👉How do high rise building resist sinking into the ground due to their mass?
.
📌All structures including skyscrapers resist sinking into the soil beneath them despite their heavy load due to their well-designed foundation that takes into account the load of the superstructure and the bearing capacity of the soil available at a particular stratum at which the foundation rests.
.
▶️Due to correct assumptions, predictions and design of foundation by geotechnical and structural experts no such failure of foundation occurs and really heavy structures can continue to stand for centuries.
.
▶️To elaborate this, let me give a brief description about the bearing capacity of soil and other concepts of foundation design.
.
▶️Bearing capacity of soil is the maximum amount of vertical stress it can bear before failing in either shear or excessive settlement.
.
▶️This bearing capacity is estimated using experiments such as plate load test or ascertained using formulae involving bearing capacity factors.
.
📌Different types of structures and soil conditions require different types of foundations.
.
🚧Shallow foundations:These are used when sufficient bearing capacity is m available at shallow depth. *For normal few storey residential buildings that are not framed structures, continuous strip footings beneath the walls are used.
*For normal few storey residential framed structures isolated footings under columns are usually used.
*Raft/mat foundations are used in places where lack of bearing capacity is taken care of by increasing area of footing to a continuous raft or mat designed as an inverted slab.
.
🚧Deep foundations:When sufficient bearing capacity for a soil is not available at shallow depths, pile or well foundations are used to transfer load of structure via a stiff pile or rubble filled well to a deeper hard stratum.
*These foundations also advantageously use the friction b/w pile and surrounding soil to carry part or whole of the load in addition to point bearing resistance available at large depths.
.
🚧Compensated raft (Floating footing):It is observed that soil experiences settlement or shear failure only at loads over and above that which it is initially subjected to due to overburden.
*Hence, if overburden pressure is removed by excavating the soil up to a particular level and not backfilled, that much load equal to overburden pressure can be applied without stressing the soil at that level.
*Such technique helps in designing extremely stable and strong foundation that experiences little to no settlement and creates room for basements as well.
*Since the soil is completely unstressed the footing is said to simply float on the soil.
.
📌In case of skyscrapers a combination of traditional and/or innovative techniques are used for foundation design.
.
▶️Shallow foundations are almost never used except in rare cases where hard rock stratum is available at shallow depths.
*Usually a combination of compensated raft and pile foundation is used to ensure non sinking, non tilting foundation.
*Compensated raft at large depth provides good bearing without over stressing the soil and pile foundation provides increased stability against differential settlement and tilting by virtue of its skin friction.
*It is preferable to sink piles up to a hard rock stratum to maximise the available point bearing resistance.
@etconp
.
📌All structures including skyscrapers resist sinking into the soil beneath them despite their heavy load due to their well-designed foundation that takes into account the load of the superstructure and the bearing capacity of the soil available at a particular stratum at which the foundation rests.
.
▶️Due to correct assumptions, predictions and design of foundation by geotechnical and structural experts no such failure of foundation occurs and really heavy structures can continue to stand for centuries.
.
▶️To elaborate this, let me give a brief description about the bearing capacity of soil and other concepts of foundation design.
.
▶️Bearing capacity of soil is the maximum amount of vertical stress it can bear before failing in either shear or excessive settlement.
.
▶️This bearing capacity is estimated using experiments such as plate load test or ascertained using formulae involving bearing capacity factors.
.
📌Different types of structures and soil conditions require different types of foundations.
.
🚧Shallow foundations:These are used when sufficient bearing capacity is m available at shallow depth. *For normal few storey residential buildings that are not framed structures, continuous strip footings beneath the walls are used.
*For normal few storey residential framed structures isolated footings under columns are usually used.
*Raft/mat foundations are used in places where lack of bearing capacity is taken care of by increasing area of footing to a continuous raft or mat designed as an inverted slab.
.
🚧Deep foundations:When sufficient bearing capacity for a soil is not available at shallow depths, pile or well foundations are used to transfer load of structure via a stiff pile or rubble filled well to a deeper hard stratum.
*These foundations also advantageously use the friction b/w pile and surrounding soil to carry part or whole of the load in addition to point bearing resistance available at large depths.
.
🚧Compensated raft (Floating footing):It is observed that soil experiences settlement or shear failure only at loads over and above that which it is initially subjected to due to overburden.
*Hence, if overburden pressure is removed by excavating the soil up to a particular level and not backfilled, that much load equal to overburden pressure can be applied without stressing the soil at that level.
*Such technique helps in designing extremely stable and strong foundation that experiences little to no settlement and creates room for basements as well.
*Since the soil is completely unstressed the footing is said to simply float on the soil.
.
📌In case of skyscrapers a combination of traditional and/or innovative techniques are used for foundation design.
.
▶️Shallow foundations are almost never used except in rare cases where hard rock stratum is available at shallow depths.
*Usually a combination of compensated raft and pile foundation is used to ensure non sinking, non tilting foundation.
*Compensated raft at large depth provides good bearing without over stressing the soil and pile foundation provides increased stability against differential settlement and tilting by virtue of its skin friction.
*It is preferable to sink piles up to a hard rock stratum to maximise the available point bearing resistance.
@etconp
👍2
👉What is the standard size of a column for building?
.
📌The size of the columns is depends on the total load on the columns.
.
▶️The minimum size of the column should not be less than 9”x9”
.
📌Distance between the columns:-
⏺Try to maintain equal distance between the centres of two columns. Always plan a column layout on a grid.
⏺The distance between two columns of size 9”x9” should not be more than 4m centre to centre of column.
⏺If larger barrier free distances are required then going for larger column size is to be used.
.
📌The size of the columns increase because of two factors:
🚧Increase in the distance between two columns (This increases the dimensions of the columns as well the depth of the beam.)
🚧Height of the building (Increase in the number of floors is directly proportional to the dimensions of the columns.
.
📌Alignment of Columns
.
➡️A rectangular grid is to be made for placing the columns. This helps in avoiding mistakes and placing in columns can be done in the right way.
.
👉The columns can preferably be arranged in two different fashions:
➡️In a straight line with the help of a grid
➡️In a circular fashion for circular buildings.
.
📌Zigzag arrangement of columns is an absolutely wrong way of working out Structural design. It should be remembered that when columns are erected, beams are laid connecting the columns.
.
👉The Zigzag column placement causes three major issues:
⏺Unbalanced load transfer
⏺Problems in wall construction
⏺Problems in laying beams
@etconp
.
📌The size of the columns is depends on the total load on the columns.
.
▶️The minimum size of the column should not be less than 9”x9”
.
📌Distance between the columns:-
⏺Try to maintain equal distance between the centres of two columns. Always plan a column layout on a grid.
⏺The distance between two columns of size 9”x9” should not be more than 4m centre to centre of column.
⏺If larger barrier free distances are required then going for larger column size is to be used.
.
📌The size of the columns increase because of two factors:
🚧Increase in the distance between two columns (This increases the dimensions of the columns as well the depth of the beam.)
🚧Height of the building (Increase in the number of floors is directly proportional to the dimensions of the columns.
.
📌Alignment of Columns
.
➡️A rectangular grid is to be made for placing the columns. This helps in avoiding mistakes and placing in columns can be done in the right way.
.
👉The columns can preferably be arranged in two different fashions:
➡️In a straight line with the help of a grid
➡️In a circular fashion for circular buildings.
.
📌Zigzag arrangement of columns is an absolutely wrong way of working out Structural design. It should be remembered that when columns are erected, beams are laid connecting the columns.
.
👉The Zigzag column placement causes three major issues:
⏺Unbalanced load transfer
⏺Problems in wall construction
⏺Problems in laying beams
@etconp
Ethio Construction Engineering via @like
#3. Abraj Al Bait ➪ Height:- 601 meters ➪ Number of story:- 124 ➪ Number of lift :- 96 ➪ Floor area :- 1,575,815 m2 ➪ Structural system:- core structure (composite of RC and steel structure) ➪ Elevator speed:- 6m/s ➪ Floors below ground :- 3 ➪ Floors above…
#4. Lotte World Tower
➪ Height:- 556 meters
➪ Number of story :- 130
➪ Floor above the ground:- 123
➪ Floor below the ground :- 6
➪ Number of elevator :- 58
➪ Speed of elevator :- 10m/s
➪ Structural system:- core structure (composite)
➪ Ground floor area :- 304,081 m²
➪ Construction started:- February 1, 2011
➪ Completed:- December 22, 2016
➪ Cost :- $3.4 billion
➪ Architect:- Kohn Pedersen Fox
➪ Structural engineer:- Leslie E. Robertson
Associates
➪ Contractor:- lotte Engineering and
construction
➪ Client :- lotte property and development
Seoul, South Korea 🇰🇷
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
➪ Height:- 556 meters
➪ Number of story :- 130
➪ Floor above the ground:- 123
➪ Floor below the ground :- 6
➪ Number of elevator :- 58
➪ Speed of elevator :- 10m/s
➪ Structural system:- core structure (composite)
➪ Ground floor area :- 304,081 m²
➪ Construction started:- February 1, 2011
➪ Completed:- December 22, 2016
➪ Cost :- $3.4 billion
➪ Architect:- Kohn Pedersen Fox
➪ Structural engineer:- Leslie E. Robertson
Associates
➪ Contractor:- lotte Engineering and
construction
➪ Client :- lotte property and development
Seoul, South Korea 🇰🇷
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉What are the basic safety features at any construction site?
.
📌Following type of accidents may occur at site.
⏺Falling down, Slipping from height.
⏺Falling of material from top.
⏺Fire
⏺Structural Collapse.
⏺Electrical Shocks.
⏺Any other injuries.
.
📌Why accidents occur ?
.
⏺No use of Safety tools i.e. Helmets, Safety Belts, Safety Shoes, Hand Glows, Goggles, Safety Nets, etc
⏺Not following of safety instructions.
⏺Electricity misuse.
⏺Negligence & Ignorance in following general safety rules
📌First Aid
⏺First Aid kit should be readily available.
⏺Administration of First-Aid.
⏺Information to ambulance.
⏺Shifting to nearby hospital.
⏺Information to corporate office.
⏺Information to other concerned agency.
⏺Police, Fire Brigade etc
.
📌Following Corrective Preventive Actions should be initiated by Project In Charge
.
➡️Proper training for all
➡️Contractor’s / owner have to be properly educated about safety.
➡️Role of Security Supervisor is to make people use safety tools.
➡️All are informed about the importance of safety and basic safety safe practices.
➡️Fire-Fighting equipments should be available at site and should be regularly checked.
➡️Electrical overloading or unauthorized connections should be avoided.
➡️Avoid working in night time
@etconp
.
📌Following type of accidents may occur at site.
⏺Falling down, Slipping from height.
⏺Falling of material from top.
⏺Fire
⏺Structural Collapse.
⏺Electrical Shocks.
⏺Any other injuries.
.
📌Why accidents occur ?
.
⏺No use of Safety tools i.e. Helmets, Safety Belts, Safety Shoes, Hand Glows, Goggles, Safety Nets, etc
⏺Not following of safety instructions.
⏺Electricity misuse.
⏺Negligence & Ignorance in following general safety rules
📌First Aid
⏺First Aid kit should be readily available.
⏺Administration of First-Aid.
⏺Information to ambulance.
⏺Shifting to nearby hospital.
⏺Information to corporate office.
⏺Information to other concerned agency.
⏺Police, Fire Brigade etc
.
📌Following Corrective Preventive Actions should be initiated by Project In Charge
.
➡️Proper training for all
➡️Contractor’s / owner have to be properly educated about safety.
➡️Role of Security Supervisor is to make people use safety tools.
➡️All are informed about the importance of safety and basic safety safe practices.
➡️Fire-Fighting equipments should be available at site and should be regularly checked.
➡️Electrical overloading or unauthorized connections should be avoided.
➡️Avoid working in night time
@etconp
👉Why do we use development length in beam reinforcement?
📌Development Length is essentially provided to create a bond between steel and concrete in order to transfer the bar force without slip to prevent the bar from pulling out under tension.
.
🚧Image A: The development length is provided in the beam and column junction.
*Due to this the stresses developed are easily transferred by the bond created by steel and concrete.
.
🚧Image B: The development length is not provided in the beam and column junction.
*Due to this the stresses developed in the beams will not be able to transfer it to the column.
📌Development Length is essentially provided to create a bond between steel and concrete in order to transfer the bar force without slip to prevent the bar from pulling out under tension.
.
🚧Image A: The development length is provided in the beam and column junction.
*Due to this the stresses developed are easily transferred by the bond created by steel and concrete.
.
🚧Image B: The development length is not provided in the beam and column junction.
*Due to this the stresses developed in the beams will not be able to transfer it to the column.
Ethio Construction Engineering via @like
#4. Lotte World Tower ➪ Height:- 556 meters ➪ Number of story :- 130 ➪ Floor above the ground:- 123 ➪ Floor below the ground :- 6 ➪ Number of elevator :- 58 ➪ Speed of elevator :- 10m/s ➪ Structural system:- core structure (composite) ➪ Ground floor area…
#5. One World Trade Center
➪ height:- 541.3 meters
➪ number of story :- 94
➪ floor above the ground:- 88
➪ floor below the ground:- 5
➪ floor area :- 325,279 m²
➪ elevators:- 73
➪ elevator speed :- 23mile/hour
➪ architect :- David childs
➪ Structural engineer:- WSP Cantor
➪ contractor :- Tishman construction
➪ cost :- $3.9 billion
➪ construction started :- April 27, 2006
➪ completed:- November 3, 2014
New York USA🇺🇸
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
➪ height:- 541.3 meters
➪ number of story :- 94
➪ floor above the ground:- 88
➪ floor below the ground:- 5
➪ floor area :- 325,279 m²
➪ elevators:- 73
➪ elevator speed :- 23mile/hour
➪ architect :- David childs
➪ Structural engineer:- WSP Cantor
➪ contractor :- Tishman construction
➪ cost :- $3.9 billion
➪ construction started :- April 27, 2006
➪ completed:- November 3, 2014
New York USA🇺🇸
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉እስቲ ኣሁን ደሞ ስለ lap length , Development length,Anchorage length ትንሽ እንንገራቹ...
.
🚧ላፕ ሌንግዝ (lap length) - ተፈላጊ የብረት (ፌሮ) ርዝመት
ውጥረትን (stresses) ከአንድ ብረት ወደሌላ የሚተላለፍበት
.
🚧ደቨሎፕመንት ሌንግዝ (Development length) -ተፈላጊ
የብረት ርዝመት ውጥረትን (stresses) ከብረቱ ወደ ኮንክሪቱ
የሚተላለፍበት
.
🚧አንኮሬጅ ሌንግዝ (Anchorage length) - ይህ ርዝመት
አይነት በቂ የሆነ ደቨሎፕመንት ሌንግዝ (development
length ) በሌለባቸው በ Support / fixed ends ላይ
provide የምናረገው ርዝመት ነው::
@etconp
.
🚧ላፕ ሌንግዝ (lap length) - ተፈላጊ የብረት (ፌሮ) ርዝመት
ውጥረትን (stresses) ከአንድ ብረት ወደሌላ የሚተላለፍበት
.
🚧ደቨሎፕመንት ሌንግዝ (Development length) -ተፈላጊ
የብረት ርዝመት ውጥረትን (stresses) ከብረቱ ወደ ኮንክሪቱ
የሚተላለፍበት
.
🚧አንኮሬጅ ሌንግዝ (Anchorage length) - ይህ ርዝመት
አይነት በቂ የሆነ ደቨሎፕመንት ሌንግዝ (development
length ) በሌለባቸው በ Support / fixed ends ላይ
provide የምናረገው ርዝመት ነው::
@etconp
👍1
👉Concrete Technology
.
➡️How to make concrete more crack resistant used for sidewalks and Any Structures?
.
📌The main reason why concrete cracks is because it shrinks.
*It shrinks as it loses water.
*Most of that happens because of evaporation when we let it dry.
.
🚧So, the first thing to do is to minimise the amount of water present in the mix.
*That is done by minimising the workability of the concrete, improving the mix design, using water reducers or high range water reducers.
.
🚧Another thing to do is to have jointing at realistic distances, and making those joints early.
.
🚧Some aggregates are more resistant to shrinkage than others. *yielding a lower shrinkage mix.
.
🚧Always put diagonal bars (plural) across reentrant corners, such as around drainage grates and other places where a diagonal crack is likely to form.
*The bars go at right angles to the expected crack, of course.
.
🚧Some other kinds of cement other than Portland cement can have a somewhat lower drying shrinkage than Portland cement.
.
🚧Concrete hardens by chemical reactions involving the cement and the water.
*Once the water is gone, strength gain, like Grandfather’s clock “stopped dead, never to go again”.😁
*Do not let your concrete dry out prematurely. *Keeping it moist is called “curing”.
#ConcreteTechnology
@etconp
.
➡️How to make concrete more crack resistant used for sidewalks and Any Structures?
.
📌The main reason why concrete cracks is because it shrinks.
*It shrinks as it loses water.
*Most of that happens because of evaporation when we let it dry.
.
🚧So, the first thing to do is to minimise the amount of water present in the mix.
*That is done by minimising the workability of the concrete, improving the mix design, using water reducers or high range water reducers.
.
🚧Another thing to do is to have jointing at realistic distances, and making those joints early.
.
🚧Some aggregates are more resistant to shrinkage than others. *yielding a lower shrinkage mix.
.
🚧Always put diagonal bars (plural) across reentrant corners, such as around drainage grates and other places where a diagonal crack is likely to form.
*The bars go at right angles to the expected crack, of course.
.
🚧Some other kinds of cement other than Portland cement can have a somewhat lower drying shrinkage than Portland cement.
.
🚧Concrete hardens by chemical reactions involving the cement and the water.
*Once the water is gone, strength gain, like Grandfather’s clock “stopped dead, never to go again”.😁
*Do not let your concrete dry out prematurely. *Keeping it moist is called “curing”.
#ConcreteTechnology
@etconp
Ethio Construction Engineering via @like
#5. One World Trade Center ➪ height:- 541.3 meters ➪ number of story :- 94 ➪ floor above the ground:- 88 ➪ floor below the ground:- 5 ➪ floor area :- 325,279 m² ➪ elevators:- 73 ➪ elevator speed :- 23mile/hour ➪ architect :- David childs ➪ Structural…
#6. Taipei 101
➪ Height :- 509.2 meters
➪ Floor above the ground:- 101
➪ Floor below the ground:- 5
➪ Floor area :- 412,500 m²
➪ Number of elevator:- 61
➪ Speed of elevator:- 38 miles per hour
➪ structural system:- core (composite)
➪ Architect:- C.Y. Lee
➪ structural engineer:- Evergreen Consulting
➪ Contractor:- KTRT Joint Venture
➪ Cost :- $1.89 billion
➪ Owner:- Taipei finical center co.
The damper has become such a popular tourist attraction that the city contracted Sanrio to create a mascot: the Damper Baby. If you’re not familiar with damper open this link https://t.me/ETCONp/1129
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
➪ Height :- 509.2 meters
➪ Floor above the ground:- 101
➪ Floor below the ground:- 5
➪ Floor area :- 412,500 m²
➪ Number of elevator:- 61
➪ Speed of elevator:- 38 miles per hour
➪ structural system:- core (composite)
➪ Architect:- C.Y. Lee
➪ structural engineer:- Evergreen Consulting
➪ Contractor:- KTRT Joint Venture
➪ Cost :- $1.89 billion
➪ Owner:- Taipei finical center co.
The damper has become such a popular tourist attraction that the city contracted Sanrio to create a mascot: the Damper Baby. If you’re not familiar with damper open this link https://t.me/ETCONp/1129
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉Why don’t we use circular beams in construction or in structures?
.
➡️RCC structures, the circular cross section of the RCC Beam is not adapted.
.
🚧Before we look at the reasons, please have a look at the framed structure where the conventional Rectangular section has been adapted :
.
🚧In context of the site photograph, let us have a look at some reasons :
1.Formwork :
.
▶️Very difficult It has to be made out of either MS sheets or Aluminum sections.
.
🚧Fixing it horizontally is more challenging since the base of the beam form work shall be semi circular.
.
🚧The Formwork shall need to have a provision on the top for pouring concrete.
2.The casting :
🚧Imagine that a conventional letter box is laid Horizontality and you have to pour concrete through the opening at the top.
.
🚧The concrete has to be high slump concrete so that it moves to all crevices of the section.
.
🚧Finishing the top portion of the beam shall be a highly skilled job.
.
3.The de shuttering :
.
🚧It shall not be possible to first strike off the sides and then the beam bottom .
.
🚧The form work shall have to be removed in two halves after the concrete attains the strength.
.
➡️Hope you’re clear with certain difficulties associated with the circular sections.
@etconp
.
➡️RCC structures, the circular cross section of the RCC Beam is not adapted.
.
🚧Before we look at the reasons, please have a look at the framed structure where the conventional Rectangular section has been adapted :
.
🚧In context of the site photograph, let us have a look at some reasons :
1.Formwork :
.
▶️Very difficult It has to be made out of either MS sheets or Aluminum sections.
.
🚧Fixing it horizontally is more challenging since the base of the beam form work shall be semi circular.
.
🚧The Formwork shall need to have a provision on the top for pouring concrete.
2.The casting :
🚧Imagine that a conventional letter box is laid Horizontality and you have to pour concrete through the opening at the top.
.
🚧The concrete has to be high slump concrete so that it moves to all crevices of the section.
.
🚧Finishing the top portion of the beam shall be a highly skilled job.
.
3.The de shuttering :
.
🚧It shall not be possible to first strike off the sides and then the beam bottom .
.
🚧The form work shall have to be removed in two halves after the concrete attains the strength.
.
➡️Hope you’re clear with certain difficulties associated with the circular sections.
@etconp
👉What is total station in surveying?
▶️TOTAL STATION
🚧This is an electronic tachometer, which consist of an electronic transit theodolite added electronic distance meter + internal data storage facilities. *which not only measure the horizontal and vertical angles and distances electronically but also is capable of calculating the parametric positions and levels instantaneously.
.
🚧An electronic field book can be interfaced with the instrument to record and store not only the angles and distance but also the coordinates and levels of the points and other related information.
.
🚧The least count is 1mm for linear measurements and 1″ and less for angular measurement.
.
🚧Total station can be used to measure and obtain data apart to distance and angular measurements on-site like (a)Automatic slope correction
(b)Remote elevation
(c)Missing line
(d) Horizontal c
#surveying
@etconp
▶️TOTAL STATION
🚧This is an electronic tachometer, which consist of an electronic transit theodolite added electronic distance meter + internal data storage facilities. *which not only measure the horizontal and vertical angles and distances electronically but also is capable of calculating the parametric positions and levels instantaneously.
.
🚧An electronic field book can be interfaced with the instrument to record and store not only the angles and distance but also the coordinates and levels of the points and other related information.
.
🚧The least count is 1mm for linear measurements and 1″ and less for angular measurement.
.
🚧Total station can be used to measure and obtain data apart to distance and angular measurements on-site like (a)Automatic slope correction
(b)Remote elevation
(c)Missing line
(d) Horizontal c
#surveying
@etconp
👉በአዲስ አበባ “ቤት ለሁሉም” የተሰኘ ፕሮጀክት ሊተገበር መሆኑ ተገለፀ
**********************
🚧በአዲስ አበባ “ቤት ለሁሉም” የተሰኘ ፕሮጀክት ትግበራ በቅርቡ ይፋ እንደሚሆን የከተማዋ አስተዳደር ገለፀ።
.
🚧ከተማ አስተዳደሩ ለተቋማት ሕንጻ ኪራይ በየዓመቱ 650 ሚሊዮን ብር እንደሚያወጣም ተነግሯል።
.
🚧ከሐምሌ 25 ቀን 2012 ዓ.ም ጀምሮ አዳማ ላይ የተካሄደው የአዲስ አበባ ከተማ አስተዳደርና የክፍለ ከተሞች ዳይሬክተሮችና የቡድን መሪዎች ስልጠና ዛሬ ተጠናቋል።
.
🚧በስልጠናው ማጠናቂያ ላይ የተገኙት ምክትል ከንቲባ ታከለ ኡማ ከከተማው የቤት ፍላጎት አኳያ የተሰራው ስራ ጎልቶ አለመውጣቱንና ግንባታው ፍላጎቱን ማሟላት ካልቻለ ቤት ተገንብቷል ማለት እንደማይቻል ተናግረዋል።
🚧ለ40/60 ቤቶች 100 ሺህ፣ ለ20/80 ደግሞ 600 ሺህ ያህል ዜጎች ተመዝገበው በመጠባበቅ ላይ እንደሚገኙም ነው ያነሱት።
🚧ኢንጂነር ታከለ ኡማ በአዲስ አበባ አስተዳደር 125 ሺህ ቤቶች እየተገነቡ እንደሆነም ነው የገለጹት።
🚧እንደ ምክትል ከንቲባው ገለፃ ከፌዴራል መንግስት ጋር በመሆን ሁሉም የመዲናዋ ነዋሪ ቤት የሚያገኝበትን ሁኔታ የሚፈጥር ፕሮጀክት በቅርቡ ይፋ ይደረጋል።
Via EBC
@etconp
**********************
🚧በአዲስ አበባ “ቤት ለሁሉም” የተሰኘ ፕሮጀክት ትግበራ በቅርቡ ይፋ እንደሚሆን የከተማዋ አስተዳደር ገለፀ።
.
🚧ከተማ አስተዳደሩ ለተቋማት ሕንጻ ኪራይ በየዓመቱ 650 ሚሊዮን ብር እንደሚያወጣም ተነግሯል።
.
🚧ከሐምሌ 25 ቀን 2012 ዓ.ም ጀምሮ አዳማ ላይ የተካሄደው የአዲስ አበባ ከተማ አስተዳደርና የክፍለ ከተሞች ዳይሬክተሮችና የቡድን መሪዎች ስልጠና ዛሬ ተጠናቋል።
.
🚧በስልጠናው ማጠናቂያ ላይ የተገኙት ምክትል ከንቲባ ታከለ ኡማ ከከተማው የቤት ፍላጎት አኳያ የተሰራው ስራ ጎልቶ አለመውጣቱንና ግንባታው ፍላጎቱን ማሟላት ካልቻለ ቤት ተገንብቷል ማለት እንደማይቻል ተናግረዋል።
🚧ለ40/60 ቤቶች 100 ሺህ፣ ለ20/80 ደግሞ 600 ሺህ ያህል ዜጎች ተመዝገበው በመጠባበቅ ላይ እንደሚገኙም ነው ያነሱት።
🚧ኢንጂነር ታከለ ኡማ በአዲስ አበባ አስተዳደር 125 ሺህ ቤቶች እየተገነቡ እንደሆነም ነው የገለጹት።
🚧እንደ ምክትል ከንቲባው ገለፃ ከፌዴራል መንግስት ጋር በመሆን ሁሉም የመዲናዋ ነዋሪ ቤት የሚያገኝበትን ሁኔታ የሚፈጥር ፕሮጀክት በቅርቡ ይፋ ይደረጋል።
Via EBC
@etconp
👉Why do we provide a concrete cover?
.
📌Reinforced Concrete is a composite material.
*We have steel to take the tension and concrete the compression.
*Now, reinforcing steel is susceptible from damage due to corrosion and it needs to bond with steel to actually work as a composite.
.
🚧This film is stable in the highly alkaline environment of concrete. However, with time and exposure to Carbon di Oxide in environment which gets dissolved in water and enters the concrete through the permeability and cracks the pH of concrete reduces.
*As a result, this layer decomposes And, deleterious agents start attacking the reinforcements resulting in corrosion.
.
🚧The corroded reinforcement expands in size and spalls the cover leading to further exposure and further corrosion till the structure fails.
@etconp
.
📌Reinforced Concrete is a composite material.
*We have steel to take the tension and concrete the compression.
*Now, reinforcing steel is susceptible from damage due to corrosion and it needs to bond with steel to actually work as a composite.
.
🚧This film is stable in the highly alkaline environment of concrete. However, with time and exposure to Carbon di Oxide in environment which gets dissolved in water and enters the concrete through the permeability and cracks the pH of concrete reduces.
*As a result, this layer decomposes And, deleterious agents start attacking the reinforcements resulting in corrosion.
.
🚧The corroded reinforcement expands in size and spalls the cover leading to further exposure and further corrosion till the structure fails.
@etconp
👉የ አዲስ አበባ ኮንስትራክሽን ቢሮ በ2012 በጀት ዓመት የተሻለ ውጤት በማስመዝገቡ ከ አዲስ አበባ ከተማ ምክር ቤት ሽልማት ተበርክቶለታል፡፡
.
🚧መላው የተቋሙ አመራርና ሰራተኞች እንኳን ለዚህ ስኬት አበቃችሁ::
@etconp
.
🚧መላው የተቋሙ አመራርና ሰራተኞች እንኳን ለዚህ ስኬት አበቃችሁ::
@etconp
Ethio Construction Engineering via @like
#6. Taipei 101 ➪ Height :- 509.2 meters ➪ Floor above the ground:- 101 ➪ Floor below the ground:- 5 ➪ Floor area :- 412,500 m² ➪ Number of elevator:- 61 ➪ Speed of elevator:- 38 miles per hour ➪ structural system:- core (composite) ➪ Architect:- C.Y.…
#7. International Commerce Centre (ICC)
➪ Height :- 484.0 meters
➪ floor above the ground:- 108
➪ floor below the ground:- 4
➪ number of story :- 113
➪ number of elevators:- 83
➪ elevator speed :- 9 m/s
➪ floor area :- 274,064 m²
➪ structural system:- reinforced-concrete central core and an eight-mega-column
➪ architect :- Kohn Pedersen Fox Associates
➪ structural engineer:- Arup
➪ contractor :- Sanfield Building Contractors Limited
➪ owner :- Sun Hung Kai Properties
➪ construction started:- 2002
➪ completed :- 2010
➪ cost :- $3.85 billion
West Kowloon ,Hong Kong 🇭🇰
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
➪ Height :- 484.0 meters
➪ floor above the ground:- 108
➪ floor below the ground:- 4
➪ number of story :- 113
➪ number of elevators:- 83
➪ elevator speed :- 9 m/s
➪ floor area :- 274,064 m²
➪ structural system:- reinforced-concrete central core and an eight-mega-column
➪ architect :- Kohn Pedersen Fox Associates
➪ structural engineer:- Arup
➪ contractor :- Sanfield Building Contractors Limited
➪ owner :- Sun Hung Kai Properties
➪ construction started:- 2002
➪ completed :- 2010
➪ cost :- $3.85 billion
West Kowloon ,Hong Kong 🇭🇰
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉Why is asphalt used for roads? Why is it better than concrete?
.
▶️This is usually a matter of cost and the type of vehicles that use the roadway.
▶️Concrete is more expensive than asphalt, but has a longer life.
▶️It is also a matter of construct ability and the ability to get production.
▶️Trucks generally use the right lane.
*The concrete can tolerate the loading of heavy trucks much longer than asphalt.
.
▶️The concrete is typically reinforced, which lengthens the life of the pavement.
.
🚧It is becoming more and more common to use concrete at intersections. This is an area with lots of turning movements, starting and stopping, and, interestingly, where vehicles drip lots of fluids onto the pavement. These fluids tend to reduce the life of asphalt.
*This is actually one very important reason that use see bus stops with concrete pads.
*Concrete does not have the same reaction to these fluids.
*Due to concrete’s durability, it is used at these locations.
🚧On rural roads where there are lots of driveways and approaches, and where the road may be on rolling terrain, it makes more sense to use asphalt because you have to pay special attention to the driveways and approaches.
.
🚧There are also different noise levels between concrete and asphalt. Some types of asphalt absorb the sound better than other asphalt, but asphalt, in general, is quieter than concrete.
🚧Some concrete pavement has lines in it, called tining.
*We used to tine across the roadway, perpendicular to the direction of travel.
.
🚧This proved to help drainage, but was very noisy.
*Now, they tine in the direction of travel, except on bridges.
*This is much quieter.
A road without tining is noisier than both.
*This is an important consideration when noise is a concern.
.
🚧Concrete can be place almost any time of the year.
*If it is too cold, it can be heated.
*This isn’t feasible for long distances.
It would require a lot of blankets.
*Asphalt can only be placed in warm weather, if you want to get any significant quantities down.
Generally, the temperature must be at least 50 degrees and rising to place asphalt.
*Typically, the oil isn’t even available in the winter. Cold patch is often used for small areas of asphalt paving in the colder months.
.
🚧Incidentally, you actually don’t have to wait 28 days to allow traffic onto concrete pavement.
*In order to expedite construction, they want to get traffic on it as soon as possible, so you can pave other areas.
*Usually, the contractor will use a mix design that reaches the minimum strength rather quickly.
As long as it has the required minimum strength of 3500 psi, small vehicles can get on the concrete.
🚧The strength must be 4000 psi when all traffic is allowed on it.
*We either break concrete cylinders or use data loggers to determine if strength has been reached.
*Usually, the concrete saw cutting trucks get onto the concrete within a couple of days.
*Concrete has to be cut in sections to control cracking.
*Then they seal the joint with a hot asphalt sealant. Traffic may be allowed onto the pavement within a week or so.
@etconp
.
▶️This is usually a matter of cost and the type of vehicles that use the roadway.
▶️Concrete is more expensive than asphalt, but has a longer life.
▶️It is also a matter of construct ability and the ability to get production.
▶️Trucks generally use the right lane.
*The concrete can tolerate the loading of heavy trucks much longer than asphalt.
.
▶️The concrete is typically reinforced, which lengthens the life of the pavement.
.
🚧It is becoming more and more common to use concrete at intersections. This is an area with lots of turning movements, starting and stopping, and, interestingly, where vehicles drip lots of fluids onto the pavement. These fluids tend to reduce the life of asphalt.
*This is actually one very important reason that use see bus stops with concrete pads.
*Concrete does not have the same reaction to these fluids.
*Due to concrete’s durability, it is used at these locations.
🚧On rural roads where there are lots of driveways and approaches, and where the road may be on rolling terrain, it makes more sense to use asphalt because you have to pay special attention to the driveways and approaches.
.
🚧There are also different noise levels between concrete and asphalt. Some types of asphalt absorb the sound better than other asphalt, but asphalt, in general, is quieter than concrete.
🚧Some concrete pavement has lines in it, called tining.
*We used to tine across the roadway, perpendicular to the direction of travel.
.
🚧This proved to help drainage, but was very noisy.
*Now, they tine in the direction of travel, except on bridges.
*This is much quieter.
A road without tining is noisier than both.
*This is an important consideration when noise is a concern.
.
🚧Concrete can be place almost any time of the year.
*If it is too cold, it can be heated.
*This isn’t feasible for long distances.
It would require a lot of blankets.
*Asphalt can only be placed in warm weather, if you want to get any significant quantities down.
Generally, the temperature must be at least 50 degrees and rising to place asphalt.
*Typically, the oil isn’t even available in the winter. Cold patch is often used for small areas of asphalt paving in the colder months.
.
🚧Incidentally, you actually don’t have to wait 28 days to allow traffic onto concrete pavement.
*In order to expedite construction, they want to get traffic on it as soon as possible, so you can pave other areas.
*Usually, the contractor will use a mix design that reaches the minimum strength rather quickly.
As long as it has the required minimum strength of 3500 psi, small vehicles can get on the concrete.
🚧The strength must be 4000 psi when all traffic is allowed on it.
*We either break concrete cylinders or use data loggers to determine if strength has been reached.
*Usually, the concrete saw cutting trucks get onto the concrete within a couple of days.
*Concrete has to be cut in sections to control cracking.
*Then they seal the joint with a hot asphalt sealant. Traffic may be allowed onto the pavement within a week or so.
@etconp
Ethio Construction Engineering via @like
#7. International Commerce Centre (ICC) ➪ Height :- 484.0 meters ➪ floor above the ground:- 108 ➪ floor below the ground:- 4 ➪ number of story :- 113 ➪ number of elevators:- 83 ➪ elevator speed :- 9 m/s ➪ floor area :- 274,064 m² ➪ structural system:…
#8. Lakhta Center
➪ Height:- 462 meters
➪ Floor above the ground:- 87
➪ Floor below the ground:- 3
➪ Number of story:- 91
➪ Number of elevator:- 40
➪ Elevator speed:- 8m/s
➪ Floor area :- 143,400 m²
➪ Structural system:- Core: Reinforced Concrete Columns: Concrete Encased Steel Floor Spanning: Steel
➪ Architect :- RMJM
➪ structural engineer:- Gorproject, Inforceproject
➪ contractor :- Rönesans Holding
➪ cost :- $1.77billion
➪ owner:- Gazprom Neft
➪ construction started :- 2012
➪ completed:- 2019
Lakhta, Saint Petersburg, Russia 🇷🇺
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
➪ Height:- 462 meters
➪ Floor above the ground:- 87
➪ Floor below the ground:- 3
➪ Number of story:- 91
➪ Number of elevator:- 40
➪ Elevator speed:- 8m/s
➪ Floor area :- 143,400 m²
➪ Structural system:- Core: Reinforced Concrete Columns: Concrete Encased Steel Floor Spanning: Steel
➪ Architect :- RMJM
➪ structural engineer:- Gorproject, Inforceproject
➪ contractor :- Rönesans Holding
➪ cost :- $1.77billion
➪ owner:- Gazprom Neft
➪ construction started :- 2012
➪ completed:- 2019
Lakhta, Saint Petersburg, Russia 🇷🇺
Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp