NoGoolag
4.54K subscribers
13.2K photos
6.93K videos
587 files
14.1K links
Live free!

πŸ“‘ @NoGoolag

FAQ:
http://t.me/NoGoolag/169

β˜…Group:
https://t.me/joinchat/nMOOE4YJPDFhZjZk

πŸ“‘ @Libreware

πŸ“‘ @TakeBackOurTech

🦊 @d3_works

πŸ“š @SaveAlexandria

πŸ’― % satire OSINT
Download Telegram
NoGoolag
Today's red pill. πŸ’Š If you think a plane can do this, then you might just be on your third booster shot.
This media is not supported in your browser
VIEW IN TELEGRAM
Controlled demolition example #911

420 Main Street Building (Old National Bank) - Controlled Demolition, Inc.

It's on the YuTube.. & more

#WTC #ControlledDemolition
911 / 22 years ago - Ground Zero

#WTC #ControlledDemolition
#FEW #DEW #NewYork #WTC7
This media is not supported in your browser
VIEW IN TELEGRAM
South Tower Destruction: Intact Corner and Uneven Sequence of Ejections

#WTC #ControlledDemolition 911 #FreeFall
Media is too big
VIEW IN TELEGRAM
9_11 - Painful Deceptions - Full Documentary

✈️
#WTC #ControlledDemolition #Pentagon #FEW #DEW 911
Audio
Engineering Students Aren't Buying The Government's Official Story.

Building 7 Evidence Delivered to the Next Generation of Truth Advocates

John Schuler is a civil engineer and a dedicated member of Project Due Diligence, which has been bringing the World Trade Center evidence to the grassroots of the engineering community through presentations all over the country.

Recently he has given two presentations about Building 7 to the ASCE student chapters of Old Dominion University and Liberty University.

In this episode of 9/11 Free Fall, John joins host, Andy Steele to talk about his experiences at these recent presentations, along with the importance of sharing the WTC evidence with the segment of the population who needs to hear it the most β€” the youth, who are inheriting the ill effects of our post-9/11 society.


@AE911TruthOfficial
#WTC #Building7 #Nist 911 #FreeFall #InsideJob
#ProjectDueDigilence
#ControlledDemolition
Media is too big
VIEW IN TELEGRAM
Controlled Demolition example 2 | Paul M. Bass Administrative Complex -The Loizeaux Group LLC 2023

Using a non-electric initiation system given the proximity of Dallas Love Field and numerous UTSW radio transmitters, Tower #1, a 200,243 sq ft, 13-story, welded steel framed office building, Tower #2, a 601,600 sq ft, 19-story, heavily reinforced concrete office building, and Tower #3, a 251,200 sq ft, 14-story, welded steel framed office building, were felled in a single implosion sequence choregraphed in Tower 3, 2, 1 sequence to separate and minimize noise levels from the detonation of explosives and mitigate vibration generated by the fall of debris to grade.

0:00 Intro
0:17 History of Paul M. Bass Buildings
1:45 CDI Explosives Preparations
4:00 Implosion
9:12 Post-Implosion

Example 1 : 420 Main Street Building (Old National Bank) - Controlled Demolition, Inc.

#ControlledDemolition #WTC
911 #InsideJob