Ethiopian Construction Vacancy & Tender
18.2K subscribers
4.61K photos
57 videos
549 files
3.88K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

๐Ÿ“ฉ @Philemona7
Download Telegram
๐Ÿ‘‰New Vacancy

๐Ÿ’ซStructural - Draftsman

๐ŸšงTVET IV in Drafting or in a related field of study with relevant work experience

๐Ÿ“œDuties & Responsibilties:

- Responsible for creating and managing Building Information Models (BIM) to support construction and design projects.
- Developing detailed 3D models, generating accurate drawings.
- Ensuring designs comply with project specifications and industry standards.
- Work autonomously or as part of a larger team and able to make design decisions, act on own initiative and operate in a pro-active way.
- Excellent communication skills will be preferred.
- Wider knowledge of other disciplines highly desirable.

โบQuanitity Required: 3

โบMinimum Years Of Experience: #3_years

โšก๏ธDeadline: May 20, 2025

๐Ÿ“ฉHow To Apply: Apply using the provided Telegram link below๐Ÿ‘‡

https://t.me/kb_betty

@etconp
๐Ÿ‘2๐Ÿ‘2
แŒจแˆจแ‰ณ

แˆชแ–แˆญแ‰ฐแˆญ แŒแŠ•แ‰ฆแ‰ต  6 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
๐Ÿ‘1
แŒจแˆจแ‰ณ

แŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ• แŒแŠ•แ‰ฆแ‰ต 6 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
โค2
แŒจแˆจแ‰ณ

แŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ• แŒแŠ•แ‰ฆแ‰ต 6 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
โค1๐Ÿ‘1
แŒจแˆจแ‰ณ

แŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ• แŒแŠ•แ‰ฆแ‰ต 6 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
โค1
แŒจแˆจแ‰ณ

แŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ• แŒแŠ•แ‰ฆแ‰ต 6 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
๐Ÿ‘1
แŒจแˆจแ‰ณ

แŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ• แŒแŠ•แ‰ฆแ‰ต 6 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
๐Ÿ‘2โค1๐Ÿ‘1
แŒจแˆจแ‰ณ

แŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ• แŒแŠ•แ‰ฆแ‰ต 5 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
โค1๐Ÿ‘1
แŒจแˆจแ‰ณ

แŠ แ‹ฒแˆต แ‹˜แˆ˜แŠ• แŒแŠ•แ‰ฆแ‰ต 5 แ‰€แŠ• 2017 แ‹“. แˆ แ‹•แ‰ตแˆ แˆ‹แ‹ญ แ‹จแ‰ฐแ‹ˆแˆฐแ‹ฐ

https://t.me/ETCONpWORK

@etconp
๐Ÿ‘4
๐Ÿ‘‰The Importance of Alignment in Construction: Building a Solid Foundation

In construction, alignment isnโ€™t just a technical detailโ€”itโ€™s the backbone of a successful project. Proper alignment ensures that all structural elements fit together seamlessly, providing strength, stability, and safety to the building. Hereโ€™s why itโ€™s so crucial:

1. Structural Integrity
Alignment ensures that load-bearing elements like beams, columns, and walls are precisely positioned, distributing weight evenly and preventing structural failures.

2. Safety First
Misalignment can lead to uneven stress on materials, increasing the risk of cracks, collapses, or other dangerous issues. Proper alignment keeps the structure safe for both workers and occupants.

3. Aesthetic Excellence
In addition to safety, alignment affects the aesthetic appeal of a project. Straight lines, level surfaces, and symmetrical designs are pleasing to the eye and reflect high-quality workmanship.

4. Cost Efficiency
Correcting misalignment can be expensive and time-consuming. By prioritizing alignment from the start, you avoid costly repairs, delays, and material waste.

5. Smooth Workflow
When all elements are aligned, it simplifies the workflow for all trades involvedโ€”plumbers, electricians, and finishers can work more efficiently, knowing that the foundation is solid.

In construction, precision matters. By focusing on alignment, we ensure that every project is not only built to last but also stands as a testament to quality and excellence.

@etconp
๐Ÿ‘12โค5
๐Ÿ‘‰Difference Between CONSTRUCTION Joints and EXPANSION Joints :

๐Ÿ’ซ‎Expansion joints and construction joints are two types of joints used in concrete construction, but they serve different purposes and have distinct characteristics.
‎
โ–  ‎EXPANSION JOINT :

‎1. PURPOSE : Accommodate thermal expansion and contraction of concrete due to temperature changes.
‎
‎2. LOCATION : Typically placed at regular intervals (e.g., 15-20 meters) in long, straight sections of concrete, such as roads, runways,walls, or building floors.
‎
‎3. DESIGN/ORIENTATION : Usually consists of a gap (e.g., 10-20 mm) filled with a flexible sealant, such as asphalt or silicone.
‎
‎4. FUNCTION : Allows the concrete to expand and contract without causing stress or damage to the surrounding structure.
‎
‎
‎
โ–  ‎CONSTRUCTION JOINT :

‎1. PURPOSE : Separate concrete pours, allowing for construction to proceed in stages.
‎
‎2. LOCATION/ORIENTATION : Typically placed at the end of a concrete pour, where the next pour will begin.
‎
‎3. DESIGN : Usually consists of a keyed joint (e.g., a roughened surface) to ensure a strong bond between the two concrete pours.
‎
‎4. FUNCTION : Allows for the construction process to be broken down into manageable sections, while maintaining the structural integrity of the concrete.

‎  โ–  KEY DIFFERENCES :

‎1. PURPOSE : Expansion joints accommodate thermal movement, while construction joints separate concrete pours.
‎
‎2. LOCATION/ORIENTATION : Expansion joints are typically placed at regular intervals, while construction joints are placed at the end of a concrete pour.
‎
‎3. DESIGN : Expansion joints have a gap filled with a flexible sealant, while construction joints have a keyed joint for bonding.

@etconp
๐Ÿ‘7โค3
๐Ÿ‘‰NEW VACANCY

๐Ÿ’ซSenior QA/QC Engineer

โบBachelor's Degree in Civil Engineering or in a related field of study with relevant work experience out of which 1 year in a senior position in a similar discipline of work (work experience at an international company will be given priority)

๐Ÿ“œDuties & Responsibilites:

- Reviews design, manufacturing, and testing documentation.
- Coordinates and performs inspections of raw materials and finished products, applying appropriate quality assurance testing process as per national and international standards
Required Skills:
- Excellent Communication Skills
- Excellent Reporting Skill
- Excellent Skill of Microsoft tools

โบQuanitity Required: 2

โบMinimum Years Of Experience: #5_years

โšก๏ธDeadline: June 6, 2025

๐Ÿ“ฉHow To Apply: submit your credentials via email MarakiE@eeigconstruction.com

@etconp
๐Ÿ‘9โค1
๐Ÿ‘‰Elus Construction are looking for a Fresh Graduate civil engineer who wishes to gain experience in a variety of projects in addis ababa,

๐Ÿ“ฉIf you're interested, send us the required documents via telegram
@Concrete_completion

@etconp
๐Ÿ‘5
๐Ÿ‘‰Job Vacancy

โญ๏ธQuantity Surveyor

๐Ÿ“Addis Ababa, Ethiopia

โšก๏ธแ‰€แА แŒˆแ‹ฐแ‰ฅ: May 22, 2025
โบแŠญแแ‰ต แ‹จแˆตแˆซ แ‰ฆแ‰ณแ‹Žแ‰ฝ: 1

๐Ÿ“œJob Summary:

We are seeking a detail-oriented and experienced Quantity Surveyor to manage all aspects of the contractual and financial side of construction projects. The successful candidate will be responsible for cost estimation, budgeting, procurement, and financial control to ensure projects are completed within budget and on schedule.

๐Ÿ’ซKey Responsibilities:

- 5 years and above
- Prepare cost estimates, budgets, and bills of quantities for construction projects.
โบAnalyze drawings and specifications to determine the scope and quantities of materials.
โบConduct feasibility studies and risk analysis.
โบManage project finances, monitor expenditures, and keep track of project progress.
โบPrepare tender documents, contracts, budgets, and other documentation.
โบNegotiate contracts and work with clients, suppliers, and contractors.
โบPerform cost analysis and provide cost advice during the design and construction phases.
โบAssess completed work and arrange payments to contractors.
โบProvide regular financial reports to management.
โบEnsure compliance with legal, contractual, and safety requirements.

โ‡๏ธRequirements:

Bachelor's degree in Quantity Surveying, Civil Engineering, or related field Job Summary:
We are seeking a detail-oriented and experienced Quantity Surveyor to manage all aspects of the contractual and financial side of construction projects. The successful candidate will be responsible for cost estimation, budgeting, procurement, and financial control to ensure projects are completed within budget and on schedule.

๐Ÿ”ฐKey Responsibilities:

โบPrepare cost estimates, budgets, and bills of quantities for construction projects.
โบAnalyze drawings and specifications to determine the scope and quantities of materials.
โบConduct feasibility studies and risk analysis.
โบManage project finances, monitor expenditures, and keep track of project progress.
โบPrepare tender documents, contracts, budgets, and other documentation.
โบNegotiate contracts and work with clients, suppliers, and contractors.
โบPerform cost analysis and provide cost advice during the design and construction phases.
โบAssess completed work and arrange payments to contractors.
โบProvide regular financial reports to management.
โบEnsure compliance with legal, contractual, and safety requirements.
โบProficiency in relevant software (e.g., AutoCAD, MS Excel, CostX, or similar).
Excellent analytical and mathematical skills.
Strong negotiation and communication skills.
Attention to detail and a proactive approach.
Preferred Qualifications:
Professional certification (e.g., RICS, MRICS, AIQS, etc.) is an advantage.

๐Ÿ“ฉHow to apply

Send Your Cv @Hr20meseso17

@etconp
๐Ÿ‘11๐Ÿ‘1
๐Ÿ‘‰Archicad is a powerful Building Information Modeling (BIM) software developed by Graphisoft, designed specifically for architects, designers, and planners. Launched in 1984, it was one of the first software applications to utilize BIM technology, allowing users to create detailed 3D models of buildings and structures efficiently. With its user-friendly interface and robust features, Archicad has become a staple in the architecture and construction industries.

โ–ŽKey Features of Archicad

1. BIM Capabilities: Archicad allows users to create intelligent 3D models that contain both geometric and non-geometric information. This means that every element of a building can be defined with its properties, making it easier to manage and modify designs.

2. Collaboration Tools: The software supports collaboration among team members through features like BIMcloud, which enables real-time teamwork on projects. This is crucial for large projects where multiple stakeholders are involved.

3. Visualization Tools: Archicad includes advanced rendering capabilities that allow users to create photorealistic images and animations of their designs. This is particularly useful for presentations and client approvals.

4. Documentation: The software automatically generates construction documentation from the 3D model, ensuring that all drawings are consistent and up-to-date. This feature significantly reduces the time spent on manual drafting.

5. OpenBIM Support: Archicad supports various industry standards for data exchange, allowing seamless integration with other software tools. This is essential for multidisciplinary projects where different teams may use different software.

Benefits of Using Archicad

- Increased Efficiency: With its automated documentation and collaborative features, Archicad helps architects save time on repetitive tasks, allowing them to focus on the creative aspects of design.

- Improved Accuracy: The intelligent nature of BIM ensures that any changes made to the model are reflected throughout all documentation, reducing the risk of errors.

- Enhanced Communication: The visualization tools improve communication with clients and stakeholders, helping them understand the design intent more clearly.

- Sustainability: Archicad includes tools for energy analysis and sustainability assessments, helping architects design more environmentally friendly building architecture.

@etconp
๐Ÿ‘8โค1
๐Ÿ‘‰the main types of flat slabs used in construction:

๐Ÿ’ซTypical Flat Slab: This type of slab is supported directly by columns without the use of beams.

โบItโ€™s often used in warehouses, offices, and public halls where beam projections are not desired.

๐ŸšงFlat Slab with Drop Panel: In this type, the slab is thickened near the columns by providing drop panels. This helps to reduce the shear stress around the columns.

๐ŸšงFlat Slab with Column Head: The column head is widened to reduce the perforation shear in the slab. This type is used to increase the capacity of the slab to resist two-way shear.
Flat Slab with Drop Panel and Column Head: This combines both drop panels and column heads to provide additional strength and reduce shear stresses around the columns.

Flat slabs are popular in modern construction due to their simplicity and ease of construction, as well as their ability to provide flexible layouts without the need for beams.

@etconp
๐Ÿ‘3โค1
๐Ÿ‘‰In concrete mix plants, batching is the process of measuring and combining various ingredients to create concrete. There are two primary methods of batching: volume batching and weight batching. Here are the key differences between the two:

### Volume Batching:
1. Measurement Method:
- In volume batching, materials (cement, aggregates, sand, and water) are measured by volume, using containers or buckets.

2. Accuracy:
- This method is generally less accurate than weight batching because the volume of materials can vary based on factors like compaction and moisture content.

3. Equipment:
- Volume batching typically uses simpler equipment, such as measuring boxes or buckets. It's often used in small construction projects or where precision is not critical.

4. Common Use:
- Volume batching is more common in small-scale projects or for field mixing where quick and straightforward measurements are needed.

### Weight Batching:
1. Measurement Method:
- In weight batching, materials are weighed using scales before being added to the mixer. Each component is measured by weight, ensuring a more precise mix.

2. Accuracy:
- This method is more accurate, as it accounts for variations in material density and moisture content, leading to a more consistent concrete mix.

3. Equipment:
- Weight batching requires more sophisticated equipment, including digital scales or load cells, and is typically used in larger, more industrialized concrete plants.

4. Common Use:
- Weight batching is preferred in large-scale construction projects where consistency and quality control are critical, such as in ready-mix concrete plants.

### Summary:
In summary, the main difference between volume batching and weight batching lies in the method of measurement (volume versus weight). Weight batching offers greater accuracy and consistency, making it the preferred choice for most commercial and large-scale concrete mixing operations, while volume batching is simpler and may be used for smaller projects.

@etconp
๐Ÿ‘10โค2
แŠญแแ‰ต แ‹จ แˆตแˆซ แ‰ฆแ‰ณ

@etconp
๐Ÿ‘5
๐Ÿ‘‰แ‹ณแ‰ณ แŠฎแˆŒแŠญแ‰ฐแˆญ (data collector) แˆˆ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆณแ‹ญแ‰ต แˆ‹แ‹ญ แˆ˜แˆตแˆซแ‰ต แ‹จแˆšแˆแˆแŒ แ‰  civil แ‹ˆแ‹ญแˆ แ‰  cotm แ‹จแ‰ฐแˆ˜แˆจแ‰€

๐Ÿ’ซแ‹จ แˆตแˆซ แˆแˆแ‹ต แŠ แ‹ซแˆตแˆแˆแŒแˆ (0 แ‹“แˆ˜แ‰ต )

๐Ÿ“แ‹จแˆตแˆซ แ‰ฆแ‰ณ แŠ แ‹ฒแˆต แŠ แ‰ แ‰ฃ แ‰„แˆซ แ‰กแˆแŒ‹แˆชแ‹ซ แŠ แŠซแ‰ฃแ‰ข

๐Ÿ“žแ‰ แАแ‹šแˆ… แˆตแˆแŠญ
090 214 8284
097 348 1397
091 355 1729
แ‹ญแ‹ฐแ‹แˆ‰แˆแŠ•

@etconp
โค9๐Ÿ˜ข3๐Ÿ™1
๐Ÿ‘‰A prime coat is a thin layer of low-viscosity bituminous material applied to a non-bituminous granular base course (e.g., crushed stone or gravel) in road construction before laying the asphalt surface layer.

โบIts primary purpose is to prepare the base for better bonding with the asphalt layer, enhance durability, and protect the base course. Below are detailed aspects of a prime coat:

๐ŸšงPurpose of Prime Coat

1. Bonding: Ensures strong adhesion between the granular base and the asphalt layer, preventing slippage or delamination.
2. Waterproofing: Seals the base course to prevent water infiltration, which could weaken the base.
3. Base Protection: Protects the granular base from weather exposure and traffic damage before the asphalt layer is applied.
4. Dust Control: Reduces dust generation from the base course during construction.
5. Strengthening: Penetrates and binds loose particles in the base, improving its stability.

๐ŸšงMaterials Used

- Cutback Asphalt: Most common, typically medium-curing (MC) grades like MC-30, MC-70, or MC-250. These are asphalt cement mixed with a solvent (e.g., kerosene) to reduce viscosity for easier application.
- Emulsified Asphalt: Less common but used in some cases (e.g., SS-1 or CSS-1). These are asphalt droplets suspended in water, environmentally friendlier due to lower solvent use.
- The choice depends on local climate, base material, and project specifications.

๐ŸšงApplication Process

1. Base Preparation:
   - The base course (e.g., aggregate base) must be clean, dry, and free of loose material, dust, or debris.
   - Compact the base to the required density and ensure a smooth, even surface.
   - Correct any surface irregularities or weak spots.
2. Equipment:
   - A distributor truck with a spray bar is used to apply the prime coat uniformly.
   - Hand sprayers may be used for small or inaccessible areas.
3. Application Rate:
   - Typically ranges from 0.65 to 1.75 liters per square meter (0.15 to 0.4 gallons per square yard), depending on the baseโ€™s porosity and texture.
   - Coarse, porous bases require higher rates; denser bases need less.
4. Temperature:
   - The bituminous material is heated to the recommended temperature (e.g., 50โ€“80ยฐC for MC-70) for proper spraying viscosity.
   - Ambient temperature should generally be above 10ยฐC (50ยฐF) to ensure proper curing.
5. Curing:
   - The prime coat must penetrate the base and cure (solvent evaporates or emulsion breaks) before the asphalt layer is placed.
   - Curing typically takes 24โ€“48 hours, depending on weather, material, and application rate.
   - Traffic should be kept off the surface during curing to avoid damage.
6. Blotting (if needed):
   - If excess prime coat pools on the surface, fine sand or aggregate is applied to absorb it and prevent tracking.

๐ŸšงKey Considerations

- Environmental Conditions: Avoid application during rain, high humidity, or cold weather, as these can hinder curing or penetration.
- Material Selection: Match the prime coat material to the base type and climate (e.g., MC-70 for warmer climates, MC-30 for cooler ones).
- Safety: Handle bituminous materials carefully due to flammability and fumes. Use proper protective equipment.
- Environmental Impact: Cutback asphalts release volatile organic compounds (VOCs). Some regions prefer emulsified asphalts for lower environmental impact.
- Testing: Conduct field tests (e.g., penetration test or visual inspection) to ensure adequate penetration and curing before overlaying asphalt.

๐ŸšงAdvantages

- Enhances pavement longevity by improving base-asphalt bonding.
- Protects the base from moisture and construction traffic.
- Cost-effective way to stabilize the base course.

๐ŸšงDisadvantages

- Requires curing time, which may delay construction.
- Improper application (e.g., excess material) can lead to bleeding or poor bonding.

@etconp
๐Ÿ‘15โค1