INVITATION FOR -BID
IFB No. ECWCT/NCB/PG/039/2017
1. The Ethiopian Construction Works Corporation (ECWC) hereby invites registered eligible bidders for Procurement of Supply of Sanitary (Bathroom) Materials.
2. Interested Potential Bidders are required to present renewed relevant Trade License for the Ethiopian fiscal year, VAT Registration Certificate, Tax Clearance Certificate and Online Supplier list Registration Certificate together with their offer.
3. Bidding document should be prepared in English language.
4. Interested Potential Bidders obtain a complete set of bidding document from the office of Procurement Department against payment of none refundable fee of Birr 400.00 upon presentation of Trade License renewed for the fiscal year.
5. This invitation of bid is open to all interested potential bidders regardless of their nationality and the bid evaluation and award shall be determined in accordance with the provision indicated in bidding document.
6. The deadline for bid Submission shall be on November 28, 2024, at 4:30 Local time
7. Bid must be accompanied with a Bid Security of an amount of Birr 200,000.00 ETB (Two hundred thousand) in the form of certified cheque (CPO) or Bank guarantee. Bid Bond in the form of insurance bond or in any other form shall not be accepted.
8. Bids must be delivered or deposited in the Tender Box situated at the office of the Procurement Department on November 28, 2024, at 5:00 Local time in Ethiopian Construction Works Corporation Procurement Department conference room, in the presence of bidders and/or their representatives who choose to attend.
9. The Ethiopian Construction Works Corporation reserves its rights to reject any or all bids.
10. Bidders may get further information at the following address:
Ethiopian Construction Works Corporation
Address: - Gurd shola behind Athletics Federation Building
In front of Andinet International school
Telephone No.01 18 55 30 81
Procurement Dep.2, Team-1
@etconp
IFB No. ECWCT/NCB/PG/039/2017
1. The Ethiopian Construction Works Corporation (ECWC) hereby invites registered eligible bidders for Procurement of Supply of Sanitary (Bathroom) Materials.
2. Interested Potential Bidders are required to present renewed relevant Trade License for the Ethiopian fiscal year, VAT Registration Certificate, Tax Clearance Certificate and Online Supplier list Registration Certificate together with their offer.
3. Bidding document should be prepared in English language.
4. Interested Potential Bidders obtain a complete set of bidding document from the office of Procurement Department against payment of none refundable fee of Birr 400.00 upon presentation of Trade License renewed for the fiscal year.
5. This invitation of bid is open to all interested potential bidders regardless of their nationality and the bid evaluation and award shall be determined in accordance with the provision indicated in bidding document.
6. The deadline for bid Submission shall be on November 28, 2024, at 4:30 Local time
7. Bid must be accompanied with a Bid Security of an amount of Birr 200,000.00 ETB (Two hundred thousand) in the form of certified cheque (CPO) or Bank guarantee. Bid Bond in the form of insurance bond or in any other form shall not be accepted.
8. Bids must be delivered or deposited in the Tender Box situated at the office of the Procurement Department on November 28, 2024, at 5:00 Local time in Ethiopian Construction Works Corporation Procurement Department conference room, in the presence of bidders and/or their representatives who choose to attend.
9. The Ethiopian Construction Works Corporation reserves its rights to reject any or all bids.
10. Bidders may get further information at the following address:
Ethiopian Construction Works Corporation
Address: - Gurd shola behind Athletics Federation Building
In front of Andinet International school
Telephone No.01 18 55 30 81
Procurement Dep.2, Team-1
@etconp
đ5
á¨á¨áł
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
đ1
á¨á¨áł
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
â¤2
á¨á¨áł
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
đ4
đNEW VACANCY
âĄď¸Deadline: November 29, 2024
âśď¸Gender Needed: Male
âşVacancies: 2
đˇEducation Qualification: Bachelors Degree
âşJob Title :-Quantity surveyor
âşDescription:
We are seeking a meticulous and skilled Quantity Surveyor to join our team. The primary responsibility of this role is to track and analyze all materials, equipment, and labor used in our projects.
âşKey Responsibilities:
⢠Track and document all materials, equipment, and labor used in ongoing and completed projects.
⢠Collect and analyze data to prepare accurate and detailed Bills of Quantities (BoQs).
⢠Collaborate with managers and team members to gather necessary information and ensure accurate data collection.
⢠Prepare cost estimates and budgets for future projects based on collected data.
⢠Maintain organized and up-to-date records of all project-related costs and inventory usage
⢠Ensure compliance with company policies and industry standards.
⢠Assist in the preparation of project pricing and cost estimates.
⢠Present findings and reports to management.
âśď¸Requirements
-Previous Experiance is mandatory
- Bachelor's degree in COTM , drafting, architecture or any other related fields that gives you a skill to understand technical drawing.
- Strong analytical skills with the ability to interpret technical drawings and specifications.
- Excellent communication skills.
- Experience on MS EXCELL.
- Attention to detail and the ability to work under pressure to meet deadlines.
đŠApply via Telegram ,send your documents @Zelalem_14
@etconp
âĄď¸Deadline: November 29, 2024
âśď¸Gender Needed: Male
âşVacancies: 2
đˇEducation Qualification: Bachelors Degree
âşJob Title :-Quantity surveyor
âşDescription:
We are seeking a meticulous and skilled Quantity Surveyor to join our team. The primary responsibility of this role is to track and analyze all materials, equipment, and labor used in our projects.
âşKey Responsibilities:
⢠Track and document all materials, equipment, and labor used in ongoing and completed projects.
⢠Collect and analyze data to prepare accurate and detailed Bills of Quantities (BoQs).
⢠Collaborate with managers and team members to gather necessary information and ensure accurate data collection.
⢠Prepare cost estimates and budgets for future projects based on collected data.
⢠Maintain organized and up-to-date records of all project-related costs and inventory usage
⢠Ensure compliance with company policies and industry standards.
⢠Assist in the preparation of project pricing and cost estimates.
⢠Present findings and reports to management.
âśď¸Requirements
-Previous Experiance is mandatory
- Bachelor's degree in COTM , drafting, architecture or any other related fields that gives you a skill to understand technical drawing.
- Strong analytical skills with the ability to interpret technical drawings and specifications.
- Excellent communication skills.
- Experience on MS EXCELL.
- Attention to detail and the ability to work under pressure to meet deadlines.
đŠApply via Telegram ,send your documents @Zelalem_14
@etconp
đ7đ2đĽ1
á¨á¨áł
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
á á˛áľ ááá á áłá 6 áá 2017 á. á ááľá áá á¨á°áá°á°
https://t.me/ETCONpWORK
@etconp
đ3đ1đĽ°1đ1
đNEW VACANCY
âď¸RESIDENT ENGINEER
âĄď¸Deadline: November 19, 2024
đ§Gender Needed: Male
âśď¸Vacancies:1
đŤEducation Qualification: Bachelors Degree
âśď¸Job Description
đ°Experience on quality control on site A minimum of 1 year experience on site and have Good communication skill.
đŠSende your CV @vibe_consult
@etconp
âď¸RESIDENT ENGINEER
âĄď¸Deadline: November 19, 2024
đ§Gender Needed: Male
âśď¸Vacancies:1
đŤEducation Qualification: Bachelors Degree
âśď¸Job Description
đ°Experience on quality control on site A minimum of 1 year experience on site and have Good communication skill.
đŠSende your CV @vibe_consult
@etconp
đ5đ2
đNEW VACANCY
đ§áŽááľáľáŤáá˝á áááá
#ethiopian_engineering_corporation
#Addis_Ababa
đá á°ááłáłá á¨áľáá ááľ ááá á¨á°áá¨á/á˝ á ááŁáĽ á¨áá á¨áľáŤ áááľ áá á¨áá ááľáĽ 6 á ááľ á ááááááľ
âşQuanitity Required: 3
âśď¸Minimum Years Of Experience: #9_years
âĄď¸Deadline: December 7, 2024
đŠHow To Apply: ááááá¨áľ áŤááľá áá¨ááá˝ @MarakiEyassu áááŠ
@etconp
đ§áŽááľáľáŤáá˝á áááá
#ethiopian_engineering_corporation
#Addis_Ababa
đá á°ááłáłá á¨áľáá ááľ ááá á¨á°áá¨á/á˝ á ááŁáĽ á¨áá á¨áľáŤ áááľ áá á¨áá ááľáĽ 6 á ááľ á ááááááľ
âşQuanitity Required: 3
âśď¸Minimum Years Of Experience: #9_years
âĄď¸Deadline: December 7, 2024
đŠHow To Apply: ááááá¨áľ áŤááľá áá¨ááá˝ @MarakiEyassu áááŠ
@etconp
â¤4đ2
đNEW VACANCY
âď¸Site Engineer
#ethiopian_engineering_corporation
#Addis_Ababa
đˇBachelor's Degree in Civil Engineering or in a related field of study with relevant work experience (experience at international company is an added advantage)
đŤDuties & Responsibilties
- Surveying new road construction sites with surveyors, and assessing existing infrastructures for upgrades.
- Designing and recommending improvements to computer-aided design (CAD) software drawings and schematics.
- Provide detail Site information to quantity surveyors, designers.
- Guide operation team as per provided design drawings.
âşQuanitity Required: 4
âśď¸Minimum Years Of Experience: #3_years
âśď¸Maximum Years Of Experience: #5_years
âĄď¸Deadline: December 14, 2024
đŠHow To Apply: Apply by using the provided linkđ
https://forms.office.com/Pages/ResponsePage.aspx?id=fbibbAsHyk2HrMuCOdJR7l_tOeSslK1NsGRsQb8bHJdURUg0Q1JGN1VVNUs0MlNZSUFDRzFGVFk1My4u
@etconp
âď¸Site Engineer
#ethiopian_engineering_corporation
#Addis_Ababa
đˇBachelor's Degree in Civil Engineering or in a related field of study with relevant work experience (experience at international company is an added advantage)
đŤDuties & Responsibilties
- Surveying new road construction sites with surveyors, and assessing existing infrastructures for upgrades.
- Designing and recommending improvements to computer-aided design (CAD) software drawings and schematics.
- Provide detail Site information to quantity surveyors, designers.
- Guide operation team as per provided design drawings.
âşQuanitity Required: 4
âśď¸Minimum Years Of Experience: #3_years
âśď¸Maximum Years Of Experience: #5_years
âĄď¸Deadline: December 14, 2024
đŠHow To Apply: Apply by using the provided linkđ
https://forms.office.com/Pages/ResponsePage.aspx?id=fbibbAsHyk2HrMuCOdJR7l_tOeSslK1NsGRsQb8bHJdURUg0Q1JGN1VVNUs0MlNZSUFDRzFGVFk1My4u
@etconp
đ10â¤8đ1
đNEW VACANCY
âşá˛áŞá áááá˛áľ
âşáááá
âşáŁáá
https://t.me/ETCONpWORK
@etconp
âşá˛áŞá áááá˛áľ
âşáááá
âşáŁáá
https://t.me/ETCONpWORK
@etconp
đ5đ4
đá ááá áŞáá
ááť
đŤá áĽáááľ á¤á°ááťá ááľ
đ§á ááłá áĽá á¨áá áĽá ἠá¨ááłáá áľá áá áá á¤á°ááťá ááľ á¨ááłá°á áĽá áĽá áŁá á ááťáá˝ á á¨á°áá˝á áĽáá˛áá á á ááŤá˝á áŤáľáááááá˘
Via áŽá´á á á¨á°áľ
@etconp
đŤá áĽáááľ á¤á°ááťá ááľ
đ§á ááłá áĽá á¨áá áĽá ἠá¨ááłáá áľá áá áá á¤á°ááťá ááľ á¨ááłá°á áĽá áĽá áŁá á ááťáá˝ á á¨á°áá˝á áĽáá˛áá á á ááŤá˝á áŤáľáááááá˘
Via áŽá´á á á¨á°áľ
@etconp
đ9â¤4
đNEW VACANCY
đ§BIM Draftsman
#ethiopian_engineering_corporation
#Addis_Ababa
đˇTVET Level IV in Drafting or in a related field of study with relevant work experience
đŤDuties & Responsibilites
- Will assume the full responsibility of drafting and documentation of discipline specific related works.
- Ability to assist other staff and BIM/Revit Technicians
- Ability to work autonomously or as part of a larger team and able to make design decisions, act on own initiative and operate in a pro-active way
âşQuanitity Required: 2
âśď¸Minimum Years Of Experience: #2_years
âĄď¸Deadline: December 17, 2024
đŠHow To Apply: Send Your CV @anduamlak4
@etconp
đ§BIM Draftsman
#ethiopian_engineering_corporation
#Addis_Ababa
đˇTVET Level IV in Drafting or in a related field of study with relevant work experience
đŤDuties & Responsibilites
- Will assume the full responsibility of drafting and documentation of discipline specific related works.
- Ability to assist other staff and BIM/Revit Technicians
- Ability to work autonomously or as part of a larger team and able to make design decisions, act on own initiative and operate in a pro-active way
âşQuanitity Required: 2
âśď¸Minimum Years Of Experience: #2_years
âĄď¸Deadline: December 17, 2024
đŠHow To Apply: Send Your CV @anduamlak4
@etconp
đ4
#ADVERTISEMENT
đááááŁáłá áá áľ áĽáá áľá áááľáááá á¨áááŁáł á áá áá° áĽá áá°ááá˘
đŤAR Building Finishing & Water Proofing Works áá áááá˝ áá áľ ááŁáŞáá˝ áá
đ§á áአáĽáŤáľ á¨ááá˝áá áľáŤáá á á ááá á¤áľá áá áľ á ááá áá áĽááľá¨ááĽááłááá˘
đá¨áááŞáŤ á¤áľ áĽáľá¨ áľááá á áááá˝ á áťáŤá˝áá á áłááááá˘
âśď¸Contextra
âśď¸Fine quartez
âśď¸Stone paint
âśď¸ Water Proofing Chemicals
âśď¸ Membranes á áĽáŤáľ áĽáá°áŤááá˘
đá áľáŤáť:âáĄáŤá¤á ááááá á áá
áľáá 0977 67 67 90
0912 23 04 71
đŤAR Building Finishing & Water Proofing Works
á´áááŤá:
@antearb
@antearb
đááááŁáłá áá áľ áĽáá áľá áááľáááá á¨áááŁáł á áá áá° áĽá áá°ááá˘
đŤAR Building Finishing & Water Proofing Works áá áááá˝ áá áľ ááŁáŞáá˝ áá
đ§á áአáĽáŤáľ á¨ááá˝áá áľáŤáá á á ááá á¤áľá áá áľ á ááá áá áĽááľá¨ááĽááłááá˘
đá¨áááŞáŤ á¤áľ áĽáľá¨ áľááá á áááá˝ á áťáŤá˝áá á áłááááá˘
âśď¸Contextra
âśď¸Fine quartez
âśď¸Stone paint
âśď¸ Water Proofing Chemicals
âśď¸ Membranes á áĽáŤáľ áĽáá°áŤááá˘
đá áľáŤáť:âáĄáŤá¤á ááááá á áá
áľáá 0977 67 67 90
0912 23 04 71
đŤAR Building Finishing & Water Proofing Works
á´áááŤá:
@antearb
@antearb
đ1đ1
đá¨áááŁáł áŚáł ááĽáŚá˝á ááá¨áľ (Site Setting Out) áá¨áł áá á°ááŁáŁáŞ áááá˛áą áá¨ááἠáŤáá áľ ááĽáŚá˝
đ§á áááŁáł áĽáŤ á¨áŚáł ááĽá¨á ááĽá á¨áá°áŤá áĽáŤ á¨áááŁáł ááľááŽá˝á (Axis) áĽá á¨áľáľáŤáá¸á áá°á¨áłá ááá¨áá ááĽáŚá˝á (Center of structures/column) ááá¨áľ ááá˘
đŤáá áĽáŤ á¨áááŁáł áŚáł ááĽáŚá˝á ááá¨áľ á¨ááŁá á˛áá áááá˛áą áá¨ááἠáŤáá áľ ááĽáŚá˝áŚ
1) á¨á°ááá áŚáł áááá ጠá¨áááŁáł áŚáł ááĽáŚá˝á ááá¨áľ (Site Setting Out) á¨áá¨ááá á ááľ á˛áŁá á¨ááá áŠáŁá¸á á˝áŤáá˝ ááá á¨ááá¤áľ (GPS) ááłáŞáŤ á¨ááŤááááľáŁá¸á ááĽáŚá˝ á¨ááł (Elevation of setting out strings) á áá áĽáá˛áłáá áĽá á°ááĽáŻá á¨áááá á¨ááŹáľ ááá áŤáá áľ áááł (Top Surface /Elevation/ of Original Ground Level) á¨á°áᨠááá áľááá áľ á¨áááŁáł áŚáł á á¨á á ááᣠá¨á°á¨ááá áááá áĽá á°ááĽáŻá á¨ááŹáľ á¨áááá ááá á¨á°á°á¨á°á áľ ááá áá¨ááἠá áá áľá˘
2) á᪠ááľá (site plan) áááŠá áĽá á á፠áá°á¨áľ áĽá¨á°á¨ááá ááááጠáááá˛áą á ááľ áááť á¨ááŤáááŁá¸áá áá°á¨áłá ááĽáŚáľ (Axis & Center) áá¨áł á áá¨áááá áľ á°ááľ ááá á¨áá á᪠á¨áŚáł ááľá (site plan) áŤáá áĽá á áááŁáł áŚáłá áá á¨ááá áááá áá¨ááἠá áá áľá˘
3) áá áá ááááá ááľááŽá˝ (main grid/Axis/ lines)ጠá¨áááŁáłá áááľáŽá˝ á á áŁáŤáá˝ (X-axis and Y-axis) á¨ááááá áľá á¨ááŤááááą ááááá ááľááŽá˝ áááŤá¸ááᣠá¨ááł ááŠááľ á ááááŠá (water level) áá¨ááἠá áá áľá˘ á áá á áá°á¨áľ áĽááľ á áĽááłá¸á á¨ááááá áľ á ááá áĽá á ááą á¨ááá áŤáá ááá¨áá áááľ (centerline dimensions) á áľáľáŤáá¸áŤá á¨áá°á¨áľ á áááἠá˛ááá (Structural foundation layout) áá á á°ááá¨á°á ááŹáľ áá°á¨áľ ááá á áááľ á¨ááŹáľ ááá°áľ á¨áááŁá¸á áááá¸áá áá¨ááἠá áá áľá˘
4) á¨áľáľáŤáá¸á áááá˝ ááá (Location of Structural Elements):- á ááááľ áĽáŤááłááą á¨áľáľáŤáá¸áŠ áá°áśáá˝/áá á ááśá˝ ááá¨áá ááĽáĽ(Columns centerline)ᣠáĽá á¨áľáľáŤáá¸áŠ áá°áśáá˝ á¨ááŤáááŁá¸áá á áŤáá ááĽáŚáľ (Coordinate points)ᣠá¨áá°áś áŤá áľááľ (Footings coverage area) á¨ááŤááááľ áááá áá¨ááἠá áá áľá˘
5) á¨á áĽá áĽáŤ (fencing or barbed)ጠá áááá¨á á¨ááŹáľ ááá ááľáĽ áá¨áľ á¨á°áłáá¸áᣠááťááľáŁ á á¨áá á¨ááá áááá°áá˝áŁ áĽááľáłáľ áĽááłáááľáá á áŤáá ááłáľ áĽááłáá°ááľá¤ á á°á¨ááŞá á áááŁáłá ááá ááľáĽ á¨ááá áĽáá° ááľááᣠáĽá¨áľáŁ áĽáá¨áľ á áááľ ááĽá áśá˝ áĽáá ááľ á ááá ááłáľ áĽááłáŤáľá¨áľáᣠááá á áááŁáł áŚáłá ááľáĽ áŤá á¨áááŁáł ááĽá áśá˝áŁ áá˝áá˝áŁ áĽááá˝áŁ áĽá ááá˝ ááĽá¨áśá˝ áĽááłááá¨á ááá¨áá¨á á¨áááŁáł áŚáłá á¨áłá ᨠááá á¨á°á¨áá ááá áá¨áááĽá á¨ááľáľá áááá˛áą áĽáŤ ááá˘
@etconp
đ§á áááŁáł áĽáŤ á¨áŚáł ááĽá¨á ááĽá á¨áá°áŤá áĽáŤ á¨áááŁáł ááľááŽá˝á (Axis) áĽá á¨áľáľáŤáá¸á áá°á¨áłá ááá¨áá ááĽáŚá˝á (Center of structures/column) ááá¨áľ ááá˘
đŤáá áĽáŤ á¨áááŁáł áŚáł ááĽáŚá˝á ááá¨áľ á¨ááŁá á˛áá áááá˛áą áá¨ááἠáŤáá áľ ááĽáŚá˝áŚ
1) á¨á°ááá áŚáł áááá ጠá¨áááŁáł áŚáł ááĽáŚá˝á ááá¨áľ (Site Setting Out) á¨áá¨ááá á ááľ á˛áŁá á¨ááá áŠáŁá¸á á˝áŤáá˝ ááá á¨ááá¤áľ (GPS) ááłáŞáŤ á¨ááŤááááľáŁá¸á ááĽáŚá˝ á¨ááł (Elevation of setting out strings) á áá áĽáá˛áłáá áĽá á°ááĽáŻá á¨áááá á¨ááŹáľ ááá áŤáá áľ áááł (Top Surface /Elevation/ of Original Ground Level) á¨á°áᨠááá áľááá áľ á¨áááŁáł áŚáł á á¨á á ááᣠá¨á°á¨ááá áááá áĽá á°ááĽáŻá á¨ááŹáľ á¨áááá ááá á¨á°á°á¨á°á áľ ááá áá¨ááἠá áá áľá˘
2) á᪠ááľá (site plan) áááŠá áĽá á á፠áá°á¨áľ áĽá¨á°á¨ááá ááááጠáááá˛áą á ááľ áááť á¨ááŤáááŁá¸áá áá°á¨áłá ááĽáŚáľ (Axis & Center) áá¨áł á áá¨áááá áľ á°ááľ ááá á¨áá á᪠á¨áŚáł ááľá (site plan) áŤáá áĽá á áááŁáł áŚáłá áá á¨ááá áááá áá¨ááἠá áá áľá˘
3) áá áá ááááá ááľááŽá˝ (main grid/Axis/ lines)ጠá¨áááŁáłá áááľáŽá˝ á á áŁáŤáá˝ (X-axis and Y-axis) á¨ááááá áľá á¨ááŤááááą ááááá ááľááŽá˝ áááŤá¸ááᣠá¨ááł ááŠááľ á ááááŠá (water level) áá¨ááἠá áá áľá˘ á áá á áá°á¨áľ áĽááľ á áĽááłá¸á á¨ááááá áľ á ááá áĽá á ááą á¨ááá áŤáá ááá¨áá áááľ (centerline dimensions) á áľáľáŤáá¸áŤá á¨áá°á¨áľ á áááἠá˛ááá (Structural foundation layout) áá á á°ááá¨á°á ááŹáľ áá°á¨áľ ááá á áááľ á¨ááŹáľ ááá°áľ á¨áááŁá¸á áááá¸áá áá¨ááἠá áá áľá˘
4) á¨áľáľáŤáá¸á áááá˝ ááá (Location of Structural Elements):- á ááááľ áĽáŤááłááą á¨áľáľáŤáá¸áŠ áá°áśáá˝/áá á ááśá˝ ááá¨áá ááĽáĽ(Columns centerline)ᣠáĽá á¨áľáľáŤáá¸áŠ áá°áśáá˝ á¨ááŤáááŁá¸áá á áŤáá ááĽáŚáľ (Coordinate points)ᣠá¨áá°áś áŤá áľááľ (Footings coverage area) á¨ááŤááááľ áááá áá¨ááἠá áá áľá˘
5) á¨á áĽá áĽáŤ (fencing or barbed)ጠá áááá¨á á¨ááŹáľ ááá ááľáĽ áá¨áľ á¨á°áłáá¸áᣠááťááľáŁ á á¨áá á¨ááá áááá°áá˝áŁ áĽááľáłáľ áĽááłáááľáá á áŤáá ááłáľ áĽááłáá°ááľá¤ á á°á¨ááŞá á áááŁáłá ááá ááľáĽ á¨ááá áĽáá° ááľááᣠáĽá¨áľáŁ áĽáá¨áľ á áááľ ááĽá áśá˝ áĽáá ááľ á ááá ááłáľ áĽááłáŤáľá¨áľáᣠááá á áááŁáł áŚáłá ááľáĽ áŤá á¨áááŁáł ááĽá áśá˝áŁ áá˝áá˝áŁ áĽááá˝áŁ áĽá ááá˝ ááĽá¨áśá˝ áĽááłááá¨á ááá¨áá¨á á¨áááŁáł áŚáłá á¨áłá ᨠááá á¨á°á¨áá ááá áá¨áááĽá á¨ááľáľá áááá˛áą áĽáŤ ááá˘
@etconp
đ11đ1
đá¨á¨á¨áł áĽáŞ ááľáłáááŤ
đ§á¨á¨áł ááĽá ECWCT/NCB/SG-41/2017
đˇá¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤáá˝ áŽáááŹá˝á á¨á°ááŤáŠ áŤáááá ááłáŞáŤáá˝á á°á˝á¨ááŤáŞáá˝á á á¨á¨áł á ááłáľáŽ ááá¸áĽ áľááááá á á á áŤá˘áá˝ áááá ááľáĽ á¨á°áááᥠáĽá á°áŤáŤážá˝á á ááá á¨á¨áł áĽáá˛áłá°á áááĽáááĄáĄ
1. á á¨á¨áłá áááŤáá á¨áááá á°áŤáŤážá˝ á á¨á¨áłá áááłá°á á¨ááŤáľá˝á ááľáá áśá˝ á¨áłá°á° áááľ áĽáŤ áááľ áĽá á¨ááĽá á¨áá áá፠ááĽá á˛áá áááá°áĽ á°áá ááłáá፠áĽá á¨ááĽá á¨áá áá፠ááĽá ááľá¨á á áá á¨áĽ á¨áááááľ áĽá 400.00/á áŤáľ ááś áĽá/á áááá á¨á¨á¨áł á°ááąá áááľá á áľáŤ á°ááľ á¨ááá ááľáĽ áĽá á áἠáĄáľá á˘áŽ á áá á¨áĽ áá ááľáłáá፠á á á˛áľ ááá ááᣠáłáľá á¨ááŁá áľ áá ááᎠááááľ áá˝áááĄáĄ
2. á¨á¨á¨áł á°ááľ áááááľ á¨ááᣠá°ááá á¨áá á¨áłá°á° áááľ áĽáŤ áááľ ááá ááłáá፠áĽá á¨ááĽá á¨áá áá፠ááĽá (Tin Number) áá áá á¨áĽ áááá áłááĄáĄ
3. á¨á¨á¨áłá á á¸áá á¨áááá á á¨á¨áł á°ááľ ááľáĽ á á°ááá¨áąáľ ááľáááśá˝ áá á¨áľ á˛áá á¨á¨áłá ááááľá áłáááá¨áľ áááááá á°áŤáŤá˝ áááľ áááĄáĄ á¨á¨á¨áłá á°ááľ á¨á°áááá á á ááá ááá áá áĄáĄ
4. á°áŤáŤážá˝ áááŤá¨áąá áľ á á áá áá áĽá á áľá á ááś (10%) á¨á¨á¨áł ááľá¨á áŞáŤ á¨áŁáá ááŤáᲠ(á¨áŁáá ááľáľá) á˛áጠá¨á¨á¨áł á°ááłá¸á áá á ááŤáŤá áá á¨áĽ ááááŁá¸áááĄáĄ á¨áá á᪠á á˘áášáŤááľ ááá á áá ááá á¨áááἠá¨á¨á¨áł ááľá¨á áŞáŤ á°ááŁáááľ á¨ááááĄáĄ
5. á°áŤáŤážá˝ á¨á¨á¨áł á°ááłá¸áá ááá á°ááŁá á á°áááá áłáĽá áἠáááŞáŤ-1 áᢠá¨ááŤá°ááá áľ á¨áá¨á¨áť áá á áłá 18 áá 2017 á.á á¨á ááą 4áĄ00 á°ááľ áľá¨áľ áĽáť áááĄáĄ
6. á¨á¨áłá á°áŤáŤážá˝ ááá ááá ááŞááťá á á°ááá áľ á áłá 18 áá 2017 á.á á¨á ááą 4áĄ30 á¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤáá˝ áŽáááŹá˝á á áĽá áᢠá áááá áἠáááŞáŤ-1 á¨áľáĽá°áŁ á áłáŤá˝ áá¨ááłááĄáĄ
7. áŽáááŹá˝á á¨á°áťá ááááľ áŤáá á¨á¨áłá á ááá áá á á¨áá á¨áá°á¨á ááĽáą á¨á°á á á áááĄáĄ
8. áá áá áá¨á á°áŤáŤážá˝ á¨áá¨á°ááá á áľáŤáť áá áá áá˝áááĄáĄ
á¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤáá˝ áŽáááŹá˝á á áἠáááŞáŤ á ááľ á˘áŽ
á áľáŤáťáĄ-áááľ ážá á áľáá˛ááľ áá´áŹá˝á á áá 200 ááľá áᣠáĽá
á ááľááľ á˘áá°ááá˝áá áľ/á¤áľ ááľ-áááľ
áľáá ááĽá 0118 72 29 91/ 0118-72 29 58
@etconp
đ§á¨á¨áł ááĽá ECWCT/NCB/SG-41/2017
đˇá¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤáá˝ áŽáááŹá˝á á¨á°ááŤáŠ áŤáááá ááłáŞáŤáá˝á á°á˝á¨ááŤáŞáá˝á á á¨á¨áł á ááłáľáŽ ááá¸áĽ áľááááá á á á áŤá˘áá˝ áááá ááľáĽ á¨á°áááᥠáĽá á°áŤáŤážá˝á á ááá á¨á¨áł áĽáá˛áłá°á áááĽáááĄáĄ
1. á á¨á¨áłá áááŤáá á¨áááá á°áŤáŤážá˝ á á¨á¨áłá áááłá°á á¨ááŤáľá˝á ááľáá áśá˝ á¨áłá°á° áááľ áĽáŤ áááľ áĽá á¨ááĽá á¨áá áá፠ááĽá á˛áá áááá°áĽ á°áá ááłáá፠áĽá á¨ááĽá á¨áá áá፠ááĽá ááľá¨á á áá á¨áĽ á¨áááááľ áĽá 400.00/á áŤáľ ááś áĽá/á áááá á¨á¨á¨áł á°ááąá áááľá á áľáŤ á°ááľ á¨ááá ááľáĽ áĽá á áἠáĄáľá á˘áŽ á áá á¨áĽ áá ááľáłáá፠á á á˛áľ ááá ááᣠáłáľá á¨ááŁá áľ áá ááᎠááááľ áá˝áááĄáĄ
2. á¨á¨á¨áł á°ááľ áááááľ á¨ááᣠá°ááá á¨áá á¨áłá°á° áááľ áĽáŤ áááľ ááá ááłáá፠áĽá á¨ááĽá á¨áá áá፠ááĽá (Tin Number) áá áá á¨áĽ áááá áłááĄáĄ
3. á¨á¨á¨áłá á á¸áá á¨áááá á á¨á¨áł á°ááľ ááľáĽ á á°ááá¨áąáľ ááľáááśá˝ áá á¨áľ á˛áá á¨á¨áłá ááááľá áłáááá¨áľ áááááá á°áŤáŤá˝ áááľ áááĄáĄ á¨á¨á¨áłá á°ááľ á¨á°áááá á á ááá ááá áá áĄáĄ
4. á°áŤáŤážá˝ áááŤá¨áąá áľ á á áá áá áĽá á áľá á ááś (10%) á¨á¨á¨áł ááľá¨á áŞáŤ á¨áŁáá ááŤáᲠ(á¨áŁáá ááľáľá) á˛áጠá¨á¨á¨áł á°ááłá¸á áá á ááŤáŤá áá á¨áĽ ááááŁá¸áááĄáĄ á¨áá á᪠á á˘áášáŤááľ ááá á áá ááá á¨áááἠá¨á¨á¨áł ááľá¨á áŞáŤ á°ááŁáááľ á¨ááááĄáĄ
5. á°áŤáŤážá˝ á¨á¨á¨áł á°ááłá¸áá ááá á°ááŁá á á°áááá áłáĽá áἠáááŞáŤ-1 áᢠá¨ááŤá°ááá áľ á¨áá¨á¨áť áá á áłá 18 áá 2017 á.á á¨á ááą 4áĄ00 á°ááľ áľá¨áľ áĽáť áááĄáĄ
6. á¨á¨áłá á°áŤáŤážá˝ ááá ááá ááŞááťá á á°ááá áľ á áłá 18 áá 2017 á.á á¨á ááą 4áĄ30 á¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤáá˝ áŽáááŹá˝á á áĽá áᢠá áááá áἠáááŞáŤ-1 á¨áľáĽá°áŁ á áłáŤá˝ áá¨ááłááĄáĄ
7. áŽáááŹá˝á á¨á°áťá ááááľ áŤáá á¨á¨áłá á ááá áá á á¨áá á¨áá°á¨á ááĽáą á¨á°á á á áááĄáĄ
8. áá áá áá¨á á°áŤáŤážá˝ á¨áá¨á°ááá á áľáŤáť áá áá áá˝áááĄáĄ
á¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤáá˝ áŽáááŹá˝á á áἠáááŞáŤ á ááľ á˘áŽ
á áľáŤáťáĄ-áááľ ážá á áľáá˛ááľ áá´áŹá˝á á áá 200 ááľá áᣠáĽá
á ááľááľ á˘áá°ááá˝áá áľ/á¤áľ ááľ-áááľ
áľáá ááĽá 0118 72 29 91/ 0118-72 29 58
@etconp
đ6
bathroom fixtures.pdf
461.7 KB
á¨áá¸áłá á¤áľ áĽá á¨á§áá§ áĽááá˝ áá á¨á¨áł
https://t.me/ETCONpWORK
@etconp
https://t.me/ETCONpWORK
@etconp
đ4