👉What are the difference between cohesive and cohesion less soil?

➡️Cohesion as the word itself denotes, is the attraction between particles of same type/origin/nature Hence cohesive soil is a type of soil where there is inter particular attraction.

▶️This adds to the shear strength of the soil.
▶️The main feature of such soil types are that their particles are very fine and they are governed by the surface forces rather than by their self weight.

⏺Clay is a very good example for a cohesive soil.
*In pure cohesive soils, the friction between particles will not occur and hence their shear strength will be contributed by only cohesive force and not by internal friction.
*The angle of internal friction will not come into play here.

➡️None cohesive soil as the name indicates do not have cohesive forces.
*They are comparatively coarser particles with self weight governing their behaviour. The particles have internal friction and their shear strength depends upon the angle of internal friction between particles.

⏺Sand is a typical example.
*Exclusively non-cohesive soils will have zero cohesion.
.
▶️Now you must know that majority of the natural soil deposits do not come under the above categories.

🚧They are mostly C φ soils.
*That means they have both cohesive forces and frictional forces contributing to their shear strength.
📌These are the difference between cohesive and cohesionless soil.

#Soil

@etconp
👍2
👉What are the advantages of marble flooring over tiles?

➡️Marble flooring is durable, scratch free and have the tenacity to withstand the tussle of little footprints that kids bring throughout the home.

⏺These are moisture resistant so easy to clean with warm water and dish soap on a daily basis and highly recommended a sealing protection to make floors shiny.

📌Advantages of Marble Flooring:

⏺For hot climates, marble flooring is favourable as one feels relatively cold underfoot.
⏺The joints of marble tiles can be easily matched.
⏺Marble flooring is extremely durable and long lasting, it can withstand any external pressure, and any sudden change of weight can easily be handled by this material. Thus it is very suitable for high traffic areas such as restaurants, hotels, etc.
⏺Tiles are not suitable for high traffic area.
⏺Marble Flooring creates a very significant aesthetic for interiors.

#finishing

@etconp
👉የመወያያ ሀሳብ

▶️እንደሚታወቀው በሀገራችን አስተማማኝ የግልግል ስርአት ስላልተዘረጋ ከአስተዳደር መ/ቤት ጋር የሚደረግ የኮንሰትራክሽን ውል ክርክር ጉዳይ ለመደበኛ ፍርድ ቤት የሚቀርብ ነው።

▶️የግንባታ ስራ ማቆም በአስቸኳይ ግዜ አዋጁ ተከልክሏል በአብዛኛው የመንግስት ተቋማት ደግሞ አሁን ባለው ሁኔታ የተቋራጮችን የክፍያና ክሌም ጉዳይ በአግባቡ መፍትሄ እየሰጡ እንዳልሆነ ይነገራል ስለዚህ ግዙፍ ኢኮኖሚ የሚንቀሳቀስበት የኮንስትራክሽን ኢንዱስትሪ ይህን ችግር ጉዳቱን ቀንሶ ለመሻገር ይችል ዘንድ አሰሪ፣ተቋራጭና አማካሪዎች በትብብር መንፈስ መስራትና ችግርን በንግግር መፍታት ይጠበቅባቸዋል።

▶️በተጨማሪም የኮንስትራክሽን ክርክር በአብዛኛው ሰፊ ስለሚሆንና ቴክኒካል ጉዳይ ስለሚበዛበት በፍርድ ቤቶች ሳይቋጭ ብዙ ጊዜ የሚወስድበት ሁኔታ ይስተዋላል ስለዚህ የዘርፍን ጉዳት ለመቀነስ ፍርድ ቤቶች በተለይ በኮንስትራክሽን ጉዳዮች ባለጉዳይ ችሎት መቅረብ ሳያስፈልግ ለጊዜው አዲስ ክስ ፣ይግባኝ፣መልስ፣ይግባኝ መጨረሱ የተረጋገጠ ጉዳይ አፈጻጸም፣እና የንብረት እግድ የማቅረብ ጉዳይ የሚያስተናግዱበት ሁኔታ ቢመቻች የሚል ሀሳብ አለን።

⏺እናንተስ ምን ትላላችሁ?
⏺የተቋራጮች ማህበራትስ ምን አይነት የመፍትሄ ሀሳብ አላቸው?
⏺የከተማ ልማትና ኮንስትራክሽን ሚንስቴር እና የኮንስትራክሽን ስራዎች ተቆጣጣሪ ባለስልጣን በዚህ ረገድ ምን የመፍትሄ ሀሳብ አላቸው?
⏺ምን ገጠመኝስ አለ?

✍ሀሳብ እና አስተያየታቹ @COTMp ላይ አጋሩን።

#ConstructionLaw

@etconp
👍1
👉How tall buildings resist the wind

📌Setbacks Besides the forementioned corner softening and tapering buildings to resist the wind, alternating a building’s profile as it rises and including setbacks can also reduce the strength of vortices as they move around buildings.

⏺Some of New York City's early skyscrapers achieved this in response to the setback ordinances of 1916 - which was a measure adopted primarily to stop massive buildings from preventing light and air from reaching the streets below, and established limits in building massing at certain heights, usually interpreted as a series of setbacks.

🚧The most notable example of setbacks today is the 828 metre Burj Khalifa in the United Arab Emirates (UAE).
*This remarkable structure uses a range of techniques to resist the wind and achieve its height including an extreme taper, multiple setbacks and high degree of corner softening, in which their effect can be demonstrated in a simulation developed using software such as SimScale.


@etconp
🔖ማሳሰብያ ለውድ የ ቻናላችን ቤተሰቦች

🚧ለሁላቹሁም በ ጠቅላላ የ ኮንስራክሽን ዘርፍ ላይ ጆርናል ና መፅሄት እትሞች፣በ ራድዮ እና ቴሌቭዥን ፕሮግራሞች፣በ ዲዛይን አውደ ርእይ እና ውድድሮች በማዘጋጀት የተሰማራቹ እንዲሁም በ ኮንስትራክሽን ተቋማት ከፍተኛ እና መካከለኛ የ ስራ ሃላፊነት ድርሻ ላይ የ ምትገኙ በ ሙሉ @ETCONp የ ቴሌግራም ቻናል ከናንተ በትብብር መስራት ስለሚፈልግ ከኛ ጋር አብራቹ መስራት ለምትፈልጉ @ETCONpADs ወይም @ETCONp_Bot ላይ በ ውስጥ መስመር እንድታገኙን በትህትና እንጠይቃለን።

➡️ኢትዮጵያ ሀገራችንን በበጎ ስራ እናገልግል የምህንድስና ሙያን ወደ ከፍታው እንመልስ!!
፡
🇪🇹ፈጣሪ ኢትዮጵያ እና ህዝቦቿን አብዝቶ ይባርክ!🙏
👍1
👉Longest Highways In The World

🚧Trans Canada Highway Canada
is transcontinental systems of roads maintained by both the federal and provincial governments and stretches from the west coast of Pacific Ocean and passes through all the ten provinces of Canada to the east coast at the Atlantic Ocean.

⏺The highway covers a distance of 4,999 miles long. The highway was approved by the Trans-Canada highway act of 1949 and the construction begun in 1950.

⏺It was officially inaugurated in 1962 and its completion was in 1971.

⏺At its completion it was the world’s longest uninterrupted highway and it was distinct with the white on green maple leaf markings along its stretch.

⏺In 2012, a number of public vehicle charging stations were installed along the highway by the Sun Country Highway company to allow owners of electric vehicles to travel across the entire highway.


@etconp
This media is not supported in your browser
VIEW IN TELEGRAM
🚧የመስቀል አደባባይ ፕሮጀክት ምን ይመስላል የሚለዉን ከዚ ቪድዮ መመልከት ይቻላል::

@etconp
👉የግድቡ አጠቃላይ የሲቪል ሥራ 88 ነጥብ 5 በመቶ፤ የፕሮጀክቱ አፈፃፀም 75 በመቶ መድረሱ ተገለጸ

⚡️የግድቡን አጠቃላይ የሲቪል ሥራ 88 ነጥብ 5 በመቶ፤ አጠቃላይ የግንባታ ፕሮጀክቱን ሥራ ደግሞ 75 በመቶ ላይ እንዳደረሰው የታላቁ የኢትዮጵያ ሕዳሴ ግድብ ዋና ሥራ አስኪያጅ ኢንጅነር ክፍሌ ሆሮ ገለጹ።

⚡️ኢንጂነር ክፍሌ በተለይ ለአዲስ ዘመን ጋዜጣ እንደገለጹት ከመጀመሪያው ዙር የግድቡ ውሃ ሙሌት በኋላም የግንባታ ሥራዎች በተያዘላቸው ዕቅድ መሰረት እየተከናወኑ መሆናቸውንና ግድቡ ውሃ መያዝ መጀመሩ በራሱ ከዚህ ቀደም ሲሠሩ የነበሩ ሥራዎችን አጠቃላይ ክንዋኔ በመቶኛ ከፍ እንዲል አስችሏል።

⚡️የዋናው ግድብ ሥራ፣ የኮርቻ ግድብ፣ የጎርፍ ማስተንፈሻና የኃይል ማመንጫ ሥራዎችን የሚያጠቃልለው የግድቡ አጠቃላይ የሲቪል ሥራ 88 ነጥብ 5 በመቶ፤ የኤሌክትሮ መካኒካል ሥራዎች ወደ 46 በመቶ፣ የብረታ ብረት ሥራው ደግሞ ወደ 33 በመቶ ከፍ አድርጓል። ይህም አጠቃላይ የግድብ ግንባታ ፕሮጀክቱን 75 በመቶ እንዲደርስ ምቹ ሁኔታ ፈጥሯል ማለታቸወኘ ኢፕድ ዘግቧል።

⚡️ከመጀመሪያው ዙር ውሃ ሙሌት በኋላ የግንባታ ሥራዎች የቀጠሉ መሆናቸውን ተናግረዋል።

⚡️ ሁለት ተርባይኖችን በመጠቀም በቀጣዩ ዓመት ኃይል ለማመንጨት የግድቡ ቀኝና ግራ የብረታ ብረት ሥራዎችና የጀኔሬተር ተከላዎች መከናወናቸውን ያመላከቱት ኢንጅነር ክፍሌ፣ ሁሉም ሥራዎች በተያዘላቸው ዕቅድ መሰረት መቀጠላቸውን፤ የውሃ ሙሊቱ በአጠቃላይ በኢትዮጵያ ህዝብ እና በግድቡ ሠራተኞችም ላይ ከፍተኛ መነሳሳትን መፍጠሩን አመልክተዋል።

Via think Abyssinia

@etconp
👍1
This media is not supported in your browser
VIEW IN TELEGRAM
Concrete shot resistance Test

Share the video with your friends

Telegram:- @etconp
👉Advance Security and
Performance Security
.
▶️1. Advance security

⏺ስራ ተቋራጩ ለሚወስደው የቅድም ክፍያ ገንዘብ በሚከፈለው የገንዘብ መጠን ልክ የሚያሲዘው የባንክ ዋስትና ቦንድ ነው።

⏺እውነተኛነቱ በተረጋገጠ ቼክ፣ ያልተገደበ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ማስያዝ ይኖርበታል።

⏺ስራ ተቋራጩ የወሰደውን ቅድመ ክፍያ ከፍሎ እስኪጨርስ ያስያዘው ዋስትና ግዜው ማለቅ(Expire) አይችልም።

⏺ከአንድ ወር ቀደም ብሎ የዋስትና ቀነ ገደቡ ከማለፉ በፊት ከአማካሪ በሚፃፍለት ደብዳቤ መሰረት ሊታደስ ይገባል ነገር ግን ስራ ተቋራጩ ያስያዘውን ዋስትና ቀነ ገደቡ አልፎ ሳያሳድስ ቢቀር ቀሪ ያልተከፈለ ቅድመ ክፍያ ሙሉ ለሙሉ ከሚቀጥለው ክፍያ ቅፅ ላይ ተቀናሽ ይደረጋል።

⏺ስራ ተቋራጩ ያስያዘውን ዋስትና ቅድመ ክፍያ ገንዘብ ከፍሎ እንደጨረሰ ተመላሽ ይደረግለታል የተለየ የቅድመ ክፍያ እና የዋስትና አከፋፈል አካሔድ ለፕሮጀክቱ የተዘጋጀው ውል special condition of contract/ ይችላል።

➡️2. Performance Security

⏹ስራ ተቋራጩ ውል ተቀብሎ ተፈፃሚ ማድረግ የሚችልበትን ለብቃት ማረጋገጫ የሚያሲዘው ዋስትና ነው።

⏹ውል በተፈራረመ በአስራ አምስት ቀናት ውስጥ (15) ውሉ የሚያዘውን መጠን ዋስትና ያቀርባል።

⏹ዋስትናው ስራ ተቋራጩ በተገቢው መንገድ ውሉን ተፈፃሚ ሳያደርግ ቢቀር ለውል ሰጪ (ባለቤት) እንደ ካሳ ክፍያ ይሆናል።

⏹እውነተኛነቱ በተረጋገጠ ቼክ፣ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ውሉ ላይ በተቀመጠው ፎርማት መሰረት ማስያዝ ይኖርበታል ይህ ዋስትና ሳይቀርብ ምንም አይነት ክፍይ ተፈፃሚ ሊደረግ አይገባም።

⏹ስራው ተጠናቆ እስኪያልቅ ይህ ዋስተና ተገቢ እና ቀነ ገደቡ ሳያልቅ መታደስ ይጠበቅበታል። ስራው ተጠናቆ ርክክብ እንደተፈፀመ በ ሀያ ስምንት(28) ቀናት ውስጥ ለስራ ተቋራጩ ሊመለስለት ይገባል።

✍ጉባኤ አሰፋ

#ConstructionLaw

@etconp
Shell and Membrane elements

Load which is applied to membrane objects transfers directly to supporting structural objects, whereas meshed shell objects have bending stiffness and therefore resist a portion of the load through flexural deformation. As a result, less load will be available to transfer to beams located under a shell, while 100% of the load will transfer through a membrane.

Moreover, membrane elements are used to represent only inplane stiffness of members. It acts like the bedsheet on your bed. The bedsheet does not have any kind of bending stiffness and so it bends without any resistance. So use this kind of element when you don’t want slabs or any other plates to resist bending I mean out of plane bending.

On the other hand, shell elements are more realistic for any structural wall or a slab or basement walls or even thick pipes. They have inplane as well as out of plane stiffness.

@etconp
👉What is Ready Mixed Concrete (RMC)?

📌Ready Mixed Concrete is a tailor made concrete that is manufactured in a factory or within a batching plant based on the standard required specifications.

▶️The prepared concrete mix is then taken to the work site within transit mixers mounted over a truck.

▶️This type of concrete guarantee higher durability and sustainability As the work is carried out by an expert supplier, the mixture formed is precise and of higher quality.
*Special concrete mixtures too can be made efficiently by this concrete manufacturing method.

📌Advantages of Ready Mixed Concrete

➡️Quality concrete is obtained as a ready-mix concrete mix plant make use of sophisticated equipment and consistent methods.
⏹There is strict control over the testing of materials, process parameters and continuous monitoring of key practices during the manufacture.
⏹Poor control on the input materials, batching and mixing methods in the case of site mix concrete is solved in a ready-mix concrete method.
⏹Speed in the construction practices followed in ready mix concrete plant is followed continuously by having mechanised operations.
⏹The output obtained from a site mix concrete plant using a 8/12 mixer is 4 to 5 metric cubes per hour which is 30-60 metric cubes per hour in a ready mix concrete plant.
⏹Better handling and proper mixing practice will help to reduce the consumption of cement by 10 – 12%. Use of admixtures and other cementitious materials will help to reduce the amount of cement.
⏹The concrete mixed is used with high versatility. It is placed by following best concrete placing methods.
⏹Cement is saved and the dust caused is reduced as ready mix concrete make use of bulk concrete instead of bags of cement.
⏹Cement saving will conserve the energy and the resources.
⏹Less consumption result in less production of cement hence less environmental pollution.
⏹More durable structure is obtained thus increasing the service life and saving the life cycle costs.
⏹Ready mix concrete manufacture have less dependency on human labours hence the chances of human errors is reduced.
⏹This will also reduce the dependency on intensive labours.
⏹Small or large quantities of concrete as per the specification is delivered timely at the site.
⏹This demands no space for storing the raw materials at site.
⏹There is no delay due to site based batching plant erection/ dismantling; no equipment to hire; no depreciation of costs.
⏹Petrol and diesel consumed is less thus noise and air pollution is reduced.

📌Disadvantages of Ready Mixed Concrete

➡️The transit time from the time of preparation of concrete to the delivery site, will result in loss of workability.
⏺This will demand for additional water or admixtures to maintain the workability as per the specification.
⏺At site, the QA/QC engineer are supposed to check the workability through slump test before using it for construction.
⏺Traffic during the transit of concrete can result in setting of concrete.
⏺This will hence require addition of admixtures to delay the setting period. But unexpected traffic is a great problem.
⏺The formwork and placing arrangement must be prepared in advance in large area as the concrete can be bought in larger amounts.

@etconp
👉Heritage Conservation.

🚧A successful completion of the Gunda Gundo Monastery in Tigray Region.

📌We need many conservation architects that help fill the gap.

Via Atsbha Gebreegziabher

@etconp
👉Which foundation design was used in Burj Khalifa?

🚧The Burj Dubai project in Dubai comprises the construction of an approximately 160 storey high rise tower, with a podium development around the base of the tower, including a 4-6 storey garage.

🚧The client for the project is Emaar, a leading developer based in Dubai. It is founded on 3.7m thick raft supported on bored piles, 1.5m in diameter, extending approximately 50m below the base of the raft.

🚧An assessment of the foundation for the structure was carried out and it was clear that piled foundations would be appropriate for both the Tower and Podium construction.

🚧The assessed pile capacities were provided to SOM and they then supplied details on the layout, number and diameter of the piles. Tower piles were 1.5m diameter and 47.45m long with the tower raft founded at 7.55m DMD.

🚧The podium piles were 0.9m diameter and 30m long with the podium raft being founded at 4.85m DMD.

🚧The thickness of the raft was 3.7m.

🚧Loading was provided by SOM and comprised 8 load cases including four comprisedload cases for wind and three for seismic conditions.

#Foundation

@etconp
BubbleDeck is a biaxial technology that increases span lengths and makes floors thinner by reducing the weight while maintaining the performance of reinforced concrete slabs. The concept is based on the fact that the area between columns of a solid slab has limited structural effect beyond adding weight. Replacing this area with a grid of “voids” sandwiched between layers of reinforcing welded wire steel and an internal lattice girder yields a slab typically 35% lighter that performs like solid reinforced concrete. Once the steel lattice/void “sandwich” is concreted, it is then precast into panels of various sizes and craned into position on shoring. Once concrete is poured over the balls in the panels, the BubbleDeck system effectively becomes, and behaves like, a monolithic two-way slab that distributes force uniformly and continuously.

Telegram:- @etconp
Magnitude of different loads, including self weight of the structure and live load.

Telegram:- @etconp
ቢም (BIM) ወይም የግንባታ መረጃ ሞዴሊንግ (Building Information Modeling) በአንድ ፕሮጀክት ከጥንስሱ እስከ ፍጻሜው የግንባታው ፕሮጀክት ላይ መረጃዎችን (drawings and associated documents) በተቀናጀ መልኩ በአንድ ቦታ ላይ በማሰባሰብ የሚሰራበት ሂደት (process) ነው ፡፡

የዚህ ሂደት ቁልፍ ከሆኑት ነገሮች መካከል አንዱ የግንባታ መረጃ ሞዴል (3D Model)፣ የሚገንባው ግንባታ (ህንጻ፣ መንገድ፣ የባቡር ሃዲድ፣ ድልድይ የመሳሰሉት በሙሉ) እያንዳንዱን ገፅታ በዲጂታል መግለጫ ነው ፡፡ ይህ ሞዴል በትብብር ፣ በሁሉም መስክ በተሰባሰቡ ባለሙያዎች (architect, civil, mechanical, sanitary, electricsl?) እና በፕሮጀክት ቁልፍ ደረጃዎች ላይ በተዘመኑ መረጃዎች(information management) ላይ ያነጣጠር አሰራር ነው ፡፡

ዲጂታል የግንባታ መረጃ ሞዴል መፍጠር ከህንፃው ጋር ትስስር ያላቸውን ባለሙያዎች በሙሉ ከአንድ ሞዴል ላይ በመተያየት እንዲሰሩ እና ስራውን በተቀላጠፈ ሁኔታ እንዲሰሩ ያስችላቸዋል ።

የቢምን አሰራር በትክክል በመጠቀምና ስራ ላይ በማዋል ከምናገኛቸው ጥቅሞች በጥቂቱ፣
• የሁሉም ባለሙያዎችን ትብብር እና ተግባብቶ መስራትን (communication) ያዳብራል።
• በ3D ሞዴል እና ተያያዥ መረጃዎች የተመሠረተ የግንባታውን የዋጋ ግምት በቀላሉ ለማውጣት (Construction Cost Estimation)።
• የቅድመ ግንባታ ፕሮጀክት እይታ (Preconstruction Project Visualization)
• የተቀናጀ አሰራር እና የተፈጠሩ ግጭቶችን ለማግኘት (Improved Coordination and Clash Detection)።
• የፕሮጀክቱ አጠቃላይ ዋጋ ቅናሽ ይኖረዋል (Reduced Cost)
• የስራ ጥራትና ምርታማነትን ይጨምራል (Increased efficiency and productivity)
በመጨረሻም
• የግንባታ መሳሪይዎችንና እቃዎችን ብክነት ይቀንሳል (Reduce Waste)

የነዚህን ትንታኔ እና በበለጠ ስለ ቢም ለመረዳት በሚቀጥለው ሐሙስ ከምሽቱ 4:30 ላይ በZoom በማደርገው webinar ላይ ይሳተፉ።

የመግቢያው ማስፈንጠሪያ (link) ማክሰኞ እዚህ ፓስት ይደረጋል።

አመሰግናለሁ
Sileshi Tesema

#BIM

@etconp
👉አሁን ላይ የህዳሴ ግድብ ከፍታ 565 ሜትር ላይ ይገኛል!

🚧ታላቁ የኢትዮጵያ ህዳሴ ግድብ ከፍታ በሚቀጥለው ዓመት የበጋ ወራት በ30 ሜትር በማሳደግ 595 ሜትር ላይ የማድረስ ስራ እንደሚከናወን ተገልጿል።

🚧የቴክኒክ ኮሚቴው ሰብሳቢ ኢንጂነር ጌድዮን አስፋው እንዳስረዱት አሁን ላይ የህዳሴ ግድብ ከፍታ 565 ሜትር ላይ ይገኛል። በሚቀጥለው ዓመት የበጋ ወራት የግድቡ መሃል ከፍታው 30 ሜትር እንዲጨምር ሲደረግ 595 ሜትር ላይ ይደርሳል ተብሏል።

🚧ከፍታው ሲጨምርም በሚቀጥለው ዓመት የክረምት ወቅት በእቅዱ መሰረት ግድቡ 18 ነጥብ 4 ቢሊዮን ኪዩቢክ ሜትር ውሃ የመያዝ አቅም ላይ ይደርሳል።

🚧ግድቡ ከሶስት ዓመታት በኋላ ተጠናቆ ከፍታው 640 ሜትር ሲደርስ በሰው ሰራሽ ሃይቁ ውስጥ ከ70 በላይ ደሴቶችን ማግኘት ይቻላል።

🚧በደሴቶቹ ላይ ሪዞርቶች እና መዝናኛዎችን በመገንባት ግድቡን ከኤሌክትሪክ ኃይል ማመንጫነት ባለፈ ለቱሪዝም እና ለትራንስፖርት አገልግሎት መጠቀም ስለሚቻል ከወዲሁ ዝግጅት ማድረግ ይገባል ሲሉ ኢንጂነር ጌዲዮን ገልጸዋል።

Via EPA