๐EFFECT OF TEMPRETURE IN CONCRETE CASTING:
๐ซTemperature has a big influence on concrete casting because it directly affects hydration rate, setting time, workability, and long-term strength.
๐A breakdown for both hot and cold conditions are listed below.
๐ง1. In Hot Weather (High Temperature)
โญ๏ธEffects: Rapid water evaporation โ reduces workability and slump.
โบFaster hydration โ shortens setting time, making placing & finishing harder.
โบHigher risk of plastic shrinkage cracks due to quick surface drying.
โบIncreased risk of cold joints if delays happen during pouring.
โบPossible reduction in long-term strength if water evaporates before proper hydration.
โก๏ธPrecautions:
โบUse cool mixing water or chilled aggregates.
โบCast during cooler times of the day (early morning/evening).
โบCover concrete immediately after finishing to reduce evaporation.
โบUse retarding admixtures to slow setting.
โบKeep formwork and reinforcement cool before casting.
๐ง2. In Cold Weather (Low Temperature)
โญ๏ธEffects:
โบSlower hydration โ delays setting and strength gain.
โบRisk of freezing water inside fresh concrete โ disrupts hydration and weakens structure.
โบExtended curing time required before formwork removal.
โบPotential scaling or surface damage if concrete freezes before gaining ~3.5 MPa strength.
โก๏ธPrecautions:
โบUse warm mixing water or heated aggregates.
โบUse accelerating admixtures to speed up setting.
โบCover concrete with thermal blankets or use heated enclosures.
โบAvoid casting if ambient temperature is below 5 ยฐC without protection.
โบGeneral Rule: Concrete performs best when the fresh concrete temperature is kept between 10 ยฐC and 30 ยฐC during casting and early curing.
@etconp
๐ซTemperature has a big influence on concrete casting because it directly affects hydration rate, setting time, workability, and long-term strength.
๐A breakdown for both hot and cold conditions are listed below.
๐ง1. In Hot Weather (High Temperature)
โญ๏ธEffects: Rapid water evaporation โ reduces workability and slump.
โบFaster hydration โ shortens setting time, making placing & finishing harder.
โบHigher risk of plastic shrinkage cracks due to quick surface drying.
โบIncreased risk of cold joints if delays happen during pouring.
โบPossible reduction in long-term strength if water evaporates before proper hydration.
โก๏ธPrecautions:
โบUse cool mixing water or chilled aggregates.
โบCast during cooler times of the day (early morning/evening).
โบCover concrete immediately after finishing to reduce evaporation.
โบUse retarding admixtures to slow setting.
โบKeep formwork and reinforcement cool before casting.
๐ง2. In Cold Weather (Low Temperature)
โญ๏ธEffects:
โบSlower hydration โ delays setting and strength gain.
โบRisk of freezing water inside fresh concrete โ disrupts hydration and weakens structure.
โบExtended curing time required before formwork removal.
โบPotential scaling or surface damage if concrete freezes before gaining ~3.5 MPa strength.
โก๏ธPrecautions:
โบUse warm mixing water or heated aggregates.
โบUse accelerating admixtures to speed up setting.
โบCover concrete with thermal blankets or use heated enclosures.
โบAvoid casting if ambient temperature is below 5 ยฐC without protection.
โบGeneral Rule: Concrete performs best when the fresh concrete temperature is kept between 10 ยฐC and 30 ยฐC during casting and early curing.
@etconp
โค5๐2
๐JOB VACANCY
๐แจแแฎแแญแต แแ แต แแแแฒแต
โถ๏ธDead Line :September 4, 2025
๐JOB REQUIREMENT
โญ๏ธแฐแแแ แจแตแแ แญแต แฐแจแแ แจแฅแซ แแแต: แจแณแแ แฉแแจแญแฒแฒ/แฎแแ แ แฎแแตแตแซแญแฝแ แแแ แแแตแฃแ แฒแชแ แขแแ แแชแแแฃแ แ แญแญแดแญแธแญ แแญแ แ แฐแแณแณแญ แจแตแแ แญแต แแตแญ แจแแแแชแซ แฒแแช แแฎแต แ แแซแ 4 แแแต แฅแ แจแแซ แ แแญ แ แแฃแฅแแต แซแแ แจแฅแซ แแแต แซแแ/แแต
โบแฐแจแ: 10
โถ๏ธแฅแแต:2
แฐแแแ:แแซแช แแ แ แฒแต แ แฐแปแปแแ แจแตแญแ แฑ แฐแแแ โถ๏ธแตแฌแ แแฐแจแต
โถ๏ธแจแฅแซ แฆแณแก แ แฒแต แ แ แฃ แฅแ แ แ แซแฃแขแ
๐ซHOW TO APPLY
โบแจแแแแฃ แแแก แญแ แแตแณแแแซ แ แชแแญแฐแญ แแแฃ แจแแฃแ แต แแ แแแฎ แฃแแต แฐแฃแต แฐแจแณแณแญ แจแฅแซ แแแตแฃแ แ แซแ แ แแ แจแฅ
โบแฐแแแแก- แ แตแญแ แฑ แตแฌแ แแ แจแต
๐แจแแแแฃ แ แตแซแปแก แ แซแต แ แญแตแฎแ แแ แ แญ แแ แ/แคแต (แจแแแแ แแฐ แแฐแ แแฎแฐแช แ แแแตแฐแ แแแแต แแซแคแ แจแตแซแแญ แแฅแซแฑ แ แ แแฅ)
๐นแแณแฐแขแซแก แ แแแซแพแฝ แแแแแฃ แฒแแญแก แจแตแแ แญแตแ แจแฅแซ แแแต แแตแจแแธแแ แแแแแ แจแแญแแแต แแถ แฎแ แญแแ แแแฃแตแ แแฃแธแแกแก
๐แ แแแซแพแฝ แฐแจแแช แแฅแซแชแซ แขแแแ แ แตแแญ แแฅแญ 09-72-57-86-37 แฐแแแ แแแแต แญแฝแแแกแก
@etconp
๐แจแแฎแแญแต แแ แต แแแแฒแต
โถ๏ธDead Line :September 4, 2025
๐JOB REQUIREMENT
โญ๏ธแฐแแแ แจแตแแ แญแต แฐแจแแ แจแฅแซ แแแต: แจแณแแ แฉแแจแญแฒแฒ/แฎแแ แ แฎแแตแตแซแญแฝแ แแแ แแแตแฃแ แฒแชแ แขแแ แแชแแแฃแ แ แญแญแดแญแธแญ แแญแ แ แฐแแณแณแญ แจแตแแ แญแต แแตแญ แจแแแแชแซ แฒแแช แแฎแต แ แแซแ 4 แแแต แฅแ แจแแซ แ แแญ แ แแฃแฅแแต แซแแ แจแฅแซ แแแต แซแแ/แแต
โบแฐแจแ: 10
โถ๏ธแฅแแต:2
แฐแแแ:แแซแช แแ แ แฒแต แ แฐแปแปแแ แจแตแญแ แฑ แฐแแแ โถ๏ธแตแฌแ แแฐแจแต
โถ๏ธแจแฅแซ แฆแณแก แ แฒแต แ แ แฃ แฅแ แ แ แซแฃแขแ
๐ซHOW TO APPLY
โบแจแแแแฃ แแแก แญแ แแตแณแแแซ แ แชแแญแฐแญ แแแฃ แจแแฃแ แต แแ แแแฎ แฃแแต แฐแฃแต แฐแจแณแณแญ แจแฅแซ แแแตแฃแ แ แซแ แ แแ แจแฅ
โบแฐแแแแก- แ แตแญแ แฑ แตแฌแ แแ แจแต
๐แจแแแแฃ แ แตแซแปแก แ แซแต แ แญแตแฎแ แแ แ แญ แแ แ/แคแต (แจแแแแ แแฐ แแฐแ แแฎแฐแช แ แแแตแฐแ แแแแต แแซแคแ แจแตแซแแญ แแฅแซแฑ แ แ แแฅ)
๐นแแณแฐแขแซแก แ แแแซแพแฝ แแแแแฃ แฒแแญแก แจแตแแ แญแตแ แจแฅแซ แแแต แแตแจแแธแแ แแแแแ แจแแญแแแต แแถ แฎแ แญแแ แแแฃแตแ แแฃแธแแกแก
๐แ แแแซแพแฝ แฐแจแแช แแฅแซแชแซ แขแแแ แ แตแแญ แแฅแญ 09-72-57-86-37 แฐแแแ แแแแต แญแฝแแแกแก
@etconp
โค11๐9
๐China cut a mountain in half to build a highway with the world's tallest bridge, standing at 2,051 feet.
In Guizhou, China has sliced through a mountain to construct a new expressway โ and soon, it will feature the worldโs highest bridge: the Huajiang Canyon Bridge.
๐งThis engineering marvel rises 2,051 feet above the canyon โ tall enough to completely hide the Eiffel Tower โ and it will transform a previously 70-minute mountainous drive into a smooth, one-minute journey.
๐ซBuilt using 49,000 tons of steel and advanced technologies like GPS-controlled cranes and wind sensors, the bridge is expected to open by the end of 2025, and it already has all internet-connected smart systems installed.
@etconp
In Guizhou, China has sliced through a mountain to construct a new expressway โ and soon, it will feature the worldโs highest bridge: the Huajiang Canyon Bridge.
๐งThis engineering marvel rises 2,051 feet above the canyon โ tall enough to completely hide the Eiffel Tower โ and it will transform a previously 70-minute mountainous drive into a smooth, one-minute journey.
๐ซBuilt using 49,000 tons of steel and advanced technologies like GPS-controlled cranes and wind sensors, the bridge is expected to open by the end of 2025, and it already has all internet-connected smart systems installed.
@etconp
โค8
#ADVERTISEMENT
๐ญ๐ TSEGAYE and YOHANNES J-Bolt & PLATE ๐๐ ๐๐
๐งฟ OUR SERVICES โคต๏ธ
๐ฒPlate
โ๏ธ J-Bolt
โAnchor Bolt
โฝTie Rod
Phone : ๐คณ0938494506
๐คณ 0951087077
๐คณ 0929044037
๐แ แตแซแปแฆ แแญแซแถ แแแ แแฝ แฐแซ แจแญแต แฐแซ แจแ แฅแ
https://t.me/tsegaye2016Jbolt
๐ญ๐ TSEGAYE and YOHANNES J-Bolt & PLATE ๐๐ ๐๐
๐งฟ OUR SERVICES โคต๏ธ
๐ฒPlate
โ๏ธ J-Bolt
โAnchor Bolt
โฝTie Rod
Phone : ๐คณ0938494506
๐คณ 0951087077
๐คณ 0929044037
๐แ แตแซแปแฆ แแญแซแถ แแแ แแฝ แฐแซ แจแญแต แฐแซ แจแ แฅแ
https://t.me/tsegaye2016Jbolt
โค2
๐Hidden Enemies of Concrete: Chlorides & Sulphates
๐ซConcrete is considered one of the most durable construction materialsโbut in reality, it is highly vulnerable to certain hidden enemies present in water, soil, or even raw materials.
๐งAmong them, Chlorides and Sulphates are the most dangerous.
โ Positive Effects (in limited amount)
โญ๏ธ1. Chlorides:
โบSmall quantity of calcium chloride (CaClโ) is sometimes added as an accelerator admixture to speed up early strength gain.
โบUseful in cold weather concreting where rapid setting is needed.
โญ๏ธ2. Sulphates:
โบIn controlled form, gypsum (calcium sulphate) is added in cement during manufacturing to regulate setting time.
โบPrevents flash setting and ensures workability.
โ Negative Effects (when in excess)
๐ฐ1. Chlorides:
โบPromote steel reinforcement corrosion by breaking down passive film around rebars.
Lead to cracking, spalling, rust stains, and reduced load-bearing capacity.
โบMain sources: saline water, marine environment, contaminated sand, de-icing salts.
๐ฐ2. Sulphates:
โบCause sulphate attackโleading to expansion, cracking, and softening of concrete.
โบReaction with C3A (tricalcium aluminate in cement) produces expansive products (ettringite), damaging structure internally.
โบSources: groundwater rich in sulphates, soil, bricks, or certain aggregates.
๐ Key Takeaways for Quality Control:
๐ฒ1. Always test mixing water, aggregates, and soil for chloride & sulphate content.
๐ฒ2. Use sulphate resisting cement or blended cement in aggressive environments.
๐ฒ3. Provide proper concrete cover & waterproofing to resist penetration.
๐ฒ4. In marine/industrial structures, use corrosion inhibitors or protective coatings.
@etconp
๐ซConcrete is considered one of the most durable construction materialsโbut in reality, it is highly vulnerable to certain hidden enemies present in water, soil, or even raw materials.
๐งAmong them, Chlorides and Sulphates are the most dangerous.
โ Positive Effects (in limited amount)
โญ๏ธ1. Chlorides:
โบSmall quantity of calcium chloride (CaClโ) is sometimes added as an accelerator admixture to speed up early strength gain.
โบUseful in cold weather concreting where rapid setting is needed.
โญ๏ธ2. Sulphates:
โบIn controlled form, gypsum (calcium sulphate) is added in cement during manufacturing to regulate setting time.
โบPrevents flash setting and ensures workability.
โ Negative Effects (when in excess)
๐ฐ1. Chlorides:
โบPromote steel reinforcement corrosion by breaking down passive film around rebars.
Lead to cracking, spalling, rust stains, and reduced load-bearing capacity.
โบMain sources: saline water, marine environment, contaminated sand, de-icing salts.
๐ฐ2. Sulphates:
โบCause sulphate attackโleading to expansion, cracking, and softening of concrete.
โบReaction with C3A (tricalcium aluminate in cement) produces expansive products (ettringite), damaging structure internally.
โบSources: groundwater rich in sulphates, soil, bricks, or certain aggregates.
๐ Key Takeaways for Quality Control:
๐ฒ1. Always test mixing water, aggregates, and soil for chloride & sulphate content.
๐ฒ2. Use sulphate resisting cement or blended cement in aggressive environments.
๐ฒ3. Provide proper concrete cover & waterproofing to resist penetration.
๐ฒ4. In marine/industrial structures, use corrosion inhibitors or protective coatings.
@etconp
โค12๐2
๐แญแซแธแช/Base profile/Column starter/Column Kicker/
๐ซแ แแแฃแณ แฅแซ แแญแฃ "แญแซแธแช" แ แแแแต แแแฃแญ แแ แแแ แญ /Vertical structure/ แตแญแญแแ แแคแแต/แ แแฃแ แแ/vertical allignment/ แฅแ แจแ แญแฝ แตแซแ/Formwork/แแแจแแแฅ แจแแแ แแฃแญ แแ แแแ แญ แแญ แฐแแณแณแญ แตแแตแ แญแแแต แซแแแฃ แแแแ แแแ แญ แแช/Refference/ แแ แจแแฐแซ แแแป แตแซ แแแข
๐งแญแซแธแช แ 2 แแแแต แแฐแซ แญแฝแแ::
โ๏ธ1แ. Column starter formwork
แแแแ แแ แแแ แญ แฐแแณแณแญ แตแแตแ แญแแแต แซแแแฃ แแแแ แแแ แญ แแช แแแป แแ แจแแฐแซ แแญแแแญแญ แฒแแ
โ๏ธ2แ Column starter Concrete
แแแแ แแ แแแ แญ แฐแแณแณแญ แตแแตแ แญแแแต แซแแแฃ แแแแ แแแ แญ แแช แแแป แแ แจ5แณแ -10แณแ แฅแแแต แซแแ แแ แจแแฐแซ แฎแแญแชแต แแแข
โแญแซแธแช แแ แแ แฅแ แ แญแฐแฃแ? แแแแ๐
@etconp
๐ซแ แแแฃแณ แฅแซ แแญแฃ "แญแซแธแช" แ แแแแต แแแฃแญ แแ แแแ แญ /Vertical structure/ แตแญแญแแ แแคแแต/แ แแฃแ แแ/vertical allignment/ แฅแ แจแ แญแฝ แตแซแ/Formwork/แแแจแแแฅ แจแแแ แแฃแญ แแ แแแ แญ แแญ แฐแแณแณแญ แตแแตแ แญแแแต แซแแแฃ แแแแ แแแ แญ แแช/Refference/ แแ แจแแฐแซ แแแป แตแซ แแแข
๐งแญแซแธแช แ 2 แแแแต แแฐแซ แญแฝแแ::
โ๏ธ1แ. Column starter formwork
แแแแ แแ แแแ แญ แฐแแณแณแญ แตแแตแ แญแแแต แซแแแฃ แแแแ แแแ แญ แแช แแแป แแ แจแแฐแซ แแญแแแญแญ แฒแแ
โ๏ธ2แ Column starter Concrete
แแแแ แแ แแแ แญ แฐแแณแณแญ แตแแตแ แญแแแต แซแแแฃ แแแแ แแแ แญ แแช แแแป แแ แจ5แณแ -10แณแ แฅแแแต แซแแ แแ แจแแฐแซ แฎแแญแชแต แแแข
โแญแซแธแช แแ แแ แฅแ แ แญแฐแฃแ? แแแแ๐
@etconp
โค22
๐TENDER ANNOUNCEMENT
โญ๏ธLOT 46 Health campus remaining Works of Main get and fence construction
โบInvitation Date Aug 28, 2025
๐Procurement Reference No DMU-NCB-W-0007-2018-BID-Open
๐ซProcuring Entity :Debremarkos University
๐Country: Ethiopia
โบTown: DEBRE MARKOS
โบStreet: HADIS ALEMAYEHU
โบRoom Number:27/10
๐Telephone:+251921071526
๐ฉEmail:diresbinalfe@gmail.com
Po Box: 269
๐งObject of Procurement LOT 46 Health campus remaining Works of Main get and fence construction
โบLot Number 1
โก๏ธClarification Request Deadline Sep 9, 2025, 5:00:00 PM
โบBid Submission Deadline Sep 22, 2025, 10:00:00 AM
โบBid Opening Schedule Sep 22, 2025, 10:30:00 AM
@etconp
โญ๏ธLOT 46 Health campus remaining Works of Main get and fence construction
โบInvitation Date Aug 28, 2025
๐Procurement Reference No DMU-NCB-W-0007-2018-BID-Open
๐ซProcuring Entity :Debremarkos University
๐Country: Ethiopia
โบTown: DEBRE MARKOS
โบStreet: HADIS ALEMAYEHU
โบRoom Number:27/10
๐Telephone:+251921071526
๐ฉEmail:diresbinalfe@gmail.com
Po Box: 269
๐งObject of Procurement LOT 46 Health campus remaining Works of Main get and fence construction
โบLot Number 1
โก๏ธClarification Request Deadline Sep 9, 2025, 5:00:00 PM
โบBid Submission Deadline Sep 22, 2025, 10:00:00 AM
โบBid Opening Schedule Sep 22, 2025, 10:30:00 AM
@etconp
โค9
๐JOB VACANCY
๐ซSITE SUPERVISOR
โบEmployment: Full-Time | Permanent
๐Place of Work: Around Gerji Mebrat Hail, Addis Ababa - Ethiopia
โก๏ธDeadline: September, 02/2025
๐งAbout the Role
โบOn behalf of our client, We are seeking a motivated and detail-oriented Site Supervisor to oversee day-to-day construction activities for our client's real estate and commercial building projects around Gerji Mebrat Hail, Addis Ababa.
โบThe ideal candidate will ensure smooth site operations, maintain quality standards, and manage timelines while coordinating effectively with workers, subcontractors, and management.
๐ทKey Responsibilities
โบSupervise and monitor construction site activities to ensure compliance with project plans and safety standards.
โบCoordinate with contractors, subcontractors, and suppliers to ensure timely completion of work.
โบOversee material usage, site logistics, and daily labor activities.
โบConduct regular inspections to maintain quality control on construction progress.
โบPrepare and submit daily/weekly site reports to project management.
โบEnsure adherence to health, safety, and environmental (HSE) regulations on site.
โบAct as the primary point of contact for site-related issues, resolving challenges efficiently.
โ๏ธQualifications & Skills
โบDiploma or Bachelorโs degree in Construction Management, Civil Engineering, or related field.
โบ1โ5 years proven experience as a Site Supervisor in real estate or commercial building projects.
โบStrong knowledge of construction processes, materials, and quality standards.
โบExcellent leadership, communication, and problem-solving skills.
โบProficiency in MS Office and construction management tools is an advantage.
โบStrong organizational skills with attention to detail.
๐ฉHow to apply
Interested? Send your application to
recruitment1@geezjobs.com
@etconp
๐ซSITE SUPERVISOR
โบEmployment: Full-Time | Permanent
๐Place of Work: Around Gerji Mebrat Hail, Addis Ababa - Ethiopia
โก๏ธDeadline: September, 02/2025
๐งAbout the Role
โบOn behalf of our client, We are seeking a motivated and detail-oriented Site Supervisor to oversee day-to-day construction activities for our client's real estate and commercial building projects around Gerji Mebrat Hail, Addis Ababa.
โบThe ideal candidate will ensure smooth site operations, maintain quality standards, and manage timelines while coordinating effectively with workers, subcontractors, and management.
๐ทKey Responsibilities
โบSupervise and monitor construction site activities to ensure compliance with project plans and safety standards.
โบCoordinate with contractors, subcontractors, and suppliers to ensure timely completion of work.
โบOversee material usage, site logistics, and daily labor activities.
โบConduct regular inspections to maintain quality control on construction progress.
โบPrepare and submit daily/weekly site reports to project management.
โบEnsure adherence to health, safety, and environmental (HSE) regulations on site.
โบAct as the primary point of contact for site-related issues, resolving challenges efficiently.
โ๏ธQualifications & Skills
โบDiploma or Bachelorโs degree in Construction Management, Civil Engineering, or related field.
โบ1โ5 years proven experience as a Site Supervisor in real estate or commercial building projects.
โบStrong knowledge of construction processes, materials, and quality standards.
โบExcellent leadership, communication, and problem-solving skills.
โบProficiency in MS Office and construction management tools is an advantage.
โบStrong organizational skills with attention to detail.
๐ฉHow to apply
Interested? Send your application to
recruitment1@geezjobs.com
@etconp
โค16
Ethiopian Construction Vacancy & Tender
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ ๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แฆแแแญแ แแญ แ แ แแญแ แแแ แแแญ แจแแตแแแ แฐแแชแแฝ แฅแ แจ แฎแแตแตแซแญแฝแ แฃแแแซแแฝ แแแฐแ แแญ แ แฐแแฃแฃแ แแ แแฅแแต แฐแแชแแฝ แแแแฃ แแแจแแ ๐ฅ แญแ
แตแแ แ แแ แแ แตแแ
แญแถแฝแ แซแซแตแณแ? ๐ซTakeoff sheet ๐ซBill of Quantity(BOQ) ๐ซPaymentโฆ
๐ทแแแแฃ แจแญแฐแแ๐
๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แ แณแ แแณ แ แแต แฐแแต แญแแต แญแแแซแ แฐแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แ แณแ แแณ แ แแต แฐแแต แญแแต แญแแแซแ แฐแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
โค6
แจแจแณ
แ แฒแต แแแ แแแด 23 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแแด 23 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค2๐1
แจแจแณ
แ แฒแต แแแ แแแด 23 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแแด 23 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค3๐1
แจแจแณ
แ แฒแต แแแ แแแด 23 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแแด 23 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค2
แจแจแณ
แขแตแฎแตแซแ แแซแแต แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แขแตแฎแตแซแ แแซแแต แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค2
แจแจแณ
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค3
แจแจแณ
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค2๐1
แจแจแณ
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค4๐2
แจแจแณ
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแแด 22 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค4๐1๐ข1
๐แจแจแณ
โบBuilding consultancy Service (แจแ แแ แแแฃแณ แตแซ แแแจแญ แ แแแแแต) | Ethiopian Intellectual Property Authority
โบInvitation Date Aug 28, 2025
๐Procurement Reference No EIPA-NCB-C-0004-2018-BID-Open
๐งProcurement Category :Consultancy Services
โบMarket Type:National
โบProcurement Method:Open
๐Procurement Classification
โ๏ธCode Title 72110000 แจแแแชแซ แแแ แแแฃแณ แ แแแแแถแฝ
โบProcuring Entity Ethiopian Intellectual Property Authority,
๐Address
โบCountry: Ethiopia
โบTown: Addis Ababa
โบStreet: kazanchis
โบRoom Number:2
๐Telephone: +251115500272
๐ฒEmail: info@eipo.gov.et
๐ฉPo Box: 25322/1000
โบObject of Procurement Building consultancy Service (แจแ แแ แแแฃแณ แตแซ แแแจแญ แ แแแแแต)
Description Building consultancy Service ** (แจแ แแ แแแฃแณ แตแซ แแแจแญ แ แแแแแต)
- Lot Number 1
Clarification Request Deadline Sep 7, 2025, 5:00:00 PM
Pre-Bid Conference Schedule Not Applicable
Site Visit Schedule Not Applicable
Bid Submission Deadline Sep 12, 2025, 10:00:00 AM
Bid Opening Schedule Sep 12, 2025, 10:30:00 AM
Bid Security Amount 50,000 ETB
Bid Security Form For SME Letter from Small and Micro Enterprise, Bank Guarantee,
Bid Security Form For Foreign Bidders Bank Guarantee,
Bid Security Form For Local Bidders Bank Guarantee,
Notice
๐Terms and Conditions
โบแจแจแณแแ แ แจแแแ แแ แแ แแแ แจแแฐแจแ แแฅแฑ แ แ แ แจแฐแ แ แ แแ
๐Application: Online on EGP
@etconp
โบBuilding consultancy Service (แจแ แแ แแแฃแณ แตแซ แแแจแญ แ แแแแแต) | Ethiopian Intellectual Property Authority
โบInvitation Date Aug 28, 2025
๐Procurement Reference No EIPA-NCB-C-0004-2018-BID-Open
๐งProcurement Category :Consultancy Services
โบMarket Type:National
โบProcurement Method:Open
๐Procurement Classification
โ๏ธCode Title 72110000 แจแแแชแซ แแแ แแแฃแณ แ แแแแแถแฝ
โบProcuring Entity Ethiopian Intellectual Property Authority,
๐Address
โบCountry: Ethiopia
โบTown: Addis Ababa
โบStreet: kazanchis
โบRoom Number:2
๐Telephone: +251115500272
๐ฒEmail: info@eipo.gov.et
๐ฉPo Box: 25322/1000
Lot Information
โบObject of Procurement Building consultancy Service (แจแ แแ แแแฃแณ แตแซ แแแจแญ แ แแแแแต)
Description Building consultancy Service ** (แจแ แแ แแแฃแณ แตแซ แแแจแญ แ แแแแแต)
- Lot Number 1
Clarification Request Deadline Sep 7, 2025, 5:00:00 PM
Pre-Bid Conference Schedule Not Applicable
Site Visit Schedule Not Applicable
Bid Submission Deadline Sep 12, 2025, 10:00:00 AM
Bid Opening Schedule Sep 12, 2025, 10:30:00 AM
Bid Security Amount 50,000 ETB
Bid Security Form For SME Letter from Small and Micro Enterprise, Bank Guarantee,
Bid Security Form For Foreign Bidders Bank Guarantee,
Bid Security Form For Local Bidders Bank Guarantee,
Notice
๐Terms and Conditions
โบแจแจแณแแ แ แจแแแ แแ แแ แแแ แจแแฐแจแ แแฅแฑ แ แ แ แจแฐแ แ แ แแ
๐Application: Online on EGP
@etconp
โค6๐1
๐แจแขแตแฎแตแซ แฒแชแ แแแแฒแถแฝ แแ
แ แญ แฅแ แแแ แ แจแฅแแต แฒแแญแแ แแฅแฅแญ แตแซแแฝ แ/แจแฐ/แจแ/แแ
แ แญ 5แฐแแแ แจแแ
แแตแตแ แแฃแค แ แฃแ
แญแณแญ แจแฐแ แแฌ แ
แณแ แแแด 24/ 2017 แซแแแแแข
๐ซแ แแ แแฃแค แแแแฒแถแฝ, แ แแญแ แแแต แฅแ แฅแแแต แซแซแ แฑ แฃแแแซแแฝ แฅแ แฃแแตแญแป แ แซแแต แจแแณแฐแแ แต แญแแแแข
๐งThe Ethiopian Association of Civil Engineers (EACE), and Lalibela Study Design & Supervision Works PLC, will host the 5th EACE Engineering
๐Conference under the theme: Transforming Construction: Innovation, Safety, and Sustainability
๐Location: Bahirdar, Ethiopia
๐ทDate: August 30, 2025
โบThis premier event will bring together engineers, industry experts, and innovators to explore forward-thinking solutions that shape a safer, more sustainable construction industry.
@etconp
๐ซแ แแ แแฃแค แแแแฒแถแฝ, แ แแญแ แแแต แฅแ แฅแแแต แซแซแ แฑ แฃแแแซแแฝ แฅแ แฃแแตแญแป แ แซแแต แจแแณแฐแแ แต แญแแแแข
๐งThe Ethiopian Association of Civil Engineers (EACE), and Lalibela Study Design & Supervision Works PLC, will host the 5th EACE Engineering
๐Conference under the theme: Transforming Construction: Innovation, Safety, and Sustainability
๐Location: Bahirdar, Ethiopia
๐ทDate: August 30, 2025
โบThis premier event will bring together engineers, industry experts, and innovators to explore forward-thinking solutions that shape a safer, more sustainable construction industry.
@etconp
โค10๐ฅฐ1
#ADVERTISEMENT
๐ญ๐ TSEGAYE and YOHANNES J-Bolt & PLATE ๐๐ ๐๐
๐งฟ OUR SERVICES โคต๏ธ
๐ฒPlate
โ๏ธ J-Bolt
โAnchor Bolt
โฝTie Rod
Phone : ๐คณ0938494506
๐คณ 0951087077
๐คณ 0929044037
๐แ แตแซแปแฆ แแญแซแถ แแแ แแฝ แฐแซ แจแญแต แฐแซ แจแ แฅแ
https://t.me/tsegaye2016Jbolt
๐ญ๐ TSEGAYE and YOHANNES J-Bolt & PLATE ๐๐ ๐๐
๐งฟ OUR SERVICES โคต๏ธ
๐ฒPlate
โ๏ธ J-Bolt
โAnchor Bolt
โฝTie Rod
Phone : ๐คณ0938494506
๐คณ 0951087077
๐คณ 0929044037
๐แ แตแซแปแฆ แแญแซแถ แแแ แแฝ แฐแซ แจแญแต แฐแซ แจแ แฅแ
https://t.me/tsegaye2016Jbolt
โค3๐1