Ethiopian Construction Vacancy & Tender
18.2K subscribers
4.61K photos
57 videos
549 files
3.88K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

๐Ÿ“ฉ @Philemona7
Download Telegram
๐Ÿ‘‰EARTH PRESSURE AND RETAINING STRUCTURE

๐ŸทA retaining structure is a wall used to maintain the ground surface at different elevation on either side of it.

๐Ÿ’ซThe following terms are used:

1. Back fill: The material retained by the wall is called back fill.

2. Surcharge: The weight of back fill above the elevation of top of the wall and any other load (may be due to building, etc.) is called surcharge.

3. Back face and face: The side of wall in contact with back fill is back face and other side face.

4. The slope of back fill above the horizontal is known as surcharge angle.

5. Angle of inclination of the back is the angle made by back face with vertical.

โ‡๏ธEarth Pressure as per Rankineโ€™s Theory: The lateral pressure exerted by the soil when the retaining wall has no movement relative to the back fill is called lateral earth pressure at rest.

โบThe lateral earth pressure when the retaining wall tends to move away from the back fill is called active earth pressure.

โบThis is the minimum earth pressure exerted by the soil when the retaining wall moves towards the back fill due to any natural cause is known as passive earth pressure.

๐ŸŽฒCoefficient of earth pressure at rest: It is the ratio of lateral pressure to vertical pressure.

@etconp
โค9
๐Ÿ‘‰Construction SAFETY

โšก๏ธConstruction safety encompasses the measures taken to protect construction workers and others from injuries, illnesses, and fatalities on construction sites.

โบIt involves a combination of practices, including proper training, the use of personal protective equipment (PPE), hazard identification and control, and emergency preparedness.


Effective safety management in construction is crucial due to the inherent risks associated with heavy machinery, working at heights, and handling hazardous materials. 


๐Ÿ’ซHere's a breakdown of key aspects of construction safety:

1. Personal Protective Equipment (PPE): 

PPE is essential for minimizing risks from hazards like falling objects, noise, and hazardous materials. Common PPE includes hard hats, safety glasses, earplugs, gloves, and safety boots. Regular inspection and maintenance of PPE are crucial to ensure its effectiveness.

2. Hazard Identification and Control:

Identifying potential hazards like working at heights, electrical hazards, and hazardous material handling is crucial. Controlling hazards involves implementing measures like fall protection systems, proper electrical wiring, and safe material handling procedures. Training workers to recognize and mitigate hazards is a vital part of the process. 

3. Training and Education:

The Occupational Safety and Health Administration (OSHA) requires specific safety training, such as the 10-hour and 30-hour construction courses. Training should cover topics like electrical safety, fall protection, and hazard communication. Regular safety meetings and toolbox talks can reinforce safe work practices. 

4. Equipment and Machinery Safety: 

All equipment should be inspected regularly for defects and proper functioning. Workers operating equipment must be properly trained and authorized. Emergency shutdown mechanisms should be in place and tested.

5. Site Safety Management:

Construction safety management involves a systematic approach to identifying, assessing, and controlling hazards. This includes developing safety policies, conducting risk assessments, and implementing safety assurance programs. A positive safety culture, where workers prioritize safety, is essential for a safe work environment. 

๏ปฟ
6. Emergency Preparedness: 

Developing emergency plans for foreseeable scenarios is crucial.
These plans should outline procedures for situations like fires, injuries, or hazardous material spills. Workers should be familiar with emergency procedures and have access to necessary resources.

7. Communication: 

Clear and timely communication is essential for preventing accidents.
Workers should be able to communicate with each other effectively, using signals, radios, or other means. Miscommunication can lead to accidents and confusion.

By implementing these measures, construction companies can create safer work environments for their employees and minimize the risk of accidents and injuries on construction sites. 

๏ปฟ
@etconp
๐Ÿ‘7โค1
๐Ÿ‘‰แ‹จแŒแ‹ฐแˆซแˆแŠ“ แ‹จแŠญแˆแˆ แ‹จแŒแ‹ฅ แˆ…แŒŽแ‰ฝ แ‹จแ‰ฐแˆแƒแˆšแАแ‰ต แ‹ˆแˆฐแŠ• (Scope of Application)

โบแŠ แ‹ฒแˆฑ แ‹จแŒแ‹ฐแˆซแˆ แŒแ‹ฅ แŠ แ‹‹แŒ… แŠฅแŠ“ แˆ˜แˆ˜แˆชแ‹ซ แ‰ฐแˆแƒแˆš แ‹จแˆšแˆ†แАแ‹ แ‰ แŒแ‹ฐแˆซแˆ แˆ˜แŠ•แŒแˆตแ‰ต แ‰ฐแ‰‹แˆ›แ‰ต แˆˆแˆšแŠจแŠ“แ‹ˆแŠ‘ แŒแ‹ฅแ‹Žแ‰ฝ แ‰ฅแ‰ป แАแ‹แข

โบแŠญแˆแˆŽแ‰ฝแŠ“ แŠจแ‰ฐแˆ› แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆฎแ‰ฝ แˆ‹แ‹ญ แ‰ฐแˆแƒแˆšแАแ‰ต แ‹จแˆˆแ‹แˆแข

โบแ‰ แ‰€แŒฃแ‹ญ แŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃแŠ• แŒจแˆแˆฎ แˆแˆ‰แˆ แŠญแˆแˆŽแ‰ฝ แ‹จแˆซแˆณแ‰ธแ‹แŠ• แ‹จแ‰ฐแˆปแˆปแˆˆ แ‹จแŒแ‹ฅ แŠ แ‹‹แŒ…แŠ“ แˆ˜แˆ˜แˆชแ‹ซ แŠฅแŠ•แ‹ฐแˆšแ‹ซแ‹ˆแŒก แ‹ญแŒ แ‰ แ‰ƒแˆ (แŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แ‰ แˆจแ‰‚แ‰… แ‹ฐแˆจแŒƒ แ‹ญแŒˆแŠ›แˆ)แข

โบแˆแˆ‰แˆ แŠญแˆแˆŽแ‰ฝแŠ“ แŠจแ‰ฐแˆ› แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆฎแ‰ฝ แŠ แ‹ฒแˆต แˆ…แŒ แŠฅแˆตแŠจแˆšแ‹ซแ‹ˆแŒก แ‹ตแˆจแˆต แ‰ แАแ‰ฃแˆฉ แ‹จแˆšแ‰€แŒฅแˆ‰ แ‹ญแˆ†แŠ“แˆแข

@etconp
๐Ÿ‘4โค1
#ADVERTISEMENT

๐Ÿญ๐Ÿ TSEGAYE and YOHANNES J-แ‰ฆแˆแ‰ต & PLATE ๐Ÿš๐Ÿ— ๐ŸŒ๐ŸŒ†

๐Ÿงฟ OUR SERVICES โคต๏ธ

๐Ÿ”ฒPlate

โš™๏ธ  J-Bolt

โš“Anchor Bolt

โžฝTie Rod

๐Ÿญ๐Ÿ›–๐ŸŒ‰scrap๐Ÿšง๐Ÿช๐Ÿ”—
Phone : ๐Ÿคณ0938494506 
              ๐Ÿคณ 0951087077
              ๐Ÿคณ 0929044037
แŠฅแŠ“แˆ˜แˆฐแŒแŠ“แˆˆแŠ•::
๐Ÿ‘‰แŠ แ‹ตแˆซแˆปแฆ  แˆ˜แˆญแŠซแ‰ถ แˆแŠ•แŠ แˆˆแˆฝ แ‰ฐแˆซ แŠจแŒญแ‹ต แ‰ฐแˆซ แŠจแ แ‰ฅแˆŽ

https://t.me/tsegaye2016Jbolt
โค1
๐Ÿ‘‰Road Pavement are of two types

1) Rigid pavement
2) Flexible pavement

A)Rigid pavement have high flexural stiffness and consist of 3 layers

--Subgrade
--Base course
--Concrete slab

B) Flexible pavement have low flexible stiffness and consist of four layers

--Subgrade
--Sub-base
--Base course
--Asphalt

In addition flexible pavement also have Prime coat and Tackcoat applied within the structure of pavement.

Prime coat:The layer between Asphalt course and crushed aggregate.

This help to bind the loose aggregates so that it can be prepared for subsequent construction activity. It also serves the purpose of blocking upward movement of water that is capillary action thereby protecting the asphalt layer.

Tack coat: The layer between Asphalt base course and Asphalt wearing course. The purpose is to form a bound between Asphalt base course and Asphalt wearing course. If Tack coat is not applied, AWC will tend to slid under traffic load and pavement will fail.
Note: AWC should be laid over the ABC after Tack coat has dried and become "Tacky".

@etconp
โค12๐Ÿ‘10
๐Ÿ‘‰แ‰ดแŠญแŠ’แŠซแ‹Š แ‹จแˆ™แ‹ซ แ‰ƒแˆ‹แ‰ต แ‰ แŠ แˆ›แˆญแŠ› แˆฒแŒปแ‰

Spatial แ‹จแˆšแˆˆแ‹ แ‹จแŠชแА แˆ…แŠ•แŒป แ‰ƒแˆ "แˆตแ“แˆปแˆ" แˆณแ‹ญแˆ†แŠ• "แˆตแ”แˆปแˆ" แ‰ฐแ‰ฅแˆŽ แ‹จแˆšแАแ‰ แ‰ฅ แˆฒแˆ†แŠ• แ‰ฅแ‹™ แŠ แˆ›แˆญแŠ› แ‰ฐแŠ“แŒ‹แˆช แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝ แ‰ แ‹šแˆ… แˆ˜แˆแŠฉ แˆ›แˆตแ‰ฐแŠซแŠจแˆ แ‹ญแŠ–แˆญแ‰ฃแ‰ธแ‹‹แˆแข

@etconp
๐Ÿคฉ7๐Ÿ‘2โค1
๐Ÿ‘‰JOB VACANCY

๐Ÿ’ซArchitect with graphic design

๐Ÿ“แŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ, แŠขแ‰ตแ‹ฎแŒตแ‹ซ

โšก๏ธแ‰€แА แŒˆแ‹ฐแ‰ฅ: July 6, 2025

๐Ÿ“œแ‹จแˆฅแˆซ แˆ˜แŒแˆˆแŒซ

โบWe are looking for a creative Architect with graphic design skills and at least 2 years of experience.
โบThe role involves architectural and interior design, project management, and enhancing visual presentations with graphic design.
โบInterest or experience in furniture design is a plus.

๐ŸšงKey Responsibilities:

โบDesign architectural plans for residential, commercial, and institutional projects Handle interior and furniture design projects Manage timelines, budgets, and site work
Conduct site surveys and estimate finishing materials (e.g., doors, cabinets)
โบCreate graphics for marketing and presentations

โญ๏ธQualifications:Bachelor's degree in Architecture

โบProficiency in AutoCAD, SketchUp, Revit, rendering software Strong graphic design skills (Adobe Photoshop, Illustrator, InDesign) Creative, detail-oriented, and organized
Strong management and communication skills

๐Ÿ“Location:  แŠจแˆ˜แŠซแŠ’แˆณ แ‹ˆแ‹ฐ แŒ€แˆญแˆ˜แŠ• แ‰ แˆšแ‹ˆแˆตแ‹ฐแ‹ แˆ˜แŠ•แŒˆแ‹ต แˆ‹แ‹ญ

๐ŸŽฒSalary: 12,000 Birr

๐Ÿ“ฉแˆˆแˆ›แˆ˜แˆแŠจแ‰ต แ‰ แ‹šแˆ… แˆŠแŠ•แŠญ แ‹ญแˆ‹แŠฉแˆแŠ•๐Ÿ‘‡

https://forms.gle/4LgkRmoKFun5eRnbA

@etconp
โค7
๐Ÿ‘‰INVITATION FOR BID

IFB Reference No. ECWCT/NCB/PG/120/2017
โ€”โ€”โ€”โ€”-
The Ethiopian Construction Works Corporation (ECWC) hereby invites registered eligible bidders for SUPPLY DIFFERENT TYPES SANTERY FIXTURE MATERIALS for (3+G+34 ECX)under National Competitive Bidding -NCB).
1.  Interested Potential Bidders are required to present renewed relevant Trade License for the fiscal year, VAT Registration Certificate, Tax Clearance Certificate, Online Supplier list Registration Certificate.

2.  Bidding document should be prepared in English language.

3.  Interested Potential Bidders obtain a complete set of bidding document from the office of Procurement department against payment of none refundable fee of Birr 400.00 upon presentation of Trade License renewed for the fiscal year; VAT Registration Certificate, Tax Clearance Certificate and Online Supplier list Registration Certificate.

4.  This invitation of bid is open to all interested potential bidders regardless of their nationality and the bid evaluation and award shall be determined in accordance with the provision indicated in bidding document.

5.  The deadline for bid Submission shall be on July 10,2025 at 03:00 PM
6.  Bid must be accompanied with a Bid Security of an amount of Birr 200,000.00 (Two hundred thousand) in the form of certified cheque (CPO) or Bank guarantee.

7.  Bids must be delivered or deposited in the Tender Box situated at the office of the Procurement Department, before the closing date and time.

8.  Bids will be opened on July 10,2025 at 03:00 PM. In Ethiopian Construction Works Corporation Procurement Department office, in the presence of bidders and/or their representatives who choose to attend.

9.  The Ethiopian Construction Works Corporation reserves its rights to reject any or all bids.

10.  Bidders may get further information at the following address: 

Ethiopian Construction Works Corporation.

P. O. Box 21952/1000, Addis Ababa, Ethiopia

Gurd Sholla, In front of Andinet International School

Telephone No. 011 8 96 29 91/011 8 67 80 89/

@etconp
โค6
๐Ÿ‘‰INVITATION FOR RE-BIDIFB.No. ECWCRT/NCB/PG-42/2017
---------------
The Ethiopian Construction Works Corporation (ECWC) hereby invites registered eligible bidders for Supply Gym Rubber flooring & floor carpet for FQRA 4B+G21+ HQ projects.Interested Potential Bidders are required to present renewed relevant Trade License for the Ethiopian fiscal year, VAT Registration Certificate, Tax Clearance Certificate and Online Supplier list Registration Certificate together with the offer.

Bidding document should be prepared in English language.Interested Potential Bidders obtain a complete set of bidding document from the office of Local Bulk Procurement Team payment of none refundable fee of Birr 400.00 upon presentation of Trade License renewed for the fiscal year.This invitation of bid is open to all interested potential bidders regardless of their nationality and the bid evaluation and award shall be determined in accordance with the provision indicated in bidding document.

The deadline for bid Submission shall be on  July 2 /2025, at 2:00 PMBid must be accompanied with a Bid Security of an amount Birr 100,000.00 (One hundred thousand birr) in the form of (CPO) or unconditional Bank guarantee. Bid Bond in the form of insurance bond or in any other form shall not be accepted.Bids must be delivered or deposited in the Tender Box situated at the office of the national Bulk Procurement Team, before the closing date and time.Bids will be opened on July 2 /2025, at 2:30 PM.

In Ethiopian Construction Works Corporation Procurement Department conference room, in the presence of bidders and/or their representatives who choose to attend.

The Ethiopian Construction Works Corporation reserves its rights to reject any or all bids.Bidders may get further information at the following

address:Ethiopian Construction Works Corporation.National Bulk Procurement team

P. O. Box 21952/1000, Addis Ababa, Ethiopia

Telephone No. 0118-96 29 91

Address; Gurd Shola behind Athletics FederationIn Front of Adinet International College

@etconp
โค3
๐Ÿ‘‰Invitation to Bid Tender No.

ECWCT/NCB/PSW/106/2017The Ethiopian Construction Works Corporation (ECWC) here by invites registered eligible bidders For the Procurement of Supply, Install & Commission Water Pumps And related works under national competitive bidding (NCB).

1. Interested Potential Bidders are required to present renewed relevant Trade License for the fiscal year, VAT Registration Certificate, Tax Clearance Certificate and Online Supplier list Registration Certificate together with the offer.

2. Bidding document should be prepared in English language.

3. Those bidders willing to participate for supply of any type of tonner must accompanied the bid with manufacturer authorization letter or manufacturer license.

4. Interested Potential Bidders obtain a complete set of bidding document from the Procurement Office with Payment of none refundable fee of Birr 400.00(Four hundred birr).

5. This invitation of bid is open to all interested potential bidders regardless of their nationality.

6. Bid must be accompanied with a Bid Security an amount of Birr 300,000.00(Three hundred thousand birr only) in the form of certified check (CPO) or Bank guarantee. Bid Bond in the form of insurance bond or in any other form shall not be accepted.

7. Bids must be delivered or deposited in the Tender Box situated at the office of the Procurement depโ€™t, before the closing date and time.

8. The deadline for bid Submission shall be on June 19, 2025 at 10:00 A.M.

9. Bids will be opened on June 19, 2025 at 10:30 A.M.   in Ethiopian Construction Works Corporation Procurement Department conference room, in the presence of bidders and/or their representatives who choose to attend.
10. The Ethiopian Construction Works Corporation reserves its rights to reject any or all bids.
11. Bidders may get further information at the following

address:Ethiopian Construction Works Corporation.

Gurd Shola behind Athletics federation building and       Infront of Andinet international College

P. O. Box 21952/1000 

Telephone 011 8 96 29 91/
01118 67 80 89

Fax No. 251-11-6 67 60 90                                                    

Addis Ababa, Ethiopia

@etconp
๐Ÿ‘6โค2
๐Ÿ‘‰แ‹จ แ‰ปแŠ“แˆ แŒฅแ‰†แˆ›

แˆตแˆˆ แ‰ดแŠญแŠ–แˆŽแŒ‚ แŠฅแŠ“ AI แŠฅแ‹แ‰€แ‰ต แ‹จแˆแ‰ณแŒˆแŠ™แ‰ แ‰ต แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แ‰ปแŠ“แˆ แ‹ญแ‰€แˆ‹แ‰€แˆ‰๐Ÿ‘‡

https://t.me/AfriTech27
๐Ÿฅฐ2โค1๐Ÿ‘Œ1
๐Ÿ‘‰Common Mistakes in Concrete and How to Avoid it

๐ŸทConcrete is one of the most widely used building materials in the world. Itโ€™s strong, versatile, durable, and relatively inexpensive.

โบFrom skyscrapers to sidewalk concrete, it forms the backbone of modern infrastructure.

โบYet achieving high-quality, long-lasting concrete construction isnโ€™t as simple as mixing cement, water, and aggregates.

โบNumerous professionals and DIY builders make common mistakes that can compromise the structural integrity, appearance, and durability of concrete.

๐Ÿ“œThis article explores the most frequent concrete-related mistakes and provides practical advice on how to avoid them.

โญ๏ธ1. Misproportions of the Mix
The mistake:

โบOne of the most essential components of concrete work is achieving the right mix ratio.

โบA standard mix of concrete is made up of cement, sand (fine aggregate), and gravel (coarse aggregate), along with water. If the ratios are incorrect, the concrete can become too weak or too brittle.

๐Ÿ’ซfor example, too much water can enhance workability but compromise the strength of the ultimate product.

โบToo little water can make the mix unworkable and lead to incomplete hydration with a resultant low development of strength.

๐ŸšงHow to avoid:

* Use a reliable mix design appropriate to your specific project needs. For residential building work in general, a mix ratio of 1:2:3 (cement:sand:gravel) with a water-cement ratio of 0.4โ€“0.6 is standard.

* Weigh rather than measure by volume, especially in large or major projects.

* Consult engineers or use standard mix designs from trusted sources such as the American Concrete Institute (ACI).

@etconp
โค19๐Ÿ‘1
๐Ÿ‘‰แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แŒˆแ‰ แ‹ซแ‹ แ‰ แˆ…แ‹แ‰ฅ แ‹˜แŠ•แ‹ต แ‹ซแˆˆแ‹ แŠฅแˆแАแ‰ต แŠฅแ‹ซแˆฝแ‰†แˆˆแ‰†แˆˆ แАแ‹ แ‰ฐแ‰ฃแˆˆ

แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆˆแˆฆแˆตแ‰ต แŠ แˆตแˆญแ‰ต แ‹“แˆ˜แ‰ณแ‰ต แ‹ซแˆˆ แ‰ฐแ‰†แŒฃแŒฃแˆช แŠ แŠซแˆ แˆฒแŠ•แ‰€แˆณแ‰€แˆต แ‹จแ‰†แ‹จแ‹แŠ“ แ‰ แ‰ฐแ‹ฐแŒ‹แŒ‹แˆš แŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แ‰ƒแˆ แ‰ แŒˆแ‰กแ‰ต แŒŠแ‹œ แ‰คแ‰ถแ‰ฝแŠ• แ‰ฃแˆˆแˆ›แˆตแˆจแŠจแ‰ฃแ‰ธแ‹ แ‹จแˆ•แ‹แ‰ฅแŠ• แŠฅแˆแАแ‰ต แ‹ซแŒฃแ‹ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แ‹˜แˆญแแฃ แ‰ แŒˆแ‰ แ‹ซแ‹ แŠฅแŠ•แ‹ฒแ‰†แ‹ญ แŠจแ‰ฐแˆแˆˆแŒˆ แˆˆแ‹แŒฅ แŠฅแŠ•แ‹ฐแˆšแ‹ซแˆตแˆแˆแŒˆแ‹ แ‰ฐแŒ แ‰แˆŸแˆแข

แ‰ แ‹šแˆ…แˆ แˆ˜แˆฐแˆจแ‰ตแฃ แ‰ แ‰…แˆญแ‰ก แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แˆ›แˆ…แ‰ แˆญ แ‰ฐแ‰‹แ‰แˆž แŠ แ‰ฃแˆ‹แ‰ฑแŠ• แ‰ แˆซแˆฑ แˆˆแˆ˜แ‰†แŒฃแŒ แˆญ แˆ›แ‰€แ‹ฑแŠ• แ‹ญแ‹ แŠ แ‹ตแˆญแŒ“แˆแข

แˆ›แˆ…แ‰ แˆฉ แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แŒแŠ•แ‰ฃแ‰ณ แ‹˜แˆญแ แ‹แˆตแŒฅ แ‰ณแ‹‹แ‰‚ แ‰ แˆ†แŠ‘ แŒแˆˆแˆฐแ‰ฆแ‰ฝ แ‹จแ‰ฐแˆ˜แˆฐแˆจแ‰ฐ แˆฒแˆ†แŠ•แฃ แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แŒˆแ‰ แ‹ซแ‹ แŠ แ‹ฐแŒˆแŠ› แŠฅแ‹จแˆ†แА แˆ˜แˆแŒฃแ‰ฑแŠ•แŠ“ แ‹จแˆ•แ‹แ‰ฅ แŠฅแˆแАแ‰ต แˆ›แˆฝแ‰†แˆแ‰†แˆ‰แŠ• แŠ แŒฝแŠ•แŠฆแ‰ต แˆฐแŒฅแ‰ทแˆแข

แ‹ญแˆ…แŠ• แ‰ฝแŒแˆญ แˆˆแˆ˜แแ‰ณแ‰ตแˆ แŠจแˆšแˆ˜แˆˆแŠจแ‰ณแ‰ธแ‹ แ‹จแˆ˜แŠ•แŒแˆฅแ‰ต แŠ แŠซแˆ‹แ‰ต แŒ‹แˆญ แ‰ แ‰…แˆญแ‰ แ‰ต แ‰ แˆ˜แˆฅแˆซแ‰ต แ‹จแ‹˜แˆญแ‰แŠ• แˆแˆ›แ‰ต แˆˆแˆ›แ‹แŒ แŠ•แŠ“ แŠขแŠ•แ‰จแˆตแ‰ตแˆ˜แŠ•แ‰ตแŠ• แˆˆแˆ˜แˆณแ‰ฅ แŠ แ‰…แ‹ทแˆแข

แ‹จแˆ›แˆ…แ‰ แˆฉ แˆ˜แˆตแˆซแ‰พแ‰ฝแฃ โ€œแ‹จแ‹˜แˆญแ‰แŠ• แˆตแˆ แˆˆแˆ˜แŒ แ‰ แ‰… แˆซแˆณแ‰ฝแŠ•แŠ• แ‰ แˆซแˆณแ‰ฝแŠ• แŠฅแŠ•แ‰†แŒฃแŒ แˆซแˆˆแŠ•แค แŠฅแŠ•แ‹ฒแˆแˆ แ‰ แŒˆแŠ•แ‰ขแ‹Žแ‰ฝแŠ“ แ‰ แŒˆแ‹ขแ‹Žแ‰ฝ แˆ˜แŠซแŠจแˆ แ‹จแˆšแˆแŒ แˆฉ แŠ แˆˆแˆ˜แŒแ‰ฃแ‰ฃแ‰ถแ‰ฝแŠ• แˆˆแˆ˜แแ‰ณแ‰ต แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ แŠ แˆ แˆซแˆญ แŠฅแŠ•แ‹˜แˆจแŒ‹แˆˆแŠ•โ€ แ‰ฅแˆˆแ‹‹แˆแข


แ‹จแŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แ‹ฉแŠ’แ‰จแˆญแˆฒแ‰ฒ แ‹จแŠจแ‰ฐแˆ› แˆแˆ›แ‰ต แ•แˆฎแŒแˆฐแˆญ แ‰ถแˆ›แˆต แŒแˆญแˆ›แ‹ญ แ‰ แˆ›แˆ…แ‰ แˆฉ แ‹ญแ‹แ‹Š แˆ›แˆตแŒ€แˆ˜แˆชแ‹ซ แ‹ˆแ‰…แ‰ต แ‰ฃแ‰€แˆจแ‰กแ‰ต แŒฅแŠ“แ‰ตแฃ แŠจแŒแˆ›แˆฝ แ‹จแˆšแŒ แŒ‰ แ‹จแ‰คแ‰ต แŒˆแ‹ขแ‹Žแ‰ฝ แŠจแŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แ‰ฃแŒˆแŠ™แ‰ต แŠ•แ‰ฅแˆจแ‰ต แŠฅแŠ•แ‹ณแˆแˆจแŠฉ แŠ แˆ˜แˆแŠญแ‰ฐแ‹‹แˆแข

แ•แˆฎแŒแˆฐแˆญ แŒแˆญแˆ›แ‹ญ โ€œแ‹จแˆ•แ‹แ‰ก แ‹จแˆชแˆ แŠฅแˆตแ‰ดแ‰ต แŒˆแŠ•แ‰ขแ‹Žแ‰ฝ แŒแŠ•แ‹›แ‰ค แ‰ แŠ แˆแŠ‘ แŒŠแ‹œ แŠ แˆ‰แ‰ณแ‹Š แАแ‹แค แ‹จแ‹˜แˆญแ‰แˆ แŒˆแŒฝแ‰ณ แˆ˜แˆตแ‰ฐแŠซแŠจแˆ แŠ แˆˆแ‰ แ‰ตโ€ แˆฒแˆ‰ แŠ แŒฝแŠ•แŠฆแ‰ต แˆฐแŒฅแ‰ฐแ‹‹แˆแข

แ‹จแ‰คแ‰ต แŠฅแŒฅแˆจแ‰ต แŠ แˆแŠ•แˆ แ‹‹แАแŠ› แ‰ฝแŒแˆญ แˆ†แŠ– แ‰ แ‰€แŒ แˆˆแ‰ แ‰ต แ‰ แ‹šแˆ… แ‹ˆแ‰…แ‰ตแฃ แ‹จแˆ›แˆ…แ‰ แˆฉ แˆแˆตแˆจแ‰ณ แ‰ แ‹˜แˆญแ‰ แ‰ณแˆ›แŠแАแ‰ตแŠ•แŠ“ แ‰ฐแŒ แ‹ซแ‰‚แАแ‰ตแŠ• แˆˆแˆ˜แˆ˜แˆˆแˆต แ‰ตแˆแ‰… แŒฅแˆจแ‰ต แˆ˜แˆ†แŠ‘แŠ• แ‰ฃแˆˆแˆ™แ‹ซแ‹Žแ‰ฝ แŒˆแˆแŒธแ‹‹แˆแข

Via capital ethiopia

@etconp
โค7๐Ÿ‘3๐Ÿ˜ข1
๐Ÿ‘‰แ‹จแ‰ฑแˆ‰แ‰ฆแˆŽ - แŠฌแˆ‹ แŠ แˆตแ‹แˆแ‰ต แˆ˜แŠ•แŒˆแ‹ต แ•แˆฎแŒ€แŠญแ‰ต แ‰ฐแŒ แŠ“แ‰€แ‰€

๐Ÿšงแ‹จแŠฆแˆฎแˆšแ‹ซ แŠฅแŠ“ แ‹จแˆ›แ‹•แŠจแˆ‹แ‹Š แŠขแ‰ตแ‹ฎแŒตแ‹ซ แŠญแˆแˆŽแ‰ฝแŠ• แ‹จแˆšแ‹ซแŒˆแŠ“แŠ˜แ‹ แ‹จแ‰ฑแˆ‰แ‰ฆแˆŽ - แŠฌแˆ‹ แŠ แˆตแ‹แˆแ‰ต แˆ˜แŠ•แŒˆแ‹ต แ•แˆฎแŒ€แŠญแ‰ต แŒแŠ•แ‰ฃแ‰ณแ‹ แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แˆ˜แŒ แŠ“แ‰€แ‰แŠ• แ‰ฐแŠจแ‰ตแˆŽ แ‹ฐแˆจแŒƒแ‹แŠ• แ‹จแŒ แ‰ แ‰€ แŠ แŒˆแˆแŒแˆŽแ‰ต แ‰ แˆ˜แˆตแŒ แ‰ต แˆ‹แ‹ญ แ‹ญแŒˆแŠ›แˆแข

แ‹จแˆ˜แŠ•แŒˆแ‹ต แ•แˆฎแŒ€แŠญแ‰ฑ 80 แŠชแˆŽแˆœแ‰ตแˆญ แ‹จแˆธแˆแА แˆฒแŠพแŠ•แฅ แ‰ แŠ แˆตแ‹แˆแ‰ต แŠฎแŠ•แŠญแˆชแ‰ต แ‹ฐแˆจแŒƒ แАแ‹ แ‹จแ‰ฐแŒˆแАแ‰ฃแ‹แข แ‹จแˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณแ‹แŠ• แ‹จแ‰ปแ‹ญแŠ“แ‹ แ‹“แˆˆแˆ-แŠ แ‰€แ แ‹จแˆฅแˆซ แ‰ฐแ‰‹แˆซแŒญ แˆแŠ“แŠ• แˆแŠ•แ‹ณ แˆฎแ‹ต แŠคแŠ•แ‹ต แ‰ฅแˆชแŒ… แŠฎแˆญแ–แˆฌแˆฝแŠ• แŠ แŠจแŠ“แ‹แŠ–แ‰ณแˆแข

แˆ€แŒˆแˆญ แ‰ แ‰€แˆ‰ แ‹จแ‰ฐแ‰ฃแ‰ แˆฉแ‰ต แ‹จแˆแˆ…แŠ•แ‹ตแˆตแŠ“ แŠ แˆ›แŠซแˆชแ‹Žแ‰ฝ แ‹จแŒแŠ•แ‰ฃแ‰ณแ‹แŠ• แŒฅแˆซแ‰ต แ‰ แˆ˜แ‰†แŒฃแŒ แˆญ แŠฅแŠ“ แ‰ แˆ›แˆ›แŠจแˆญ แ‰ แŠฉแˆ แ‰ฐแˆณแ‰ตแแˆแข แˆˆแ•แˆฎแŒ€แŠญแ‰ฑ แ‹จแ‹‹แˆˆแ‹ 1 แАแŒฅแ‰ฅ 3 แ‰ขแˆŠแ‹ฎแŠ• แ‰ฅแˆญ แ‹ˆแŒช แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แ‰ แŒแ‹ฐแˆซแˆ แˆ˜แŠ•แŒแˆตแ‰ต แ‰ฐแˆธแแŠ—แˆแข

แ‰ แˆ˜แŠ•แŒˆแ‹ต แ•แˆฎแŒ€แŠญแ‰ฑ แˆฆแˆตแ‰ต แ‹ตแˆแ‹ตแ‹ฎแ‰ฝแŠ• แŒจแˆแˆฎ แŠ แАแˆตแ‰ฐแŠ›แฃ แŠจแแ‰ฐแŠ› แแˆณแˆฝ แˆ›แˆตแ‰ฐแˆ‹แˆˆแŠแ‹ซแ‹Žแ‰ฝแฃ แ‰ฑแ‰ฆแ‹Žแ‰ฝ แŠฅแŠ“ แŠจแˆแ‰จแˆญแ‰ถแ‰ฝ แŒแŠ•แ‰ฃแ‰ณแˆ แ‰ฐแŠซแ‰ตแ‰ทแˆแข แˆ˜แŠ•แŒˆแ‹ฑ แ‰ แŒˆแŒ แˆญ แ‹จแˆ˜แŠ•แŒˆแ‹ต แ‰ตแŠจแˆปแŠ• แŒจแˆแˆฎ 10 แˆœแ‰ตแˆญแฃ แ‰ แ‹ˆแˆจแ‹ณ 20 แˆœแ‰ตแˆญ แŠฅแŠ•แ‹ฒแˆแˆ แ‰ แ‰€แ‰ แˆŒ 15 แˆœแ‰ตแˆญ แ‹จแŒŽแŠ• แˆตแ‹แ‰ต แŠ แˆˆแ‹แข

แ‹จแˆ˜แŠ•แŒˆแ‹ฑ แˆ˜แŒ แŠ“แ‰€แ‰… แ‹จแŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ-แ‰กแ‰ณแŒ…แˆซ -แˆ†แˆณแ‹•แŠ“ แŠฅแŠ“ แ‹จแŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ - แ‹ˆแˆแ‰‚แŒค - แŒ…แˆ› แˆ˜แˆตแˆ˜แˆญ  แ‹ซแˆ‰แ‰ตแŠ• แŠ แ‹แˆซ แˆ˜แŠ•แŒˆแ‹ถแ‰ฝ แ‹ซแŒˆแŠ“แŠ›แˆแกแก แ‹ญแˆ…แˆ แŠจแ‹šแˆ… แ‰€แ‹ฐแˆ แ‹ญแ‹ฐแˆจแŒ แ‹จแАแ‰ แˆจแ‹แŠ• แ‹™แˆชแ‹ซ แŒฅแˆแŒฅแˆ แŒ‰แ‹ž แ‰ แˆ›แˆตแ‰€แˆจแ‰ต แ‹จแŒ‰แ‹ž แŒŠแ‹œแŠ• แ‹ซแˆณแŒฅแˆซแˆแข

แ‹จแ‰ฐแ‰€แˆ‹แŒ แˆ แ‹จแ‰ตแˆซแŠ•แˆตแ–แˆญแ‰ต แŠฅแŠ•แ‰…แˆตแ‰ƒแˆด แŠฅแŠ•แ‹ฒแŠ–แˆญ แ‰ แˆ›แˆตแ‰ปแˆแฃ แ‹จแˆ›แŠ…แ‰ แˆซแ‹Š แ‰ฐแ‰‹แˆ›แ‰ต แ‰ฐแ‹ฐแˆซแˆฝแАแ‰ตแŠ• แ‰ แˆ›แˆตแ‹แ‰ต แŠฅแŠ•แ‹ฒแˆแˆ แ‹จแŒˆแ‰ แ‹ซ แ‰ตแˆตแˆตแˆฉแŠ• แ‰ แˆ›แŒ แŠ“แŠจแˆญ แ‹จแˆ˜แŠ•แŒˆแ‹ฑ แˆ˜แŒˆแŠ•แ‰ฃแ‰ต แŠจแแ‰ฐแŠ› แŠ แˆตแ‰ฐแ‹‹แŒฝแ‹– แ‹ซแ‰ แˆจแŠญแ‰ณแˆแข

แ‹จแ‰ฑแˆ‰แ‰ฆแˆŽแฃ แˆ€แˆญแ‰กแŒฉแˆ‰แˆŒแฃ แŠฎแˆแ‰ แˆแฃ แŠ แŒจแ‰ แˆญแฃ แ‰€แˆฝแ‰ต แŠฅแŠ“ แŠฌแˆ‹แŠ• แŒจแˆแˆฎ แˆŒแˆŽแ‰ฝ แ‰ แˆญแŠซแ‰ณ แŠ แŠซแ‰ฃแ‰ขแ‹Žแ‰ฝแŠ• แ‰ แ‰…แˆญแ‰ แ‰ต แ‹ซแŒˆแŠ“แŠ›แˆแข

@etconp
โค11๐Ÿ‘4
๐Ÿ‘‰Retaining walls are solid wall constructions that hold soil lateral to a building to maintain the ground surface at different elevations on both sides.

โบRetaining walls are indispensable because the soil at higher elevations tends to sink due to the various destabilising forces acting on it.

๐Ÿ’ซThe primary purpose of retaining walls is to maintain the vertical or nearly vertical alignment of the soil or other materials destabilised by external forces.

โบThe different types of retaining walls are frequently utilised for a variety of purposes, including coastal engineering, irrigation engineering, and road, railway, and bridge construction.

โบThe base block is solidly monolithically linked to the vertical or inclined stem.

โบRetaining walls are usually constructed to a height of 6 metres.

๐ŸทRetaining Wall:

โบA retaining wall is a structure designed to hold back soil and prevent erosion. Constructed from materials like concrete, stone, or timber, it's crucial in landscape engineering.

โบRetaining walls prevent slope instability, create usable spaces, and enhance aesthetics. Proper design and engineering ensure safety and effectiveness against earth pressures.

โ‡๏ธFunctions of Retaining Wall: The assorted functions of Retaining Walls encompass the following:

1. The retaining wall acts as a barrier that prevents the movement of soil or other materials along a steep slope.

2. They maintain the ground surface height by retaining the earth in place.

3. Retaining walls that are made to withstand the soils or backfill securely transfer other externally applied stresses to a foundation.

โบPurpose of Retaining Wall: Retaining walls are essential structures used to support soil where level differences exist.

๐ŸŽฒTheir main purpose is to prevent the natural movement of soil and maintain the shape of the terrain.

โบIn areas with steep slopes, retaining walls help protect against erosion, landslides, and slope failure.

โบThey are widely used in construction to create flat surfaces on uneven ground, making space available for roads, buildings, and landscaping.

โบIn highway, railway, and irrigation projects, retaining walls help stabilize embankments and prevent soil from interfering with built structures.

โบApart from providing support, these walls also contribute to site safety and improve land usability in hilly or unstable areas.


@etconp
โค11
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•

โ™ง แˆแˆ‰แŠ• แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แˆˆแˆแˆ‰แˆ แ‰…แˆญแ‰ฅ

โ™ง แˆแˆตแŠญแˆซแ‰ฝแŠ• แˆตแˆซแ‰ฝแŠ•

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

โ™ง แ‹ญแ‹ฐแ‹แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

0904040477
0994941708
โค3๐Ÿ‘1
๐Ÿ‘‰Lets Answer On Comment

๐Ÿ’ซ1. The creep strains are _

(a)  Caused due to dead loads only
(b)  Caused due to live loads only
(c)  Caused due to both dead loads and live loads
(d)  Independent of loads

๐Ÿ’ซ2. Specific volume is reciprocal of _

(a)  Mass
(b)  Area
(c)  Volume
(d)  Mass density

๐Ÿ’ซ3. Which of the following scales is the smallest one?

(a)  4 : 200000
(b)  1 cm = 5000 m
(c)  1 cm = 50 m
(d)  RF =1/50000

๐Ÿ’ซ4. Consider the following statements in the case of stone masonry and find the correct statement

A.  Stone used should not be dumb bell-shaped
B.  Stone masonry section should always designed to take compressive and tensile stresses

(a)  Only A
(b)  Only B
(c)  Both A & B
(d)  None of the above

๐Ÿ’ซ5. Fineness modulus of sand greater than _ will not be suitable for satisfactory concrete mix.

(a)  3.5
(b)  3.2
(c)  2.9
(d)  2.6

๐Ÿ’ซ6. For limit state of collapse flexure, the maximum strain in concrete at the outermost compression fibre is taken equal to _.

(a)  0.002
(b)  0.02
(c)  0.0035
(d)  0.035

๐Ÿ’ซ7. For flow through pipes, the laminar flow occurs, when Reynolds number is _.

(a)  Between 2000 and 4000
(b)  Less than 4000
(c)  More than 4000
(d)  Less than 2000

๐Ÿ’ซ8. Give an example for flaky shape of aggregate

(a)  Pit sand
(b)  Crushed rock
(c)  Blown sand
(d)  Laminated rock

๐Ÿ’ซ9. The S-curve is used for the _.

(a)  Development of synthetic unit hydrograph
(b)  Conversion of unit hydrograph of one duration to another
(c)  Estimation of peak flow of a storm hydrograph
(d)  Derivation of unit hydrograph from complex type of storm

๐Ÿ’ซ10. For a given discharge, the efficiency of sedimentation tank can be increased by _.

(a)  Increasing the depth of the tank
(b)  Increasing the surface area of the tank
(c)  Decreasing the depth of the tank
(d)  Decreasing the surface area of the tank

@etconp
โค8๐Ÿ‘4