• แ‹ญแŒจแˆแˆซแˆแข
แˆตแˆˆแ‹šแˆ…แฆ
๐Ÿ”น Slope regrading
๐Ÿ”น Benching / terracing
๐Ÿ”น แ‹จแˆ‹แ‹ญแŠ›แ‹แŠ• แ‹จแŠ แˆแˆญ แŒญแАแ‰ต แˆ˜แ‰€แАแˆต
๐Ÿ”น แ‹จแ‰ณแ‰ฝแŠ›แ‹แŠ• แŠญแแˆ แ‰ แ‰ฐแŒˆแ‰ข แˆ˜แˆแŠฉ แˆ˜แ‹ฐแŒˆแ
แ‰ Slope Stability Analysis แ‹แŒคแ‰ต แˆ˜แˆ แˆจแ‰ต แˆ˜แ‰ฐแŒแ‰ แˆญ แ‹ญแ‰ปแˆ‹แˆแข

4๏ธโƒฃ  Retaining Wall แˆ˜แŒˆแŠ•แ‰ฃแ‰ต

แ‹จแˆ˜แˆฌแ‰ต แŒแŠแ‰ตแŠ• แˆˆแˆ˜แ‰†แŒฃแŒ แˆญ แ‹จRetaining แ‹ญแŒ แ‰…แˆ›แˆ‰แข

แˆˆแˆแˆณแˆŒแฆ
๐Ÿ”น Gravity retaining wall
๐Ÿ”น Reinforced concrete cantilever wall
๐Ÿ”น Gabion wall
๐Ÿ”น Mechanically Stabilized Earth (MSE) wall
แАแŒˆแˆญ แŒแŠ• retaining wall แ‰ฅแ‰ป แˆ˜แŒˆแŠ•แ‰ฃแ‰ต แˆแˆแŒŠแ‹œ แˆ˜แแ‰ตแˆ” แŠ แ‹ญแ‹ฐแˆˆแˆแข Drainage, bearing capacity, sliding, overturning แŠฅแŠ“ global stability แ‰ แ‹ฒแ‹›แ‹ญแŠ• แ‹แˆตแŒฅ แˆ˜แˆจแŒ‹แŒˆแŒฅ แŠ แˆˆแ‰ฃแ‰ธแ‹แข

5๏ธโƒฃ  แ‹จแŠฅแ…แ‹‹แ‰ต แˆฝแ‹แŠ•แŠ• แˆ˜แŒ แ‰ แ‰…

แ‹จแŠฅแ…แ‹‹แ‰ต แˆฅแˆญ แŠ แˆแˆญแŠ• แ‰ แˆ›แŒ แŠ“แŠจแˆญแŠ“ แ‹จSurface erosion แŠ• แ‰ แˆ˜แ‰€แАแˆต แ‹จSlope แˆ˜แˆจแŒ‹แŒ‹แ‰ตแŠ• แˆŠแ‹ซแˆปแˆฝแˆ แ‹ญแ‰ฝแˆ‹แˆแข
๐Ÿ”น แˆฃแˆญ แˆ˜แ‰ตแŠจแˆ
๐Ÿ”น แ‰ฐแˆตแˆ›แˆš แ‹›แŽแ‰ฝแŠ•แŠ“ แ‰แŒฅแ‰‹แŒฆแ‹Žแ‰ฝแŠ• แˆ˜แ‰ตแŠจแˆ
๐Ÿ”น Bio-engineering techniques
๐Ÿ”น Erosion-control mats / geotextiles
แˆ˜แŒ แ‰€แˆ แ‹ญแ‰ปแˆ‹แˆแข

6๏ธโƒฃ ๐Ÿชจ แ‹จSlope แŠแ‰ตแŠ• แˆ›แŒ แŠ“แŠจแˆญ
แ‰ แ‰ฆแ‰ณแ‹ แˆแŠ”แ‰ณ แˆ˜แˆ แˆจแ‰ตแฆ

๐Ÿ”น Riprap
๐Ÿ”น Gabion
๐Ÿ”น Shotcrete
๐Ÿ”น Rock bolts
๐Ÿ”น Soil nails
๐Ÿ”น Geogrid / geotextile reinforcement
แˆ˜แŒ แ‰€แˆ แ‹ญแ‰ปแˆ‹แˆแข

7๏ธโƒฃ  แ‹จแˆ˜แŠ•แŒˆแ‹ต แ‰แ‹แˆฎแŠ“ แ‹จCut Slope แŠ• แ‰ แ‰ตแŠญแŠญแˆ แˆ›แˆตแ‰ฐแ‹ณแ‹ฐแˆญ

แ‰ แˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณ แ‹ˆแ‰…แ‰ต แ‹จแ‰ฐแˆแŒฅแˆฎ slope แˆ˜แ‰†แˆจแŒฅ แ‹จแˆ˜แˆฌแ‰ต แˆ˜แ‹ฐแˆญแˆ˜แˆต แˆตแŒ‹แ‰ตแŠ• แˆŠแŒจแˆแˆญ แ‹ญแ‰ฝแˆ‹แˆแข

แˆตแˆˆแ‹šแˆ…แฆ
๐Ÿ”น แ‹จCut slope แ‰ฐแŒˆแ‰ข แ‹แŠ•แ‰ฃแˆŒ แˆ˜แˆตแŒ แ‰ต
๐Ÿ”น Benching
๐Ÿ”น Drainage structures
๐Ÿ”น Retaining structures
๐Ÿ”น Slope protection
แ‰ แ‹ฒแ‹›แ‹ญแŠ‘ แ‹แˆตแŒฅ แˆ˜แŠซแ‰ฐแ‰ต แŠ แˆˆแ‰ฃแ‰ธแ‹แข

8๏ธโƒฃ  แ‹จแˆ˜แˆฌแ‰ต แŠฅแŠ•แ‰…แˆตแ‰ƒแˆด Monitoring แˆ›แ‹ตแˆจแŒ

แŠ แ‹ฐแŒ‹แ‹ แŠจแˆ˜แŠจแˆฐแ‰ฑ แ‰ แŠแ‰ต แ‹จแˆ˜แˆฌแ‰ต แŠฅแŠ•แ‰…แˆตแ‰ƒแˆดแŠ• แˆ˜แˆˆแ‹จแ‰ต แ‰ แŒฃแˆ แŒ แ‰ƒแˆš แАแ‹แข
แˆŠแŒ แ‰€แˆ™ แ‹จแˆšแ‰ฝแˆ‰แ‰ตแฆ
๐Ÿ”น Inclinometer
๐Ÿ”น Piezometer
๐Ÿ”น Crack monitoring
๐Ÿ”น Survey monitoring
๐Ÿ”น GNSS/GPS monitoring
๐Ÿ”น Remote sensing / satellite monitoring แŠ“แ‰ธแ‹แข

9๏ธโƒฃ  Early Warning System แˆ›แ‰‹แ‰‹แˆ

แ‰ แŠจแแ‰ฐแŠ› แˆตแŒ‹แ‰ต แ‹ซแˆ‰ แ‰ฆแ‰ณแ‹Žแ‰ฝ แ‹จMonitoring แˆ˜แˆจแŒƒแŠ• แŠจแ‹แŠ“แ‰ฅ แˆ˜แˆจแŒƒ แŒ‹แˆญ แ‰ แˆ›แŒฃแˆ˜แˆญ แ‹จEarly Warning System แˆ›แ‰‹แ‰‹แˆ แ‹ญแ‰ปแˆ‹แˆแข

แ‹ญแˆ…แˆ แ‹จแˆ˜แˆฌแ‰ต แŠฅแŠ•แ‰…แˆตแ‰ƒแˆด แŠจแˆ˜แŒจแˆ˜แˆฉ แ‰ แŠแ‰ต แˆˆแˆ…แ‰ฅแˆจแ‰ฐแˆฐแ‰ก แˆ›แˆตแŒ แŠ•แ‰€แ‰‚แ‹ซ แŠฅแŠ•แ‹ฒแˆฐแŒฅ แ‹ซแˆตแ‰ฝแˆ‹แˆแข

๐Ÿ”Ÿ  แ‹จแˆ…แŠ•แƒ แŠฅแŠ“ แ‹จแˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แ‰ฆแ‰ณ แˆแˆญแŒซ

แ‰ แŠจแแ‰ฐแŠ› landslide susceptibility แ‹ซแˆˆแ‹ แ‰ฆแ‰ณ แˆ‹แ‹ญ แ‹ซแˆˆแ‰…แŒฅ แˆ…แŠ•แƒแฃ แˆ˜แŠ•แŒˆแ‹ต แ‹ˆแ‹ญแˆ แˆŒแˆ‹ แˆ˜แˆ แˆจแ‰ฐ แˆแˆ›แ‰ต แˆ˜แŒˆแŠ•แ‰ฃแ‰ต แˆตแŒ‹แ‰ฑแŠ• แˆŠแŒจแˆแˆญ แ‹ญแ‰ฝแˆ‹แˆแข

แˆตแˆˆแ‹šแˆ… Geological + Geotechnical + Hydrological assessment แ‰ แˆ›แ‹ตแˆจแŒ แ‰ฐแŒˆแ‰ขแ‹แŠ• แ‹จแŒแŠ•แ‰ฃแ‰ณ แ‰ฆแ‰ณ แˆ˜แˆแˆจแŒฅ แ‹ญแŒˆแ‰ฃแˆแข

@etconp
โค8๐Ÿ”ฅ1๐Ÿ˜ข1
๐Ÿ›ฃ๏ธ Why Does a Road Need Different Layers?

โฌ‡๏ธA road is built in layers, and each layer has a specific purpose.

๐Ÿ—‚Understanding these layers is essential for every civil engineer, contractor, and site professional.

๐Ÿ”น Subgrade โ€“ The prepared natural soil that supports the entire pavement structure.
๐Ÿ”น Sub-base โ€“ Provides additional support and helps improve drainage.
๐Ÿ”น Base Course โ€“ A strong structural layer that distributes traffic loads.
๐Ÿ”น Prime Coat โ€“ Helps bind the granular base with the asphalt layer.
๐Ÿ”น Binder Course โ€“ Provides structural strength and supports the wearing surface.
๐Ÿ”น Wearing Course โ€“ The top asphalt layer that directly receives traffic and provides a smooth riding surface.

๐Ÿ“Œ Remember:-The better the foundation, the longer the road can perform.

๐ŸŒŸProper material selection, moisture control, layer thickness, and compaction are critical at every stage.

๐Ÿ—๏ธ Construction Knowledge | Practical Learning | Professional Growth

๐Ÿšฅแ‰ฃแˆแŠ• แ‹‹แŒ‹ แ‹จแ‰ฐแˆฐแˆซ แ‹จแˆ˜แŠ•แŒˆแ‹ต แˆตแˆซ BOQ แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aa4f7a526f13_etconp
โค3๐Ÿ™3
๐Ÿ‘‰แˆšแ‹›แŠ• แŠฅแŠ“ แˆแŒฃแŠ” แ‰ แŠชแАแˆ…แŠ•แŒป (Scale and Proportion) แ‹จ แ‹˜แˆˆแ‰€ แ‰ แˆ‹แ‹ญ แŠ•แ‹ตแŽแ‰ฝ

๐ŸŒŸแ‹˜แˆˆแ‰€ แŠ•แ‹ตแŽแ‰นแŠ• แŠจแ‰ฐแˆˆแˆ˜แ‹ฐแ‹ แˆ˜แ‹ฐแ‰ แŠ› แ‹จแˆšแ‹›แŠ• แŠฅแŠ“ แˆแŒฃแŠ” แˆ˜แˆตแˆแˆญแ‰ถแ‰ฝ แ‰ แˆ›แˆตแˆแŠ•แŒˆแŒฅ แŠ•แ‹ตแ‰ แŠ แŒซแ‹‹แ‰ฝ แŠฅแŠ“ แ‰€แˆแ‰ฅ แˆณแ‰ข แŠฅแŠ•แ‹ฒแˆ†แŠ• แˆ›แ‹ตแˆจแŒ แ‰ฝแˆแˆแข 

แ‰ แ‹šแˆ…แˆ แˆแŠญแŠ•แ‹ซแ‰ต แŠ•แ‹ตแŽแ‰นแŠ• แŒแ‹แˆแ‰ต แˆˆแˆ˜แˆจแ‹ณแ‰ต แ‹จแŒแ‹ดแ‰ณ แˆฐแ‹แฃ แ‰ฐแˆฝแŠจแˆญแŠซแˆช แ‹ˆแ‹ญแŠ•แˆ แŠฅแŒฝแ‹‹แ‰ถแ‰ฝแŠ• แ‰ แŠ•แŒฝแŒฝแˆญ แŠจแˆ…แŠ•แŒปแ‹Žแ‰น แŒ‹แˆญ แˆ˜แˆ˜แˆแŠจแ‰ต แ‹ญแŠ–แˆญแ‰ฅแŠ“แˆแข

แ‰ แ‰ฆแˆŒ แˆ˜แŠ•แŒˆแ‹ต แˆ‹แ‹ญ แˆญแ‹‹แŠ•แ‹ณ แŠ แŠซแ‰ฃแ‰ข แ‹จแАแ‹ฐแˆแ‹ แ‹จแŠ“แ‹ญแˆ แˆถแˆญแˆต แˆ…แŠ•แŒป แŠ แŠ•แ‹ต แˆแˆณแˆŒแŠ แ‰ฝแŠ• แАแ‹แข แ‰ แˆ˜แ‹ฐแ‰ แŠ› แˆแŠ”แ‰ณ แ‹จแˆšแАแ‹ฐแ‰ แˆ˜แŒแ‰ขแ‹ซแ‹Žแ‰ฝ แŠจแˆ…แŠ•แŒปแ‹ แŒ‹แˆญ แ‹จแˆšแˆ˜แŒฃแŒ แŠ• แˆแŒฃแŠ” แŠฅแŠ“ แˆšแ‹›แŠ“แ‰ธแ‹แŠ• แŒ แ‰ฅแ‰€แ‹ แŒŽแˆ‹ แˆตแˆˆแˆšแˆ‰  แŠ แ‹ญแŠ“แ‰ฝแŠ•แˆ แˆ†แŠ‘ แŠ แŠฅแˆแˆฎแŠ แ‰ฝแŠ• แ‰ แ‹šแˆ แˆ˜แˆแŠฉ แ‹ซแˆˆ แˆฐแ‹ แ‹ˆแ‹ญแˆ แ‰ฐแˆฝแŠจแˆญแŠซแˆช แŠฅแˆญแ‹ณแ‰ณ  แ‹จแˆ…แŠ•แŒปแ‹Žแ‰ฝแŠ• แˆšแ‹›แŠ• แŠฅแŠ“ แˆแŒฃแŠ” แ‰ฐแˆจแ‹ตแ‰ถ แŠฅแŠ“  แ‰ฐแˆญแŒ‰แˆž แ‹ซแˆแ‹แˆแข

แ‹ญแˆ…แŠ• แˆ˜แ‹ฐแ‰ แŠ›แАแ‰ต แŠจแ‰ฐแŒฃแˆฐ แŒแŠ• แŠ แŠฅแˆแˆฎ แˆšแ‹›แŠ‘แŠ• แŠฅแŠ“ แˆแŒฃแŠ”แ‹แŠ• แˆˆแˆ˜แˆจแ‹ณแ‰ต แ‹จแŒแ‹ต แŠฅแАแ‹šแˆ…แŠ• แˆ˜แˆˆแŠชแ‹ซ แˆ˜แˆตแˆแˆชแ‹ซแ‹Žแ‰ฝ แ‹จแˆ†แŠ‘แ‰ตแŠ• แˆฐแ‹Žแ‰ฝ แŠฅแŠ“ แ‰ฐแˆฝแŠจแˆญแŠซแˆชแ‹Žแ‰ฝแŠ• แˆ›แ‹จแ‰ต แ‹ญแˆแˆแŒ‹แˆแข แ‹˜แˆˆแ‰€ แ‰ แŠ“แ‹ญแˆ แˆถแˆญแˆต แˆ…แŠ•แŒป แˆ‹แ‹ญ แ‹ซแˆ‰แ‰ตแŠ• แŠ แ‹ซแˆŒ แ‹จแŠ•แ‹ตแ แ‹แˆญแ‹แˆฎแ‰ฝแŠ• แˆˆแˆ˜แˆจแ‹ณแ‰ต แŠฅแŠ•แ‰†แ‰…แˆแˆฝ แ‰ แˆ†แА แˆ˜แˆแŠฉ แŠจแˆ˜แ‹ฐแ‰ แŠ›แ‹ แˆแˆแˆแ‹ต แŠ แˆตแˆแŠ•แŒแŒฆแŠ แ‰ธแ‹‹แˆแข 

แˆ˜แŒแ‰ขแ‹ซแ‹แฃ แˆ˜แˆตแŠฎแ‰ต แАแŠญ แŠญแแ‰ฐแ‰ถแ‰ฝแฃ แˆณแŒฅแŠ–แ‰ฝแฃ แŒแ‹™แ แŠ แˆญแˆ›แ‰ณ แŒแŠ•แ‰ฅ แ‹ˆแ‹˜แ‰ฐ...แ‰ฃแˆแ‰ฐแˆˆแˆ˜แ‹ฑ แˆแŒฃแŠ”แ‹Žแ‰ฝ แ‹จแ‰ฐแАแ‹ฐแ‰ แŠ“แ‰ธแ‹แข

แŠฅแˆตแ‰ฒ แ‹จแŠ“แ‹ญแˆ แˆถแˆญแˆต แˆ…แŠ•แŒปแŠ• แˆ˜แŒแ‰ขแ‹ซ แŠจแ‰ตแŠญแŠญแˆˆแŠ› แ‹จแˆฐแ‹  แˆแˆตแˆŽแ‰ฝ แŠฅแŠ“ แˆ˜แŒ แŠ“แ‰ธแ‹  แ‰ แŠ แˆญแ‰ตแŠฆแ‰ต แŠจแ‰ฐแ‰€แ‹จแˆฉ แ‹จแˆฐแ‹ แˆแˆตแˆŽแ‰ฝ แŒ‹แˆญ  แŠฅแŠ•แˆ˜แˆแŠจแ‰ฐแ‹แข

แŠฅแˆญแˆตแ‹Ž แ‹จแ‰ตแŠ›แ‹ แ‰ตแŠญแŠญแˆ แˆแˆตแˆ แАแ‹ แ‰ฅแˆˆแ‹ แ‹ญแŒˆแˆแ‰ณแˆ‰? แˆ˜แˆแˆตแ‹Žแ‰ตแŠ• แ‰ แˆšแŠจแ‰ฐแˆ‰แ‰ต แˆแˆตแˆŽแ‰ฝ แ‹ญแŒแˆˆแŒก

แˆแ‰ฅ แ‰…แˆญแŒฝ โค๏ธ.....1แŠ›แ‹ แˆแˆตแˆ
แŒญแ‰ฅแŒจแ‰ฃ ๐Ÿ‘... 2 แŠ›แ‹ แˆแˆตแˆ
แŠ แ‹แˆซแŒฃแ‰ต ๐Ÿ‘....3แŠ›แ‹ แˆแˆตแˆ

แŒฝแˆแ แŠฅแŠ“ แˆแˆตแˆ แŠจ แ‹ณแ‹Šแ‰ต แ‰ แŠ•แ‰ฒ

@etconp
โค8๐Ÿ‘2
๐Ÿ‘‰แŠณแŠ•แ‰ฒแ‰ฒ แˆฐแˆญแ‰จแ‹ญแŠ•แŒ แ‰ แ‰€แˆ‹แˆ‰ แˆˆแˆ˜แˆจแ‹ณแ‰ต แŠฅแŠ“ แ‰ดแŠญ แŠฆแ แŠฅแŠ•แ‹ฒแˆแˆ Cost Breakdown แˆˆแˆ›แ‹˜แŒ‹แŒ€แ‰ต แ‹จแˆšแŒ แ‰…แˆ แˆแˆญแŒฅ แˆ˜แ…แˆแ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6a71b78edc006_etconp
๐Ÿฅฐ4
๐Ÿ‘‰Elements of a Building Structure ๐Ÿ—๏ธ

๐Ÿ›A building is made up of several interconnected structural and functional elements.

๐ŸšฅEach element has a specific role in providing strength, stability, protection, comfort, and durability.

1. Weathering Course โ€“ Protects the roof/parapet from rainwater and weather effects.

2. Coping โ€“ A sloped protective layer on top of a parapet that helps drain rainwater.

3. Parapet Wall โ€“ Low wall constructed above roof level for safety and edge protection.

4. Ceiling โ€“ Provides a finished surface below the roof slab and conceals services.

5. RCC Roof Slab โ€“ Reinforced concrete slab that carries roof loads and transfers them to supporting members.

6. Lintel โ€“ Horizontal structural member provided above doors and windows to support masonry above openings.

7. Sunshade/Chhajja โ€“ Projects beyond openings to provide shade and protect doors/windows from rain.

8. Window โ€“ Provides natural light, ventilation, and external views.

9. Window Sill โ€“ The bottom horizontal portion of a window opening.

10. Brick Wall โ€“ Provides enclosure, separation, and protection; its structural role depends on the building system.

11. Damp-Proof Course (DPC) โ€“ Prevents moisture from rising through walls by capillary action.

12. Flooring โ€“ Provides a durable and finished walking surface.

13. Ground Level (GL) โ€“ Reference level indicating the existing or finished surrounding ground.

14. Footing โ€“ Transfers and distributes column/wall loads safely to the supporting soil.

15. PCC/Base Concrete โ€“ Provides a clean, level and stable base beneath the footing.

๐ŸŒŸImportant Construction Points

RCC members should be designed and detailed according to the applicable structural code and project design.

Proper reinforcement, concrete cover, anchorage and development length are essential for RCC durability and strength.

Concrete requires adequate compaction and curing.

DPC and proper roof drainage are important for controlling moisture.

Actual dimensions and thicknesses must be based on structural design, architectural requirements, loads, soil conditions and applicable local codes.

Note: The image mentions IS 456:2000, which is the Indian code for plain and reinforced concreteโ€”not โ€œIS 456:200.โ€ IS 13920 relates to ductile detailing of RC structures for seismic resistance.

@etconp
โค6